York Ychbc Users Manual 115.20 NOM2_105

YCHBC to the manual ce5e4c1f-a3b5-4ec9-9ab6-17fc424d99b4

2015-02-02

: York Ychbc-Users-Manual york-ychbc-users-manual-455207 york pdf

Open the PDF directly: View PDF PDF.
Page Count: 16

DownloadYork Ychbc-Users-Manual 115.20-NOM2_105  York-ychbc-users-manual
Open PDF In BrowserView PDF
FAN COIL
AIR CONDITIONERS
INSTALLATION, OPERATION, & MAINTENANCE Supersedes: Form 115.20-NOM2 (1199) Form 115.20-NOM2 (105)

00168VIP

00172VIP

MODEL YCHBC – Ceiling Cabinet Model

MODEL YHBC – Ceiling Concealed Model

00173VIP

00170VIP

MODEL YHH – Ceiling Concealed Model with Electric Heat

MODEL YRHBC – Telescoping / Recessed Ceiling Model

00171VIP

MODEL YPHBC – Ceiling Concealed Model with Insulated
Return. Plenum and Filter

00174VIP

MODEL YHYB – High Capacity Ceiling Concealed Model

MODEL YPHH – Ceiling Concealed Model with Electric
Heat, Insulated Return Plenum and Filter

00175VIP

MODEL YPHYB – High Capacity Ceiling Concealed Model
with Insulated Return Plenum and Filter

Notes:
1. 2-Pipe units have one water coil. 4-Pipe units have two water coils.
2. Changeover is used to select heating or cooling mode.

3. YORK International does not recommend “fan cycle” applications for cooling on unit mounted thermostats.
4. For proper operation, control valve must be normally closed.
5. Aquastats provided where required.
6. Electric Heat is only available in the YHH and YPHH units. These units require a remote thermostat (low voltage 4 wire thermostat).

***** WARNING TO INSTALLER, SERVICE PERSONNEL AND OWNER *****

Altering the product or replacing parts with non authorized factory parts voids all warranty or
implied warranty and may result in adverse operational performance and/or a possible hazardous
safety condition to service personnel and occupants. Company employees and/or contractors are
not authorized to waive this warning.
L23952Y 1-05

FORM 115.20-NOM2 (105)

TABLE OF CONTENTS
RECEIVING..........................................................................................................................................................3
STORAGE............................................................................................................................................................3
PREPARE CEILING FOR MOUNTING................................................................................................................3
WIRING ...............................................................................................................................................................3
PIPING .................................................................................................................................................................6
DRAIN PIPING .....................................................................................................................................................7
DRAWINGS...................................................................................................................................................8 - 14
STARTUP...........................................................................................................................................................15
MAINTENANCE .................................................................................................................................................16

Reference Documents:
• IOM for YVC-YVF-YVS
• IOM for YSHW, YSHX
• IOM for YSVW, YSVX
• Parts List

Form 115.20-NOM3 (Latest)
Form115.22-NOM5 (Latest)
Form 115.22-NOM2(Latest)
Form 115.20-RP2(Latest)

These documents can be ordered through Publications Dept.
or downloaded @ http://intranet.york.com/web0003/library/default.asp

NOTE:
Use direction of airflow
for selecting right- and
left-hand units.

TABLE 1 - NOMINAL AIRFLOWS

2

UNIT SIZE

CFM

3

300

4

400

5

500

6

600

8

800

10

1000

12

1200

13

1300

16

1600

20

2000

PLENUM
(OPTIONAL)
LD04775

FIG. 1 – DETERMINATION OF RIGHT-HAND /
LEFT-HAND REFERENCES
YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION
RECEIVING

Material in this shipment has been inspected at the
factory and released to the transportation agency in
good condition. When received, a visual inspection of
all cartons should be made immediately. Any evidence
of rough handling or apparent damage should be noted
on the delivery receipt and the material inspected in the
presence of the carrier's representative.

If damage is found, a claim should be
filed against the carrier immediately.

In free (non-ducted return air) return installations of
YHBC, YHH, YHHS and YHYB units; the furred
down area must be completely sealed (except return
air grille) to ensure that all return air is pulled from
the conditioned space and not from other areas of the
building structure.
Access must be provided for servicing the unit. If
this access is provided by a removable ceiling panel,
ample space must be allowed for removal of the blower
panel and to provide access to electrical and plumbing
controls.

Unit must not be operated during
building construction due to excessive airborne dust and debris. The
units must not be operated under any
circumstances without an air filter in
place.

STORAGE

If the equipment is not to be immediately installed, store
it in a dry location with the motor protected against
moisture, dust, corrosion and physical damage.
PREPARE CEILING FOR MOUNTING

Depending upon building construction, provisions
for mounting the unit must be made by the contractor
according to architects; drawings.
It is important to ensure that the fan coils are securely
mounted and the structure is sufficient to support the
weight of the equipment. All anchors for mounting the
equipment must be placed and sized to ensure a safe
and durable installation.
The YHBC, YPHBC, YRHBC, YHH, YHHS, YPHH,
YHYB, and YPHYB units are designed for installation
in a horizontal position above a dropped ceiling. The
YCHBC is a cabinet unit intended for horizontal
exposed surface mounting.

YORK INTERNATIONAL

WIRING

All wiring must comply with the local and national code
requirements. Units are provided with wiring diagrams
and nameplate data to provide information required for
necessary field wiring.
For power wiring a 4 x 4 electrical box is provided on
the cabinet for connection of power supply and is located
on the same side as piping.
On YHBC units, the box is shipped unattached, it is
field attached to the unit in a location convenient to
electrical entrance.

Any devices such as fan switches or
thermostats that have been furnished
by the factory for field installation
must be wired in strict accordance
with the wiring diagram that is supplied with the unit. Failure to do so
could result in damage or injury.

3

FORM 115.20-NOM2 (105)

INSTALLATION

��� �����
����� � ���

����������
����� �� ��������
�

�

� �

�

� � �

���

�������� �����
�����������

��� �����

�

�
�����
������
�

�
�����
������
�

�
�

����

� � � �����
��� �����

�����

�����

�����

��������
������������

��������
�����
������

�������� ����

���
���
���
���

���
���
���
���

� � � �����
��� �����

���
���
���
���

� � � �����
��� �����

�����
������

� � � �����
��� �����

���

���
�����
������
�
�

�

���� �����
����� � ���

LD010198

������
�� ������ ����� ����
��� � ������
��� � �� �����
��� � ��� �����
��� � �� �����

�� ����������� �� �� ��

�� ������ ����������
������� ������
����� ������

�� ��� ��� ������ ����� �����

FIG. 2 – HORIZONTAL UNITS - TYPICAL WIRING

4

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION
T334 THERMOSTAT

Heat-Off Cool, Fan Auto-On, 24V, Manual changeover, 4-Wire Thermostat (R, G, Y, W) Adj. Heat Anticipator,
Fixed Cooling Anticipator, Fan Cycling (Cooling) or (Heating/Cooling), No Heating Required.
T404 THERMOSTAT

Heat-Off Cool, Fan Auto-On, 24V, Manual changeover, 6-Wire Thermostat (R, G, O, Y, W, B)
Adj. Heat / Fixed Cool Anticipator, Fixed Cooling Anticipator, Fan Cycling.
(O & B can be used for cool and heat relays respectively, or for cool & heat water valves.)
T200 THERMOSTAT OPTION (W/CONTROLLER)

Heat-Off Cool, Fan -On, 24V, Manual changeover, 7-Wire Thermostat (R, C, Hi, Med, Lo, 24V Heat,
24V Coil), Auto fan speed control, digital readout, auto-overide.

����������
���������
�������� ����������

��� ���� �����

����������
������

��� ���� �����

����

������

���

�

�

���� ��� ����������

��� ����� �
���� ���� ���
������ �����

����� �����
������

��� � ���� � ���� � ����
��� � ����
������� ��� ����

������� � ���� �����

LD010200
LD010200

FIG. 3 – WIRING SCHEMATIC FOR HBC/PHBC/CHBC/RHBC/HYB/PHYB
YORK INTERNATIONAL

5

FORM 115.20-NOM2 (105)

INSTALLATION
These units are provided with six (6) mounting holes
(see drawings for details). Metal washers and nuts of
the proper size are to be provided by the installer. When
necessary, use shims to obtain the proper level. This will
ensure that the condensate will drain from the unit.
PIPING

These units employ a hydronic coil designed for use
with either hot or chilled water.
All piping must be adequately sized to meet the design
water flow requirements as specified for the specific
installation. Piping must be installed in accordance with
all applicable codes.
PIPE SIZES
All models except YHYB/YPHYB:

• HW/CW coils are 3/8" OD tubing.
• Tubing connections are 5/8" OD.
Models YHYB/YPHYB:

• HW/CW coils are 1/2" OD tubing.
• Tubing connections are 7/8" OD.
Manual air vents are provided standard on all coils
All chilled water piping must be insulated to prevent
condensation.

Prior to connecting to the fan coil,
all external piping must be purged
of debris.

When connecting piping or valve
kits to fan coil units, do not bend or
reposition the coil header tubing for
alignment purposes. This could cause
a tubing fracture resulting in a water
leak when water pressure is applied
to the system.
PRECAUTIONS

1. Flush all field piping prior to connection to remove
all debris.
2. Use wet cotton rags to cool valve bodies when
soldering.
6

3. Open all valves (mid-way for hand valves, manually
open on motorized valves) prior to soldering.
4. When soldering to bronze or brass, heat the piping while in the socket/cup and begin introducing
the solder when the flux boils rapidly. Avoid direct
flame into the solder joint.
5. Heat can only be applied to the cup of the valve body
for a minimal time before damage occurs (even with
the use of wet rags.
6. Avoid rapid quenching of solder joints, as this will
produce joints of inferior quality.
7. The valve package will not support the weight of
the connecting pipes. All pipes, which are connected
to the units, must be completely supported prior to
connection to the unit.
8. Provisions must be made for expansion and contraction of piping systems. All horizontal and
vertical risers, including runouts, must be able to
withstand significant movement with temperature
changes. Failure to do so will result in damage and
failure of piping, fittings and valves throughout the
building.
9. Never insulate the heads or motorized portion of
control valves. Damage can occur in the form of
excessive heat build up and interference to the
operation and moving parts will result.
10. All piping made in the field should be installed with
consideration of additional space for any electrical
routing that may be required.
11. Hydronic systems are not designed to hold pressurized air and should only be tested with water.
After the system has been proven leak free, all lines and
valve control packages must be insulated as specified
on the building plans.

Many valve packages will not physically allow all components to fit
over an auxiliary drain pan. It is the
installers responsibility to ensure adequate condensation prevention. The
installer must also ensure that there
is no condensate drippage onto electrical components beneath insulated
components.

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION
VALVE CLUSTER

2-Way Motorized Valve Assemblies
1. The motorized valve assembly should be attached to
the supply header, which is the connection nearest
the air outlet flange on the unit.
2. Prior to soldering the joints, operate all the hand
valves to ensure that the handles will fully open and
close without interference to other valves, ceiling,
wall, plenum or other accessories.
3. All valves will operate at any angle with the exception of the motorized valve, which must be installed
with the power head above horizontal. The actuator
box requires a 3/4" clearance for removal.

00186VIP

FIG. 4 – 2 WAY MOTORIZED VALVE ASSEMBLY

3-Way Motorized Valve Assembly
1. The 3-way valve assemblies will mount to the
coil in only one position. On four-pipe right hand
systems, a "B" valve assembly is required for the
chilled water connection and an "A" valve assembly
is required for the hot water connection. On left
hand systems, an "A" valve assembly is required
for the chilled water connection and the hot water
connection. (See figure 4.)
2. Prior to soldering the joints, operate all the hand
valves to ensure that the handles will fully open and
close without interference to other valves, ceiling,
wall, plenum or other accessories.
3. All valves will operate at any angle with the exception of the motorized valve, which must be installed
with the power head above horizontal. The actuator
box requires a 3/4" clearance for removal.

YORK INTERNATIONAL

00187VIP

FIG. 5 – 3 WAY MOTORIZED VALVE ASSEMBLY
DRAIN PIPING

Condensate drain lines must be installed with adequate
slope away from the unit to assure positive drainage.
YRHBC and YCHBC fan coil units require a minimum
trap of 1-1/2 inches be provided in the drain line to
assure proper drainage. YHBC, YPHBC, YHH, YPHH,
YHYB, and YPHYB fan coil units may be located where
the return air space is large enough that a negative
pressure is not present, however, a trapped condensate
line is recommended to ensure proper drainage of unit in
case a negative condition should occur (see Installation
Drawings for locations and sizes).
The drain should always be connected or piped to an
acceptable disposal point sloped away from the unit at
least 1/8" per foot

LD04801

FIG. 6 – TYPICAL CONDENSATE PIPING

TABLE 2 - DRAIN LINE SIZES
UNIT

PRIMARY

SECONDARY

YHBC

3/4 MPT

5/8 OD

YPHBC

3/4 MPT

3/4 MPT

YRHBC

3/4 MPT

3/4 MPT

YHH

3/4 MPT

7/8 OD

YPHH

3/4 MPT

7/8 OD

YHYB

3/4 MPT

3/4 MPT

YPHYB

3/4 MPT

3/4 MPT

7

FORM 115.20-NOM2 (105)

INSTALLATION
Ceiling Concealed Model – MODEL YHBC
6

NOM. CFM (100's)
3, 4, 5, 6, 8, 10 or 13

YP HBC -

126 - 3 RH
Coil Connections (looking with airflow,
from blower end)
RH = Right Hand
LH = Left Hand

Unit Style
Y - Ceiling Concealed
YP - with return plenum & filter
YR - recessed w/telescoping panel
YC - cabinet exposed
HBC - Horizontal Blower Coil

Coil Configuration
3 = 2 Pipe Coil, 3 Row
4 = 2 Pipe Coil, 4 Row
31 = 4 Pipe Coil, 3 Row Cool
1 Row Heat
32 = 4 Pipe Coil, 3 Row Cool
2 Row Heat
41 = 4 Pipe Coil, 4 Row Cool
1 Row Heat

Unit Voltage
126 - 120V – 1 Ph – 60 Hz
Filter Note:

YHBC units are not available with filters. YHBC units can be field converted YHBC to YPHBC by adding an accessory plenum. See instruction
below for details on field conversion.
FIELD CONVERSION YHBC TO YPHBC
Remove 2 screws holding the motor/blower assembly to the fan coil unit; remove and discard the drip guard; remove the bottom panel from
the plenum; attach the plenum box to the fan coil unit using 5 screws; re-install the motor/blower assembly to the fan coil unit; for wiring,
remove the motor leads from the j-box and attach the box to the outside of the plenum; route the motor leads to the j-box; replace the bottom
panel; install the filter; if hanger brackets are needed, attach to the plenum, both ends.

���
����������
������ ���
���� ��������
�� ��������
�������� ������

PHYSICAL DIMENSIONS (inches)
MODEL

A

B

C

D

3YHBC

30-1/8

27-1/4

20-1/8

25-1/4

4YHBC

36-1/8

33-1/4

26-1/8

31-1/4

5YHBC

40-1/8

37-1/4

30-1/8

35-1/4

6YHBC

40-1/8

37-1/4

30-1/8

35-1/4

8YHBC

46-1/8

43-1/4

36-1/8

41-1/4

10YHBC

52-1/8

49-1/4

42-1/8

47-1/4

13YHBC

59-1/8

56-1/4

49-1/8

54-1/4

��� ����

����� �����
�������

���������
�����
���� ����
�������

�

�������
�����
���� ���

NOTES:
1. Model 3 YHBC has only one blower
2. Model 13 YHBC has four blowers and two motors

�����
�����

�����

�

�������

�

������
�����

���

�����

��

��� ���� ����
�����
�������

�����

�
���� � � ���� ���� �����

8

����� ����� ���� ����� ����� � ���� ���� �����
��� ����� ��� ������ ����������� ��
�������� ���� �� ��� �����
LD047768B

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION

Ceiling Concealed Model with Insulated Return Plenum and Filter – MODEL YPHBC

���� ������
��������
���� ������
������

������

������

����

���� ����

���

�
�
�
�

��

��

���

������

�

�����

���� ���� ����
����� �������

���������� �����

�������

���������� ���������
������� ���� ��� ���
��� �� ������ �� ����

LD010229

.

PHYSICAL DIMENSIONS - INCHES
MODEL

A

B

C

D

E

FILTER SIZE

3YPHBC

24

22

20-1/8

30-1/8

27-1/4

10 X 24 X 1

4YPHBC

30

28

26-1/8

36-1/8

33-1/4

10 X 30 X 1

5YPHBC

34

32

30-1/8

40-1/8

37-1/4

10 X 34 X 1

6YPHBC

34

32

30-1/8

40-1/8

37-1/4

10 X 34 X 1

8YPHBC

40

38

36-1/8

46-1/8

43-1/4

10 X 40 X 1

10YPHBC

46

44

42-1/8

52-1/8

49-1/4

10 X 46 X 1

13YPHBC

53

51

49-1/8

59-1/8

56-1/4

10 X 53 X 1

NOTES:

1) Return plenums are insulated
2) YPHBC units are provided with filters in the plenum.
3) Standard plenums are end return and can be field converted to bottom return by trading
the blockoff and face panel of the plenum.
4) Filter has seperate filter access panel for easier service.

YORK INTERNATIONAL

9

FORM 115.20-NOM2 (105)

INSTALLATION
CEILING EXPOSED CABINET – MODEL YCHBC
������
�� ��� ���������� �� �������
�� ���� ���������� ��������� �� � �����
�� ��� ����������� ��� ���� ���
�� ����� ����� ��� ��������� ���� �������
�� ��� �������� ������ ������

���

���

���

�������

�

������

�

����� ����
�����������
����

�����

���� �����
����

����
����

�����
�����

�������� ���
����� ������
����� ����
��������

�����
�����

������
��

�
�����

���� �����

���� ����
�����������

����
�����
�����
�����

���

�����
���������
��� ������

��

��������
���������
��� ���� ����

������� �����

�����

�����
�����

���

�����

�����

������
������
������

������� ����

������

���� ����
��

������

�

������
������
������

���������
�� ���� ������ ��� ��������� ��� ������ �����
�������
�� ������� ����� ������ ��� �������� ��� ���� ������
�������

LD010230

GENERAL DIMENSIONS
MODEL

UNIT WIDTH
A

MOUNTING WIDTH
B

SUPPLY LOUVERED
PANEL WIDTH
C

RETURN LOUVERED
PANEL WIDTH
E

FILTER SIZE (INCL)

3YCHBC

38

34

26

31-1/2

10 X 37 X1

4YCHBC

44

40

31-1/2

37

10 X 43 X1

5YCHBC

48

44

37

42-1/2

10 X 46 X1

6YCHBC

48

44

37

42-1/2

10 X 46 X1

8YCHBC

54

50

42-1/2

48

10 X 53 X1

10YCHBC

60

56

48

53

10 X 59 X1

13YCHBC

67

63

53

58-1/2

10 X 65 X1

10

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION
RECESSED CEILING – MODEL YRHBC
�����

�

�����
�����

�����
���������
���
������

�����
������
������
������
�����

�
�

�

�

������

���

���� ����
�����������

�

�����
����� �� ��� ��
��

�

� ����

���
���

���

����
���
����

����� ����
�����������
��� ���� ��
�����
����

����
���
����

���
���

���

�������
���
�����
������ �����

����

�

�����
�������
�����

���
���

����

������ ��� �����
������� ��� ����
������ ���

NOTES:
1. Telescoping panel allows the cabinet to be installed to within 2
inches of the ceiling line.
2. Telescoping access panel shipped as seperate item.
3. YRHBC units are available with filters on units with louvered
access panels ONLY.

���

All 1-1/2" dia. K.O.;s

���

���

* 4-Pipe system only

������� ����
LD010220

GENERAL DIMENSIONS (Inches)
MODEL

PANEL
WIDTH
(A)

UNIT
WIDTH
(B)

SUPPLY
OPENING
(C)

LOUVERED
MOUNTING
PANEL'WIDTH
WIDTH
(E)
(H)

RETURN
OPENING*
(I)

FILTER
SIZE
(INCL)

3YRHBC

41

38-3/8

29

36-5/8

35

14

10 x 37 x 1

4YRHBC

47

44-3/8

35

5YRHBC

51

48-3/8

39

41-3/4

41

20

10 x 43 x 1

47-1/4

45

24

10 x 47.5 x 1

6YRHBC

51

48-3/8

39

47-1/4

45

24

10 x 47.5 x 1

8YRHBC

57

54-3/8

45

52-1/2

51

30

10 x 53 x 1

10YRHBC

67

60-3/8

51

57-7/8

57

36

10 x 59 x 1

13YRHBC

70

67-3/8

58

63-1/8

64

42

10 x 65 x 1

* Field cut for above ceiling return.

YORK INTERNATIONAL

11

FORM 115.20-NOM2 (105)

INSTALLATION
Ceiling Concealed Model with Electric Heat – MODEL YHH
6

Y

HHS

-

6.0 - 240 - 3 - RH

NOM. CFM (100's)
3,4,6,8,10 or 12

Coil Connections
(looking with airflow,
from blower end)
RH = Right Hand
LH = Left Hand

Unit Style
Y - basic unit
YP - with insulated return plenum

Coil Configuration
3 = 2 Pipe Coil, 3 Row
4 = 2 Pipe Coil, 4 Row
Voltage
(1) 240 / 1 / 60
(2) 208 / 1 / 60
(3) 277 / 1 / 60

Motor Type
HH - PSC Motor
HHS - SP Motor

Electric Heat (kW)
6.0 kW
10.0 kW
Notes:
1. Fuse size and wire size per ampacities on unit nameplate.
Follow NEC guidelines in absence of local codes.

PHYSICAL DIMENSIONS (INCHES)
MODEL

OVERALL
WIDTH
A

MOUNTING
WIDTH
B

SUPPLY
OPENING
C

3YHHS

25

19-11/16

15

40

34-11/16

30

10YHH

46

40-11/16

36

12YHH

52

46-11/16

42

4YHHS
6YHHS
6YHH
8YHH

2. YHH units are not available with filters.

�
�

��� ����
������

�������

��� ����
��

������
��

�
�����������
���� ���� �����

�
�

���

������

����

������

����� ����

�
�
��

������� ���
��� ������� ������ ����
��� ��� ������ �������
������ �������� ���

����� ���� ����

������� �����
���� ���

�
��������� �����
���� ���� ����� ����� ��������
����� ����� ���� ����� � ����
���� ����� ��� ����� ��� ������
����������� �� �������� ����
�� ��� �����
LD010233

12

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

INSTALLATION
Ceiling Concealed Model with Electric Heat,
Insulated Return Plenum and Filter – MODEL YPHH
�
�

������
���������
����� ����
���

��� �������

�������
����� ����
���

������

��������
������

�

������

�
�
LD010231

����� ���� ����� ����� � ���� ����
����� ��� ����� ��� ������ �����������
�� �������� ���� �� ��� �����

PHYSICAL DIMENSIONS (INCHES)
MODEL

OVERALL
WIDTH
A

MOUNTING
WIDTH
B

SUPPLY
OPENING
C

PLENUM
WIDTH
D

RETURN
OPENING
E

FILTER
(INCL)

3YPHHS

25

19-11/16

15

20

18

10 X 20 X 1

40

34-11/16

30

34

32

10 X 34 X 1

10YPHH

46

40-11/16

36

40

38

10 X 40 X 1

12YPHH

52

46-11/16

42

46

44

10 X 46 X 1

4YPHHS
6YPHHS
6YPHH
8YPHH

YPHH FEATURES:

YORK INTERNATIONAL

1) Return Plenums are insulated.
2) All plenums include throw away filter.

13

FORM 115.20-NOM2 (105)

INSTALLATION
MODEL YHYB – High Capacity Ceiling Concealed Model
12 YP HYB

NOM. CFM (100's)
12,16 or 20

- 126 - 3 RH
Coil Connections
(looking with airflow, from blower end)
RH = Right Hand
LH = Left Hand

Unit Style
Y -high capacity ceiling concealed
YP - with return plenum & filter
HYB - Horizontal Blower Coil

Coil Configuration
3 = 2 Pipe Coil, 3 Row
4 = 2 Pipe Coil, 4 Row
6 = 2 Pipe Coil, 6 Row
31 = 4 Pipe Coil, 3 Row Cool, 1 Row Heat
32 = 4 Pipe Coil, 3 Row Cool, 2 Row Heat
41 = 4 Pipe Coil, 4 Row Cool, 1 Row Heat
42 = 4 Pipe Coil, 4 Row Cool, 2 Row Heat
61 = 4 Pipe Coil, 6 Row Cool, 1 Row Heat
62 = 4 Pipe Coil, 6 Row Cool, 2 Row Heat

Unit Voltage
126 - 120V – 1 Ph – 60 Hz
277 - 277V – 1 Ph – 60 Hz
Notes: 1. YHYB units are not available with filters.
2. YPHYB units are provided with filters in the plenum.

PHYSICAL DIMENSIONS (INCHES)
MODEL

OVERALL
TOP
SUPPLY MOUNTING RETURN
WIDTH
PLATE OPENING
WIDTH
OPENING
A
WIDTH
C
D
E
B

FILTER
(INCL)

12YHYB

41

35-1/2

28

31-1/4

23-1/4

___

12YPHYB

41

35-1/2

28

31-1/4

23-1/4

16YHYB

51

42-1/2

38

41-1/4

38-1/4

14 x 28 x 1
___

16YPHYB

51

42-1/2

38

41-1/4

38-1/4

20YHYB

60

51-1/2

47

50-1/4

47-1/4

14 x 38 x 1
___

20YPHYB

60

51-1/2

47

50-1/4

47-1/4

14 x 43 x 1

�����

��

�

���

������
�������
��� ��� ����

�����
������
�����

��� ��� �����
������� ���
���������

�

����� � ����� ���� ���� �����

������

������

������

�����

�
��� ��
�����������
�� ��� �����
��� ��� ���

��

��� ��� �����
������� ���
���������

���� � ����� ���� ���� �����

14

5.
6.
7.
8.

Manual air vents
4-speed direct drive motors
1/2" copper tubing
Primary and secondary condensate
drains on one end
120/1/60Hz. motors (2)
3-row and 6-row models available
Rubber isolation grommets
Insulated and coated drain pan

������

������ ��

������
�������

FEATURES:
1.
2.
3.
4.

�����
��
�

�
��� ���������
�������� ���������
LD04781

YORK INTERNATIONAL

FORM 115.20-NOM2 (105)

FAN COILS START - UP CHECKLIST
INSTALL CHECKLIST
 Equipment received as ordered.
 Unit checked for damage interior and exterior.
 Make sure all ductwork is complete and available for full air flow.
 Unit installed level to ensure proper drainage and operation.
 Unit installed with proper clearances.
 Ensure condensate water will drain toward the drain connection. An overflow drain may be required as a back up to a clogged
primary drain.
 Check that coil(s), valves and piping have been leak checked and insulated as required.
 Main coil drain pan must be properly trapped and charged with water before units are started.
 Ensure that all air has been vented from the system.
 Return valves to their proper operating positions prior to start-up.
 Repair any solder joint leaks and gently tighten any leaking valve packing nuts and piping accessories as required.
 Install all panels.
NOTE: If the motor and fan have not been operated in the last (4) four weeks or more, lubricate all the bearings and rotate the motor and fan
monthly to prevent moisture from accumulating in the bearings. (See Form 50.20-NM3, Long Term Storage)

CLEANING CHECKLIST
 Installer has cleaned out interior.
 Ensure drain pan free from foreign material.
 Ensure air filters are clean, installed properly and secured. Use the directional arrows or other information on the filter to
determine the proper flow direction.

CONTROLS CHECKLIST
 Check that supply voltage matches nameplate data.
 Ensure that the unit is properly grounded.
 Controls installation complete
 Check all electrical connections for tightness.
 Review electrical print for correct wiring.

Fan INSPECTION - The fan should be inspected and cleaned, in conjunction with maintenance of the motor and bearings. It is
important to keep the wheel clean in order to avoid imbalance and vibration.

 Check tightness of fan bearing locking collar.
 With power off, check blower wheel set screws for tightness and ensure that the blower wheel(s) rotate freely and quietly.
 Check tightness of all motor base and mounting bolts.
 Check motor connections to ensure that they are secure and made in accordance with the wiring diagram
 Rotate all moving components manually. Adjust as required.

YORK INTERNATIONAL

15

MAINTENANCE
MOTOR

The blower motor should be cleaned annually and if it
has oiling ports, it should be oiled with a good grade of
SAE 20 oil. Normally a few drops of oil in each bearing
is sufficient.
COIL

The coil must be kept clean by any of the following
methods.
1. Cleaning with low-pressure compressed air.
2. Flushing or rinsing with water (a detergent is advisable for greasy surfaces).
3. Prior to the water system start-up and balancing, the
chilled/hot water systems should be flushed to clean
out dirt and debris, which may have accumulated
during construction. All unit service valves are to
be closed during this process. Strainers are to be
installed in the piping mains to prevent this material
from entering the units during normal operation.

Because of dust and lint in the room, room-air filters
load up much more rapidly than outdoor-air filters.
Under normal conditions, the room air filter requires
replacement every six to eight weeks.
To ensure proper maintenance of the filters, it is best
to follow an organized maintenance procedure. The
following one is recommended:
Divide the total number of units on the job into six
equal groups. Each week inspect, clean or replace the
filters in each group, in rotation. This insures a uniform
servicing interval. The interval may be lengthened or
shortened as determined by experience. If inspection
shows only the room-air filter to be dirty, this one alone
should be replaced.

Dirty filters reduce the air and heating capacities of the Unit Ventilator.
When the filters are excessively dirty,
the unit heating capacity will be so reduced that it is ineffective for heating
the room. When a room fails to heat,
always check the filters.

FILTERS

Clean or Replace Air Filters Regularly

CLEAN UNIT INTERIOR

Once a year clean the fans and coils of the unit
thoroughly. Remove the access panel as necessary.
The intervals at which filters require replacement
depend on local conditions.

P.O. Box 1592, York, Pennsylvania USA 17405-1592
Copyright © by York International Corporation 2004
Form 115.20-NOM2 (105)
Supercedes 115.20-NOM2 (904)

Wipe the interior of the unit clean with a rag. Wipe the
motor and inside and outside of the fan housings. (In
cooling units, clean out the drain pan.)

Tele. 800-861-1001
www.York.com

Subject to change without notice. Printed in USA
ALL RIGHTS RESERVED



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Modify Date                     : 2005:02:15 14:44:19-05:00
Create Date                     : 2005:01:24 14:42:24Z
Producer                        : Adobe PDF Library 5.0
Creator                         : Adobe InDesign 2.0.1
Trapped                         : False
Page Count                      : 16
Creation Date                   : 2005:01:24 14:42:24Z
Mod Date                        : 2005:02:15 14:44:19-05:00
Metadata Date                   : 2005:02:15 14:44:19-05:00
Document ID                     : adobe:docid:indd:12601c93-6e40-11d9-91bc-b081aeec5f08
Version ID                      : 1
Rendition Class                 : proof:pdf
Rendition Of Document ID        : adobe:docid:indd:12601c93-6e40-11d9-91bc-b081aeec5f08
Rendition Of Version ID         : 1
Rendition Of Rendition Class    : default
Format                          : application/pdf
Title                           : 115.20-NOM2_105.indd
Tagged PDF                      : Yes
Page Mode                       : UseOutlines
EXIF Metadata provided by EXIF.tools

Navigation menu