ZTE K-BS8922S1900 Outdoor FDD Micro Base Station User Manual
ZTE Corporation Outdoor FDD Micro Base Station
ZTE >
User manual
Version: V1.0 Serial Number: 51-20150812094530-003 Publishing Date: 2015-08-19 lRi.0l Outdoor UMTS Micro Base Station Engineering Installation Guide (ZXSDR 388922) Address: No. 55, ill-Inch Rood Soulh. ShanZhen. alanine Postcode: 518057 10!: +86-755-261108m URI; http://wwwzioxomcn E-muil: loofizhnl'nm ' V ‘ 1' ZTE CORPORATION ZTE CORPORATION Content — Safety Information ——————————————————————————— 3 Safety Symbols ----------------------------- 3 Installation Precautions ---------------------- 4 Space Requirement ------------------------- 4 Hoisting ————————————————————————————————————— 5 Installation Flow ----------------------------- 6 Installation Preparation ----------------------- 6 Installation Accessories ---------------------- 8 Unpacking and Inspection -------------------- 8 Media Requirement ————————————————————————— 9 RRU Installation Modes ---------------------- 9 Installing the ZXSDR B88922 on a Pole ———————— 9 Installing the ZXSDR B88922 on the Wall ------- 12 GPS Antenna Installation (Optional) ———————————— 16 Cable List ---------------------------------- 17 Cable Installation ---------------------------- 19 Installing the Grounding Cable ---------------- 19 Installing the Power Cable -------------------- 21 Installing the Optical Fiber ———————————————————— 24 Installing Antenna Feeder Cables —————————————— 25 Installing the Monitoring Cable ---------------- 26 Installing the GPS Cable ---------------------- 27 Installing the Ethernet Cable —————————————————— 28 Waterproof Handling ————————————————————————— 30 Concentrator Installation (Optional) ------------ 32 Installing the Waterproof Cover ---------------- 33 Installation Check --------------------------- 35 Equipment Power-On ----------------------- 36 Closure ———————————————————————————————————— 37 ZXSDR 838922 Outdoor UM TS Micro Base Station Engineering installation Guide - us'w00'612'MMM/Izd1tu LOQOLLQZ-QQL-98+ 191 EUILIO'H‘d ‘UQHZUSHS ‘umos 9908 U09HH ‘99 'ON 3391va- ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - Safety Information Installation Precautions The following describes personal health and safety information when you work with ZT E system products. To prevent accidents, read the safety information provided in this document carefully before using ZTE system products. 1 Never open the hermetic seal before or after the installation. I Local regulations supersede the information provided in this manual. Where applicable local ; ? _ _ . regulations are unavailable, the information herein prevails. The RRU bOdy '5 aPPI'Ed W'th antirust coating. Make sure that IAII personnel must be equipped with the knowledge of safety operations, technical training, the coating is not damaged during and corresponding qualifications certified by ZT E CORPORATION. For some operations, they may need special trainings or qualifications certified by ZTECORPORATION. transl’onation and installation. Safety Symbols 3 Do not install the device with 4 Do not install the device Laser Hazard: Beware of strong laser beams. Do not look directly at the laser beam. interfaces facing upwards. horizontally. " Heat Hazard: Beware of heat sources or hot surfaces that can cause burns. I Personal Protection r Remove items of jewelry. such as rings, necklaces, and watches. These items may get entangled with moving parts. Metal jewelry items are conductors that can result in electric shock. > Always wear appropriate personal protective equipment when working. 8 p a C e R e q U ire m e nt > Pay attention to the hazard labels and caution or warning information on products. Never cover or remove the hazard labels and caution or warning information. DeVlce DlmeDSIOns Recommended Mlnlmum (”'“t‘ mm) Installation Space Installation Space (Unit: mm) (Unit: mm) 2200 l I Only use the tools described in the instructions. I Installation Security > All personnel working at height must be specially-trained and certificated. Working at height must comply with local laws, regulations, and guidelines. D The device is heavy. Lifting the device without using a lifting device can result in serious personal injury. > Do not work at height or iron tower in bad weather such as rain or frog. > Falling objects can result in serious or even fatal injuries. Always wear a safety helmet. Never stand or walk under any heavy object that is being lifted. r Incorrect electrical installation can result in fire, electric shock, or explosion that is likely to be fatal. Only qualified electricians are allowed to install or modify electrical installations. > It is recommended that fibers be installed in a temperature higher than —20°C. > Switch off transmitting antennas, or reduce their output power to a safe level when working with, or staying near, these antennas. UO'wOO‘GIZ'MMM/lidllll l080££92’991.'98+ ilel BUNO‘H'd 'UeliZUSHS 'l-linOS 9908 LKPHH '99 ’ON 3391va- ?500 ‘3 @ Note: For mounting multiple RRUs on a pole or centralized mounting, the spacing between RRUs depends on the mounting components. ZTE We, "-3.— The information provided in this section is used for reference when it is necessary to hoist the RRU. Life b—_lt Hoist the RRU Fixed p—_Iley H—_isting rope _auling cable 1Installer A on the tower secures the fixed pulley on the tower, and passes the hoisting rope down to the ground through the fixed pulley. Hoisting rope Handle 2lnstaller C on the ground bundles the RRU tightly with a cross tie and passes the rope through the handle. Meanwhile, installer C pulls the dragline outwards to protect the device from colliding with the tower when the device reaches the installation platform. Hauling cable ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - 4 Lift the properly-packed engineering materials used for tower mounting onto the tower in the manner mentioned above. Never lift the engineering materials by binding them directly to the hoisting rope. » Installation Flow Installation Preparation Unpacking and inspection c°2$£tofligmfl passed? Pole-mou nted Wall-mounted installation installation Install the GPS antenna(optional) Install cables nsta t e concentrate optlonal Check the Installatlon Power-on the equipment Closure InstallatIon PreparatIon Tools and Instruments Illustrates the tools and instruments required for the installation: UO'HJOO‘GIZ'MMM/liduu L080£LQZ'99£'98+ 3|9J. eUNO‘hl'd ‘ueuzueus ‘HIT‘OS 9908 U09HH '99 "ON 5339-IPDV' ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - Installation Accessories Illustrates the installation accessories. Angle adjustment Clamp (used in Expansion bolt (used GPS antenna Power cable installation pole-mounted in wall-mounted installation crirn in tool component installation mode) installation mode) component (optional) p g I...“ - - vacuum rope pulley Safety harness marker pen percussron dr'" cleaner Image IE. I I (=3 63 \ V - \ Unpacking and Inspection . Ci‘OSS - o o . ' “m m— mummy Goods The packing boxes for the ZXSDR 388922 include crates and cartons. I Step 'I.Verify that the packing boxes are in good condition. If any is broken, contact the transportation company immediately. . . . .. . ‘ ' ' , - 2.Un ack the ackin boxes and veri that the oods are consistent with the ackin list. diagonal pliers slip icint pliers rgt’g'sfggfigga' hé‘ijrgasg'rc hot-air blower cogtxiglpgable p p g fy g p g IChecking Goods 7 Check the ZXSDR 888922 and verify that: 1.There are no dents, bumps, peeling, scratches, foaming, paint stripping, or blots on the -» case. 2.The case surface is in good condition, without problems such as lacquer flaking off and . . Ethernet cable scoring. crysfrli-rfigglr‘ecmr 3.All captive screws are tightly secured without dislocation. 4.The accessories required for the installation are correct and complete. Arrange the inspected goods in accordance with categories. IEquipment Handover 'l.After the goods are inspected, the project supervisor and the customer representative must waterproof instulating grounding approve and sign the Unpacking Acceptance Report. tape tape network tester retzissttgrnce 2.Each party keeps one copy of the Unpacking Acceptance Report. The project supervisor should, within seven days, send the Unpacking Acceptance Report to the local ZTE office for filing. UO'wOO‘Glz'MMM/lidllll Loeouszsswm :iei BUILIO‘a'd 'Uelizueus ‘Liinos 9908 Noel-iH ‘99 ‘ON :38erle ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - ZTE _ Angle Adjustment installation Component 0 Fixing clip Media Requirement Single-RRU Mounting 9 Installation bracket and mo mm~o120 mm fastening screws ’ 0 Installation bracket >4 . . mm 0 Vertical fastening screws RRU Installation Modes Illustrates the ZXSDR BS8922 installation modes. Steps Inshtfcl’lggon Pole-mounted installation Wall-mounted installation @ Clamps are used in pole-mounted installation mode. The pole diameter is between 40 mm and 120 mm. 1 Use four M6x20 screws to install the installation bracket on the ZXSDR B88922. Installing the ZXSDR 888922 on a Pole Installation Tools @D Note=When installinsthe Mexzoscreswfirstfastenthescmwabout7°°kof . . the depth, than fasten the screws in accordance with the diagonal sequence. Install the installation bracket on the M6 internal hexagonal wrench ZXSDR 888922. Secure the vertical fastening screws. M6 internal hexagonal wrench 2 Use clamps to install the fixing clip on the pole. UO‘UJOO'SIZ'MMM/lidull L080£LQZ'99£'98+ 3|91. EUNO‘H'd ‘ueuzueus 'l-IanS 9908 LIOQHH '99 'ON 33919le Secure the bracket fastening screws. M6 internal hexagonal wrench ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - 5 Adjust the horizontal angle of the ZXSDR 388922. ($3 Note: The horizontal angle adjustment range for the ZXSDR 388922 must be between —30° and 30°. 3 Adjust the horizontal angle of the ZXSDR 388922. Mount the ZXSDR BS8922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the 6ZXSDR 388922 Installed installation bracket on the on a Pole. fixing clip. of the ZXSDR BS8922. @ Note: The angle between the ZXSDR 388922 and the pole must be between 0° and 20°. 4 Adjust the vertical angle merrier. I ' #7 “[ a Loosen the vertical fastening screws until the ZXSDR BS8922 can be adjusted vertically. UO‘LUOO'QIZ'MMMIIIdIN i080LLQZ‘99L'98+ ilai BUNO‘H'd ‘UQUZUQUS 'llinoS 990E! ”Gal-M ‘99 'ON 5359mm"!- b Adjust the vertical angle of the ZXSDR 388922. Installing the ZXSDR 388922 on the Wall . . ' Installation Tools C Secure the vertIcal fastenIng screws. ZTE _ ZXSDR 838922 Outdoor UM TS Micro Base Station Engineering Installation Guide - b Use a o12 percussion drill to drill holes at the marked positions on the wall, and use a vacuum cleaner to remove the dust. C Use a claw hammer to knock the expansion bolts into the holes, and Long tape fasten the nuts clockwise to make the bolts fully expand in the wall. Marking pen Level rule, d Loosen the nuts counterclockwise, and remove the nuts, spring FIx screws. Percussion drill washers, and flat washers. Vacuum cleaner Adaptor Adjustable wrench Claw hammer ‘ g ’3‘" Note: It is recommended that you use a level ruler to keep the holes horizontal when marking 2lnstall the fixing clip on the wall. I Drilling Specification Follow the installation diagram to mark the drilling position on the wall. Steps 0 Nut 9 Spring washer 9 Flat washer 1 Drill holes on the wall and install the drilling holes. expansion bolts. Use four M6x20 screws to install the installation bracket on the ZXSDR 338922. 7 ’ ‘ a Mark holes on the wall in accordance with the drilling specification. g—NUI Fastening Spring washer Flat washer M10x100 expansion bolt ll. UO‘uJOO'BiZ‘MMMI/Idlill l080£t§Z-99t99+ ileJ. EUNO‘U'd 'UeliZUQLIS “limos 9908 LI991'!H '99 'ON 35919le ix Note: When installing the MGX20 screws. first fasten the screws about 70% of the depth, than fasten the screws in accordance with the diagonal sequence. 4 Mount the ZXSDR 888922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the 7 ZXSDR 888922 Installed on installation bracket on the the Wall. E’- fixing clip. 5 Adjust the vertical angle of the ZXSDR BS8922. Note: The angle between the ZXSDR 888922 and the wall must be between 0° and 20°. 3 Loosen the vertical fastening screws until the ZXSDR 888922 can be adjusted vertically. ' I b Adjust the vertical angle T ' ' of the ZXSDR 888922. T 1 T , , T T T I i l 1 C Secure the vertical fastening screws. 6Adjust the horizontal angle of the ZXSDR 888922. $ Note: The horizontal angle adjustment range for the ZXSDR 888922 must be . between _3oo and 30., cross screwdriver 3 Adjust the horizontal angle of the ZXSDR 888922. ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering Installation Guide - us'wOO‘eIZ'MMM/rduu L090LL92‘99L'98+ ilai BUNO'B'd ‘Uel-Izueus 'Lnnos Peoa noel-m '99 'ON ZSSSJDPVI 1 Remove the two MGXZO 2 Mount the GPS antenna onto screws from the GPS the GPS antenna mounting antenna mounting part. part. I” “““ (1..., 3 Mount the GPS antenna assembly onto the ZXSDR 388922 with two MGX16 screws. l p 2,, “’i Q», Cable List “ Local Equipment Interconnected Equipment Connector Type OT terminal OT terminal Grounding Local grounding terminal of Groun din bar Cable Interconnected Port ZXSDR 388922 9 Connector Type DC power input connector The power interface of the DC power supply. Terminals Interconnected Po” ZXSDR 388922 need to be fabricated on site. DC power cable External View ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering Installation Guide - AC power cable Optical fiber Antenna feeder cable Monitoring cable GPS cable Ethernet cable Connector Type Interconnected Port External View Connector Type Interconnected Port External View Connector Type Interconnected Port External View Connector Type Interconnected Port External View Connector Type Interconnected Port External View Connector Type Interconnected Port External View Power input connector Three—flat-bottom plug Power interface of the ZXSDR DC power supply. Terminals BS8922 need to be fabricated on site. OPT interface of the ZXSDR Core network or neighbor B88922 device N-type connector N-type connector Antenna port of the ZXSDR B88922 Antenna RF port D-type 15-pin (three rows) straight cable welding circle Bare wire connector MON interface of the ZXSDR Monitoring device 388922 N-type connector N-type connector GPS port of the ZXSDR 388922 GPS antenna RF port 8-pin RJ45 connector 8-pin RJ45 connector ETH interface of the ZXSDR PC. core network, neighbor B88922 device, or peripheral device UO'wOO'elz'MMM/lidllli l080££93‘99£'98+ ilal BUNO‘H'd ‘UQUZUGUS 'LlinOS 990E! lpal-lH ‘99 'ON 3339-IPPV- ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - ZTE Cable Installation 9 _ ZXSDR 358922 Cable Installation Illustration , 3 Cut a proper length of the grounding cable, and peel off the external » C Use a hot-air blower to heat the heat-shrinkable tube. d Use the same method to crimp end B on a grounding terminal. Steps "1 l— 1 Remove the two grounding screws from the grounding point of the ZXSDR 388922. / ' V‘ A sheath at end A to expose the wires. n b Put a heat-shrinkable tube on end A, and crimp it on a grounding terminal. uh. 0 Ethernet cable 0 GPS cable H! Grounding cable 0 DC/AC power cable 2 9 Monitoring cable Optical fiber 0 Antenna feeder cable 0 '0 Installing the Grounding Cable 2|nstall end A of the grounding cable on the grounding point of the ZXSDR BS8922. ' L l Installation Tools '/ m ,. l Crimp an OT terminal. Hydraulic clamp F... mm mm... cab... p g g ' Adjustable wrench The grounding cable consists of 16 mm2 yellow/green fire-resistant multi-strand wires. End A is a dual-hole grounding terminal while end B is a single-hole grounding terminal. The grounding cable is made on site. Figure illustrates how to make a grounding cable. UO'wOO'alZ‘MMM/lidull L080L£92'99£'98+ ilal euNO'H'd 'U9HZU9HS 'HanS 9908 Ll9~")l‘!H '99 'ON :sserpvl L-A ZTE ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - 3 Remove the dust on the copper grounding busbar, install end B on the 3 Lead the power cable into the tube-shaped terminals, and crimp them copper grounding busbar, and put anti-rust paint around the grounding tightly. screws on the copper grounding busbar. JD 4 Paste labels on the two ends of the grounding cable. The grounding cable is installed successfully. Installing the Power Cable Connect the power cable to a power connector. Installation Tools 3 Insert the power cable with crimped tube-shaped terminals into a powernlus-and press the crimping part- T ‘I bl . an or ca es Wire stripper/paper knife Crimp tubular terminals. Crimping pliers Rinsulate the shielding layer. Black insulation tape II. Fix the power cable to the shell. Black ties Tailor black ties. Diagonal pliers Remove cables from the DC power connector. Flathead screwdriver The following describes how to make a power cable: “II 1 Loosen the power cable sheath counterclockwise, and lead end A of the power cable into the cable sheath. UO'LUOO'elZ'MMM/lidllll l080££93'9§1.'98+ ilal EUNO‘H'd ‘ueuzueus ‘LlWOS 990E! Noel-H ‘99 ‘ON 3359JPPV- b Loosen the screw for the grounding interface of the power connector, . \ “I A B twist the shielding layer of the power cable into a strip, and connect \ it to the grounding interface of the power connector. Tighten the screw for the grounding interface. ll. 2 Use a cable stripper to peel the cable. “amass- (Wire Stripping Diagram) ifi‘i(Unit):mm Fasten the nut at the end of the power cable sheath clockwise. ER twill (Length Scale) 1 :1 Steps t. 0 10 20 30 4O 50 so 70 . . - Prerequisite: The power cable Is made. 1 Loosen the nut at the end of the power cable sheath counterclockwise. InStallmg the Optical F'ber Installation Tools Fix the optical fiber. (‘ Insert the power plug of the power cable into the power interface of the ZXSDR 388922. Optical Fiber / n H E- 3 Push the power cable sheath ' . upwards until it fastens onto the slot of the power interface. (3 Note: When the power cable sheath is completed engaged in the slot of the power interface. two click sounds are heard. Steps optical fiber sheath counter- clockwise. 1 Loosen the nut at the end of the H .k H 2 Insert the optical connector into ’ the OPT1 port or OPT2 port of the ZXSDR 388922. 3 Push the optical fiber sheath upwards until it fastens onto the slot of the OPT1 port or OPT2 port. 4 Fasten the nut at the end of the power cable sheath clockwise. ($3 Note: When the optical fiber sheath is completed engaged in the slot of the OPT port, two click sounds are heard. 5 Connect end B of the power cable to the power supply. 6 Paste labels on the two ends of the power cable. The power cable is installed successfully. ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - UO‘LUOO'QIZ'MMM/lidlill LOQOLLQZ'SSL'QQ+ ilel BUNO‘B'd ‘U9UZU9US 'lllnoS 9908 ”Gal-M ‘99 'ON 535933“!- 4 Fasten the nut at the end of the optical fiber sheath clockwise. T T II. ‘f 5 Connect end B of the optical fiber to the transmission device at the opposite end. 6 Paste labels at the two ends of the optical fiber. The optical fiber" Is installed successfully. Installing Antenna Feeder Cables Prerequisite: The ZXSDR BS8922 is connected to an antenna installed in separate-installation mode. Installation Tools Fasten feeder connectors Cross- head screwdriver/Torque wrench PVC adhesive t—ape Waterproof feeder connectors. W—_terproof cement _Itraviolet-proof tape Antenna Feeder Cable Steps 1 Connect end As of antenna feeder cables to ANT interfaces of the ZXSDR 338922, see the Figure . ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - 1 Connect end As of antenna feeder / cables to ANT interfaces of the ZXSDR BS8922, see the Figure . 2 Connect end B5 of antenna feeder n '1 1— cables to the antenna installed in separate-installation mode. 3 Perform 1+3+3 waterproof handling for the cable connectors. For detailed information, refer to Appendix A Waterproof Handling. 4Paste labels on the two ends of antenna feeder cables. The antenna feeder cables are installed successfully. Installing the Monitoring Cable Installation Tools Fasten monitoring cable. Cross-head screwdriver Monitoring Cable End B of the monitoring cable is a bare wire, and needs to be connected on site. For a description of the signal definitions and cable connections, refer to Table. UO‘LUOO'eiZ'MMM/lidllu LOQOLLQZ'SSL'98+ ilai BUNO‘B'd ‘ueuzueus 'lllnoS F3908 ”Gel-M ‘99 'ON 53591991- Pin No. at End A Signal Name Signal Description Cable Color at End B MON_RS485A IVIIONITOR‘interface RS485 bus _ Signal, posmve MON_RS4853 NIONITOR Interface RS485 bus Signal, negative Dry_Node_ln1+ _——— DW_N°de_'n2+ Dry contact input. positive Ei_ Steps , 1 Connect end A of the / monitoring cable to the . l MON interface of the ‘ i \ ZXSDR 888922. F 2Connect end B of the monitoring cable to a monitoring device. 3 Paste labels on the two ends of the monitoring cable. The monitoring cable is installed successfully. Installing the GPS Cable Prerequisite: The GPS antenna is installed. Installation Tools Fasteners ceotet PVC adhesive tape Waterproof GPS cable connectors. Waterproof cement Ultraviolet-proof tape GPS Cable Installing the Ethernet Cable Installation Tools ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering Installation Guide - 1 Connect end A of the GPS cable to the GPS interface of the ZXSDR 888922. 2 Connect and B of the GPS cable to the GPS antenna. 3 Perform 1+3+3 waterproof handling for the GPS cable connectors. For detailed information, refer to Appendix A Waterproof Handfing. 4 Paste labels on the two ends of the GPS cable. The GPS cable is installed successfully. Crimp the crystal connector at end A and B. Test the Ethernet cable. The following describes how to make an Ethernet cable: 1 Loosen the Ethernet cable sheath counterclockwise, and lead end A of the Ethernet cable into the cable sheath. UO‘WOO'QJZ'MMMI/Idllll l080LLQZ‘99L'98+ ilai BUNO‘H'd ‘UQUZUQUS 'lllnoS 990E! ”Gal-M '99 'ON 55591991. ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - Peel the Ethernet cable, and crimp the crystal connector at end A. 3 n_ cabneconoratEnuA “the ET” '"‘°”a°°- _ White/orange - . * _—— __— ——_ __— _— ___ 3 Fasten the nut at the end of the Ethernet cable sheath clockwise. (? Note: When the Ethernet cable sheath is completely engaged in the ETH interface, two click sounds are heard. 4 Fasten the nut at the end of the Ethernet cable sheath clockwise. 5 Connect the other end of the Ethernet cable to the transmission device at the oppositeend. Crimp the crystal connector at end B of the Ethernet cable. 5 Use a network tester to verify that the wires of the Ethernet cable are UO‘LUOO'QIZ'MMMIIIdllll L080LL92'99L'98+ 1|9.L BUNO‘H'd ‘UQUZUQUS 'lllnoS p908 ”Gal-M ‘99 'ON 53591991. crimped and connected properly. The Ethernet cable is made 6 Paste labels on the two ends of successfully. the Ethernet cable. The Ethernet cable is installed successfully. Steps . 1 Waterproof Handling Loosen the nut at the end of the Ethernet cable sheath counterclockwise. Waterproof Handling Requirement ' ”if; _— Insert end A of the Ethernet cable into the ETH interface of the ZXSDR The following procedure describes how to waterproof a feeder 338922. connector. Steps 1 Wrap one layer of insulating tape from bottom to top, see Figure 0 . 2 Wrap three layers of waterproof tape in the following manner: from bottom to top, from top to bottom, and from bottom to top, see Figure 9 , 9,and0. Expand the waterproof tape, remove the release paper, and paste one end of the tape 20—50 mm below the connector. Make sure that the tape layer faces inwards. Stretch the waterproof tape with even force to make its width 50% to 75% of its original width. Keep the stretching force and wrap the tape from bottom to top in overlapping mode, namely, each layer of the tape covers half of the previous layer. When the tape is wrapped 20-50 mm above the connector, use the same method to wrap the tape from top to bottom until the tape is 20-50 mm below the connector, then, wrap the tape from bottom to top. After the waterproof tape is wrapped properly, squeeze the tape by hand to make the layers stick firmly to the cable and connector. ZXSDR BS8922 Outdoor UM TS Micro Base Stat/on Engineering Installation Guide - 3 Wrap three layers of ultraviolet-proof tape in the following manner: from bottom to top, from top to bottom, and from bottom to top, see Figure 9 , 9,and0. e Ultraviolet-proof cable tie 4 Use ultraviolet-proof cable ties to bind the two ends of the tape tightly . Use ultraviolet-proof cable ties to bind the two ends of the tape tightly, see Figure 6 . g Concentrator |nstal|ation(0ptiona|) Prerequisite: The cables are installed. Installation Tools Fasten a Concentrator on the ZXSDR 888922 Cross-head screwdriver Concentrator UO'LUOO'SIZ'MMM/Iidllll l080££93'991.'98+1l91 BUNO‘B'd ‘U9UZU9US ‘uinos 990E! L1991-!H ‘99 ‘ON 3359JPPV- Steps 1 Clamp a concentrator to the 2 Fasten the two captive screws ZXSDR 388922, and fix it on the on the front of the concentrator. ZXSDR 388922 with the screws The concentrator is installed on the two sides of it. successfully. ‘4 ’—. o a In «E? \ .- C (I . t. a (W “ tip/i news?" M I. —'-".'—'V Installing the Waterproof Cover A waterproof cover protects the device from water and ensures proper air tightness. This procedure uses a waterproof cover for the power supply as an example to describe how to install and remove a waterproof cover. Steps for Installing the Waterproof Cover 1 Push the elastic barrier to 2 Pull the outer enclosure, and unlock the inner and outer install the inner enclosure enclosures. onto the power interface, until two click sounds are heard. ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering Installation Guide - 3 Cover the inner enclosure with the outer enclosure, until a click sound is heard. @D 0 Inner enclosure 0 Outer enclosure Steps for Removing the Waterproof Cover 4 Unlock the inner and outer enclosures by referring to the right Figure. 5 Pull the outer enclosure properly, and press the fasteners of the inner 0 Inner enclosure 9 Outer enclosure 0 Protruding part of the power interface Note: 0 If the outer enclosure cannot be installed, verify that the fasteners of the inner enclosure are in position, and install the outer enclosure again. 0 After the outer enclosure is installed. slightly pull the outer enclosure to verify that the waterproof cover is properly installed. K'o-I ‘ enclosure to remove the waterproof cover. 0 Inner enclosure 0 Outer enclosure UO‘LUOO'QIZ'MMM/lidlill LOQOLLQZ'SSL'QQ+ ilel BUNO‘B'd ‘U9UZU9US 'lllnoS 9908 UOQI‘IH ‘99 'ON 535933“!- ZXSDR BS8922 Outdoor UM TS Micro Base Station Engineering installation Guide - Installation Check Rust and stains on the grounding terminal of the protective grounding 13 cable are removed before the cable is connected. After the cable is . connected, anticorrosion and antirust measures are taken properly. mm Requirement The installation components are installed in proper order and the equipment is fixed securely Without swaying. Grounding and 14 All cable connectors are wrapped for waterproof purposes. Insulating 1 tape and waterproof tape are wrapped tightly and sequentially. waterproof handling Equipment . . The protective grounding cable of the equipment is installed properly, Installation and cannot be cascaded with other protective grounding cables. The protective grounding cable is connected to the nearest copper grounding bar. The independent pole is equipped with a lightning rod, and the equipment is within the protection scope of 45 degrees and grounded reliably. The wire lugs and bare wires of the power cable and the grounding cable are wrapped with tubes or insulating tape. There are no exposed copper wires.The copper lug type is consistent with the cable diameter. E q U i p m e nt POW e r— O n The power supply is connected properly, and the terminals of the power cable and grounding cable are crimped tightly. The copper lugs ZXSDR 338922 Power-On Procedure are fastened on binding posts through flat washer and spring washer. Troubleshoot the problem Cable installation The surplus grounding cable and power cable are cut off. All cables are complete and their insulating layers are in good condition. It is prohibited to splice two cables. Whether the output voltage of the power supply is normal The power cable, signal cables, and fiber pigtails are bundled by category and routed separately, with a spacing of 5 cm between each other. All cable connectors are connected securely. All DIN-type connectors and N-type connectors are fastened properly. The bending radius of all cables satisfy the requirement. Unused optical cables, optical channels, and sockets are equipped with protective caps. Black cable ties and white cable ties cannot be interchanged. White cable ties are used indoors and must be cut off at the end, without leaving any sharp edge. Black cable ties are used outdoors, and must be cutoff at the end with a 3-5 mm margin in case of expansion due to high temperature. Cable installation Troubleshoot the problem Power off the equipment Whether the input voltage of the equipment is normal .4 Whether the status of indicators is normal us'w00'aiZ'MMM/Izduu Losougzsst-99+ ilel EUNO'H‘d ‘Uetlzueus ‘uinos 9908 MOSHH ‘99 'ON £391va- 11 All cable labels are correct and pasted in the same direction. The outdoor feeder cable and GPS cable are grounded in accordance with relevant specifications. Power-On Steps: 1 Connect the power supply equipment to the junction box of the ZXSDR 388922, or switch on the air circuit breaker of the lightning protection box. 2 Observe the indicators to determine whether the ZXSDR B88922 is powered on successfully. if Note: The following describes the status of indicators when the ZXSDR 388922 is operating properly: 0 RUN (operating status indicator): flashing (lit for 0.3 s and not lit for 0.3 s) ALM (fault indicator): not lit OPT1IETH (link status indicator): flashing (lit for 0.3 s and not lit for 0.3 s) OPT2 (Ilnk status Indicator): flashing (lit for 0.3 s and not lit for 0.3 s) VSWR (SWR indicator): not llt ACT (cell status indicator): lit REF (clock reference indicator): flashing (lit for 0.3 s and not lit for 0.3 3) Closure Before leaving the installation site, make sure that the following jobs are completed: I Put away the tools. Put away the installation tools. I Recycle redundant materials. Recycle excess materials and hand them to the customer. I Clean up the installation site. Remove trash from the installation site to keep a clean environment. I Complete the installation report. Fill in the installation report and submit it to the person in charge. ZXSDR 888922 Outdoor UM TS Micro Base Station Engineering installation Guide - UO‘wOO'alZ'MMM/iiduu LOBOLLQZ'SSL'98+ ilal BUNO'a'd ‘Ueuzueus ‘Lunos P908 noel-m ‘99 'ON ZSSGJDPVI
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Create Date : 2016:07:08 09:38:11+08:00 Creator : Adobe Acrobat 9.0 Modify Date : 2016:07:08 09:38:11+08:00 XMP Toolkit : Adobe XMP Core 4.2.1-c041 52.342996, 2008/05/07-20:48:00 Metadata Date : 2016:07:08 09:38:11+08:00 Creator Tool : Adobe Acrobat 9.0 Format : application/pdf Document ID : uuid:682b7ef3-fc4a-4193-b932-0069dc8d8b41 Instance ID : uuid:61e92a77-1484-4b9b-b56a-d4990c0983e7 Producer : Adobe Acrobat 9.0 Image Conversion Plug-in Page Count : 20EXIF Metadata provided by EXIF.tools