ZTE R8882S8500 ZXSDR R8882 S8500 is Macro Radio Remote Unit User Manual III

ZTE Corporation ZXSDR R8882 S8500 is Macro Radio Remote Unit III

User Manual III

Download: ZTE R8882S8500 ZXSDR R8882 S8500 is Macro Radio Remote Unit User Manual III
Mirror Download [FCC.gov]ZTE R8882S8500 ZXSDR R8882 S8500 is Macro Radio Remote Unit User Manual III
Document ID1687502
Application IDYEThYhWD4MEelLb1eWRNYQ==
Document DescriptionUser Manual III
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize350.32kB (4379061 bits)
Date Submitted2012-05-01 00:00:00
Date Available2012-05-01 00:00:00
Creation Date2012-04-26 16:07:22
Producing SoftwarePDF Editor 2.0 - Foxit Software
Document Lastmod2012-04-26 16:07:22
Document TitleUser Manual III

ZXSDR R8882
Macro Radio Remote Unit
Hardware Installation Guide
Hardware Version: HV2.0
ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
Copyright © 2011 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited.
Additionally, the contents of this document are protected by
contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.
Revision History
Serial No.
Publishing Date
Publishing Reason
R1.1
2012–01–30
Modified the following sections:
R1.0
2011–11–30
Serial Number: SJ-20111021104623-004
Publishing Date: 2012–01-30 (R1.1)
1.1, Device Appearance
1.5, Installation Flow
3.2, Installation Assemblies
4.3, Connecting the DC Power Cable
Appendix C, Assembling the Portal Frame
First Edition
Contents
About This Manual ......................................................................................... I
Chapter 1 Installation Overview ................................................................ 1-1
1.1 Device Appearance ............................................................................................ 1-1
1.2 Preparation for Installation .................................................................................. 1-2
1.2.1 Environment Inspection ............................................................................ 1-2
1.2.2 Equipment Table ...................................................................................... 1-2
1.2.3 Tools and Meters List................................................................................ 1-2
1.3 Installation Space Requirement........................................................................... 1-3
1.4 Unpacking Inspection ......................................................................................... 1-5
1.4.1 Counting Goods ....................................................................................... 1-5
1.4.2 Unpacking Crate ...................................................................................... 1-6
1.4.3 Unpacking Carton .................................................................................... 1-6
1.4.4 Acceptance and Handover ........................................................................ 1-7
1.5 Installation Flow ................................................................................................. 1-7
Chapter 2 PIMDC Installation .................................................................... 2-1
2.1 Overview ........................................................................................................... 2-1
2.2 Installing the PIMDC on the Front of the Device ................................................... 2-2
2.3 Installing the PIMDC on the Side of the Device..................................................... 2-2
Chapter 3 Device Installation .................................................................... 3-1
3.1 Overview ........................................................................................................... 3-1
3.2 Installation Assemblies ....................................................................................... 3-2
3.3 Wall-Mounted Installation.................................................................................... 3-7
3.3.1 Using Mounting Kit 1 to Mount the Device on a Wall ................................... 3-7
3.3.2 Using Mounting Kit 2 to Mount the Device on a Wall ................................. 3-10
3.4 Pole-Mounted Installation.................................................................................. 3-14
3.4.1 Using Mounting Kit 1 to Mount the Device on a Pole................................. 3-14
3.4.2 Using Mounting Kit 2 to Mount the Device on a Pole................................. 3-17
3.5 Portal Frame-Mounted Installation ..................................................................... 3-23
3.5.1 Using Mounting Kit 1 to Mount the Device on a Portal Frame .................... 3-23
3.5.2 Using Mounting Kit 2 to Mount the Device on a Portal Frame .................... 3-25
3.6 Installing the Protection Shade .......................................................................... 3-26
Chapter 4 Cabling....................................................................................... 4-1
4.1 Flow of Connecting External Cables .................................................................... 4-1
4.2 Connecting the Protective Grounding Cable ......................................................... 4-2
4.3 Connecting the DC Power Cable ......................................................................... 4-3
4.4 Connecting the Optical Fiber ............................................................................... 4-7
4.5 Connecting the Monitoring Cable......................................................................... 4-9
4.6 Connecting the AISG Cable ...............................................................................4-11
4.7 Connecting the Feeder Jumper ......................................................................... 4-12
Chapter 5 Post-Installation Check ............................................................ 5-1
Chapter 6 Concluding Routines................................................................ 6-1
Appendix A Waterproofing Outdoor Connectors ................................... A-1
Appendix B Labeling Specifications ....................................................... B-1
Appendix C Assembling the Portal Frame.............................................. C-1
Figures............................................................................................................. I
Tables ............................................................................................................ III
Index ...............................................................................................................V
Glossary .......................................................................................................VII
II
About This Manual
Purpose
This manual describes how to install the ZXSDR R8882(take ZXSDR R8882 S9000(C)
as an example) including installation overview, PIMDC installation, device installation,
cabling, and post-installation check.
There are two types of protection shades which are optional parts, here we take the old
type for example to describe installation steps.
Intended Audience
This manual is intended for the following personnel:
Personnel who install ZXSDR R8882
Maintenance engineers
Related Documents
Before installation, installation personnel must read and understand the following
documents:
Personal Health and Safety Information
System Safety Information
Installation personnel should make sure that the following documents are kept handy:
ZXSDR
ZXSDR
ZXSDR
ZXSDR
ZXSDR
ZXSDR
ZXSDR
R8882 Product Description
R8882 Hardware Description
R8882 Project Survey Report
R8882 Environment Acceptance Report
R8882 Installation Design Drawing
R8882 Parts List
R8882 Tools and Meters List
What is in This Manual
Chapter
Summary
Chapter 1, Installation Overview
Describes the ZXSDR R8882 appearance,
installation preparations, unpacking inspection
and installation flow.
Chapter 2, PIMDC Installation
Describes the PIMDC installation.
Chapter 3, Device Installation
Describes three installation modes for R8882.
Chapter 4, Cabling
Describes R8882 external cables installation.
Chapter 5, Post-Installation Check
Describes post-installation check items.
Chapter
Summary
Chapter 6, Concluding Routines
Describes the follow-up tasks after installation.
Appendix A, Waterproofing Outdoor Connectors
Describes how to connect and seal outdoor
connectors.
Appendix B, Labeling Specifications
Describes labeling specifications.
Appendix C, Assembling the Portal Frame
Describes how to install the portal frame.
Conventions
ZTE documents employ the following typographical conventions.
Typeface
Meaning
Italics
References to other Manuals and documents.
“Quotes”
Links on screens.
Bold
Menus, menu options, function names, input fields, radio button names,
check boxes, drop-down lists, dialog box names, window names.
CAPS
Keys on the keyboard and buttons on screens and company name.
Note: Provides additional information about a certain topic.
Checkpoint: Indicates that a particular step needs to be checked before
proceeding further.
Tip: Indicates a suggestion or hint to make things easier or more productive
for the reader.
II
Chapter 1
Installation Overview
Table of Contents
Device Appearance ....................................................................................................1-1
Preparation for Installation..........................................................................................1-2
Installation Space Requirement ..................................................................................1-3
Unpacking Inspection .................................................................................................1-5
Installation Flow .........................................................................................................1-7
1.1 Device Appearance
Figure 1-1 shows the ZXSDR R8882 device appearance.
Figure 1-1 ZXSDR R8882
1-1
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Dimensions: 480 mm (height) × 320 mm (width) × 150 mm (depth)
Weight: 27 kg
1.2 Preparation for Installation
1.2.1 Environment Inspection
Before installing the device, installation personnel should make sure that the site
environment is inspected and the Environment Acceptance Report is issued.
1.2.2 Equipment Table
This table gives the Materiel Description and Quantity required installing a ZXSDR R8882.
Table 1-1 ZTE Parts and Equipment List for a RRU
Material Name
Quantity
R8882 (RRU)
RRU engineering accessory
RRU installation assembly
(wall-mounted installation assembly,
pole-mounted installation assembly, or
L-shaped portal frame)
Device hook (U-shaped hook)
0–2 (used for Mounting Kit 1)
RRU mounting piece
0–1 (used for Mounting Kit 2)
RRU protection shade
0–1 (used for the RRU base)
RRU external cable
PIMDC
0–1 (used when the R8882 has no built-in
lightning arrester, currently does not supporting
AC)
PIMDC mounting piece
0–1 (optional, used to secure the PIMDC to the
front or flank sides of the R8882)
1.2.3 Tools and Meters List
This table lists tools and meters required installing ZXSDR R8882.
1-2
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 1 Installation Overview
Table 1-2 Tools and Meters List
Item
List
General-purpose
Measuring and ruling
5 m steel tape, 1 m ruler, gradienter, marker, drilling
tools
tools
template (delivered with the device)
Drilling tools
Electric percussion drill (auxiliary drill bits) and vacuum
cleaner
Tightening tools
Cross screwdrivers (M3–M6), Allen key (M6),
adjustable wrench (M10), and torque wrench
Small tools
Snipe-nose pliers, diagonal pliers, vices, file, hacksaw,
and hydraulic pressure pliers
Auxiliary tools
Chain wheel, Ladder, Rope, scissors, slip-proof
gloves, safety helmet, connector card, paintbrush, and
hot air blower
Special-purpose tools
Multi-functional crimping pliers and feeder connector
knife
Meters
Digital multimeter, VSWR tester, earth resistance
tester, base station tester, compass, field strength
tester (for special purpose), and spectrum analyzer
(for special purpose)
1.3 Installation Space Requirement
Figure 1-2 shows the recommended space for installing ZXSDR R8882.
1-3
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Figure 1-2 Recommended Space for Installing ZXSDR R8882 (Unit: mm)
Figure 1-3 shows the minimum space for installing ZXSDR R8882.
1-4
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 1 Installation Overview
Figure 1-3 Minimum Space for Installing ZXSDR R8882 (Unit: mm)
1.4 Unpacking Inspection
1.4.1 Counting Goods
Prerequisite
The goods have been delivered to the site for installation.
Context
The goods counting needs to be jointly completed by the engineer- ing technicians from
both ZTE and the operator.
Steps
1. Count the total number of cargos, the status of packing crate and the shipping address
on the cargo need to be checked. When all inspections are passed, start the unpacking
inspection.
1-5
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
2. Equipment check list and unpacking inspection report are packed in crate #1. The
unpacking inspection report need to be checked out and archived first.
3. If any goods missing, default, wrong equipments, inaccuracy in number or damages
are found, the Feedback For Unpacking Inspection needs to be filled out by
engineering supervisor with relevant reason. It should be send back to ZTE as soon
as possible for processing.
– End of Steps –
1.4.2 Unpacking Crate
Context
The required tools are claw hammer, pliers, straight screw driver and crow bar.
Steps
1. Insert a straight screw driver or a claw hammer into the metal lock on the cover of the
wooden crate. Rotate the screw driver or the claw hammer to loosen the iron sheet.
Then open it with crow bar and pliers.
2. Open up all the other metal locks on the wooden crate top surface and remove the top
cover.
3. Take out the carton from the wooden crate.
– End of Steps –
1.4.3 Unpacking Carton
Context
Cartons are generally used for packing spare parts for electronic equipments, terminal
devices and ancillary materials. Spare parts for electronic equipments are delivered in
static-free bags. The static-free protective measures are needed when unpacking.
Unpacking tools: Oblique clamp, paper cutter
Follow the two points during the unpacking process:
The static-free bag should not be broken for future storage or repair purpose.
Desiccant in the carton should be properly disposed and be kept away from children.
Steps
1. Cut off packing bands with the oblique clamp.
2. Slice along the tapes on the edges of the case cover and mind the depth when cutting.
3. Open up the carton and take out the bubbles.
4. Check out the goods according to the check list attached to the carton.
1-6
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 1 Installation Overview
5. Take out the static-free bag.
6. Open up the static-free bag and take out the electronic device.
– End of Steps –
1.4.4 Acceptance and Handover
Steps
1. Inspection
Check the good's name, model, number etc against the packing list. Verify each goods
according to the following items:
Any concave, convex, scratches, peeling, blistering, blot outside the case.
Any paint stripping, scratches on the case.
Any loosing screw, drop bolts or dislocation.
Any missing parts.
Place the goods inspected by categories.
2. Delivery
The customer representative and engineering supervisor need to sign on the
Unpacking inspection report after the inspection. If the contract specifies the goods be
kept by the customer after the inspection, both parties need to sign on the Unpacking
Inspection Report and transfer the goods to the customer.
– End of Steps –
1.5 Installation Flow
Figure 1-4 shows the flowchart of installing ZXSDR R8882, including PIMDC installation,
device installation, and cabling.
1-7
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Figure 1-4 Flowchart of Installing ZXSDR R8882
1-8
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 2
PIMDC Installation
Table of Contents
Overview ....................................................................................................................2-1
Installing the PIMDC on the Front of the Device .........................................................2-2
Installing the PIMDC on the Side of the Device...........................................................2-2
2.1 Overview
Figure 2-1 shows the appearance of the power interface module DC (PIMDC).
Figure 2-1 PIMDC Appearance
The dimensions of a PIMDC are 233.2 mm (Height) × 119 mm (Width) × 55 mm (Depth).
If the device is configured with a PIMDC , installation personnel can install the PIMDC onto
the device before installing the device. The PIMDC can be installed on the front or side of
the device.
2-1
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
2.2 Installing the PIMDC on the Front of the Device
Steps
1. Put the PIMDC mounting piece in place and align the holes on the PIMDC mounting
piece with the mounting holes on the device.
2. Tighten the four M6 screws with a screwdriver, as shown in Figure 2-2.
Figure 2-2 Securing the PIMDC Mounting Base on the Front of the Device
3. Place the PIMDC on the mounting piece and tighten the two captive screws with a
screwdriver, as shown in Figure 2-3.
Figure 2-3 Securing the PIMDC on the Front of the Device
– End of Steps –
2.3 Installing the PIMDC on the Side of the Device
Steps
1. Unscrew the four screws on the left side of the RRU with an Allen key.
2-2
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 2 PIMDC Installation
2. Put the PIMDC mounting piece in place and tighten the four M6 screws with an Allen
key, as shown in Figure 2-4.
Figure 2-4 Securing the PIMDC Mounting Base on the Side of the Device
3. Place the PIMDC on the mounting piece and tighten the two captive screws with a
screwdriver, as shown in Figure 2-5.
Figure 2-5 Securing the PIMDC on the Side of the Device
– End of Steps –
2-3
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
This page intentionally left blank.
2-4
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3
Device Installation
Table of Contents
Overview ....................................................................................................................3-1
Installation Assemblies ...............................................................................................3-2
Wall-Mounted Installation ...........................................................................................3-7
Pole-Mounted Installation .........................................................................................3-14
Portal Frame-Mounted Installation............................................................................3-23
Installing the Protection Shade .................................................................................3-26
3.1 Overview
Depending on the configured installation assemblies, installation personnel can install
ZXSDR R8882 in one of the following modes:
Wall-mounted installation
Pole-mounted installation
Portal frame-mounted installation
The following table describes the installation positions supported by the installation
assemblies of ZXSDR R8882.
Table 3-1 Installation Positions Supported by the Installation Assemblies of ZXSDR
R8882
Installation Position
Description
Round pole
φ60 mm–φ120 mm (GB/T8162-99, φ60, φ76, φ89, and φ114):
supports single-unit, double-unit, triple-unit, and quadro-unit
solutions.
φ40 mm–φ60 mm:
supports only single-unit and double-unit solutions.
Channel steel
60 mm–100 mm (GB/T707—1988 6.3, 6.5, 8, and 10): supports
the single-unit solution.
Angle steel
63 mm–100 mm (angle steel No. 6.3, 7, 7.5, 8, 9, and 10): supports
the single-unit solution.
High-speed railway tunnel
Supports the single-unit solution. Installation personnel can use
some assembly parts of the wall-mounted mode and design some
new assembly parts as required. The designed assembly parts
should support the RRU installation interfaces.
3-1
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Installation Position
Description
Indoor/Outdoor wall
Supports the single-unit solution. The assembly parts are the same
as that in pole-mounted mode.
Indoor portal frame
Supports four RRUs. The assembly parts are the same as that
in pole-mounted mode.
3.2 Installation Assemblies
Based on the installation mode and installation assembly, installation personnel can install
ZXSDR R8882 in one of the following six ways:
Use mounting kit 1 to mount the device on a wall.
Use mounting kit 2 to mount the device on a wall.
Use mounting kit 1 to mount the device on a pole.
Use mounting kit 2 to mount the device on a pole.
Use mounting kit 1 to mount the device on a portal frame.
Use mounting kit 2 to mount the device on a portal frame.
Installation Assembly of Mounting Kit 1 (Wall-Mounted)
Table 3-2 describes the installation assembly of mounting kit 1 for wall-mounted installation.
Table 3-2 Installation Assembly of Mounting Kit 1 (Wall-Mounted)
Name
Appearance
Function
Wall mounting assembly
It is used to mount ZXSDR
R8882 on a wall.
Device hook (U-shaped hook)
Install two U-shaped hooks
at the back of the device to
connect and secureZXSDR
R8882
Installation Assemblies of Mounting Kit 2 (Wall-Mounted)
Table 3-3 describes the installation assemblies of mounting kit 2 for wall-mounted
installation.
3-2
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3 Device Installation
Table 3-3 Installation Assemblies of Mounting Kit 2 (Wall-Mounted)
Name
Appearance
Function
Wall mounting assembly
It is used to mount ZXSDR
R8882 on a wall.
RRU mounting base
It is installed on the back
or side of ZXSDR R8882 to
secure ZXSDR R8882 on
the wall mounting assembly,
pole mounting assembly,
parallel mounting base, or pole
mounting clamp.
Installation Assemblies of Mounting Kit 1 (Pole-Mounted)
Table 3-4 describes the installation assemblies of mounting kit 1 for pole-mounted
installation.
Table 3-4 Installation Assemblies of Mounting Kit 1 (Pole-Mounted)
Name
Appearance
Wall mounting assembly
Function
It is used to mount ZXSDR
R8882.
Pole mounting piece
It is used to secure ZXSDR
R8882 on a pole.
3-3
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Name
Appearance
Function
Device hook (U-shaped hook)
Install two U-shaped hooks
at the back of the device to
connect and secureZXSDR
R8882
Extension piece
It is used to extend the pole
mounting piece to mount
ZXSDR R8882 with the wall
mounting assembly.
Installation Assemblies of Mounting Kit 2 (Pole-Mounted)
Table 3-5 describes the installation assemblies of mounting kit 2 for pole-mounted
installation.
Table 3-5 Installation Assemblies of Mounting Kit 2 (Pole-Mounted)
Name
Appearance
Pole mounting assembly
Function
It is used to secure ZXSDR
R8882 on a pole.
Parallel mounting base
It is used to mount three ZXSDR
R8882s on a pole. One parallel
mounting base can mount two
ZXSDR R8882s. The parallel
mounting base is located
between the RRU mounting
base and pole mounting piece.
RRU mounting base
It is installed on the back
or side of ZXSDR R8882 to
secure ZXSDR R8882 on
the wall mounting assembly,
pole mounting assembly,
parallel mounting base, or pole
mounting clamp.
3-4
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3 Device Installation
Installation Assemblies of Mounting Kit 1(Portal Frame-Mounted)
Table 3-6 describes the installation assemblies of the mounting kit 1 for portal
frame-mounted installation.
Table 3-6 Installation Assemblies of the Mounting Kit 1 (Portal Frame-Mounted)
Name
Appearance
Portal frame
Function
It is fixed on the indoor floor to
mount the mounting panel.
Mounting panel
It is installed on the portal frame
to secure ZXSDR R8882.
Device hook (U-shaped hook)
Install two U-shaped hooks
at the back of the device to
connect and secureZXSDR
R8882
3-5
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Installation Assemblies of Mounting Kit 2 (Portal Frame-Mounted)
Table 3-7 describes the installation assemblies of mounting kit 2 for portal frame-mounted
installation.
Table 3-7 Installation Assemblies of Mounting Kit 2 (Portal Frame-Mounted)
Name
Appearance
Portal frame
Function
It is fixed on the indoor floor to
mount the pole mounting clamp.
Pole mounting clamp
It is installed on the portal frame
to secure ZXSDR R8882.
Transition board
It is used to secure the pole
clips to the portal frame.
3-6
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3 Device Installation
Name
Appearance
RRU mounting base
Function
It is installed on the back
or side of ZXSDR R8882 to
secure ZXSDR R8882 on
the wall mounting assembly,
pole mounting assembly,
parallel mounting base, or pole
mounting clamp.
3.3 Wall-Mounted Installation
3.3.1 Using Mounting Kit 1 to Mount the Device on a Wall
Steps
1. Identify the installation position on the wall and draw lines: Draw lines on the wall by
using the drilling template and mark the four drilling positions, as shown in Figure 3-1.
Figure 3-1 Drilling Positions
3-7
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
2. Drill holes and install expansion bolts: Drill four Ф16 mm×80 mm holes at the marked
drilling positions by using a percussion drill and install expansion bolts. Use a vacuum
cleaner to clean the dust when drilling holes.
3. Secure the wall mounting assembly: Secure the wall mounting assembly on the wall
with the nuts removed from the expansion bolts, as shown in Figure 3-2.
Figure 3-2 Securing the Wall Mounting Assembly
1. Nut
2. Spring washer
3. Flat washer
4. Insulation washer
5. Wall mounting
assembly
6. Insulation plate
7. Expansion bolts
4. Install device hooks (two U-shaped hooks): Use the 12 M16 bolts disassembled from
the ZXSDR R8882 to secure the two U-shaped hooks to the back of the device. See
Figure 3-3.
3-8
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3 Device Installation
Figure 3-3 Install Device Hooks (Two U-shaped Hooks)
5. Mount the device on the wall mounting assembly: Hang ZXSDR R8882 on the hook
on the wall mounting assembly, as shown in Figure 3-4.
Figure 3-4 Mounting the Device on the Wall Mounting Assembly
6. Secure the device: Secure ZXSDR R8882 on the wall mounting assembly with four
M6 screws, as shown in Figure 3-5.
3-9
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Figure 3-5 Securing the Device
– End of Steps –
3.3.2 Using Mounting Kit 2 to Mount the Device on a Wall
Steps
1. Identify the installation position on the wall and draw lines: Draw lines on the wall by
using the drilling template and mark the four drilling positions, as shown in Figure 3-6.
3-10
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
Chapter 3 Device Installation
Figure 3-6 Drilling Positions
2. Drill holes and install expansion bolts: Drill four Ф16 mm×80 mm holes at the marked
drilling positions by using a percussion drill and install expansion bolts. Use a vacuum
cleaner to clean the dust when drilling holes.
3. Secure the wall mounting assembly: Secure the wall mounting assembly on the wall
with the nuts removed from the expansion bolts, as shown in Figure 3-7.
3-11
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential
ZXSDR R8882 Hardware Installation Guide
Figure 3-7 Securing the Wall Mounting Assembly
4. Install the RRU mounting base on the back of the device: Align the holes on the back
of the device with the holes on the RRU mounting base and secure the RRU mounting
base on the back of the device with four M6 screws, as shown in Figure 3-8.
Figure 3-8 Installing the RRU Mounting Base on the Back of the Device
5. Mount and secure the device: Mount the RRU mounting base on the wall mounting
assembly, push the locking shim to lock the RRU mounting base, and then tighten the
two screws on the locking shim, as shown in Figure 3-9 and Figure 3-10.
3-12
SJ-20111021104623-004|2012–01-30 (R1.1)
ZTE Proprietary and Confidential

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : No
Page Count                      : 30
Producer                        : PDF Editor 2.0 - Foxit Software
Author                          : 
Create Date                     : 2012:04:26 16:07:22
Modify Date                     : 2012:04:26 16:07:22
EXIF Metadata provided by EXIF.tools
FCC ID Filing: Q78-R8882S8500

Navigation menu