Installation Guide for BACKYARD models including: BACKYARD, Gable Shed, GABLE 12 x 12
79 96” (243,8 cm) 96” (243,8 cm) 144" (365,8 cm) 144" (365,8 cm) Place two rafter-halves AD in the corner of back and side walls, fl ush to panels and studs. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg.A).
assembly manual keep this manual for future reference building size actual floor size base model 12' x 12' (365,8 x 365,8 cm) ... 16490 03/01/2021 part 2
12 X 365 — What is 365 times 12? - Answers Lawrence Frames. $34.57. reg $36.94. Sale. Sold and shipped by MyOfficeInnovations. a Target Plus™ partner. Free standard shipping with $35 orders. Not in stores. Visit Page GABLE 12' x 12' (365,8 x 365,8 cm)
PART 2 ASSEMBLY MANUAL GABLE 12' x 12' (365,8 x 365,8 cm) 16490 03/01/2021 BASE MODEL +1: 12' x 4' Extender +1: 12' x 8' Extender +1: 12' x 8' and +1: 12' x 4' Extender BUILDING SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm) ACTUAL FLOOR SIZE 12' x 12' (365,8 x 365,8 cm) 12' x 16' (365,8 x 487,7 cm) 12' x 20' (365,8 x 609,6 cm) 12' x 24' (365,8 x 731,5 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE Base Building +1 Extender 12' x 16' Base Building 12' x 12' .... continued from PART 1 (Continued from PART 1, page 78.) 12x12' 12x16' 12x20' 12x24' RAFTERS PARTS REQUIRED: x12 x16 x20 x24 6 x 24" (15,2 x 60,9 cm) x1 OO Temporary Support 69" (175,3 cm) Door Stiffener x14 x18 x22 x26 ADA 2 x 4 x 77-15/16" (5,1 x 10,2 x 198 cm) x144 x192 x240 x288 2" (5,1 cm) Build (2) rafter assemblies with (1) gusset (Fig. B). BEGIN 1 Place two rafter-halves AD in the corner of back and side walls, flush to panels and studs. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A). Flush 1/4" 1/4" (1,9 cm) (1,9 cm) 144" (365,8 cm) Fit base of rafters in corners of back wall. Fig. A HINT: Use floor and walls to help assemble rafters! Temporary support (OO) SET ASIDE THESE TWO RAFTER ASSEMBLIES. Flush at peak Depending on your shed size, build rafters with (2) gussets (Fig. C). 2 Place two rafter-halves on floor and flush in the corners of wall and RL, as shown in STEP - 1. Flush rafters at peak. Secure gusset to rafters with 2" nails following the pattern shown (FIg. A). 3 Flip over rafter assembly and fasten second gusset to other side with 2" nails (FIg. C). Fig. B - Build 2 for all sizes Fig. C 14946"" (3(62543,8,8ccmm)) x2 1-GUSSET RAFTERS FINISH Your rafters are now assembled. Remove RL and screws from floor. 19464" " ((326453,,88 ccmm)) 2-GUSSET RAFTERS 12x12' 12x16' 12x20' 12x24' x5 x7 x9 x11 79 PARTS REQUIRED: 12x12' 12x16' RAFTER INSTALLATION x5 x28 x7 x36 2-Gusset Preassembled x2 1-Gusset Preassembled 3" (7,6 cm) BEGIN 1 Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side. Maintain the measurements between rafters. 12' x 12' DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS. 24-3/8" (61,9 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24-3/8" (62 cm) Rafter with ONE GUSSET facing inward. Rafter with ONE GUSSET facing inward. Flush to outside of panel Fig. A ALIGN OVER STUDS 3" (7,6 cm) Screws angled into top plate Flush to inside of panel Flush to outside of panel Fig. B Maintain the measurements between rafters. 12' x 16' DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS. 24-3/8" (61,9 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24-3/8" (62 cm) Fig. A FINISH Your rafters are now installed. ALIGN OVER STUDS 3" (7,6 cm) Screws angled into top plate 80 Flush to inside of panel Fig. B 12x20' 12x24' PARTS REQUIRED: x9 x11 x44 x52 RAFTER INSTALLATION 2-Gusset Preassembled x2 1-Gusset Preassembled 3" (7,6 cm) BEGIN 1 Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side. Maintain the measurements between rafters. 12' x 20' DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS. 24-3/8" (61,9 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24-3/8" (62 cm) Rafter with ONE GUSSET facing inward. Flush to outside of panel Fig. A ALIGN OVER STUDS 3" (7,6 cm) Flush to inside Screws angled of panel into top plate Rafter with ONE GUSSET facing inward. Flush to outside of panel Fig. B Maintain the measurements between rafters. 12' x 24' 24-3/8" (61,9 cm) 24" (61 cm) 24" (61 cm) DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS TO CENTER OF RAFTERS. 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24" (61 cm) 24-3/8" (62 cm) Rafter with ONE GUSSET facing inward. Flush to outside of panel Fig. A FINISH Your rafters are now installed. ALIGN OVER STUDS 3" (7,6 cm) Screws angled into top plate 81 Flush to inside of panel Fig. B Rafter with ONE GUSSET facing inward. Flush to outside of panel PARTS REQUIRED: x4 AF GABLE UNITS 2 x 4 x 18-1/8" (5,1 x 10,2 x 46 cm) x32 1-1/2" (3,8 cm) x2 x2 x2 Install gable panels with the primed side facing up. BEGIN 1 Place middle panel on (2) AF. Arrange parts to measurements shown. Secure panel with 1-1/2" nails spaced 6" apart along edge. Check measurements as you build the gable unit. 2 Place left and right panels on AF, flush to middle panel. Secure panel with 1-1/2" nails spaced 6" apart along edge. Mark the center of the middle gable panel. AF AF Flush 6" (15,2 cm) Window hole of front panel 1-3/4" (4,4 cm) 1-3/4" (4,4 cm) Flush 2-9/16" (6,5 cm) Flush Mark 144" (365,8 cm) Flush 2-9/16" (6,5 cm) Repeat steps to assemble the 2nd gable unit. FINISH Your (2) gable units are now assembled. 82 PARTS REQUIRED: x2 Preassembled GABLE INSTALLATION x8 x118 3" (7,6 cm) 2" (5,1 cm) BEGIN 1 Measure 2-9/16" (6,5 cm) down from top plate doubler and mark at each side as shown. Set gable unit on top plate. Fasten with (1) 2" nail on each side. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING. Continue nailing lower edge of panels to wall doubler with 2" nails spaced 6" apart. 2 Secure gable panels to rafter with with 2" nails spaced 6" apart. 3 Working inside, secure gable unit with (2) 3" screws angled into each AF at an angle (Fig. A). 6" (15,2 cm) AF Window hole of front panel NAIL FIRST 2" (5,1 cm) 2-9/16" (6,5 cm) Measure and Mark Fig. A 6" (15,2 cm) DOUBLER 3" (7,6 cm) Screws 2-9/16" (6,5 cm) Measure and Mark NAIL FIRST 2" (5,1 cm) Repeat steps to install the opposite side gable. FINISH Your gable units are now installed. 83 PARTS REQUIRED: 12' x 12' ROOF PANELS x4 3/4" GAUGE 7/16 x 48 x 96" BLOCK x1 (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig. A) and the panel flush at the peak (Fig. B). Secure panel with (2) 2" nails in the corners. Two Nails Gauge Block 3/4" (1,9 cm) Fig. A 48" x 96" 2" (5,1 cm) Fig. B Flush at peak 2 Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 1/2" measurement on the gable end rafter (Fig. C). Secure panel with (2) 2" nails in the corners. Fig. B Flush at peak 1/2" (1,2 cm) Fig. C Gable End Rafter 84 Move Gable Two Nails PARTS REQUIRED: 12' x 12' ROOF PANELS x12 47-7/8 x 48" x1 (121,6 x 121,9 cm) 3 Install a 23-7/8" x 48" roof panel flush to the installed panel and flush at peak (Fig. B). 1/2" (1,2 cm) Secure panel with (1) 2" nail in each corner. Fig. C Move Gable 2" (5,1 cm) Fig. B Flush at peak 4 Gable End Rafter Move the gable end rafter edge until it is 1/2" from the 23-7/8" x 48" roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner. 47-7/8" x 48" Flush 2" nail in each corner 5 Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter. Fig. D NOTE: Measurements from inside of gable panels 24-3/8" (61,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24-3/8" (61,9 cm) 2" (5,1 cm) Nails 85 PARTS REQUIRED: 12' x 12' ROOF PANELS x8 x1 36-1/2" x 96" (60,692,7 x1 36-1/2" x 47-7/8" (91,7 x 121,9 cm) 3/4" GAUGE BLOCK 2" (5,1 cm) 6 Next, install 36-1/2" x 47-7/8" and 36-1/2" x 96" roof panels with a 3/4" measurement on the rafter (Fig A) and flush to the installed panels (Fig. E). Secure panels with (1) 2" nail in each corner. 2" (5,1 cm) Nails 3/4" (1,9 cm) Fig. A Gauge Block Flush 36-1/2" x 96" Flush Flush 36-1/2" x 47-7/8" 86 PARTS REQUIRED: 12' x 12' ROOF PANELS x168 2" (5,1 cm) 7 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels. 6" (15,2 cm) (30,152c"m) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed. 87 PARTS REQUIRED: 12' x 16' ROOF PANELS x4 2" (5,1 cm) 3/4" GAUGE 48 x 96" BLOCK x1 (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Fig. B Flush at peak Gauge Block Fig. A 3/4" (1,9 cm) 48" x 96" Two Nails 2 Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B). Move gable end rafter edge until it is 1/2" from the panel (Fig. C). Secure panel with (1) 2" nail in each corner. 1/2" (1,2 cm) Fig. C Gable End Rafter 88 Fig. B Flush at peak Move Gable Two Nails PARTS REQUIRED: x2 12' x 16' ROOF PANELS 47-7/8 x 48" (121,6 x 121,9 cm) x18 2" (5,1 cm) 3 Install first 47-7/8" x 48" roof 1/2" (1,2 cm) panel flush to the installed panel and flush at the peak. Fig. C Secure panel with (1) 2" nail in each corner. Move to the opposite end. Gable End Rafter Using the unattached end of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A). Finish securing panel with (1) 2" nail in each corner. Move Gable 47-7/8" x 48" Flush 4 Gauge Block Install next 48" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Fig. A 3/4" (1,9 cm) Move gable end rafter edge until it is 1/2" from the 2nd 48" x 48" roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner. Fig. B 47-7/8" x 48" Flush 2" nail in each corner 5 Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter. Fig. D NOTE: Measurements from inside of gable panels Flush at peak 24-3/8" (62,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24-3/8" (62,9 cm) 2" (5,1 cm) Nails 89 PARTS REQUIRED: 12' x 16' ROOF PANELS x12 x1 36-1/2" x 96" (60,692,7 x2 36-1/2" x 47-7/8" (91,7 x 121,9 cm) 3/4" GAUGE BLOCK 2" (5,1 cm) 6 Next, install 36-1/2" x 96" with a 3/4" measurement on the rafter (Fig A), and flush to the installed panels. Secure panel with (1) 2" nail in each corner. 2" (5,1 cm) Nails Flush 3/4" (1,9 cm) Fig. A Gauge Block 36-1/2" x 47-7/8" Flush Flush 36-1/2" x 96" Flush Flush 36-1/2" x 47-7/8" 7 Instal (2) 36-1/2" x 47-7/8" roof panels flush to the installed panels in the following order: Secure panels with (1) 2" nail in each corner. 90 PARTS REQUIRED: 12' x 16' ROOF PANELS x236 2" (5,1 cm) 8 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels. 6" (15,2 cm) (30,152c"m) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed. 91 PARTS REQUIRED: 12' x 20' ROOF PANELS x4 3/4" GAUGE 48 x 96" BLOCK x1 (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. 2" (5,1 cm) Fig. B Flush at peak Gauge Block Fig. A 48" x 96" Two Nails 3/4" (1,9 cm) 2 Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B). Move gable end rafter edge until it is 1/2" from the panel (Fig. C). Secure panel with (1) 2" nail in each corner. 1/2" (1,2 cm) Fig. C Gable End Rafter 92 Fig. B Flush at peak Move Gable Two Nails PARTS REQUIRED: 12' x 20' ROOF PANELS 48 x 96" x1 (121,9 x 243,8 cm) x1 x22 47-7/8 x 48" (121,6 x 121,9 cm) 2" (5,1 cm) 3 Install next 48" x 96" roof panel flush to the installed panel and Fig. C flush at the peak. Secure panel with (1) 2" nail in each corner. Gable End Rafter Move to the opposite end. Using the unattached end of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A). Finish securing panel with (1) 2" nail in each corner. 1/2" (1,2 cm) Move Gable 47-7/8" x 48" Flush 4 Install a 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Gauge Block Fig. A 3/4" (1,9 cm) Fig. B Flush at peak 48" x 96" Flush 2" nail in each corner Move gable end rafter edge until it is 1/2" from the roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner. 5 Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter. Fig. D NOTE: Measurements from inside of gable panels 24-3/8" (62,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24-3/8" (62,9 cm) 2" (5,1 cm) Nails 93 PARTS REQUIRED: 12' x 20' ROOF PANELS x12 x1 36-1/2" x 96" (60,692,7 x2 36-1/2" x 47-7/8" (91,7 x 121,9 cm) 3/4" GAUGE BLOCK 6 Next, install 36-1/2" x 96" roof panel with a 3/4" measurement on the rafter (Fig A). Secure panel with (1) 2" nail in each corner. 2" (5,1 cm) 2" (5,1 cm) Nails Flush 36-1/2" x 96" Flush 3/4" (1,9 cm) Fig. A Gauge Block Flush 36-1/2" x 96" Flush Flush 36-1/2" x 47-7/8" 7 Install 2nd 36-1/2" x 96" and 36-1/2" x 47-7/8" roof panels flush to the installed panels. Secure panels with (1) 2" nail in each corner. 94 PARTS REQUIRED: 12' x 20' ROOF PANELS x268 2" (5,1 cm) 8 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels. 6" (15,2 cm) (30,152c"m) Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed. 95 PARTS REQUIRED: 12' x 24' ROOF PANELS x4 2" (5,1 cm) 3/4" GAUGE 48 x 96" BLOCK x1 (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN 1 Place the 48" x 96" panel on rafters with a 3/4" measurement on the rafter (Fig A) and the panel flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Fig. B Flush at peak Gauge Block 3/4" (1,9 cm) Fig. A 48" x 96" Two Nails 2 Move to the opposite end. Using the long edge of the panel as a lever, move the panel sideto-side until the top corner is flush to the peak (Fig. B). Move gable end rafter edge until it is 1/2" from the panel (Fig. C). Secure panel with (1) 2" nail in each corner. 1/2" (1,2 cm) Fig. C Gable End Rafter 96 Fig. B Flush at peak Move Gable Two Nails PARTS REQUIRED: 12' x 24' ROOF PANELS 48 x 96" x1 (121,9 x 243,8 cm) x2 x28 47-7/8 x 48" (121,6 x 121,9 cm) 2" (5,1 cm) 3 Install 2nd 48" x 96" roof panel flush to the installed panel, and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. 1/2" (1,2 cm) Fig. C Move Gable Move to the opposite end. Gable End Rafter Using the unattached end of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A). Finish securing panel with (1) 2" nail in each corner. Flush 47-7/8" x 48" Flush 47-7/8" x 48" Gauge Block 4 Install 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Fig. A 3/4" (1,9 cm) Move to the opposite end. Using the unattached end of the panel as a lever, move the panel side-to-side until the top corner is flush to the peak (Fig. B) and there is a 3/4" measurement on the rafter (Fig A). Finish securing panel with (1) 2" nail in each corner. Fig. B Flush at peak 2" nail 48" x 96" in each corner Flush 5 Install 47-7/8" x 48" roof panel flush to the installed panel and flush at the peak (Fig. B). Secure panel with (1) 2" nail in each corner. Move gable end rafter edge until it is 1/2" from the 2nd 48" x 48" roof panel (Fig. C). Finish securing panel with (1) 2" nail in each corner. 6 Maintain spacing between the center of the rafters at the lower edge of the panels (Fig. D). Secure panels with (1) 2" nail into each rafter, as shown. Move to the top of the panel and keep spacing between the center of the rafters. Secure panels with (1) 2" nail into each rafter. Fig. D NOTE: Measurements from inside of gable panels 24-3/8" (62,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24" (60,9 cm) 24-3/8" (62,9 cm) 2" (5,1 cm) Nails 97 PARTS REQUIRED: 12' x 24' ROOF PANELS x16 x1 36-1/2" x 96" (60,692,7 x2 36-1/2" x 47-7/8" (91,7 x 121,9 cm) 3/4" GAUGE BLOCK 2" (5,1 cm) 7 Install (1) 36-1/2" x 96" roof panels with a 3/4" measurement on the rafter at each side (Fig A), and flush to the installed panels. Secure panels with (1) 2" nail in each corner. 2" (5,1 cm) Nails Flush 36-1/2" x 47-7/8" Flush Flush 36-1/2" x 96" 3/4" (1,9 cm) Gauge Block Flush 36-1/2" x 96" Fig. A Flush Flush Flush 36-1/2" x 47-7/8" 8 Install 2nd 36-1/2" x 96" flush to the installed panels and with a 3/4" measurement on the rafter (Fig A). Secure panel with (1) 2" nail in each corner. Install (2) 36-1/2" x 47-7/8" roof panels flush to the installed panels.. Secure panels with (1) 2" nail in each corner. 98 PARTS REQUIRED: 12' x 24' ROOF PANELS x336 2" (5,1 cm) 9 Secure all roof panels with 2" nails spaced 6" apart and 12" apart inside panels. 6" (15,2 cm) (30,51c2m") Repeat all steps to install roof panels on the opposite side. FINISH Your roof panels are now installed. 99 GABLE TRIM PARTS REQUIRED: x64 x2 CQR 19/32" x 3-1/2" x 84-15/16" (1,5 x 8,9 x 215,7 cm) x2 CQL 19/32" x 3-1/2" x 84-15/16" (1,5 x 8,9 x 215,7 cm) 2" (5,1 cm) BEGIN 1 Install gable trim CQR and CQL flush to top of roof panel and flush at peak, as shown. Secure trim with 2" finish nails spaced evenly. CQL Flush at peak Flush Flush Flush to roof panel CQR 2" (5,1 cm) Finishing Nails Flush Repeat steps to install trim to the opposite gable. FINISH Your gable trim is now installed. 100 PARTS REQUIRED: x2 AS 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) x2 VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) 12' x 12' EAVE TRIM x8 3" (7,6 cm) x58 1-1/4" (3,2 cm) BEGIN 1 Place VX eave trim flush along edge of roof panel (Fig. A). Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 2 Install AS flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. VX Flush Fig. A AS 3" (7,6 cm) Screws VX 1-1/4" (3,2 cm) Screws Evenly Spaced AS Repeat installation on opposite side. FINISH Your eave trim is now installed. 101 PARTS REQUIRED: x2 VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) x2 AS 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) 12' x 16' EAVE TRIM x8 3" (7,6 cm) x2 VVFF 2 x 6 x 48" (5,1 x 15,2 x 121,9 cm) x70 1-1/4" (3,2 cm) BEGIN 1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into trimwith 1-1/4" screws spaced evenly in a staggered pattern. 2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 3 Install VF flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. Flush Fig. A VF VX 3" (7,6 cm) AS Screws VF 1-1/4" (3,2 cm) Screws 48" (121,9 cm) Evenly Spaced 96" (243,9 cm) VX 49-1/2" (125,7 cm) AS Repeat installation on opposite side. FINISH Your eave trim is now installed. 102 12' x 20' EAVE TRIM PARTS REQUIRED: x8 x2 AS 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) x2 VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) 3" (7,6 cm) x82 1-1/4" (3,2 cm) BEGIN 1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into AS with 1-1/4" screws spaced evenly in a staggered pattern. 2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 3 Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel intotrim with 1-1/4" screws spaced evenly in a staggered pattern. Flush Fig. A 3" (7,6 cm) Screws VX 1-1/4" (3,2 cm) Screws VX VX AS 96" (243,9 cm) Evenly Spaced 96" (243,9 cm) VX 49-1/2" (125,7 cm) AS Repeat installation on opposite side. FINISH Your eave trim is now installed. 103 PARTS REQUIRED: x4 VX 2 x 6 x 96" (5,1 x 15,2 x 243,8 cm) x2 AS 2 x 6 x 49-1/2" (5,1 x 15,2 x 125,7 cm) 12' x 24' EAVE TRIM x8 3" (7,6 cm) x2 VVFF 2 x 6 x 48" (5,1 x 15,2 x 121,9 cm) x94 1-1/4" (3,2 cm) BEGIN 1 Place AS eave trim flush along edge of roof panel (Fig. A) and flush to gable trim. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 2 Install VX flush to edge of roof panel and flush to installed eave trim AS. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 3 Install 2nd VX flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. 4 Install VF flush to edge of roof panel and flush to installed eave trim VX. Screw through roof panel into trim with 1-1/4" screws spaced evenly in a staggered pattern. Flush Fig. A 3" (7,6 cm) Screws VF 1-1/4" (3,2 cm) Screws VF VX VX AS 48" (121,9 cm) Evenly Spaced 96" (243,9 cm) VX 96" (243,9 cm) VX 49-1/2" (125,7 cm) AS Repeat installation on opposite side. FINISH Your eave trim is now installed. 104 PARTS REQUIRED: x8 3/8" x 1-3/4" x 83-1/2" (1 x 4,5 x 212.1cm) CORNER TRIM x64 2" (5,1 cm) BEGIN 1 Install gable end 83-1/2" corner trim under gable panel, (Fig. A) and flush to eave wall panel (Fig. B). Secure with 2" finishing nails spaced evenly. 2 Install eave side 83-1/2" corner trim flush to eave soffit and flush along seam of installed corner trim (Fig. C). Secure with 2" finishing nails spaced evenly. Fig. B Fig. A Flush to eave soffit 83-1/2" (212,1 cm) Flush to eave panel Flush to gable panel 10-3/4" (27,3 cm) 2" (5,1 cm) Finishing Nails Fig. C Seam is flush. Caulk seam before painting trim. Repeat steps for each corner of shed. FINISH Your corner trim is now installed. 105 83-1/2" (212,1 cm) NOTE: 12' x 12' Model Shown. COLLAR TIE INSTALLATION PARTS REQUIRED: TP 2 x 4 x 96" (5,1 x 10,2 x 243,9 cm) 3" (7,6 cm) 12x12' 12x16' 12x20' 12x24' x2 x3 x4 x5 x12 x18 x24 x30 BEGIN 1 Install collar tie to the rafter with (3) 3" nails at each end (Fig. A). Starting at the wall with the door, install first collar tie on the 2nd rafter from the wall and then on every other rafter, as shown. Fig. A 3" (7,6 cm) Nails Flush to roof panel HINT: For best appearance, install collar ties on back side of rafter. 12' x 12' 4th 2nd DOOR WALL 12' x 16' 6th 4th 2nd DOOR WALL 12' x 20' 8th 6th 4th 2nd DOOR WALL 12' x 24' 10th 8th 6th 4th 2nd FINISH Your collar tie(s) are now installed. 106 DOOR WALL PARTS REQUIRED: DOORS x4 x1 Left Door x1 Right Door x1 GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) x1 OO 69" (175,3 cm) Door Stiffener BEGIN 1 Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board. Attach temporary supports OO and GAA as shown. OFFSET 3/8" (1 cm) GREEN 3/8" (1 cm) 3" (7,6 cm) x2 1-1/4" (3,2 cm) RED 3/8" OFFSET (1 cm) (4) 3" (7,6 cm) Screws OO (2) 1-1/4" (3,2 cm) Screws GAA 3/8" (1 cm) Bottom edges flush. 107 PARTS REQUIRED: x1 OO TEMPORARY SUPPORT 69" (175,3 cm) Door Stiffener DOORS x12 2 Install OO flush under panels. Secure to floor frame with (2) 3" screws (Fig. A). Mark center of door opening. 3" (7,6 cm) Fig. A Flush against wall panels OO 3 Center doors on mark (Fig. B). OO (2) 3" (7,6 cm) Screws TEMPORARY SUPPORT 4 Screw hinge boards into wall supports with (10) 3" screws, as shown. Make sure screws go into framing. Fig. B Center 3/8" measurement on mark. 3/8" (1 cm) (5) 3" (7,6 cm) Screws in door stud Remove temporary supports and check to make sure doors open and close properly. FINISH Your doors are now installed. 108 DOORS PARTS REQUIRED: x7 x2 AH x1 ZJ 19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm) 19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm) 2" (5,1 cm) x2 MDR 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x2 MDL 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) x72 3/4" (1,9 cm) You have 3 options for door trim, see Fig. C. BEGIN 1 Arrange trim AH, MDL and MDR as shown. Square AH before fastening. Fasten trim to each door from inside with 3/4" screws (Fig. A, Fig B). CENTER Fig. C 2 Center trim ZJ over doors and secure with (7) 2" finishing nails into framing, as shown. 2" (5,1 cm) Finishing Nails CENTER ZJ CENTER AH Trim Option 2 Trim Option 3 Customize your door trim; use 1 of 3 options: Assembly for Option 1 is shown in Fig. A. If you choose Option 2, reverse MDL and MDR. If you choose Option 3, center AH horizontally. Follow steps 1, 2 and 3. Add or subtract more screws as needed. MDL Fig. A Trim Option 1 MDR 3/4" (1,9 cm) Screws Fig. B AH MDL or MDR MDR MDL CENTER FINISH Your door trim is now installed. 109 AH CENTER MDL or MDR PARTS REQUIRED: x2 OO 69" (175,3 cm) Door Stiffener DOOR STIFFENERS x14 2" (5,1 cm) BEGIN 1 Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. 2 Center OO vertically on the right door in the door opening offset 1" (2,5 cm) from the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Fig. A Center OO in door opening. IT IS IMPORTANT TO HOLD THESE DIMENSIONS Fig. B 1" OO (2,5 cm) 1" (2,5 cm) OFFSET 2" (5,1 cm) Screws 12" (30,5 cm) Approx. 2" (5,1 cm) Screws x14 FINISH Your door stiffeners are now installed. 110 PARTS REQUIRED: x2 DOOR HARDWARE x8 3/4" (1,9 cm) 5/16" (7,9 mm) Drill Bit BEGIN 1 Place bolt on OO in open position with bolt end 3/8" (9,5 mm) down from frame. Bolt is open when loop is contacting base (Fig A). 2 Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (7,9 mm) hole deep enough for bolt to slide into. 3 Place bolt on OO in open position with bolt end 1/2" (12,7 mm) up from floor. Bolt is open when loop is connecting base (Fig. B). 4 Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16" (7,9 mm) hole deep enough for bolt to slide into. LEFT DOOR FINISH Your spring bolts are now installed. Fig. A OVER DOOR FRAME OO x4 OPEN POSITION Spring is loose. 5/16" (7,9 mm) drill for bolt: 1" (2,5 cm) deep. 3/8" (9,5 mm) with bolt in open position. PRE-DRILL (4) HOLES Loop contacts base Fig. B Loop contacts base OPEN POSITION Spring is loose. FLOOR 1/2" (12,7 mm) OO PRE-DRILL (4) HOLES x4 5/16" (7,9 mm) drill for bolt: 1" (2,5 cm) deep. 111 PARTS REQUIRED: DOOR HARDWARE x2 x2 1-1/4" (3,2 cm) 1" (2,5 cm) x1 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill hole with 1/4" drill. Re-drill hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of door stiffener. RIGHT DOOR 1-3/4" (4,4 cm) TOP VIEW Fig. A 35-3/4" (90 cm) 1-3/4" (4,4 cm) 1/4" Pre-drill and 1/2" Drill through. 2 Secure backplate with 1" screws and handle with 1-1/4" screws as shown. 1" (25 mm) x2 1-1/4" (32 mm) x2 FINISH Your door handle is now installed. 112 PARTS REQUIRED: HOOK & EYE x2 ¸BEGIN 1 Install hooks in wall and into framing behind (Fig.A). 2 Swing door open to locate eye. Eye Fig. A Hook Install hook into framing, if possible. FINISH You have installed your hook & eyes. 113 VENT (Not included in kit.) · Follow directions provided by manufacturer and these instructions. x2 16" x 8" x12 1/2" (13 mm) BEGIN 1 Locate and mark for two vents in side walls as shown; (1) at top and (1) at bottom. Cut out marked openings. Caulk behind vent flanges. Secure with 1/2" screws. 14" (35,6 cm) Caulk 6" (15,2 cm) 3"- 5" (7,6 - 12,7 cm) 7"- 8" (17,8 - 20,3 cm) 1/2" Screws (1,3 cm) Caulk 1/2" Screws (1,3 cm) 5" (12,7 cm) 6" (15,2 cm) 14" (35,6 cm) FINISH Your vents are now installed. 114 PAINT & CAULK - NOT INCLUDED - · Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. · Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: · Bottom edge of all siding and trim · Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.) ROOF FELT - NOT INCLUDED - · Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place. Flush 3" OVERLAP OK to overlap at ridge. Flush DRIP EDGE - NOT INCLUDED - · Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A). · Do not use nails on side of drip edge that hangs over side of building. · Only nail top of drip edge as shown. Roof felt Fig. A Drip edge Drip edge Snip bottom side of drip edge and bend over to other side of roof. (Follow directions provided by manufacturer.) Edge flush to trim. NOTE: 12' x 12' Model Shown. 115 SHINGLES - NOT INCLUDED - · Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Half A Rain Slot Notch SHINGLE NAIL PATTERN Notch 1" (2,5 cm) 1/2" (1,3 cm) Sealing Strip 1" (2,5 cm) Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles flush to drip edge. FRONT OF SHED (4) Nails TABS UP BACK OF SHED 1" (2,5 cm) overhang or flush with drip edge. Shingle overlaps roof decking. 1" (2,5 cm) overhang past roof deck. 116 SHINGLES continued... 2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. FRONT OF SHED 1" (2,5 cm) Roof Deck BACK OF SHED Notch Drip Edge - or - Notch Flush with starter row. Flush with starter row. 3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots. Flush with rain slots. 4 Continue installing rows of shingles by staggering at front. FRONT OF SHED Notch 1" (2,5 cm) 117 SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. · If more than 5" to rain slot you must install another row of shingles. 5" (12,7 cm) or less. 6 Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge. 8 Using your shingle hooked blade carefully cut shingles along chalk line. FINISH You have finished shingling your roof. Proceed to capping the ridge. 118 SHINGLES - RIDGE CAP · You will finish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles in THREE pieces. Hint: Use cut-off pieces first. 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) 2" (5,1 cm) Score shingle, then snap-off angled cut. 12'x12' 12'x16' 12'x20' 12'x24' Weather Seal Top of slot. 2 Install first ridge cap flush to shingles at front, as shown. 30 to 32 Pieces 42 to 44 51 to 53 Pieces Pieces 60 to 62 Pieces (1) Nail per side through weather seal. Flush 3 Install second ridge cap 5" back, as shown. 5" 12,7 cm FRONT OF SHED 119 (1) Nail per side through weather seal. Flush SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off flush to shingles 6 When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install flush to shingles. Flush to shingles (2) Nails per side. FINISH You have finished your ridge cap. 120 16490 12' x12' Order Form CATEGORY 2 X 4 2 X 6 1 X 3 PINE 7/16 OSB GUSSETS NO GROOVE SIDING 8OC SIDING 19/32 X 3 SMART TRIM 19/32 X 4 SMART TRIM PURCHASED COMPONENTS PACKAGING PART DESCRIPTION Back Wall Top & Btm "A" / Dblr "A" / Collar Tie Side Wall T & B Plate "A" / Dblr "B" Side Wall T & B Plate "B" Doubler "C" Side Wall Top Plate Wall Studs Jack Studs Over Door Crippler Header Rafter Front / Rear Gable Connector Overhang "A" Overhang "B" Gauge Block Upper Roof Panel "A" Upper Roof Panel "B" Lower Roof Panel "A" Lower Roof Panel "B" Door Header Filler Gusset Center Gable Panel Front / Rear Gable Panel - Right Front / Rear Gable Panel - Left Corner Trim Rearwall Panel "A" / Side Panel Rear Panel "B" Frontwall Panel Right Frontwall Panel Left Vertical / Over Door Trim Long Cross Buck - Right Long Cross Buck - Left Horizontal Door Rail Gable Trim Right Gable Trim Left Door Stiffener Chrome Single Point Locking Handle Hardware Kit Instructions PART SIZE LUM SPF 2X4X96 #2&BTR LUM SPF 2X4X92-5/8 #2&BTR 2 X 4 X 44 3/8" PLATE 2X4X48" DOUBLER/ PLATE/ CRATE 2 X 4 X 68-1/2" 2 X 4 X 78 1/2" 2 X 4 X 68" STUD 2 X 4 X 7" 2 X 4 X 67" 2 X 4 X 77-15/16" @ 22.5 2 X 4 X 18 1/8"-22.5* CONNECT LUM WSPF 2X6X96 #1 PREMIUM PET 2 X 6 X 49 1/2" OVERHANG 1 X 3 X 5" PINE FILLER OSB 7/16" x 4' x 8' 7/16" OSB 47 7/8" X 48" ROOF 7/16" OSB 36-1/2" X 96" ROOF 7/16" OSB 36 1/2" X 47-7/8" 7/16" OSB 3 1/4" X 66 3/4" HEADER EZ8"/OSB 6" X 24" GUSSET 22.5* 3/8" NG 23 9/16"" X 33 1/2"" 3/8" NG 23 9/16" X 48" RIGHT FRONT GABLE 3/8" NG 23 9/16" X 48" LEFT FRONT GABLE 3/8" NG 1 3/4" X 83-1/2" SIDING 8" OC 4'X7' EZ 8" 23 7/8" X 84" WALL PANEL EZ 8" 48" x 84" RIGHT FRONTWALL EZ 8" 48" x 84" LEFT FRONTWALL 19/32 TST 2 1/2" X 72" TRIM 19/32 TST 2 1/2" X 39-7/8" 36.5* L/S RGT X-BUCK 19/32 TST 2 1/2" X 39-7/8" 36.5* L/S LFT X-BUCK 19/32 TST 2 1/2" X 26 5/8" 19/32 TST 3 1/2" X 84 15/16" 22.5* O/E RGT TRIM 19/32 TST 3 1/2" X 84 15/16" 22.5* O/E LFT TRIM LSL 1-1/4 X 2-1/4 X 69 PET DOOR HANDLE LOCKING SINGLE PT. H/K HHP SERIES GABLES Right Door Assembly Left Door Assembly 30222-R Door Panel Right Hinge Assembly Vertical Door Stiles Horizontal Door Rails 30222-L Door Panel Left Hinge Assembly Vertical Door Stiles Horizontal Door Rails EZ 8" 31 1/4" X 71 1/2" HINGE RIGHT (RED) 19/32x3 THIN TRIM 19/32 TST 2 1/2" X 71 5/8" 19/32 TST 2 1/2" X 26 5/8" EZ 8" 31 1/4" X 71 1/2" HINGE LEFT (GREEN) 19/32x3 THIN TRIM 19/32 TST 2 1/2" X 71 5/8" 19/32 TST 2 1/2" X 26 5/8" PART ITEM # 12306 12305 O 44060000000 O 48000000000 O 68080000000 O 78080000000 O 68000000000 O 07000000000 O 67000000000 O 77152222000 O 18022222000 12416 N 49080000000 U 05000000000 11110 C 48004714000 C 96003608000 C 47143608000 C 66120304000 J 24000600225 K 48003308044 K 48002309100 K 48002309200 K 83080112000 11506 J 84002314000 J 84004800101 J 84004800201 UT72000208000 UT39143737100 UT39143737200 UT26100208000 UT84150308221 UT84150308222 12715 15210 15773 16490 J 71083104000 30121-TT UT71100208000 UT26100208000 J 71083104000 30131-TT UT71100208000 UT26100208000 BUILDING QTY. 8 4 4 6 4 23 2 5 2 14 4 2 2 1 2 2 2 2 1 12 2 2 2 8 9 2 1 1 1 2 2 2 2 2 2 1 1 1 PART ID TP TJ HVC SP YFA AI UM AL AM ADA AF VX AS GAA ----------- --- --------- --------- ZJ MDR MDL AH CQR CQL OO ----- --- 1 --- 1 --- 2 GY 2 AH 1 --- 1 --- 2 GY 2 AH 121 LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4. Siding and Trim is warranted for 15 years. 5. LP Prostruct® Flooring is warranted for 10 years 6. Cedar lumber is warranted for 15 years. 7. Preserved Pine is warranted for 10 years. 8. Redwood is warranted for 10 years. 9. Metal Roof is warranted for 25 years. Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase. CONDITIONS The warranty is effective only when: 1. The unit has been erected in accordance with the assembly instructions. 2. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter. 3. The failure occurs when the unit is owned by the original purchaser. 4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and notification of the failure in writing within the warranty period specified above. 5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the failure prior to commencement of any repair work. REQUIREMENTS Storage Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors. Gazebos & Pergolas To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty. Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½") from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit. This warranty gives you certain specific rights that vary from state to state. CLAIM PROCEDURE To make a claim under this warranty, you can either call 1-888-827-9056 or email: customerservice@backyardproducts.com. Please have ready the information below when you call or include the information in your email: 1. The model and size of the product. 2. A list of the part(s) for which the claim is made. 3. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice or receipt. 4. Run code: found on exterior product label or assembly instructions enclosed in the product package. All other inquiries can be mailed to: Backyard Storage Solutions, LLC Attn: Customer Service 1000 Ternes Monroe, MI 48162 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A. IMPORTANT: This is your warranty certificate. 15Y PSS BB GEN LDR: 3/20/2019Adobe PDF Library 10.0.1 Adobe InDesign CS6 (Windows)