This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for connection of the SolarEdge inverter to the SolarEdge monitoring server. This guide assumes that the SolarEdge power harvesting system is already installed and commissioned. For additional
This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for.
Installation Guide Cellular Plug-in for Inverters with SetApp Version 1.1 2 Version History Version 1.0 (initial release)- January 2019 Version 1.1- January 2019 Modified Technical Specifications modem size Cellular Plug-in Installation Guide MAN-01-00556-1.1 3 Contents Disclaimers 4 Important Notice 4 FCC Compliance 5 Support and Contact Information 7 About This Guide 8 Chapter 1: System Compatibility Check and Upgrade 10 Software Requirements 10 Chapter 2: Cellular Plug-in and Antenna Installation 11 Package Contents 11 Clipping the Antenna to the inverter 12 Connecting the Antenna to a Vertical Surface using a Bracket 15 Installing the Plug-In in the Inverter 15 Chapter 3: Configuring Cellular Communication 18 Configuring the Inverter 18 Verifying the Connection and Viewing Communication Status 19 Viewing Error Messages and Troubleshooting 22 Technical Specifications - Cellular Plug-in 27 Cellular Plug-in Installation Guide MAN-01-00556-1.1 Disclaimers 4 Disclaimers Important Notice Copyright © SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photographic, magnetic or otherwise, without the prior written permission of SolarEdge Inc. The material furnished in this document is believed to be accurate and reliable. However, SolarEdge assumes no responsibility for the use of this material. SolarEdge reserves the right to make changes to the material at any time and without notice. You may refer to the SolarEdge web site (https://www.solaredge.com/us/) for the most updated version. All company and brand products and service names are trademarks or registered trademarks of their respective holders. Patent marking notice: see https://www.solaredge.com/us/patent The general terms and conditions of delivery of SolarEdge shall apply. The content of these documents is continually reviewed and amended, where necessary. However, discrepancies cannot be excluded. No guarantee is made for the completeness of these documents. Cellular Plug-in Installation Guide MAN-01-00556-1.1 5 FCC Compliance Please note: This product is intended to provide remote shutdown of the SolarEdge PV harvesting system, to enable safer access to a building in the event of fire. This product DOES NOT reduce the risk of fire or protect firefighters or others accessing a building in the event of a fire. If the RS485 communication between the firefighter gateway and the SolarEdge inverter(s) is disconnected for any reason (including fire), the firefighter gateway LCD will display "No Communication" or "Partial Com.". In this case, the firefighter gateway cannot be relied upon to disconnect the SolarEdge PV harvesting system. The images contained in this document are for illustrative purposes only and may vary depending on product models. FCC Compliance This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be Cellular Plug-in Installation Guide MAN-01-00556-1.1 Disclaimers 6 determined by turning the equipment off and on, you are encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and the receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance may void the user's authority to operate the equipment. Cellular Plug-in Installation Guide MAN-01-00556-1.1 7 Support and Contact Information Support and Contact Information If you have technical problems concerning SolarEdge products, please contact us: USA and Canada: 1 510 498 3200 Fax: +1 (530) 273-2769 Email: ussupport@solaredge.com. Support Center: https://www.solaredge.com/us/service/support Before contact, make sure to have the following information at hand: Model and serial number of the product in question. The error indicated on the Inverter SetApp mobile application or on the monitoring platform or by the LEDs, if there is such an indication. System configuration information, including the type and number of modules connected and the number and length of strings. The communication method to the SolarEdge server, if the site is connected. The inverter software version as appears in the status screen. Cellular Plug-in Installation Guide MAN-01-00556-1.1 About This Guide 8 About This Guide This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for connection of the SolarEdge inverter to the SolarEdge monitoring server. This guide assumes that the SolarEdge power harvesting system is already installed and commissioned. For additional information about how to install and commission the SolarEdge power harvesting system, refer to the relevant installation guide. This guide includes the following chapters: Chapter 1: "System Compatibility Check and Upgrade" on page 10 describes how to check the inverter SW version and upgrade if required. Chapter 2: "Cellular Plug-in and Antenna Installation" on page 1, describes how to mount, connect and verify the connection of the Cellular Plug-in and antenna. Chapter 3:"Configuring Cellular Communication " on page 18 describes, how to set up the cellular communication option in the inverter, and check the communication. Cellular Plug-in Installation Guide MAN-01-00556-1.1 9 About This Guide Technical Specifications - Cellular Plug-in on page 27, provides the electrical and mechanical specifications of the SolarEdge Cellular Plug-in. For further information, datasheets and the most up-to-date certifications for various products in different countries, please visit the SolarEdge website: www.solaredge.com. Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 1: System Compatibility Check and 10 Chapter 1: System Compatibility Check and Upgrade Software Requirements To use the Cellular communication option, the communication board firmware (CPU) version must be 4.2.XX or higher(three phase inverters) or 4.4.xx or higher (single phase inverters). To check the inverter CPU version and upgrade firmware using SetApp: 1. Access SetApp and select Commissioning è Information 2. If required, upgrade to the latest available firmware :select MaintenanceèFirmware Upgrade, and follow the instructions on the screen. Cellular Plug-in Installation Guide MAN-01-00556-1.1 11 Chapter 2: Cellular Plug-in and Antenna Chapter 2: Cellular Plug-in and Antenna Installation This chapter describes how to install a Cellular Plug -in and antenna in each of a SolarEdge devices that will communicate with the SolarEdge monitoring platform. When using multiple SolarEdge inverters in the same site, a cellular modem must be installed in each inverter. Figure 1: Cellular Plug-in connection diagram Package Contents Cellular Plug-in Antenna and mounting clip with antenna cable Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 2: Cellular Plug-in and Antenna Installation Clipping the Antenna to the inverter 1. Power off the inverter: a. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to discharge. b. Turn the Safety Switch to OFF. c. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel. 2. Insert the clip from the bottom of the inverter between the bracket and the inverter rear side. 3. Route the antenna cable upwards along the inner fins or the inverter side, by threading the clip and RF cable from the bottom of the inverter between the bracket and the inverter's rear side. Cellular Plug-in Installation Guide MAN-01-00556-1.1 13 Clipping the Antenna to the inverter Figure 2: Routing the antenna cable 4. Clip the antenna vertically to the heatsink fins or the inverter side. Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 2: Cellular Plug-in and Antenna Installation 5. Pass the antenna cable between the mounting bracket and the rear side of the inverter or along the heatsink fins. 6. Open the communication gland at the bottom of the inverter. 7. Remove the rubber seal from the gland and insert the cable through the gland body and the opened connection of the inverter. 8. Insert the rubber seal with the cable into the gland body and reconnect the gland to the inverter. Tighten the sealing gland. 9. Pull the excess cable into the inverter so that the cable can be attached to the inverter communication board (see Figure 4). The cable connects to the cellular Plug-in as described in the next section. Cellular Plug-in Installation Guide MAN-01-00556-1.1 15 Connecting the Antenna to a Vertical Surface Connecting the Antenna to a Vertical Surface using a Bracket For connecting the antenna to a vertical surface (i.e. a wall), use a bracket with the following recommended dimensions (not supplied by SolarEdge): Figure 3: Example of antenna bracket 1. Drill two holes in the surface and attach the bracket to it with two screws. 2. Clip the antenna onto the bracket. Make sure the antenna is vertical. Installing the Plug-In in the Inverter NOTE If the Cellular Plug-in is pre-installed in the inverter, this step is not required. 1. Remove the inverter cover as described in its manual. Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 2: Cellular Plug-in and Antenna Installation To Install the Plug-in in the inverter: 1. Locate the Plug-in in its place on the communication board, as shown in Figure 4. follow these guidelines: Plug in the Plug-in making sure that all pins are correctly positioned in the Plug-in connector, and no pins are left out of the connector. Make sure that the Plug-in is firmly in place. 2. Connect the antenna cable to the cellular Plug-in and tighten manually (as shown in Figure 3). Figure 4: Installed Plug-in and antenna connector 3. Turn the AC ON. Cellular Plug-in Installation Guide MAN-01-00556-1.1 17 Installing the Plug-In in the Inverter WARNING! ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is removed. AVERTISSEMENT! RISQUE D'ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur est retiré. 4. Check that all the cellular Plug-in LEDs are lit. If not, refer to "Configuring Cellular Communication " on page 18 Figure 5: Cellular Plug-in LEDs Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 3: Configuring Cellular Communication Chapter 3: Configuring Cellular Communication This chapter describes how to configure the inverter to use cellular communication, verify the connection and troubleshoot problems. Configuring the Inverter 1. Ensure you have installed the Plug-in and antenna. For instructions see"Cellular Plug-in and Antenna Installation" on page 11 . 2. Activate, commission and configure the inverter (except for communication) according to the Inverter Installation Guide. 3. Access SetApp and select CommunicationèServer èCellular A blue check mark appears in the Cellular row indicating that a connection has been established. Cellular Plug-in Installation Guide MAN-01-00556-1.1 19 Verifying the Connection and Viewing Verifying the Connection and Viewing Communication Status You view error messages on the Status screen. The Cellular Plug-in communicates with the SolarEdge monitoring platformcontinuously and every 5 minutes sends all monitoring data accumulated since last communication. To access the SetApp Status screen: 1. Do one of the following: During first time Commissioning and configuration: From the Commissioning menu select Status. The main inverter Status screen is displayed (see on the following page) If the inverter has already been activated and commissioned - open SetApp and follow the instructions on the screen (scan the inverter barcode; move the ON/OFF/P switch to P position (for less than 5 sec) and release. The mobile device creates a Wi-Fi connection with the inverter and displays the inverter main Status screen. Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 3: Configuring Cellular Communication Status Inverter SN 07318000C Power Voltage Frequency 100 kW 277 Vac 60.9 Hz P_OK: 138 of S_OK 141 Optimizers Connected Server Connected Cell Status Switch Production OFF CosPhi Limit Country 1.00 No Limit USA2 Voltage Temp Fan 850 Vdc 156 F OK Switch Off. Production > disabled Commissioning Figure 6: SetApp Status screen Cellular Plug-in Installation Guide MAN-01-00556-1.1 21 Verifying the Connection and Viewing 2. Verify that S_OK ( inverter established a successful physical connection to the monitoring platform) and Cell (the method of communication to the SolarEdge monitoring platform) appear on the Status screen. 3. If required you can view the: mobile network operator name (MNO) on the Communication menu. The Signal strength received from the cellular Plug-in(Sig) on the Status screenFigure 6. The strength is displayed as a value between 0-5, (0 = no signal, 5 = excellent signal). Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 3: Configuring Cellular Communication Viewing Error Messages and Troubleshooting The Inverter is not Starting Up If the inverter is not starting up, the Plug-in may have been installed in an inverter with an incompatible CPU software version. Check if the Plug-in is installed, remove it and upgrade the inverter as described in System Compatibility Check and Upgrade on page 10 . You view error messages on the SetApp screen. To access the SetApp Status screen see Viewing Error Messages and Troubleshooting on page 22. Error message Cellular Plug-in detected Not activated Description Troubleshooting The internal Plug- Check that the in is not Cellular Plug- in is communicating installed properly: All with the the pins are inserted communication in the correct location board. and not shifted. The cellular Plugin is not activated for use. Contact SolarEdge support Cellular Plug-in Installation Guide MAN-01-00556-1.1 23 Viewing Error Messages and Troubleshooting Error message Description Not registered The Cellular Plug in is not registered to a network provider. No signal No cellular signal is received. Troubleshooting Check antenna connection or change antenna location. Contact SolarEdge support. Check antenna connection or change antenna location. Check that the cable is connected properly to both Plug-in and antenna Contact SolarEdge support. Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 3: Configuring Cellular Communication Error message DNS Failed TCP Connect. Failed S_OK is not displayed Description Troubleshooting The DNS request that was forwarded to the cellular network provider has Contact SolarEdge failed, or there is a support. problem in the DNS registration on the SolarEdge server. Connection to the SolarEdge server has failed. Contact SolarEdge support. Verify that none of Communication with the SolarEdge monitoring server is not established. the above errors appear. To force communication with the server, scroll to the Communication menu and re-select Cellular. Cellular Plug-in Installation Guide MAN-01-00556-1.1 25 Viewing Error Messages and Troubleshooting Plug-in LED Indications Function LED functionality All LEDs are OFF AUX Power LEDs The green Plug-in power LED is ON, but one or more of the other LEDs is OFF Description Troubleshooting The Plug-in is not connected properly The Plug-in is damaged Check that the Plug-in is installed properly: All the pins are inserted in the correct location and not shifted. Contact SolarEdge support The Plug-in is damaged Contact SolarEdge support Cellular Plug-in Installation Guide MAN-01-00556-1.1 Chapter 3: Configuring Cellular Communication Function LED functionality Description Troubleshooting Init LEDS Red LED is blinking slowley Orange ON Communication between Plug-in and main board Indication only is established The Plug is registered to a Indication only cellular network Green ON The Plug-in is connected to the Indication only Internet Cellular Plug-in Installation Guide MAN-01-00556-1.1 27 Technical Specifications - Cellular Plug-in Technical Specifications - Cellular Plug-in Electrical Modem CDMA transmit 800 Operating Modem receive frequency range CDMA Modem transmit 1900 Modem receive Receiver input sensitivity (Forward link RF level@ FER < 0.5%) Maximum transmit power Antenna connector Power consumption @transmit Min. 824 869 1850 1930 -106 Typ. Max. - 849 - 894 - 1910 - 1990 -107 - 24 RP-SMA 2.5 Units MHz MHz MHz MHz dBm dBm W Mechanical Modem dimensions (L x W) Through-Hole: 3.9 x 1.25 / 78.3 x 32.2 Operating temperature -40 to +185 / -40 to +85 Compliance EMC and Radio FCC class B, Parts 15, 22, 24; Safety UL, UL60950 RoHS Yes in/mm °F/°C Cellular Plug-in Installation Guide MAN-01-00556-1.1 lf you have technical queries concerning our products, please contact our support through SolarEdge service portal: www.solaredge.com/service/support US & Canada (+1) (0) 510 498 3200 Worldwide (+972) (0) 073 240 3118 Fax (+1) (0) 530 273-2769 Email ussupport@solaredge.commadbuild