This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for connection of the SolarEdge inverter to the SolarEdge monitoring server. This guide assumes that the SolarEdge power harvesting system is already installed and commissioned. For additional

This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for.

Current View
cellular-plug-in-for-setapp-installation-guide
Installation Guide
Cellular Plug-in
for Inverters with SetApp
Version 1.1

2
Version History
Version 1.0 (initial release)- January 2019 Version 1.1- January 2019
Modified Technical Specifications modem size
Cellular Plug-in Installation Guide MAN-01-00556-1.1

3
Contents

Disclaimers

4

Important Notice

4

FCC Compliance

5

Support and Contact Information

7

About This Guide

8

Chapter 1: System Compatibility Check and Upgrade 10

Software Requirements

10

Chapter 2: Cellular Plug-in and Antenna Installation 11

Package Contents

11

Clipping the Antenna to the inverter

12

Connecting the Antenna to a Vertical Surface using a

Bracket

15

Installing the Plug-In in the Inverter

15

Chapter 3: Configuring Cellular Communication

18

Configuring the Inverter

18

Verifying the Connection and Viewing Communication

Status

19

Viewing Error Messages and Troubleshooting

22

Technical Specifications - Cellular Plug-in

27

Cellular Plug-in Installation Guide MAN-01-00556-1.1

Disclaimers 4
Disclaimers
Important Notice
Copyright © SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photographic, magnetic or otherwise, without the prior written permission of SolarEdge Inc. The material furnished in this document is believed to be accurate and reliable. However, SolarEdge assumes no responsibility for the use of this material. SolarEdge reserves the right to make changes to the material at any time and without notice. You may refer to the SolarEdge web site (https://www.solaredge.com/us/) for the most updated version. All company and brand products and service names are trademarks or registered trademarks of their respective holders. Patent marking notice: see https://www.solaredge.com/us/patent The general terms and conditions of delivery of SolarEdge shall apply. The content of these documents is continually reviewed and amended, where necessary. However, discrepancies cannot be excluded. No guarantee is made for the completeness of these documents.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

5 FCC Compliance
Please note: This product is intended to provide remote shutdown of the SolarEdge PV harvesting system, to enable safer access to a building in the event of fire. This product DOES NOT reduce the risk of fire or protect firefighters or others accessing a building in the event of a fire. If the RS485 communication between the firefighter gateway and the SolarEdge inverter(s) is disconnected for any reason (including fire), the firefighter gateway LCD will display "No Communication" or "Partial Com.". In this case, the firefighter gateway cannot be relied upon to disconnect the SolarEdge PV harvesting system. The images contained in this document are for illustrative purposes only and may vary depending on product models.
FCC Compliance
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Disclaimers 6 determined by turning the equipment off and on, you are encouraged to try to correct the interference by one or more of the following measures:
Reorient or relocate the receiving antenna. Increase the separation between the equipment and the receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance may void the user's authority to operate the equipment.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

7 Support and Contact Information
Support and Contact Information
If you have technical problems concerning SolarEdge products, please contact us: USA and Canada: 1 510 498 3200 Fax: +1 (530) 273-2769 Email: ussupport@solaredge.com. Support Center: https://www.solaredge.com/us/service/support Before contact, make sure to have the following information at hand:
Model and serial number of the product in question. The error indicated on the Inverter SetApp mobile application or on the monitoring platform or by the LEDs, if there is such an indication. System configuration information, including the type and number of modules connected and the number and length of strings. The communication method to the SolarEdge server, if the site is connected. The inverter software version as appears in the status screen.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

About This Guide 8
About This Guide
This manual describes how to install and set up Cellular communication in a SolarEdge inverter. SolarEdge offers the Cellular communication option for connection of the SolarEdge inverter to the SolarEdge monitoring server. This guide assumes that the SolarEdge power harvesting system is already installed and commissioned. For additional information about how to install and commission the SolarEdge power harvesting system, refer to the relevant installation guide. This guide includes the following chapters:
Chapter 1: "System Compatibility Check and Upgrade" on page 10 describes how to check the inverter SW version and upgrade if required. Chapter 2: "Cellular Plug-in and Antenna Installation" on page 1, describes how to mount, connect and verify the connection of the Cellular Plug-in and antenna. Chapter 3:"Configuring Cellular Communication " on page 18 describes, how to set up the cellular communication option in the inverter, and check the communication.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

9 About This Guide
Technical Specifications - Cellular Plug-in on page 27, provides the electrical and mechanical specifications of the SolarEdge Cellular Plug-in. For further information, datasheets and the most up-to-date certifications for various products in different countries, please visit the SolarEdge website: www.solaredge.com.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 1: System Compatibility Check and 10
Chapter 1: System Compatibility Check and Upgrade
Software Requirements
To use the Cellular communication option, the communication board firmware (CPU) version must be 4.2.XX or higher(three phase inverters) or 4.4.xx or higher (single phase inverters).
To check the inverter CPU version and upgrade firmware using SetApp: 1. Access SetApp and select Commissioning è Information 2. If required, upgrade to the latest available firmware
:select MaintenanceèFirmware Upgrade, and follow the instructions on the screen.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

11 Chapter 2: Cellular Plug-in and Antenna
Chapter 2: Cellular Plug-in and Antenna Installation
This chapter describes how to install a Cellular Plug -in and antenna in each of a SolarEdge devices that will communicate with the SolarEdge monitoring platform. When using multiple SolarEdge inverters in the same site, a cellular modem must be installed in each inverter.
Figure 1: Cellular Plug-in connection diagram
Package Contents
Cellular Plug-in Antenna and mounting clip with antenna cable
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 2: Cellular Plug-in and Antenna Installation
Clipping the Antenna to the inverter
1. Power off the inverter: a. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to discharge. b. Turn the Safety Switch to OFF. c. Disconnect the AC to the inverter by turning OFF the circuit breakers on the distribution panel.
2. Insert the clip from the bottom of the inverter between the bracket and the inverter rear side.
3. Route the antenna cable upwards along the inner fins or the inverter side, by threading the clip and RF cable from the bottom of the inverter between the bracket and the inverter's rear side.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

13 Clipping the Antenna to the inverter
Figure 2: Routing the antenna cable 4. Clip the antenna vertically to the heatsink fins or the
inverter side.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 2: Cellular Plug-in and Antenna Installation 5. Pass the antenna cable between the mounting bracket
and the rear side of the inverter or along the heatsink fins. 6. Open the communication gland at the bottom of the
inverter. 7. Remove the rubber seal from the gland and insert the
cable through the gland body and the opened connection of the inverter. 8. Insert the rubber seal with the cable into the gland body and reconnect the gland to the inverter. Tighten the sealing gland. 9. Pull the excess cable into the inverter so that the cable can be attached to the inverter communication board (see Figure 4). The cable connects to the cellular Plug-in as described in the next section.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

15 Connecting the Antenna to a Vertical Surface
Connecting the Antenna to a Vertical Surface using a Bracket
For connecting the antenna to a vertical surface (i.e. a wall), use a bracket with the following recommended dimensions (not supplied by SolarEdge):
Figure 3: Example of antenna bracket 1. Drill two holes in the surface and attach the bracket to it
with two screws. 2. Clip the antenna onto the bracket. Make sure the antenna
is vertical.
Installing the Plug-In in the Inverter
NOTE If the Cellular Plug-in is pre-installed in the inverter, this step is not required. 1. Remove the inverter cover as described in its manual.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 2: Cellular Plug-in and Antenna Installation To Install the Plug-in in the inverter: 1. Locate the Plug-in in its place on the communication
board, as shown in Figure 4. follow these guidelines:
Plug in the Plug-in making sure that all pins are correctly positioned in the Plug-in connector, and no pins are left out of the connector. Make sure that the Plug-in is firmly in place. 2. Connect the antenna cable to the cellular Plug-in and tighten manually (as shown in Figure 3).
Figure 4: Installed Plug-in and antenna connector 3. Turn the AC ON.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

17 Installing the Plug-In in the Inverter WARNING! ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is removed. AVERTISSEMENT!
RISQUE D'ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de l'onduleur est retiré. 4. Check that all the cellular Plug-in LEDs are lit. If not, refer to "Configuring Cellular Communication " on page 18
Figure 5: Cellular Plug-in LEDs
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 3: Configuring Cellular Communication
Chapter 3: Configuring Cellular Communication
This chapter describes how to configure the inverter to use cellular communication, verify the connection and troubleshoot problems.
Configuring the Inverter
1. Ensure you have installed the Plug-in and antenna. For instructions see"Cellular Plug-in and Antenna Installation" on page 11 .
2. Activate, commission and configure the inverter (except for communication) according to the Inverter Installation Guide.
3. Access SetApp and select CommunicationèServer èCellular A blue check mark appears in the Cellular row indicating that a connection has been established.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

19 Verifying the Connection and Viewing
Verifying the Connection and Viewing Communication Status
You view error messages on the Status screen. The Cellular Plug-in communicates with the SolarEdge monitoring platformcontinuously and every 5 minutes sends all monitoring data accumulated since last communication.
To access the SetApp Status screen: 1. Do one of the following:
During first time Commissioning and configuration: From the Commissioning menu select Status. The main inverter Status screen is displayed (see on the following page) If the inverter has already been activated and commissioned - open SetApp and follow the instructions on the screen (scan the inverter barcode; move the ON/OFF/P switch to P position (for less than 5 sec) and release. The mobile device creates a Wi-Fi connection with the inverter and displays the inverter main Status screen.
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 3: Configuring Cellular Communication

Status

Inverter

SN 07318000C

Power

Voltage Frequency

100 kW 277 Vac 60.9 Hz

P_OK: 138 of

S_OK

141
Optimizers Connected

Server Connected
Cell

Status

Switch

Production

OFF

CosPhi

Limit

Country

1.00

No Limit USA2

Voltage

Temp

Fan

850 Vdc

156 F

OK

Switch Off. Production

> disabled

Commissioning Figure 6: SetApp Status screen

Cellular Plug-in Installation Guide MAN-01-00556-1.1

21 Verifying the Connection and Viewing 2. Verify that S_OK ( inverter established a successful
physical connection to the monitoring platform) and Cell (the method of communication to the SolarEdge monitoring platform) appear on the Status screen. 3. If required you can view the:
mobile network operator name (MNO) on the Communication menu. The Signal strength received from the cellular Plug-in(Sig) on the Status screenFigure 6. The strength is displayed as a value between 0-5, (0 = no signal, 5 = excellent signal).
Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 3: Configuring Cellular Communication
Viewing Error Messages and Troubleshooting

The Inverter is not Starting Up
If the inverter is not starting up, the Plug-in may have been installed in an inverter with an incompatible CPU software version.
Check if the Plug-in is installed, remove it and upgrade the inverter as described in System Compatibility Check and Upgrade on page 10 .
You view error messages on the SetApp screen. To access the SetApp Status screen see Viewing Error Messages and Troubleshooting on page 22.

Error message Cellular Plug-in detected
Not activated

Description

Troubleshooting

The internal Plug- Check that the

in is not

Cellular Plug- in is

communicating installed properly: All

with the

the pins are inserted

communication in the correct location

board.

and not shifted.

The cellular Plugin is not activated for use.

Contact SolarEdge support

Cellular Plug-in Installation Guide MAN-01-00556-1.1

23 Viewing Error Messages and Troubleshooting

Error message

Description

Not registered

The Cellular Plug in is not registered to a network provider.

No signal

No cellular signal is received.

Troubleshooting
Check antenna connection or change antenna location.
Contact SolarEdge support.
Check antenna connection or change antenna location.
Check that the cable is connected properly to both Plug-in and antenna
Contact SolarEdge support.

Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 3: Configuring Cellular Communication

Error message
DNS Failed
TCP Connect. Failed
S_OK is not displayed

Description

Troubleshooting

The DNS request

that was

forwarded to the

cellular network

provider has

Contact SolarEdge

failed, or there is a support.

problem in the

DNS registration

on the SolarEdge

server.

Connection to the SolarEdge server has failed.

Contact SolarEdge support.

Verify that none of

Communication with the SolarEdge monitoring server is not established.

the above errors appear. To force communication with the server, scroll to the Communication menu and re-select

Cellular.

Cellular Plug-in Installation Guide MAN-01-00556-1.1

25 Viewing Error Messages and Troubleshooting

Plug-in LED Indications

Function

LED functionality

All LEDs are OFF

AUX Power LEDs

The green Plug-in power LED is ON, but one or more of the other LEDs is OFF

Description Troubleshooting

The Plug-in is not connected
properly
The Plug-in is damaged

Check that the Plug-in is installed properly: All the pins are inserted in the correct location and not shifted.
Contact SolarEdge support

The Plug-in is damaged

Contact SolarEdge support

Cellular Plug-in Installation Guide MAN-01-00556-1.1

Chapter 3: Configuring Cellular Communication

Function

LED functionality

Description

Troubleshooting

Init LEDS

Red LED is blinking slowley
Orange ON

Communication

between Plug-in and main board

Indication

only

is established

The Plug is registered to a Indication only

cellular network

Green ON

The Plug-in is connected to the Indication only
Internet

Cellular Plug-in Installation Guide MAN-01-00556-1.1

27 Technical Specifications - Cellular Plug-in

Technical Specifications - Cellular Plug-in

Electrical

Modem

CDMA transmit

800 Operating

Modem receive

frequency range
CDMA

Modem transmit

1900 Modem

receive

Receiver input sensitivity

(Forward link RF level@ FER < 0.5%)

Maximum transmit power

Antenna connector

Power consumption @transmit

Min. 824 869 1850 1930
-106

Typ. Max.

-

849

-

894

-

1910

-

1990

-107

-

24 RP-SMA
2.5

Units MHz MHz MHz MHz
dBm dBm
W

Mechanical

Modem dimensions (L x W)

Through-Hole: 3.9 x 1.25 / 78.3 x 32.2

Operating temperature -40 to +185 / -40 to +85

Compliance

EMC and Radio

FCC class B, Parts 15, 22, 24;

Safety

UL, UL60950

RoHS

Yes

in/mm °F/°C

Cellular Plug-in Installation Guide MAN-01-00556-1.1

lf you have technical queries concerning our products, please contact our support through SolarEdge service portal: www.solaredge.com/service/support

US & Canada (+1)

(0) 510 498 3200

Worldwide (+972) (0) 073 240 3118

Fax (+1)

(0) 530 273-2769

Email

ussupport@solaredge.com


madbuild