Installation Guide for BACKYARD models including: BACKYARD, Gable Shed, GABLE 12 x 12

GABLE 12' x 12' (365,8 x 365,8 cm)

79 96” (243,8 cm) 96” (243,8 cm) 144" (365,8 cm) 144" (365,8 cm) Place two rafter-halves AD in the corner of back and side walls, fl ush to panels and studs. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg.A).

GABLE 12' x 12' (365,8 x 365,8 cm)

assembly manual keep this manual for future reference building size actual floor size base model 12' x 12' (365,8 x 365,8 cm) ... 16490 03/01/2021 part 2

https://media.tractorsupply.com/is/content/TractorSupplyCompany/tsc/product/1/65/70/93/1657093 Man2

12 X 365 — What is 365 times 12? - Answers Lawrence Frames. $34.57. reg $36.94. Sale. Sold and shipped by MyOfficeInnovations. a Target Plus™ partner. Free standard shipping with $35 orders. Not in stores. Visit Page GABLE 12' x 12' (365,8 x 365,8 cm)

Not Your Device? Search For Manuals / Datasheets:

File Info : application/pdf, 46 Pages, 3.58MB

Document
1657093 Man2
PART 2 ASSEMBLY MANUAL
GABLE 12' x 12' (365,8 x 365,8 cm)

16490

03/01/2021

BASE MODEL +1: 12' x 4' Extender +1: 12' x 8' Extender +1: 12' x 8' and +1: 12' x 4' Extender

BUILDING SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm)

ACTUAL FLOOR SIZE 12' x 12' (365,8 x 365,8 cm)
12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm)

KEEP THIS MANUAL FOR FUTURE REFERENCE

Base Building +1 Extender 12' x 16'

Base Building 12' x 12'

.... continued from PART 1

(Continued from PART 1, page 78.)

12x12' 12x16' 12x20' 12x24'

RAFTERS

PARTS REQUIRED:

x12 x16 x20 x24

6 x 24" (15,2 x 60,9 cm)

x1 OO

Temporary Support

69" (175,3 cm) Door Stiffener

x14 x18 x22 x26 ADA
2 x 4 x 77-15/16" (5,1 x 10,2 x 198 cm)

x144 x192 x240 x288

2" (5,1 cm)

Build (2) rafter assemblies with (1) gusset (Fig. B).

BEGIN
1 Place two rafter-halves AD in the corner of back and side walls, flush to panels and studs. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A).

Flush

1/4"

1/4"

(1,9 cm)

(1,9 cm)

144" (365,8 cm)

Fit base of rafters in corners of back wall.

Fig. A

HINT: Use floor and walls to help
assemble rafters!

Temporary support (OO)

SET ASIDE THESE TWO RAFTER ASSEMBLIES.

Flush at peak

Depending on your shed size, build rafters with (2) gussets (Fig. C).
2 Place two rafter-halves on floor and flush in the corners of wall and RL, as shown in STEP - 1. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A).
3 Flip over rafter assembly and fasten second gusset to other side with 2" nails (FIg. C).

Fig. B - Build 2 for all sizes

Fig. C

14946"" (3(62543,8,8ccmm))
x2 1-GUSSET RAFTERS
FINISH
Your rafters are now assembled. Remove RL and screws from floor.

19464" " ((326453,,88 ccmm))
2-GUSSET RAFTERS
12x12' 12x16' 12x20' 12x24'
x5 x7 x9 x11 79

PARTS REQUIRED:

12x12' 12x16' RAFTER INSTALLATION

x5 x28

x7 x36

2-Gusset Preassembled

x2

1-Gusset Preassembled

3" (7,6 cm)

BEGIN
1 Align rafters over the wall studs.
Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side.

Maintain the measurements between rafters.

12' x 12'

DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS.

DIMENSIONS TO CENTER OF RAFTERS.

24-3/8" (61,9 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24-3/8" (62 cm)

Rafter with ONE GUSSET facing inward.

Rafter with ONE GUSSET facing inward.

Flush to outside of panel

Fig. A

ALIGN OVER STUDS

3" (7,6 cm) Screws angled into top plate

Flush to inside of panel

Flush to outside of panel
Fig. B

Maintain the measurements between rafters.

12' x 16'

DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS.

24-3/8" (61,9 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24-3/8" (62 cm)

Fig. A
FINISH
Your rafters are now installed.

ALIGN OVER STUDS

3" (7,6 cm) Screws angled into top plate
80

Flush to inside of panel

Fig. B

12x20' 12x24'
PARTS REQUIRED:
x9 x11
x44 x52

RAFTER INSTALLATION

2-Gusset Preassembled

x2

1-Gusset Preassembled

3" (7,6 cm)

BEGIN
1 Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side.
Maintain the measurements between rafters.

12' x 20'

DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS.

24-3/8" (61,9 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24-3/8" (62 cm)

Rafter with ONE
GUSSET facing
inward.
Flush to outside of panel

Fig. A

ALIGN OVER STUDS

3" (7,6 cm) Flush to inside

Screws angled

of panel

into top plate

Rafter with ONE GUSSET facing inward.
Flush to outside of panel
Fig. B

Maintain the measurements between rafters.

12' x 24'
24-3/8" (61,9 cm)

24" (61 cm)

24" (61 cm)

DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS.

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24" (61 cm)

24-3/8" (62 cm)

Rafter with ONE
GUSSET facing
inward.
Flush to outside of panel

Fig. A

FINISH
Your rafters are now installed.

ALIGN OVER STUDS

3" (7,6 cm) Screws angled into top plate
81

Flush to inside of panel

Fig. B

Rafter with ONE GUSSET facing inward.
Flush to outside of panel

PARTS REQUIRED: x4 AF

GABLE UNITS

2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm)

x32

1-1/2" (3,8 cm)

x2

x2

x2

Install gable panels with the primed side facing up.
BEGIN
1 Place middle panel on (2) AF. Arrange parts to measurements shown. Secure panel with 1-1/2" nails spaced 6" apart along edge. Check measurements as you build the gable unit.

2 Place left and right panels on AF, flush to middle panel. Secure panel with 1-1/2" nails spaced 6" apart along edge.
Mark the center of the middle gable panel.

AF

AF

Flush

6" (15,2 cm) Window hole of front panel

1-3/4" (4,4 cm)

1-3/4" (4,4 cm)

Flush

2-9/16" (6,5 cm)

Flush

Mark 144" (365,8 cm)

Flush

2-9/16" (6,5 cm)

Repeat steps to assemble the 2nd gable unit.

FINISH
Your (2) gable units are now assembled.
82

PARTS REQUIRED:
x2 Preassembled

GABLE INSTALLATION
x8 x118

3" (7,6 cm) 2" (5,1 cm)

BEGIN
1 Measure 2-9/16" (6,5 cm) down from top plate doubler and mark at each side as shown. Set gable unit on top plate. Fasten with (1) 2" nail on each side.
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING. Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart.

2 Secure gable panels to rafter with with 2" nails spaced 6" apart.

3 Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A).

6" (15,2 cm)

AF
Window hole of front panel

NAIL FIRST 2" (5,1 cm)

2-9/16" (6,5 cm) Measure and Mark

Fig. A

6" (15,2 cm)

DOUBLER

3" (7,6 cm) Screws

2-9/16" (6,5 cm) Measure and Mark

NAIL FIRST 2" (5,1 cm)

Repeat steps to install the opposite side gable.
FINISH
Your gable units are now installed.
83

PARTS REQUIRED:

12' x 12' ROOF PANELS
x4

3/4" GAUGE

7/16 x 48 x 96"

BLOCK

x1

(1,1 x 121,9 x 243,8 cm)

Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines).
BEGIN
1

Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig. A) and the panel flush at the peak (Fig. B).
Secure panel with (2) 2" nails in the corners.

Two Nails

Gauge Block

3/4" (1,9 cm)
Fig. A

48" x 96"

2" (5,1 cm)

Fig. B

Flush at peak

2
Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 1/2" measurement on the gable end rafter (Fig. C).
Secure panel with (2) 2" nails in the corners.

Fig. B

Flush at peak

1/2" (1,2 cm)
Fig. C
Gable End Rafter
84

Move Gable

Two Nails

PARTS REQUIRED:

12' x 12' ROOF PANELS
x12

47-7/8 x 48"

x1

(121,6 x 121,9 cm)

3
Install a 23-7/8" x 48" roof panel flush to the installed panel and flush at peak (Fig. B).

1/2" (1,2 cm)

Secure panel with (1) 2" nail in each corner. Fig. C

Move Gable

2" (5,1 cm)

Fig. B

Flush at peak

4

Gable End Rafter

Move the gable end rafter edge until it

is 1/2" from the 23-7/8" x 48" roof panel

(Fig. C).

Finish securing panel with (1) 2" nail in each corner.

47-7/8" x 48"

Flush

2" nail in each corner

5 Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D).
Secure panels with (1) 2" nail into each rafter, as shown.
Move to the top of the panel and keep spacing between the center of the rafters.
Secure panels with (1) 2" nail into each rafter.
Fig. D
NOTE: Measurements from inside of gable panels

24-3/8" (61,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24-3/8" (61,9 cm)

2" (5,1 cm) Nails
85

PARTS REQUIRED:

12' x 12' ROOF PANELS
x8

x1
36-1/2" x 96" (60,692,7

x1
36-1/2" x 47-7/8" (91,7 x 121,9 cm)

3/4" GAUGE BLOCK

2" (5,1 cm)

6 Next, install 36-1/2" x 47-7/8" and 36-1/2" x 96" roof panels with a 3/4" measurement on the rafter (Fig A) and flush to the installed panels (Fig. E).
Secure panels with (1) 2" nail in each corner.

2" (5,1 cm) Nails

3/4" (1,9 cm)
Fig. A Gauge Block
Flush

36-1/2" x 96"

Flush
Flush
36-1/2" x 47-7/8"

86

PARTS REQUIRED:

12' x 12' ROOF PANELS
x168

2" (5,1 cm)

7 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels.

6" (15,2 cm)

(30,152c"m)

Repeat all steps to install roof panels on the opposite side.
FINISH
Your roof panels are now installed.
87

PARTS REQUIRED:

12' x 16' ROOF PANELS
x4

2" (5,1 cm)

3/4" GAUGE

48 x 96"

BLOCK

x1

(121,9 x 243,8 cm)

Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines).
BEGIN
1
Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B).

Secure panel with (1) 2" nail in each corner.

Fig. B

Flush at peak

Gauge Block Fig. A
3/4" (1,9 cm)

48" x 96" Two Nails

2
Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B).
Move gable end rafter edge until it is 1/2" from the panel (Fig. C).
Secure panel with (1) 2" nail in each corner.

1/2" (1,2 cm)

Fig. C

Gable End Rafter
88

Fig. B

Flush at peak

Move Gable

Two Nails

PARTS REQUIRED:
x2

12' x 16' ROOF PANELS

47-7/8 x 48" (121,6 x 121,9 cm)

x18

2" (5,1 cm)

3 Install first 47-7/8" x 48" roof

1/2" (1,2 cm)

panel flush to the installed panel

and flush at the peak.

Fig. C

Secure panel with (1) 2" nail

in each corner.

Move to the opposite end.

Gable End Rafter

Using the unattached end of

the panel as a lever, move the panel

side-to-side until the top corner is

flush to the peak (Fig. B) and there is

a 3/4" measurement on the rafter

(Fig A).

Finish securing panel with (1) 2" nail

in each corner.

Move Gable

47-7/8" x 48"

Flush

4

Gauge Block

Install next 48" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B).
Secure panel with (1) 2" nail in each
corner.

Fig. A
3/4" (1,9 cm)

Move gable end rafter edge until it is 1/2" from the 2nd 48" x 48" roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner.

Fig. B
47-7/8" x 48"
Flush 2" nail in each corner

5
Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter.

Fig. D
NOTE: Measurements from inside of gable panels

Flush at peak

24-3/8" (62,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24-3/8" (62,9 cm)

2" (5,1 cm) Nails
89

PARTS REQUIRED:

12' x 16' ROOF PANELS
x12

x1
36-1/2" x 96" (60,692,7

x2
36-1/2" x 47-7/8" (91,7 x 121,9 cm)

3/4" GAUGE BLOCK

2" (5,1 cm)

6 Next, install 36-1/2" x 96" with a 3/4" measurement on the rafter (Fig A), and flush to the installed panels. Secure panel with (1) 2" nail in each corner.

2" (5,1 cm) Nails

Flush

3/4" (1,9 cm)
Fig. A Gauge Block

36-1/2" x 47-7/8"

Flush Flush
36-1/2" x 96"

Flush

Flush
36-1/2" x 47-7/8"

7 Instal (2) 36-1/2" x 47-7/8" roof panels flush to the installed panels in the following order: Secure panels with (1) 2" nail in each corner.

90

PARTS REQUIRED:

12' x 16' ROOF PANELS
x236

2" (5,1 cm)

8 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels.

6" (15,2 cm)

(30,152c"m)

Repeat all steps to install roof panels on the opposite side.
FINISH
Your roof panels are now installed.
91

PARTS REQUIRED:

12' x 20' ROOF PANELS
x4

3/4" GAUGE

48 x 96"

BLOCK

x1

(121,9 x 243,8 cm)

Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines).
BEGIN
1
Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B).

Secure panel with (1) 2" nail in each corner.

2" (5,1 cm)

Fig. B

Flush at peak

Gauge Block Fig. A

48" x 96"
Two Nails

3/4" (1,9 cm)

2
Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B).
Move gable end rafter edge until it is 1/2" from the panel (Fig. C).
Secure panel with (1) 2" nail in each corner.

1/2" (1,2 cm)

Fig. C

Gable End Rafter
92

Fig. B

Flush at peak

Move Gable

Two Nails

PARTS REQUIRED:

12' x 20' ROOF PANELS

48 x 96"

x1 (121,9 x 243,8 cm)

x1

x22
47-7/8 x 48" (121,6 x 121,9 cm)

2" (5,1 cm)

3

Install next 48" x 96" roof panel flush to the installed panel and

Fig. C

flush at the peak.

Secure panel with (1) 2" nail

in each corner.

Gable End Rafter

Move to the opposite end. Using the unattached end of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A). Finish securing panel with (1) 2" nail in each corner.

1/2" (1,2 cm)

Move Gable

47-7/8" x 48"

Flush

4
Install a 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner.

Gauge Block
Fig. A
3/4" (1,9 cm)

Fig. B

Flush at peak

48" x 96"
Flush

2" nail in each corner

Move gable end rafter edge until it is 1/2" from the roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner.

5
Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter.
Fig. D
NOTE: Measurements from inside of gable panels

24-3/8" (62,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24-3/8" (62,9 cm)

2" (5,1 cm) Nails
93

PARTS REQUIRED:

12' x 20' ROOF PANELS
x12

x1
36-1/2" x 96" (60,692,7

x2
36-1/2" x 47-7/8" (91,7 x 121,9 cm)

3/4" GAUGE BLOCK

6 Next, install 36-1/2" x 96" roof panel with a 3/4" measurement on the rafter (Fig A). Secure panel with (1) 2" nail in each corner.

2" (5,1 cm)

2" (5,1 cm) Nails

Flush

36-1/2" x 96"

Flush

3/4" (1,9 cm)
Fig. A Gauge Block

Flush
36-1/2" x 96"

Flush
Flush
36-1/2" x 47-7/8"

7 Install 2nd 36-1/2" x 96" and 36-1/2" x 47-7/8" roof panels flush to the installed panels. Secure panels with (1) 2" nail in each corner.

94

PARTS REQUIRED:

12' x 20' ROOF PANELS
x268

2" (5,1 cm)

8 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels.

6" (15,2 cm)

(30,152c"m)

Repeat all steps to install roof panels on the opposite side.
FINISH
Your roof panels are now installed.
95

PARTS REQUIRED:

12' x 24' ROOF PANELS
x4

2" (5,1 cm)

3/4" GAUGE

48 x 96"

BLOCK

x1

(121,9 x 243,8 cm)

Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines).
BEGIN
1
Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B).

Secure panel with (1) 2" nail in each corner.

Fig. B

Flush at peak

Gauge Block

3/4" (1,9 cm)

Fig. A

48" x 96" Two Nails

2
Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B).
Move gable end rafter edge until it is 1/2" from the panel (Fig. C).
Secure panel with (1) 2" nail in each corner.

1/2" (1,2 cm)

Fig. C

Gable End Rafter
96

Fig. B

Flush at peak

Move Gable

Two Nails

PARTS REQUIRED:

12' x 24' ROOF PANELS

48 x 96"

x1 (121,9 x 243,8 cm)

x2

x28
47-7/8 x 48" (121,6 x 121,9 cm)

2" (5,1 cm)

3
Install 2nd 48" x 96" roof panel flush to the installed panel, and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner.

1/2" (1,2 cm)
Fig. C

Move Gable

Move to the opposite end.

Gable End Rafter

Using the unattached end of

the panel as a lever, move the panel

side-to-side until the top corner is

flush to the peak (Fig. B) and there is

a 3/4" measurement on the rafter

(Fig A).

Finish securing panel with (1) 2" nail

in each corner.

Flush

47-7/8" x 48"

Flush

47-7/8" x 48"

Gauge Block

4
Install 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner.

Fig. A
3/4" (1,9 cm)

Move to the opposite end. Using the unattached end
of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A).
Finish securing panel with (1) 2" nail in each corner.

Fig. B

Flush at peak

2" nail

48" x 96"

in each corner

Flush

5
Install 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner.
Move gable end rafter edge until it is 1/2" from the 2nd 48" x 48" roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner.

6
Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter.
Fig. D
NOTE: Measurements from inside of gable panels

24-3/8" (62,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24" (60,9 cm)

24-3/8" (62,9 cm)

2" (5,1 cm) Nails
97

PARTS REQUIRED:

12' x 24' ROOF PANELS
x16

x1
36-1/2" x 96" (60,692,7

x2
36-1/2" x 47-7/8" (91,7 x 121,9 cm)

3/4" GAUGE BLOCK

2" (5,1 cm)

7 Install (1) 36-1/2" x 96" roof panels with a 3/4" measurement on the rafter at each side (Fig A), and flush to the installed panels.
Secure panels with (1) 2" nail in each corner.

2" (5,1 cm) Nails

Flush

36-1/2" x 47-7/8"

Flush

Flush

36-1/2" x 96"
3/4" (1,9 cm)
Gauge Block

Flush
36-1/2" x 96"

Fig. A

Flush

Flush

Flush

36-1/2" x 47-7/8"

8 Install 2nd 36-1/2" x 96" flush to the installed panels and with a 3/4" measurement on the rafter (Fig A). Secure panel with (1) 2" nail in each corner. Install (2) 36-1/2" x 47-7/8" roof panels flush to the installed panels.. Secure panels with (1) 2" nail in each corner.
98

PARTS REQUIRED:

12' x 24' ROOF PANELS
x336

2" (5,1 cm)

9 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels.
6" (15,2 cm)

(30,51c2m")

Repeat all steps to install roof panels on the opposite side.
FINISH
Your roof panels are now installed.
99

GABLE TRIM

PARTS REQUIRED:

x64

x2

CQR

19/32" x 3-1/2" x 84-15/16" (1,5 x 8,9 x 215,7 cm)

x2

CQL

19/32" x 3-1/2" x 84-15/16" (1,5 x 8,9 x 215,7 cm)

2" (5,1 cm)

BEGIN
1 Install gable trim CQR and CQL flush to top of roof panel and flush at peak, as shown. Secure trim with 2" finish nails spaced evenly.

CQL

Flush at peak Flush

Flush

Flush to roof panel

CQR
2" (5,1 cm) Finishing Nails
Flush

Repeat steps to install trim to the opposite gable.
FINISH
Your gable trim is now installed. 100

PARTS REQUIRED:
x2 AS
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)
x2 VX
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)

12' x 12' EAVE TRIM
x8
3" (7,6 cm)

x58
1-1/4" (3,2 cm)

BEGIN
1 Place VX eave trim flush along edge of roof panel (Fig. A). Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
2 Install AS flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
VX
Flush
Fig. A
AS

3" (7,6 cm) Screws
VX

1-1/4" (3,2 cm) Screws
Evenly Spaced

AS
Repeat installation on opposite side.
FINISH
Your eave trim is now installed. 101

PARTS REQUIRED:
x2 VX
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)
x2 AS
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)

12' x 16' EAVE TRIM
x8
3" (7,6 cm)
x2 VVFF
2 x 6 x 48" (5,1 x 15,2 x 121,9 cm)

x70
1-1/4" (3,2 cm)

BEGIN
1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into trimwith 1-1/4" screws spaced evenly in a staggered pattern.

2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
3 Install VF flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.

Flush

Fig. A

VF VX

3" (7,6 cm)

AS

Screws

VF
1-1/4" (3,2 cm) Screws

48" (121,9 cm)

Evenly Spaced

96" (243,9 cm)

VX

49-1/2"

(125,7 cm)

AS

Repeat installation on opposite side.
FINISH
Your eave trim is now installed. 102

12' x 20' EAVE TRIM

PARTS REQUIRED:

x8

x2 AS
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)

x2 VX
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)

3" (7,6 cm)

x82
1-1/4" (3,2 cm)

BEGIN
1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into AS with 1-1/4" screws spaced evenly in a staggered pattern.

2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
3 Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel intotrim with 1-1/4" screws spaced evenly in a staggered pattern.

Flush

Fig. A

3" (7,6 cm) Screws
VX

1-1/4" (3,2 cm) Screws

VX VX AS

96" (243,9 cm)

Evenly Spaced

96" (243,9 cm)

VX

49-1/2"

(125,7 cm)

AS

Repeat installation on opposite side.

FINISH
Your eave trim is now installed.
103

PARTS REQUIRED:
x4 VX
2 x 6 x 96" (5,1 x 15,2 x 243,8 cm)
x2 AS
2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm)

12' x 24' EAVE TRIM
x8
3" (7,6 cm)
x2 VVFF
2 x 6 x 48" (5,1 x 15,2 x 121,9 cm)

x94
1-1/4" (3,2 cm)

BEGIN
1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
3 Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.
4 Install VF flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern.

Flush

Fig. A

3" (7,6 cm) Screws
VF

1-1/4" (3,2 cm) Screws

VF VX

VX AS

48" (121,9 cm)

Evenly Spaced

96" (243,9 cm)
VX

96" (243,9 cm)

VX

49-1/2" (125,7 cm)

AS

Repeat installation on opposite side.
FINISH
Your eave trim is now installed. 104

PARTS REQUIRED:
x8
3/8" x 1-3/4" x 83-1/2" (1 x 4,5 x 212.1cm)

CORNER TRIM
x64

2" (5,1 cm)

BEGIN
1 Install gable end 83-1/2" corner trim under gable panel, (Fig. A) and flush to eave wall panel (Fig. B). Secure with 2" finishing nails spaced evenly.
2 Install eave side 83-1/2" corner trim flush to eave soffit and flush along seam of installed corner trim (Fig. C). Secure with 2" finishing nails spaced evenly.
Fig. B

Fig. A
Flush to eave soffit

83-1/2" (212,1 cm)

Flush to eave panel

Flush to gable panel

10-3/4" (27,3 cm)
2" (5,1 cm) Finishing Nails

Fig. C
Seam is flush. Caulk seam before
painting trim.
Repeat steps for each corner of shed.
FINISH
Your corner trim is now installed. 105

83-1/2" (212,1 cm)
NOTE: 12' x 12' Model Shown.

COLLAR TIE INSTALLATION PARTS REQUIRED:
TP
2 x 4 x 96" (5,1 x 10,2 x 243,9 cm)
3" (7,6 cm)

12x12' 12x16' 12x20' 12x24' x2 x3 x4 x5 x12 x18 x24 x30

BEGIN
1 Install collar tie to the rafter with (3) 3" nails at each end (Fig. A).
Starting at the wall with the door, install first collar tie on the 2nd rafter from the wall and then on every other rafter, as shown.

Fig. A
3" (7,6 cm) Nails

Flush to roof panel

HINT: For best appearance, install
collar ties on back side of rafter.

12' x 12'

4th 2nd

DOOR WALL

12' x 16'

6th

4th

2nd

DOOR WALL

12' x 20'

8th

6th

4th

2nd

DOOR WALL

12' x 24'

10th

8th

6th

4th

2nd

FINISH
Your collar tie(s) are now installed.

106

DOOR WALL

PARTS REQUIRED:

DOORS
x4

x1
Left Door

x1
Right Door

x1 GAA
1 x 3 x 5" (2,5 x 7,6 x 12,7 cm)
x1 OO
69" (175,3 cm) Door Stiffener

BEGIN
1 Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
Attach temporary supports OO and GAA as shown.

OFFSET 3/8" (1 cm)

GREEN

3/8" (1 cm)

3" (7,6 cm)
x2 1-1/4" (3,2 cm)

RED

3/8" OFFSET (1 cm)

(4) 3" (7,6 cm) Screws

OO
(2) 1-1/4" (3,2 cm) Screws

GAA

3/8" (1 cm)

Bottom edges flush.

107

PARTS REQUIRED:

x1 OO

TEMPORARY SUPPORT

69" (175,3 cm) Door Stiffener

DOORS
x12

2 Install OO flush under panels. Secure to floor frame with (2) 3" screws (Fig. A). Mark center of door opening.

3" (7,6 cm)

Fig. A

Flush against wall panels
OO
3 Center doors on mark (Fig. B).

OO

(2) 3" (7,6 cm) Screws

TEMPORARY SUPPORT

4 Screw hinge boards into wall supports with (10) 3" screws, as shown. Make sure screws go into framing.

Fig. B

Center 3/8" measurement on mark.

3/8" (1 cm)

(5) 3" (7,6 cm) Screws in door stud

Remove temporary supports and check to make sure doors open and close properly.
FINISH
Your doors are now installed. 108

DOORS

PARTS REQUIRED:

x7

x2 AH

x1 ZJ

19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm)

19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm)

2" (5,1 cm)

x2 MDR
19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm)

x2 MDL
19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm)

x72
3/4" (1,9 cm)

You have 3 options for door trim, see Fig. C.
BEGIN
1 Arrange trim AH, MDL and MDR as shown. Square AH before fastening. Fasten trim to each door from inside with 3/4" screws (Fig. A, Fig B).

CENTER

Fig. C

2 Center trim ZJ over doors and secure with (7) 2" finishing nails into framing, as shown.
2" (5,1 cm) Finishing Nails
CENTER ZJ

CENTER

AH

Trim Option 2

Trim Option 3

Customize your door trim; use 1 of 3 options: Assembly for Option 1 is shown in Fig. A. If you choose Option 2, reverse MDL and MDR. If you choose Option 3, center AH horizontally. Follow steps 1, 2 and 3. Add or subtract more screws as needed.

MDL

Fig. A
Trim Option 1

MDR

3/4" (1,9 cm) Screws

Fig. B

AH

MDL or MDR

MDR

MDL

CENTER

FINISH
Your door trim is now installed.

109

AH
CENTER
MDL or MDR

PARTS REQUIRED:
x2 OO
69" (175,3 cm) Door Stiffener

DOOR STIFFENERS
x14

2" (5,1 cm)

BEGIN
1 Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO.
2 Center OO vertically on the right door in the door opening offset 1" (2,5 cm) from the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO.

Fig. A
Center OO in door
opening.

IT IS IMPORTANT
TO HOLD THESE
DIMENSIONS

Fig. B

1"

OO

(2,5 cm)

1" (2,5 cm) OFFSET

2" (5,1 cm) Screws

12" (30,5 cm) Approx.

2" (5,1 cm) Screws
x14

FINISH
Your door stiffeners are now installed.
110

PARTS REQUIRED:
x2

DOOR HARDWARE

x8 3/4" (1,9 cm)

5/16" (7,9 mm) Drill Bit

BEGIN
1 Place bolt on OO in open position with bolt end 3/8" (9,5 mm) down from frame. Bolt is open when loop is contacting base (Fig A).
2 Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (7,9 mm) hole deep enough for bolt to slide into.
3 Place bolt on OO in open position with bolt end 1/2" (12,7 mm) up from floor. Bolt is open when loop is connecting base (Fig. B).
4 Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (7,9 mm) hole deep enough for bolt to slide into.

LEFT DOOR
FINISH
Your spring bolts are now installed.

Fig. A

OVER DOOR FRAME

OO
x4
OPEN POSITION Spring is loose.

5/16" (7,9 mm) drill for bolt: 1" (2,5 cm) deep.
3/8" (9,5 mm) with bolt in open position.
PRE-DRILL (4) HOLES
Loop contacts base

Fig. B
Loop contacts base

OPEN POSITION Spring is loose.

FLOOR

1/2" (12,7 mm)

OO
PRE-DRILL (4) HOLES
x4
5/16" (7,9 mm) drill for bolt: 1" (2,5 cm) deep.

111

PARTS REQUIRED:

DOOR HARDWARE

x2

x2

1-1/4" (3,2 cm)

1" (2,5 cm)

x1

1/2" (13 mm) Drill Bit

1/4" (6 mm) Drill Bit

BEGIN
1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill.

Re-drill hole with 1/2" drill.
Keep drilled hole square to trim to avoid breaking edge of door stiffener.

RIGHT DOOR

1-3/4" (4,4 cm)

TOP VIEW

Fig. A

35-3/4" (90 cm)

1-3/4" (4,4 cm)

1/4" Pre-drill and 1/2" Drill through.

2 Secure backplate with 1" screws and handle with 1-1/4" screws as shown.
1" (25 mm) x2
1-1/4" (32 mm) x2

FINISH
Your door handle is now installed. 112

PARTS REQUIRED:

HOOK & EYE
x2

¸BEGIN 1 Install hooks in wall and into framing behind (Fig.A). 2 Swing door open to locate eye.

Eye

Fig. A Hook

Install hook into framing, if possible.

FINISH
You have installed your hook & eyes.
113

VENT (Not included in kit.)
· Follow directions provided by manufacturer and these instructions.

x2
16" x 8"

x12
1/2" (13 mm)

BEGIN
1 Locate and mark for two vents in side walls as shown; (1) at top and (1) at bottom.
Cut out marked openings.
Caulk behind vent flanges.
Secure with 1/2" screws.

14" (35,6 cm)

Caulk

6" (15,2 cm)
3"- 5" (7,6 - 12,7 cm)
7"- 8" (17,8 - 20,3 cm)

1/2" Screws (1,3 cm)

Caulk

1/2" Screws (1,3 cm)

5" (12,7 cm)

6" (15,2 cm)
14" (35,6 cm)

FINISH
Your vents are now installed.

114

PAINT & CAULK
- NOT INCLUDED -

· Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim.
· Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: · Bottom edge of all siding and trim · Inside of doors and all 4 edges
Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.)
ROOF FELT
- NOT INCLUDED -
· Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.

Flush

3" OVERLAP

OK to overlap at ridge.

Flush
DRIP EDGE
- NOT INCLUDED -
· Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A).
· Do not use nails on side of drip edge that hangs over side of building. · Only nail top of drip edge as shown.
Roof felt

Fig. A
Drip edge

Drip edge

Snip bottom side of drip edge and bend over to other side of roof.
(Follow directions provided by manufacturer.) Edge flush to trim.

NOTE: 12' x 12' Model Shown.
115

SHINGLES
- NOT INCLUDED -
· Follow directions provided by manufacturer and these instructions.

Familiarize yourself with a 3-Tab Shingle.

Half A Rain Slot

Notch

SHINGLE NAIL PATTERN

Notch

1" (2,5 cm)

1/2" (1,3 cm)

Sealing Strip

1" (2,5 cm)

Full Rain Slot

NAILS

NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.

BEGIN
1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles flush to drip edge.

FRONT OF SHED

(4) Nails

TABS UP

BACK OF SHED
1" (2,5 cm) overhang or flush with drip edge.

Shingle overlaps roof decking.

1" (2,5 cm) overhang past roof deck.

116

SHINGLES
continued...

2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge.

FRONT OF
SHED 1"
(2,5 cm)

Roof Deck

BACK OF SHED

Notch Drip Edge

- or -

Notch

Flush with starter row. Flush with starter row.

3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front,
stagger each row.

FRONT OF SHED

BACK OF SHED

Bend in roof

1" (2,5 cm) Notch

Flush with rain slots.

Flush with rain slots.

4 Continue installing rows of
shingles by staggering at front.
FRONT OF SHED Notch

1" (2,5 cm)

117

SHINGLES
continued...

5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as
shown below. If shingles overlap at ridge cut to peak with a utility knife.

Cut Off.

5" (12,7 cm) MAX.

CUT

Top of rain slot.

· If more than 5" to rain slot you must install another row of shingles.

5" (12,7 cm) or less.

6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge. 8 Using your shingle hooked blade carefully cut shingles along chalk line.

FINISH You have finished shingling your roof. Proceed to capping the ridge.
118

SHINGLES - RIDGE CAP
· You will finish off the top of the roof with a ridge cap made from shingles.

BEGIN

1 Cut shingles in THREE pieces. Hint: Use cut-off pieces first.

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm)

2" (5,1 cm) Score shingle,
then snap-off angled cut.

12'x12' 12'x16' 12'x20' 12'x24'

Weather Seal

Top of slot.

2 Install first ridge cap flush to shingles at front, as shown.

30 to 32 Pieces

42 to 44 51 to 53 Pieces Pieces

60 to 62 Pieces

(1) Nail per side through weather seal.

Flush 3 Install second ridge cap 5" back, as shown.

5" 12,7 cm
FRONT OF SHED 119

(1) Nail per side through weather seal. Flush

SHINGLES - RIDGE CAP
continued...
4 Continue installing ridge cap to back of roof.

5 Make sure there is 4" between the shingle-color and edge of shingles.
4" (10,2 cm)

Trim cap off flush to shingles

6 When you have 4" minimum of shingle color cut one piece to cap your roof.

Cut at top of rain slot. Cap

7 Install flush to shingles.

Flush to shingles (2) Nails per side.

FINISH You have finished your ridge cap.

120

16490 12' x12' Order Form

CATEGORY
2 X 4
2 X 6 1 X 3 PINE 7/16 OSB GUSSETS NO GROOVE SIDING 8OC SIDING 19/32 X 3 SMART TRIM 19/32 X 4 SMART TRIM PURCHASED COMPONENTS PACKAGING

PART DESCRIPTION
Back Wall Top & Btm "A" / Dblr "A" / Collar Tie Side Wall T & B Plate "A" / Dblr "B" Side Wall T & B Plate "B" Doubler "C" Side Wall Top Plate Wall Studs Jack Studs Over Door Crippler Header Rafter Front / Rear Gable Connector
Overhang "A" Overhang "B"
Gauge Block
Upper Roof Panel "A" Upper Roof Panel "B" Lower Roof Panel "A" Lower Roof Panel "B" Door Header Filler
Gusset
Center Gable Panel Front / Rear Gable Panel - Right Front / Rear Gable Panel - Left Corner Trim
Rearwall Panel "A" / Side Panel Rear Panel "B" Frontwall Panel Right Frontwall Panel Left
Vertical / Over Door Trim Long Cross Buck - Right Long Cross Buck - Left Horizontal Door Rail
Gable Trim Right Gable Trim Left
Door Stiffener Chrome Single Point Locking Handle Hardware Kit
Instructions

PART SIZE
LUM SPF 2X4X96 #2&BTR LUM SPF 2X4X92-5/8 #2&BTR
2 X 4 X 44 3/8" PLATE 2X4X48" DOUBLER/ PLATE/ CRATE
2 X 4 X 68-1/2" 2 X 4 X 78 1/2" 2 X 4 X 68" STUD
2 X 4 X 7" 2 X 4 X 67" 2 X 4 X 77-15/16" @ 22.5 2 X 4 X 18 1/8"-22.5* CONNECT
LUM WSPF 2X6X96 #1 PREMIUM PET 2 X 6 X 49 1/2" OVERHANG
1 X 3 X 5" PINE FILLER
OSB 7/16" x 4' x 8' 7/16" OSB 47 7/8" X 48" ROOF 7/16" OSB 36-1/2" X 96" ROOF
7/16" OSB 36 1/2" X 47-7/8" 7/16" OSB 3 1/4" X 66 3/4" HEADER
EZ8"/OSB 6" X 24" GUSSET 22.5*
3/8" NG 23 9/16"" X 33 1/2"" 3/8" NG 23 9/16" X 48" RIGHT FRONT GABLE 3/8" NG 23 9/16" X 48" LEFT FRONT GABLE
3/8" NG 1 3/4" X 83-1/2"
SIDING 8" OC 4'X7' EZ 8" 23 7/8" X 84" WALL PANEL EZ 8" 48" x 84" RIGHT FRONTWALL EZ 8" 48" x 84" LEFT FRONTWALL
19/32 TST 2 1/2" X 72" TRIM 19/32 TST 2 1/2" X 39-7/8" 36.5* L/S RGT X-BUCK 19/32 TST 2 1/2" X 39-7/8" 36.5* L/S LFT X-BUCK
19/32 TST 2 1/2" X 26 5/8"
19/32 TST 3 1/2" X 84 15/16" 22.5* O/E RGT TRIM 19/32 TST 3 1/2" X 84 15/16" 22.5* O/E LFT TRIM
LSL 1-1/4 X 2-1/4 X 69 PET DOOR HANDLE LOCKING SINGLE PT.
H/K HHP SERIES GABLES

Right Door Assembly Left Door Assembly

30222-R Door Panel Right Hinge Assembly Vertical Door Stiles Horizontal Door Rails
30222-L Door Panel Left Hinge Assembly Vertical Door Stiles Horizontal Door Rails

EZ 8" 31 1/4" X 71 1/2" HINGE RIGHT (RED) 19/32x3 THIN TRIM
19/32 TST 2 1/2" X 71 5/8" 19/32 TST 2 1/2" X 26 5/8"
EZ 8" 31 1/4" X 71 1/2" HINGE LEFT (GREEN) 19/32x3 THIN TRIM
19/32 TST 2 1/2" X 71 5/8" 19/32 TST 2 1/2" X 26 5/8"

PART ITEM #
12306 12305 O 44060000000 O 48000000000 O 68080000000 O 78080000000 O 68000000000 O 07000000000 O 67000000000 O 77152222000 O 18022222000
12416 N 49080000000
U 05000000000
11110 C 48004714000 C 96003608000 C 47143608000 C 66120304000
J 24000600225
K 48003308044 K 48002309100 K 48002309200 K 83080112000
11506 J 84002314000 J 84004800101 J 84004800201
UT72000208000 UT39143737100 UT39143737200 UT26100208000
UT84150308221 UT84150308222
12715 15210 15773
16490
J 71083104000 30121-TT
UT71100208000 UT26100208000
J 71083104000 30131-TT
UT71100208000 UT26100208000

BUILDING QTY.
8 4 4 6 4 23 2 5 2 14 4
2 2
1
2 2 2 2 1
12
2 2 2 8
9 2 1 1
1 2 2 2
2 2
2 1 1
1

PART ID
TP TJ HVC SP YFA AI UM AL AM ADA AF
VX AS
GAA
-----------
---
---------
---------
ZJ MDR MDL AH
CQR CQL
OO -----
---

1

---

1

---

2

GY

2

AH

1

---

1

---

2

GY

2

AH

121

LIMITED CONDITIONAL WARRANTY*

Backyard Storage Solutions, LLC warrants the following:

1.

Every product is warranted from defects in workmanship and manufacturing for 1 year.

2.

All accessories, hardware and metal components are warranted for 2 years.

3.

All Oriented Strand Board (OSB) is warranted for 2 years

4.

Siding and Trim is warranted for 15 years.

5.

LP Prostruct® Flooring is warranted for 10 years

6.

Cedar lumber is warranted for 15 years.

7.

Preserved Pine is warranted for 10 years.

8.

Redwood is warranted for 10 years.

9.

Metal Roof is warranted for 25 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase.

CONDITIONS

The warranty is effective only when:

1.

The unit has been erected in accordance with the assembly instructions.

2.

The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.

3.

The failure occurs when the unit is owned by the original purchaser.

4.

Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and

notification of the failure in writing within the warranty period specified above.

5.

Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to

inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTS Storage Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.

Gazebos & Pergolas To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½") from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit. This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURE

To make a claim under this warranty, you can either call 1-888-827-9056 or email: customerservice@backyardproducts.com.

Please have ready the information below when you call or include the information in your email:

1.

The model and size of the product.

2.

A list of the part(s) for which the claim is made.

3.

Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice or receipt.

4.

Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162

*WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A. IMPORTANT: This is your warranty certificate. 15Y PSS BB GEN LDR: 3/20/2019


Adobe PDF Library 10.0.1 Adobe InDesign CS6 (Windows)