Utica Boilers Je Operation And Installation Manual

2015-05-18

: Utica-Boilers Utica-Boilers-Je-Operation-And-Installation-Manual-719528 utica-boilers-je-operation-and-installation-manual-719528 utica-boilers pdf

Open the PDF directly: View PDF PDF.
Page Count: 16

DownloadUtica-Boilers Utica-Boilers-Je-Operation-And-Installation-Manual-  Utica-boilers-je-operation-and-installation-manual
Open PDF In BrowserView PDF
SUPPLEMENTAL
INSTALLATION AND OPERATING
INSTRUCTIONS

CSD-1 COMMERCIAL BOILER CONTROLS

P/N 240010413, Rev. A [12/2013]

CSD-1 COMMERCIAL BOILER CONTROLS

! WARNING

C.	 Also, an independent pilot gas line which includes
manual shutoff valve, pressure regulator and
safety shutoff valve, two leak test valves on
main gas valve, and manual shutoff valve located
downstream of the main gas valve are added. See

Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death
or serious injury. Read this manual and understand
all requirements before beginning installation.

See Table #2: CSD-1 Component Carton Material List
for component carton material list which replaces the
corresponding list in the installation manuals.
•	See Table #3: CSD-1 Electronic Ignition Base Material
List.

Your commercial boiler is furnished with combustion side
water or steam controls to meet our interpretation of the
American Society of Mechanical Engineers (ASME) Safety
Code for Controls and Safety Devices for Automatically
Fired Boilers, No. CSD-1.
Installation shall conform to the requirements of the
authority having jurisdiction, or, in the absence of such
requirements, to the National Fuel Gas Code, ANSI-Z223.1/
NFPA-54 (latest revision). Where required by the authority
having jurisdiction, the installation shall conform to the
American Society of Mechanical Engineers (ASME) Safety
Code for Controls and Safety Devices for Automatically Fire
Boilers, No. CSD-1.
CSD-1 controls and this installation may be subject to
approval by local inspectors. Additional parts or equipment
may be required. Consult local authorities having
jurisdiction before the installation of the boiler.
CSD-1 controls furnished with commercial boilers are
applicable to boilers with inputs above 400,000 Btu/hr.
(Models 500-1500)
Additional parts required by CSD-1 standards may be
necessary to make this boiler compliant. This supplemental
instruction manual should be used in conjunction with the
Installation, Operation and Maintenance manual for your
specific boiler.

•	Installed locations of additional components see Figures
1a and 1b.
For CSD-1 combustion side control, light off sequence is as
follows:
1.	 Turn on power. Set thermostat to call for heat.
2.	 Ignition starts to spark and lights pilot flame.
3.	 Ignition continues sparking about 12 seconds after pilot
lights.
4.	 Main burners ignite.

NOTICE
A longer pilot flame recognition time is a design
feature of this module and is correct.
Gas Pressure Requirements
•	Maximum allowable inlet gas pressure (natural gas
only) to controls in CSD-1 gas train is 14” w.c. (½
psig).

CSD-1 Component Installation
Based on parts listed in Installation, Operation and
Maintenance manual for your particular boiler, the following
changes should be made:

•	Verify inlet gas pressure is at least 5” w.c. but no
greater than 14” w.c.
•	If gas pressure entering the building is greater than 14”
w.c., installing contractor must provide overpressure
protection on downstream piping to prevent buildup of
downstream pressures in excess of 14” w.c. in event
the fuel system pressure regulator fails.

Complete Boiler Material List - See Table #1: CSD-1
Complete Boiler Material List.

•	Alternatively, gas pressure entering the building may
be reduced with additional gas pressure regulator
outdoors. If inlet gas pressure to this additional
regulator is less than 14” w.c., then overpressure
protection may not be required.

Combustion Side Control :
•	Models 300 and 400, no changes are required to
existing gas trains.
•	Models 500 through 1500 requirements include:
A.	 Intermittent pilot control module is required to
have maximum 15 second pilot flame establishing
period and ability to perform safety shutdown and
lockout in event of loss of flame signal at pilot.
B.	 The intermittent pilot module and manual reset
switch are used to replace the existing pilot
module.

•	Consult local authority(s) having jurisdiction before
installing gas supply piping to the boiler.

2

MATERIAL LISTS
Table #1: CSD-1 Complete Boiler Material List
CSD-1 Component Carton a & b

Sections
Model

300 CSD-1

400 CSD-1

500 CSD-1

Steam
Trim
Cartond

CSD-1
AC
Carton

Jacket
End
Panel
Carton

Base
End
Panel
Carton
1

L

Inner

R

300

1

2

1

SA-1

300

1

400

1

3

1

SA-1

400

1

1

500

1

4

1

SA-1

500

1

1
1

1

600

1

5

1

2

700

1

6

1

1

SA-2

600

1

1

SA-2

700

1

800

1

7

1

1

2

SA-3

800

1

1

1

900

1

8

1

1000

1

9

1

1100

1

10

1

1200

1

11

1

1300

1

12

1

1

1

SA-3

900

1

1

2

SA-3

1000

1

1
1

2

SA-3

1100

1

3

SA-3

1200

1

1

2

SA-3

1300

1

1

1

1400

1

13

1

1

2

SA-3

1400

1

1

1500

1

14

1

3

3

SA-4

1500

1

1

a. Boilers having total inputs of 400 MBH or less as complying with ANSI Z21.13 (Models 300 and 400), the standard combustion
side controls meet CSD-1 and no changes to the standard component carton are required.
b. There are additional parts on base assemblies for boilers having total inputs from 500 to 1,500 MBH (Models 500 to 1500)
to meet CSD-1. See “Table 2: CSD-1 Component Carton Material List” for details.
c. For steam boilers, there is an additional CSD-1 steam trim carton for gravity or condensate pump return (Part# 41257103)
or an additional CSD-1 steam trim carton for boiler feed pump return (Part# 41257104). See appropriate CSD-1 Steam
Trim Carton Material List (Tables 5a and 5b) for details.

Table #2: CSD-1 Component Carton Material List
Description

Stock No.

Unit

300 Base Assembly CSD-1
400 Base Assembly CSD-1
500 Base Assembly CSD-1
300 Intermediate Jacket Carton
400 Intermediate Jacket Carton

550001670
550001671
550001672
550001673
550001674

Ea.
Ea.
Ea.
Ea.
Ea.

500 Intermediate Jacket Carton
300 Draft Hood
400 Draft Hood
500 Draft Hood
Control Panel Assembly
Control Panel Assembly CSD-1 300/400
Control Panel Assembly CSD-1 500
Top Front Panel 300
Top Front Panel 400
Top Front Panel 500

550001675
42557113
42557114
42557115
550001801
550001869
550001870
109009216
109009217
109009210

Ea.
Ea.
Ea.
Ea.
Ea.
Ea.
Ea.
Ea.
Ea.
Ea.

550001664

550001665

550001666

300 CSD-1

400 CSD-1

500 CSD-1

1
1
1
1
1
1
1
1
1
1

1
1

1
1
1

Boilers having total inputs of 400 MBH as complying with ANSI Z21.13 (Models 300 and 400), the standard combustion side controls
meet CSD-1 and no changes to the standard component carton are required.

3

MATERIAL LISTS
Figure 1a - CSD-1 500 Gas Train

15

14

5

4

Figure 1b - CSD-1 500 Gas Train

32

26

16

25
23

17
21

7

19b

3

20

8

27b

24

29

2

30

28
4

33
10

9

11

2

12

8

Table #3: CSD-1 Electronic Ignition Base Material List
Description

6

10

12

Item

5

3

13

13
1

22

11

7

9

Table #3: Continued

Part No.

Qty.

Item

1

¾” 90 Street Elbow Back

14693040

1

19a*

Harness CSD-1 Control (300, 400)

Description

Part No.

Qty.

1263016

1

2

¾” Manual Shutoff Valve

14657001

1

19b

Harness CSD-1 Control (500)

3

¾” x 2” Nipple Black

14607201

2

20

Harness CSD-1 Control

1263019

1

240006623

Compression Fitting, ⅛”NPT x ¼” Tube

14657025

1
1

4

¾” Tee Black

14693076

1

21

5

¾” x ¼” Bushing

1060002

1

22

Brass Coupling, Male ⅛” x /16”-24

14657024

1

6

¼” x 2” Nipple Black

1310018

1

23

⅛” x 2½”” Nipple Black

14607804

2

7

¼” Street Elbow Black

14657007

1

24

⅛” 90 Elbow (500 Only)

14657010

1

8

¼” Manual Shutoff Valve

14657002

1

25

⅛” Manual Shutoff Valve

14657003

2

5

9

¼” x 2½” Nipple Black

14607000

2

26

⅛” Pipe Cap

14657012

2

10

¼” Gas Pres. Regulator, 6” w.c.

14657004

1

27a*

Gas Valve, Electronic Ignition, Nat. (300, 400)

14662315

1

11

¼” Magnetic Valve w/Connector Assembly

43357103

1

27b

Gas Valve, Electronic Ignition, Nat. (500)

14663001

1

12

⅛” NPT x ⅛” Tube M. Connector

14657019

1

28

⅛” Coupling Steel

14657013

1

13

¼” x ⅛” Bushing

14657008

1

29

CSD-1 Pilot Outlet Adapter

43357104

1

14

Control STP W/Alarm

15

Control Mounting Panel, CSD-1 24 GA Galv

16

Control CSD Lockout Daughter Board

17
18*

1140007

1

30

Wire Harness, Base to Base

240006732

1

109006833

1

31*

⅛ x 1½, Nipple, Black (300, 400 Only)

14657009

1

1140008

1

32

Wire Jumper, CSD-1 Board (Orange)

1263017

1

Control Mounting Panel

109006832

1

33

Ground Wire, Spark (White)

371-1-21.01

1

Screws, #8 x ⅜ Self Tap

201000001

8

*Not Shown

4

STEAM SIDE CONTROLS
Steam Side Control - Two low water cutoff devices and
two pressuretrols, one with auto reset and the second with
manual reset, are required. In order to make the two
low water cutoff devices work in the appropriate
sequence, manufacture recommends locating both
devices at same end of boiler.
There are three different control systems for three different
types of condensate returns.

Figure 2 - Steam Boiler Feed Pump Return

Normal
Water Line

Identify the three different types of condensate returns:
•	Gravity return - condensate is returned by gravity.
•	Condensate pump return - condensate is returned
by pump(s), controlled by the water level in the
condensate receiver tank.
•	Boiler Feed Pump Return - condensate is returned by
pump(s), controlled by the water level in the boiler.
Gravity Return And Condensate Pump Return
With gravity and condensate pump return, additional
control components are the same. See Table #5a and
Figure #2 for tappings.
•	Tappings B & B location shown in Figure #2.
Installation shown in Figure #3, Primary LWCO and
Pressuretrol with gauge glass set.

Figure 3 - Steam Gravity and Condensate Pump Return

•	Tappings D or F (Figure #2)- Manual reset pressuretrol
and ¼” 90° brass syphon.
•	Tappings E & F - Secondary LWCO (w/manual reset).
Use in conjunction with primary LWCO equipped on
boiler.
When using two LWCOs, place manual reset lower than
automatic LWCO. Water must be visible in gauge glass
when manual reset trips.
•	Figure 3 shows how to raise automatic (Series 67)
LWCO 1-inch.
•	Remove 1” from long side of ¼” diameter 90° brass
siphon tube.
•	Remove nipple in series 67 and replace with 1 ½” long
nipple and street elbow.

WATER LEVEL
29” TO FLOOR

•	Water level control device located on condensate
receiver tank and controls condensate return pump is
not supplied.

Table #5a: CSD-1 Steam Trim Carton Material List for Gravity Return
or Condensate Pump Return (Part No. 41257103)
Item

Description

Part No.

Qty.

1

LWCO w/Manual Reset (secondary)

240007388

1

2

Bushing, Steel or Cast 1” x 1¼”

14657016

1

3

Pressure Switch Control, Manual Reset

14662311

1

4

90° Brass Syphon, ¼”

14643004

1

5

ELB,ST,1/2”,45 DEG.BRASS

240007541

1

6

NIPPLE 1/2” X 1/2”LG BRASS

240007542

1

5

BOILER FEED PUMP RETURN
Boiler feed pump return additional parts See Table #5b.
See Figure #2 for installed locations of additional parts.
•	Tappings B & B - Water gauge glass set and
pressuretrol (requires fittings 4-7 in Table #5b).
•	Tapping D - Steam gauge and pressuretrol (requires
fitting 8 in Table #5b).
•	Tappings E & F - LWCO (auto and manual) and
pump control. Installer supply and size the steam
(top) and water (bottom) equalizing pipe lengths so
the horizontal cast line on the control body is 28”
above floor. Secondary control is 24” above the floor.
See Figure #2.

Table #5b: CSD-1 Steam Trim Carton Material List For
Boiler Feed Pump Return (Part No. 41257104)
Item

Description

Part No.

Qty.

1

Pressure Switch Control, Manual Reset

14662311

1

2

LWCO and Pump Control (primary)

14626306

1

3

LWCO, MAN RESET, CSD-1 APRVD, SHT PROBE

240007388

1

4

90° Brass Syphon, ¼”

14643004

1

5

Brass Nipple, ½” x 3½”

14607024

2

6

Brass Tee, ½” x ½” x ¼”

14693051

2

7

Brass Coupling, ½”

14693052

2

8

Bushing, ½” x ¼”

1060001

1

6

SEQUENCE OF OPERATION

PILOT

Call For Heat
Control recognizes call for heat when power is applied
to 24V terminal on control module. Since control
receives signal from the thermostat, when call for heat is
terminated, heating cycle immediately terminates and all
control outputs will shut off.

If maximum number of ignition trials has not been
completed, control delays for 5 minute inter-purge period.
After the inter-purge, control attempts another ignition
trial. Refer back to Ignition Trial Period for details.
Steady-State Heating
Control keeps pilot gas valve and main gas valve energized
while continuously monitoring call for heat and flame
status. Control will remain in this steady-state heating
mode until power is removed by (a) thermostat satisfied,
(b) pressure switch opening, or (c) flame being lost.

Ignition Trial Period
Control energizes pilot gas valve and spark outputs for
ignition trial time of 12 seconds. If flame is sensed during
12 seconds of ignition trial, spark output is de-energized,
main gas valve is energized, and control enters steady heat
mode. If flame is not established within ignition trial period,
control de-energizes the spark and gas valve and operates
as described below in Ignition Failure/Re-try Sequence.

If call for heat is satisfied, power is removed from control,
de-energizing pilot gas valve and main gas valve.
If flame is lost, control will shut off main gas valve within
one second, leave pilot gas on, and immediately start
ignition trial. Control checks to see if maximum number
of flame losses (2 per call for heat) has been reached.
If maximum number of flame losses has been reached,
control locks out. See Lockout section for details.

Ignition Failure/Re-Try Sequence
After an unsuccessful ignition trial, control checks to see
if maximum number of ignition trials (2 trials) has been
completed. If maximum number of ignition trials has been
completed, control will lockout. See Lockout (next page) for
details.

7

SEQUENCE OF OPERATION
Gas Valve Sensing
If either or both the pilot and main gas valves are sensed
to be on when commanded to be off, or if no voltage
appears at gas valve output which was commanded on,
control will shut off all outputs and enter either “soft” or
“hard” lockout state. Main valve is interlocked with the pilot
valve and voltage can only be detected on main valve when
pilot valve is energized. Control locks out the first time
as “soft” lockout, then retries after 5 minutes and enters
“hard” lockout state. Lockout should be manually reset as
described in “Lockout.”
Flame Present With Gas Off
If flame is sensed for longer than 2 seconds during a period
when gas valve should be closed, control will enter lockout.
Power Interruptions
Power interruptions less than 0.15 seconds will not
cause control to interrupt heat sequence while power
interruptions over 0.25 seconds will cause the control
to reset lockout and ignition trial counters. Power
interruptions of any duration will not cause a lockout or any
other operation requiring manual intervention.
Lockout
Controller automatically resets from first lockout in 5
minutes. If second lockout occurs before call for heat is
satisfied, it will require manually resetting by depressing
red button on CSD-1 daughter board. This can be reached
with a pencil through the vent holes. A red LED will also
indicate lockout and can be seen through the vent holes.

8

ELECTRICAL WIRE DIAGRAMS - GAS VALVE CONTROL WIRING
The suggested schematic wiring diagrams are included. Please use the appropriate one for the installation.
CSD-1 HONEYWELL VR8304M,H MAIN GAS VALVE CONTROL WIRING

9

ELECTRICAL WIRE DIAGRAMS - GAS VALVE CONTROL WIRING
The suggested schematic wiring diagrams are included. Please use the appropriate one for the installation.
CSD-1 ROBERT SHAW 7000 DE RHC GAS VALVE CONTROL WIRING

MAIN GAS VALVE
ROBERT SHAW 7000 DE RHC

PILOT SAFETY
SHUTOFF
VALVE

TR

TH
CONTROL
1003-612A
D

RED

D

BLACK

MV

WHITE

MV PV

BLUE

WHITE
BLUE

PV

RED

ALARM

RED

ALARM

YELLOW

PER

JUM

24V
GND

GREEN

BOILER

24V

GREEN

ALARM
CONTACTS
R
24 VAC

STAT

GROUND

SPARK

TO CONTROL
BOX

WHITE

UT 1145-2

BLUE

COM

WHITE

BLACK

SPARK
CABLE
TO PILOT
TO PILOT
GROUND

NOTE: REF. CAD DRAWING 1650010
REV: 2

10

ELECTRICAL WIRE DIAGRAMS - CSD-1 STEAM BOILERS
WITH CONDENSATE PUMP/GRAVITY RETURN

11

ELECTRICAL WIRE DIAGRAMS - CSD-1 STEAM BOILERS
WITH CONDENSATE PUMP/GRAVITY RETURN

3

12

ELECTRICAL WIRE DIAGRAMS - CSD-1 STEAM BOILERS
WITH BOILER FEED PUMP RETURN

13

ELECTRICAL WIRE DIAGRAMS - CSD-1 STEAM BOILERS
WITH BOILER FEED PUMP RETURN

3

14

NOTES

15



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 5.3-c011 66.145661, 2012/02/06-14:56:27
Create Date                     : 2013:12:06 10:57:41-05:00
Metadata Date                   : 2013:12:06 10:57:54-05:00
Modify Date                     : 2013:12:06 10:57:54-05:00
Creator Tool                    : Adobe InDesign CS6 (Windows)
Instance ID                     : uuid:8812dd3c-43a7-4192-8029-9db0156e534d
Original Document ID            : adobe:docid:indd:77ce9e46-4eb2-11dd-a80b-900785cbd2b2
Document ID                     : xmp.id:55177A138F5EE31192D7FDDCE1FB89A2
Rendition Class                 : proof:pdf
Derived From Instance ID        : xmp.iid:54177A138F5EE31192D7FDDCE1FB89A2
Derived From Document ID        : adobe:docid:indd:77ce9e46-4eb2-11dd-a80b-900785cbd2b2
Derived From Original Document ID: adobe:docid:indd:77ce9e46-4eb2-11dd-a80b-900785cbd2b2
Derived From Rendition Class    : default
History Action                  : converted
History Parameters              : from application/x-indesign to application/pdf
History Software Agent          : Adobe InDesign CS6 (Windows)
History Changed                 : /
History When                    : 2013:12:06 10:57:41-05:00
Format                          : application/pdf
Producer                        : Adobe PDF Library 10.0.1
Trapped                         : False
Page Count                      : 16
Creator                         : Adobe InDesign CS6 (Windows)
EXIF Metadata provided by EXIF.tools

Navigation menu