Airspan Networks AIRSPAN-BSR900 Base Station Radio (BSR) User Manual Part 2B

Airspan Networks Inc Base Station Radio (BSR) Users Manual Part 2B

Users Manual Part 2B

Download: Airspan Networks AIRSPAN-BSR900 Base Station Radio (BSR) User Manual Part 2B
Mirror Download [FCC.gov]Airspan Networks AIRSPAN-BSR900 Base Station Radio (BSR) User Manual Part 2B
Document ID388062
Application ID4c8lLtukPSserEtPj+vXxg==
Document DescriptionUsers Manual Part 2B
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize144.95kB (1811823 bits)
Date Submitted2004-01-12 00:00:00
Date Available2004-01-02 00:00:00
Creation Date2003-10-19 09:54:34
Producing SoftwareAcrobat Distiller 4.05 for Windows
Document Lastmod2003-12-23 16:03:49
Document TitleUsers Manual Part 2B

Installing the BSDU
Hardware Installation Guide
Figure 5-5: Cable connections for BSDU daisy chaining
Note: When daisy-chaining BSDUs, it does not matter which 100Base-T ports
you use to connect two BSDUs. For example, you can connect 100Base-T 1 to
100Base-T 2, or 100Base-T 1 to 100Base-T 1.
5-10
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
5.8. Connecting Sync IN/OUT ports
The BSDU’s front panel provides an in/out synchronization 8-Pin RJ-45 ports for
synchronization between BSDUs at the base station. The SYNC OUT of the master
BSDU is connected to the SYNC IN of a slave BSDU, which then connects its
SYNC OUT to the SYNC IN of another slave BSDU, and so on.
! Connector: 8-Pin RJ-45 (male)
! Cable: straight-through cable
! Connector Pinouts:
Sync IN
Pin
02030311-05
Name
Description
TD+
Transmit data to GPS
TD-
Transmit data from
GPS
Rx+
Receive Data (hop
synchronization)
NC
Not connected
NC
Not connected
Rx-
Receive Data (hop
synchronization)
1PPS+
GPS pulse per second
1PPS-
GPS pulse per second
Airspan Networks Ltd.
5-11
Installing the BSDU
Hardware Installation Guide
! Sync OUT
Pin
5-12
Name
Description
TD+
Transmit data to GPS
TD-
Transmit data from
GPS
Tx+
Transmit Data (hop
synchronization)
RD+
Receive Data (from
GPS)
RD-
Receive Data (to GPS)
Tx-
Transmit Data (hop
synchronization)
1PPS+
GPS pulse per second
1PPS-
GPS pulse per second
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
5.9. Connecting to BSPS for Power
Management
The BSDU’s front panel provides a 9-Pin DB-type port for serial RS-232 power
management of the BSPS. WipLL’s WipManage manages BSPS by connecting to
the BSDU through the IP network (i.e., from the BSR), and then manages BSPS
through the serial connection between the BSDU and BSPS. The reason for the
serial connection is that the BSPS does not support SNMP-based management,
which is the basis of WipManage.
! Connector: depending on the BSPS model:
9-Pin D-type female (BSDU and BSPS)
-Or-
9-Pin D-type female (BSDU) to 8-Pin RJ-45 (BSPS) adapter (see Figure 5-6)
Figure 5-6: BSDU-to-BSPS power management connectors (RJ-45 to 9-Pin D-type
cable adapter)
! Cable length: 60 cm
02030311-05
Airspan Networks Ltd.
5-13
Installing the BSDU
Hardware Installation Guide
! Connector pinouts:
Pin
BSDU
BSPS
9-Pin D-type
RJ-45
Name
Description
Pin
Name
NC
Not connected
NC
Rx
Receive Data
NC
Tx
Transmit Data
Rx
NC
Not connected
NC
GND
Ground
GND
NC
Not connected
Tx
NC
Not connected
NC
NC
Not connected
NC
NC
Not connected
To connect the BSDU to the BSPS for BSPS serial power management:
1. Connect the 9-pin D-type female connector, at one end of the cable, to the
BSDU’s 9-pin D-type port labeled POWER Management (see Figure 5-7).
2. Connect the RJ-45 connector, at the other end of the cable, to the BSPS System
Controller’s RJ-45 serial port (see Figure 5-7).
5-14
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
Figure 5-7: BSDU-to-BSPS serial cable connections for BSPS power management
02030311-05
Airspan Networks Ltd.
5-15
Installing the BSDU
Hardware Installation Guide
5.10. Connecting to PC for Serial Management
The BSDU’s front panel provides a 9-Pin D-type port for BSDU serial management
(labeled Monitor). Serial management allows you to connect the WipLL’s network
management system (WipConfig) to BSDU without assigning BSDU an IP address.
! Connector: 9-pin D-type male
! Cable: straight-through
! Connector pinouts:
9-Pin D-type Connector
Pin
5-16
Signal
Not connected (NC)
Rx
Tx
NC
NC
NC
NC
NC
NC
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
To connect the PC to the BSDU by serial connection (see Figure 5-8):
1. Connect the 9-pin D-type female connector to the PC.
2. Connect the 9-pin D-type male connector, at the other end of the cable, to the
BSDU’s serial port (labeled Monitor).
Figure 5-8: PC-to-BSDU Serial Connections
02030311-05
Airspan Networks Ltd.
5-17
Installing the BSDU
Hardware Installation Guide
5.11. Connecting to PC for Network IP
Management
For network (IP) configurations, you can connect the PC to the BSDU’s local port,
or remotely (from anywhere) if you have IP connectivity to the device. For PC-toBSDU local network (IP) connections you need to connect the PC to the BSDU’s
10BaseT or 100BaseT port. The BSDU’s front panel provides two 10Base-T ports:
left is labeled 10Base-T 1; right is labeled 10Base-T 2. Port 1 provides PC
management interface to all BSRs connected to the BSDU. Port 2 provides
management interface only to the BSDU. If you connect the BSDU’s two 10BaseT
ports (i.e., loop the ports) to one another by a crossover cable, then you can connect
the PC to one of the BSDU’s 100BaseT ports. If the two BSDU 10BaseT ports are
not connected to one another, then you need to connect the PC to the BSDU’s rightmost 10BaseT port (labeled 10Base-T 2).
Note: For WipLL management, it is recommended to connect Port 1 to Port 2
by a crossover cable, and then connect the management station (PC) to one of
the 100Base-T ports. In such a setup, you can provide management to all
daisy-chained BSDUs and their associated BSRs through one 100Base-T port.
! Connector: 8-Pin RJ-45 (male)
! Cables:
Crossover cable for looping the two 10BaseT ports
Straight-through for connecting the PC to the 100BaseT port
5-18
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
! Connector pinouts:
RJ-45 (100Base-T)
RJ-45 (10Base-T)
Pin
Signal
+Rx
-Rx
+Tx
NC
NC
-Tx
NC
NC
Pin
Function
+Tx
-Tx
+Rx
NC
NC
-Rx
NC
NC
To connect the PC to the BSDU using a network connection:
1. Connect the RJ-45 connector to the PC’s Ethernet port.
2. Connector the RJ-45 connector, at the other end of cable, to the BSDU’s
10Base-T port labeled 2 (see Figure 5-9);
-OrConnect the BSDU’s two 10Base-T ports with the supplied crossover cable, and
then connect the RJ-45 connector to the BSDU’s 1000Base-T port
(see Figure 5-10).
02030311-05
Airspan Networks Ltd.
5-19
Installing the BSDU
Hardware Installation Guide
Figure 5-9: PC-to-BSDU Local Network Connection – 10Base-T Port
Figure 5-10: PC-to-BSDU Local Network Connection – 100Base-T Port
5-20
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
Note: If you have multiple BSDUs at a base station (i.e., daisy chained
BSDUs), the connection to any BSDU 100Base-T provides management to all
the BSDUs in the daisy chain.
5.12. Connecting to Power
The BSDU requires a power supply of –48 VDC. If the service provider’s base
station cannot supply AC-to-DC voltage, the BSDU can be powered by an optional
WipLL BSPS unit (see Chapter 7, “Installing the BSPS”) that supplies –48 VDC
power as well as power redundancy. Table 5-2 lists the BSDU's power requirements.
Table 5-2: BSDU power requirements
Parameter
Voltage
Value
-48 VDC nominal
Comment
• Minimum -38 VDC
• Maximum -55 VDC
Power consumption
Maximum 300W
Including the feeding of six
BSRs
Note: Before you can connect the BSDU to a power supply, you need to
ground (earth) the BSDU.
02030311-05
Airspan Networks Ltd.
5-21
Installing the BSDU
Hardware Installation Guide
5.12.1. Grounding the BSDU
Before connecting the power supply to the BSDU, you need to ground (earth) the
BSDU.
To ground the BSDU:
1. Connect one end of the grounding lug wire (green/yellow) to the grounding lug
screw located on the rear panel of the BSDU chassis (see Figure 5-11).
2. Connect the other end of the grounding wire to the cabinet rack or any other
customer grounded point at the base station.
Figure 5-11: BSDU grounding connection (BSDU rear panel)
5-22
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
5.12.2. Connecting to Power Supply (BSPS)
The connection between the BSDU and the power supply unit (BSPS) is made via a
two-meter long DC shielded power cable (supplied). The power cable has a power
connector at each end of the cable and a wire for preventing cable disturbances and
radiation. The power cable is connected to the BSDU’s power connector.
The wire color-coding is as follows:
! Red: positive
! Black: negative
Figure 5-12 displays the power cable with the power connectors on each side and the
grounding lug wire on the side that connects to the BSDU.
Grounding lug wire
Power connectors
Power connectors
for BSPS
for BSDU
Figure 5-12: Power cable (with ground wire) for connecting BSDU to BSPS
To connect the BSDU to the power supply unit (see Figure 5-13):
1. Connect the cable’s power connectors on the cable side that provides an
additional wire for preventing power radiation, to the BSDU’s power port
labeled POWER -48 VDC. Ensure that the black-colored (i.e., negative) side of
the connector is inserted in the upper part of the power receptacle; and the redcolored (i.e., positive) side of the connector is inserted in the lower part of the
power receptacle (see Figure 5-13).
2. Connect the grounding lug wire for radiation immunity, to the BSDU’s
grounding lug screw, located alongside the BSDU’s power receptacle (see
Figure).
02030311-05
Airspan Networks Ltd.
5-23
Installing the BSDU
Hardware Installation Guide
3. Connect the other end of the power cable to the power source (i.e., to the
customer’s power supply or to the WipLL BSPS). Ensure that the black-colored
(i.e., negative) side of the connector is inserted in the upper part of the power
receptacle; and the red-colored (i.e., positive) side of the connector is inserted in
the lower part of the power receptacle (see Figure 5-13).
Figure 5-13: BSDU-to-BSPS power cable connections
5-24
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
5.13. LED Indicators
The BSDU provides various LED indicators located on the BSDU’s front panel (see
Figure 5-14). These LEDs are grouped as follows:
! BSR’s LEDs
! 100Base-T LEDs
! Status LEDs
100Base-T LEDs
Status LEDs
BSR’s LEDs
Figure 5-14: BSDU LED indicators
5.13.1. BSR’s LEDs
The BSDU’s BSR’s LED indicators, located on the BSDU’s front panel, includes
three LEDs for each of the six BSR ports. These LEDs are described in Table 5-3.
Table 5-3: BSR’s LED Description
LED
Act
Link
PWR
Color
Yellow
Yellow
Yellow
02030311-05
Status
Meaning
On
Ethernet activity is detected on the BSR port
Off
No Ethernet activity is detected on the BSR port
On
Physical link exists between the BSDU and BSR
Off
No physical link exists between the BSDU and BSR
On
Power is supplied to the BSDU’s BSR port
Off
The BSDU’s BSR port is disabled by software, or port failure
has occurred
Airspan Networks Ltd.
5-25
Installing the BSDU
Hardware Installation Guide
5.13.2. 100Base-T LEDs
The BSDU’s 100Base-T LED indicators, located on the BSDU’s front panel,
includes three LEDs for each of the two 100Base-T ports. These LEDs are described
in Table 5-4.
Table 5-4: 100Base-T LED Description
LED
Rx
Link
10/100
5-26
Color
Yellow
Yellow
Yellow
Status
Meaning
On
Data is received through the 100Base-T port
Off
No data is received through the 100Base-T port
On
Viable physical link between the 100Base-T port and the
external device to which this port connects
Off
No physical link between the 100Base-T port and the external
device to which this port connects
On
Power is supplied to the 100Base-T port
Off
No power at the 100Base-T port
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSDU
5.13.3. Status LEDs
The BSDU’s Status LED indicators, located on the BSDU’s front panel, are
displayed in Figure 5-15.
HSP
State
GPS
HSP P
Figure 5-15: BSDU Status LEDs
The Status LEDs are described in Table 5-5.
Table 5-5: Status LED Description
LED
Color
Status
Meaning
HSP (Hop
Synchronization
Process)
Green
On
BSDU synchronization process is
active
State (two LEDs)
Green
Only right LED is on
Synchronization process is starting
Both LEDs are on
BSDU is the master unit
Only left LED is on
BSDU is a slave unit
Both LEDs are off
BSDU sync pulse lost
On
GPS is connected to the BSDU
Blinking
Receiving a satellite signal
On
Change state for the HSP pulse
Green
GPS (Global
Positioning Satellite)
HSP P (Hop
Synchronization
Process Pulse)
02030311-05
Green
Airspan Networks Ltd.
5-27
6
Installing the GPS
The WipLL system provides BSDU connectivity to GPS antennas for synchronizing
multiple base stations and avoiding radio frequency ghosting effects. The GPS
antenna ensures that the entire WipLL network operates with the same clock, based
on a universal satellite clock signal.
Figure 6-1: GPS antenna for clock synchronization
02030311-05
Airspan Networks Ltd.
6-1
Installing the GPS
Hardware Installation Guide
6.1. Mounting the GPS
Depending on individual customer requirements and environmental influences there
are several available options for mounting the GPS:
! Pole Mounting:
The GPS may be mounted to a pole similar to that used to mount the BSR (See
Chapter 4, “Installing the BSR”).
! Mounting Plate:
The GPS may be mounted to a wall or roof top structure using a purpose-made
mounting plate supplied with the unit.
! Direct Mounting:
The unit may be mounted directly to a suitable structure that has been provided
with holes suited to the GPS mounting details.
! Magnetic Mounting:
An optional magnetic mounting device is available to allow GPS mounting to a
suitable surface, e.g., vehicle roof or steel building structure. This device is
attached by means of the threaded holes provided in the base of the GPS.
6-2
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the GPS
6.2. Connecting to the BSDU
The GPS antenna is connected to the BSDU’s 15-Pin D-type port, labeled GPS (see
Figure 6-2).
15-Pin D-type
port for GPS
Figure 6-2: BSDU rear panel showing GPS port
Note: Airspan supplies un-terminated cables for connecting the GPS to the
BSDU. Refer to Appendix B, “Cable Crimping" for cable crimping procedures
for these connectors.
Warning: To avoid electrical or fire hazard, ensure that the connection to the
GPS is made prior to connecting the BSDU to the power supply.
The following describes the cables and connectors:
! Connector:
GPS: 12-pin female (Deutsch MMP26C-2212S1)
BSDU: 15-Pin D-type male
! Cable: Multipair Overall Shielded (22 AWG)
02030311-05
Airspan Networks Ltd.
6-3
Installing the GPS
Hardware Installation Guide
! Connector pinouts: The GPS connector receptacle contains 12 male contacts, as
displayed in Figure 6-3.
Figure 6-3: GPS connector pinouts
The connector pinouts for the GPS and BSDU are described in the following table.
12-pin female (GPS)
Pin
6-4
Pin name
15-pin D-type male (BSDU)
Cable color
Pin
Lead
POWER
Red
RX_DATA_1-
Blue
TD+ (after R5)
RX_DATA_1+
Black
TD-
TX_DATA_1-
Yellow
RD-
TX_DATA_1+
Black
RD+ (after R3)
RX_DATA_2-
Brown
RX_DATA_2+
Black
GND
Black
10
11
1PPS+
Green
1PPS-
12
1PPS-
Black
1PPS+ (After R7)
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the GPS
To connect the GPS antenna to the BSDU:
1. Connect the 12-pin female connector, at the one end of the cable, to the 12-pin
receptacle connector located at the underside of the GPS.
2. Connect the 15-pin D-type male connector, at the other end of the cable, to the
15-pin D-type port labeled “GPS” at the rear panel of the BSDU.
Figure 6-4 illustrates the BSDU-to-GPS cable connections.
Note:
- When installing the cable, secure the cable to the mounting pole or bracket
with a cable tie to hold the weight of the cable (cable strain relief).
- A loop should be left in the dressed cable for maintenance purposes and to
prevent the cable weight being taken directly on the connector itself.
- Ensure that the connector is waterproof.
02030311-05
Airspan Networks Ltd.
6-5
Installing the GPS
Hardware Installation Guide
Figure 6-4: BSDU-to-GPS cable connections
6-6
Airspan Networks Ltd.
02030311-05
7
Installing the BSPS
This chapter describes the installation of the WipLL Base Station Power Supply
unit (BSPS), which is installed at the base station.
This chapter includes the following sections:
! Overview
BSPS Components
General Site Requirements
BSPS Cabinet Cabling
! BSPS Installation Summary
! Installing BSPS Batteries
! Rectifiers
Installing
Calibrating
! Operating the System Controller
! Connecting BSPS Power to BSDUs
! Connecting the BSPS Management Cables
! BSPS Cabinet Power Requirements
BSPS Cabinet Grounding
BSPS Equipment Supplementary Grounding
! BSPS Troubleshooting
02030311-05
Airspan Networks Ltd.
7-1
Installing the BSPS
Hardware Installation Guide
7.1. Overview
The WipLL Base Station Power Supply unit (BSPS) is an optional WipLL unit that
provides power (and power redundancy) to the BSDU/BSR if no –48 VDC power
supply exists at the base station.
The BSPS front panel is displayed in Figure 7-1.
Figure 7-1: BSPS front panel
The BSPS provides the BSDUs/BSRs with the following:
! Power supply of –48 VDC
! Power redundancy in case of power failure. The BSPS charges a battery bank
that provides this power redundancy during mains failure. Thus, the BSPS acts
as a DC-UPS with a battery connected to it. The size of the battery determines
the backup and charging time. Since the system is current limited, the maximum
battery size is based on that limit.)
7-2
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
! Remote management and monitoring through WipLL’s WipManage or
WipConfig management application.
The BSPS is delivered pre-installed in an Airspan cabinet. The only installation that
is required includes the following:
! Installing the BSPS battery
! Connecting the BSPS temperature sensor to measure battery temperature
! Connecting the BSPS to the BSDU
7.1.1. BSPS Components
The BSPS consists of the following basic components:
! DC Rectifier modules: The Rectifier converts the AC current to DC. The BSPS
can house up to four rectifiers. The rectifiers are “hot plugged” and operate in
parallel. This enables the user to define an “N+1”or “N+2”redundant system.
Each rectifier has its own current sharing system, satisfying a complete sharing
among rectifiers.
! System controller: provides BSPS management control and BSPS operating
information
! Electronic Low Voltage Detector (ELVD): disconnects the battery from the
load, avoiding damage to the battery when over-discharged.
! Battery: provides the BSPS system with back-up power
! Load and battery circuit breakers for DC protection and distribution
! DC Distribution unit: provides circuit breakers for distributing the output
current to multiple BSDUs.
The unit also contains a bypass switch to bypass the LVD.
Note: For power redundancy, at least two rectifiers must be installed.
02030311-05
Airspan Networks Ltd.
7-3
Installing the BSPS
Hardware Installation Guide
The main power rack is housed in a 19” (inches) front mountable chassis.
Figure 7-2 displays the BSPS main components.
DC Distribution module
Rectifier module
Load Breaker
Battery Breaker
Line Breaker
Power ports for connection
to BSDUs
System Controller
Figure 7-2: BSPS Main Rack front view
7-4
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
Figure 7-3 displays the rear panel of the main BSPS rack.
Figure 7-3: BSPS Main Rack rear view
1. AC connection
2. Comm to DC Distribution
3. Temperature Sensor
4. Comm to power system
5. LVD connection
6. Ground
02030311-05
Airspan Networks Ltd.
7-5
Installing the BSPS
Hardware Installation Guide
7.1.2. General Site Requirements
Note: Cable sizes and electrical circuit protection devices discussed in the
following section are typical for 230 Volt AC circuits only. Adjustments are
required for applications other than this.
During AC power installation activities at base station premises the following
general requirements should be adhered to:
! The customer must provide a valid safety certificate for the electrical circuit to
which the equipment is to be connected. If this documentation is not available
checks must be carried out in accordance with local electrical installation test
requirements.
! A qualified electrician must carry out the provision of any additional power
outlets.
! Cables used in the customer premises electrical circuit are to be 3-core 6mm2.
Color-coding for live neutral and earth conductors shall be in accordance with
local electrical regulations.
! The base station premises AC distribution panel must be capable of supplying up
to 240 Volts AC.
! The customer is to allocate and clearly identify fuses in AC distribution panel
that will provide protection for equipment in BSPS cabinet. The circuit is to be
protected by a 32 amp protective device in accordance with local standards.
! The customer shall provide a wall mounted AC power socket adjacent to the
BSPS cabinet. Local territory equipment isolation and earth leakage
requirements are to be met when selecting the plug and socket type.
Alternatively a 32-amp isolator switch may be used for connection to the mains
power supply.
! A common earth point (CEP) shall be designated in the customers’ base station
premises to which the system cabinet earth will be connected.
! A minimum separation distance of 200 mm is to be maintained between AC and
DC signaling cables when they run parallel to each other. However these cables
may cross each other at right angles.
7-6
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
7.1.3. BSPS Cabinet Cabling
This section defines the procedures to be adhered to when installing data cables in
the BSPS cabinet.
Note: A minimum separation of 200 mm should exist between power and data
cables.
! Cable access apertures are located in the top surface of the cabinet. Separate
apertures are provided for power and data cables. All cabling entering and
exiting the BSPS cabinet shall be protected using flexible conduit and gland
systems suited to the cabinet. Power and data cables should exit from the BSPS
cabinet via separate apertures.
! Data cables are to be secured to cable guides provided on the left-hand side of
the cabinet when viewed from the rear. Cables are to be brought together to a
point on the cable guide from where they can be fanned out and fed to the Base
station Distribution Units (BSDU’s).
! Data cables terminating at the front of the BSDU’s should be fed through the
brush gland fitted adjacent to the units and secured to the cable management bar
using tie-wraps.
! When cabling the BSPS cabinet consideration should be given to future growth
and expansion. Allowances in cable forms should be made for the removal of
equipment for maintenance, i.e., BSDU’s, Power racks etc.
! Where cables are installed but not connected to equipment they should be tied
off in such a way as to prevent damage, allow for future growth and
maintenance. Pre-terminated cables should be treated with care and should not
be laid out in vulnerable areas where they may be susceptible to damage.
! Cable crossovers should be kept to a minimum to prevent system interference
and allow easy equipment removal.
! Ensure that the cables are dressed in such a fashion that they are not exposed to
hot exhaust air, sharp edges, doors etc.
02030311-05
Airspan Networks Ltd.
7-7
Installing the BSPS
Hardware Installation Guide
! Observe recommended minimum bend radii when installing copper cables.
Wherever a cable changes direction, ensure that it does so in a smooth curve
with a radius of at least 50mm in order to prevent damage.
! Cables shall be secured directly to cabinet cable trays with plastic cable ties.
Secure the data and power cables at regular intervals within the cabinet to the
cable management trays/trunking provided using cable ties. These ties should be
tensioned and cut using the supplied tool 1PAC10370ACK.
! Care is to be taken to ensure that cables providing connection to peripheral
equipment (e.g. PC’s) do not pose a trip hazard.
! WipLL system interface cables providing connection to a network shall be
terminated and presented to a digital distribution frame (DDF) as agreed with the
customer. Dressing of cables at the DDF shall be done to ensure a potential trip
hazard is not created.
! All data cables should be labeled with both the source and destination at each
end. Un-used cable ends must also be identified with labels to assist with future
upgrades.
7-8
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
7.2. BSPS Installation Summary
The following is a summary of the procedural steps for installing the BSPS:
1. Verify that the circuit breakers of the load, battery and line input are
disconnected and the system is not connected to the line.
2. Connect the main unit to the battery and load via the Battery and Load terminals
on the rear panel.
3. Connect (if needed) the Extension and DC Distribution units. Pay special
attention to the polarities of the wires and locations.
4. Insert a rectifier module into the main unit. All compartments are similar and
connected in parallel.
5. Use 16mm2 (5 AWG) wires for the AC terminals. Minimum requirement is
8mm2 (8 AWG)
6. AC source must be current limited (50A) using an external circuit breaker.
7. Plug the AC input cord into the AC source.
8. Turn on the Line circuit breaker, and verify that the system controller is
activated.
9. Insert the other rectifiers, and verify all green LED's on the panels are lit.
10. All parameters such as the output voltage are pre-defined in the factory.
11. Connect the temperature sensors to the appropriate connector at the rear panel of
the main unit. Place the sensors in the battery compartment.
12. Switch on the LOAD and BATTERY circuit breakers. Verify that the BYPASS
breakers are off.
The system is now ready for use.
13. Verify that the FAULT red LED is not lit and the buzzer not active.
02030311-05
Airspan Networks Ltd.
7-9
Installing the BSPS
Hardware Installation Guide
14. Connect a PC to the RJ-45 port at the front panel of the main unit to control the
system (optional).
Figure 7-4: BSPS Main Rack front view
7-10
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
Protective
covers
Figure 7-5: Rear BSPS cable connections
02030311-05
Airspan Networks Ltd.
7-11
Installing the BSPS
Hardware Installation Guide
7.3. Installing BSPS Batteries
To provide the BSPS system with back-up power, two battery circuits are provided.
Batteries are located on two shelves fitted in the lower sections of the system
cabinet.
A battery protection tray is to be fitted beneath the BSPS racks to prevent tools from
falling onto batteries below.
Warnings:
1) Final battery connection, at the DC distribution rack, must only be made
once the battery is fully installed.
2) The Airspan insulated torque wrench 1PAC10383 AAD must be used when
attaching battery terminations. The wrench is pre-set to ‘break’ at 5.5 Nm
(Newton-meters).
3) Caution must be observed when fitting and connecting batteries as to
prevent the shorting of connections to the cabinet structure.
Insulated tools and the removal of jewellery are mandatory in all live power
installations.
To install the BSPS battery:
1. Prior to installation use a digital multimeter (DMM) to measure the voltage
output from each monobloc. A reading of 12.3 Volts DC is required from each
monobloc.
2. Install the monoblocs onto the battery trays as shown in Figure 7-6.
7-12
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
Figure 7-6: Cabinet battery area
Up to four monoblocs can be housed on each shelf. Connections between the
monoblocs are as illustrated in Figure 7-7.
3. Connect a short battery strap between monoblocs 1 and 2.
4. Using an insulated spanner/wrench tighten the battery terminal nut to the torque
setting recommended by the manufacturer.
5. Using a digital multimeter check across the positive and negative terminals of
the connected monoblocs and ensure that a voltage of 24 VDC is present.
6. Repeat the above steps for the connections between monoblocs 3 and 4.
7. Connect a long battery strap between monoblocs 2 and 3.
8. Using a digital multimeter check across the positive and negative terminals of
monoblocs 1 and 4 and ensure that a voltage of 48 VDC is present.
02030311-05
Airspan Networks Ltd.
7-13
Installing the BSPS
Hardware Installation Guide
Figure 7-7: Method of interconnection between monoblocs
9. Protect the terminals of the monoblocs using suitable battery grease.
10. Before connecting the BSPS battery cables to the battery ensure that the battery
isolation circuit breakers are in the OFF position.
11. Connect the red lead of the BSPS battery cables to the positive terminal on
monobloc 4.
12. Connect the black lead of the BSPS battery cable to the negative terminal on
monobloc 1.
Battery 1
connection
7-14
Airspan Networks Ltd.
Battery 2
connection
02030311-05
Hardw are Installation Guide
Installing the BSPS
13. Check the voltage across the terminals battery input plug DC distribution rack
using a DMM. Ensure that a reading of 48 volts DC is present. If so insert the
plug into the corresponding socket on the front of the DC distribution rack.
14. Repeat the above steps for battery 2 if required.
Note: If any faulty readings were recorded during the process, this would
indicate a damaged monobloc or battery strap. Investigate and replace the
faulty component.
7.4. Rectifiers
The Rectifier module is the heart of the Full-Redundancy 48 VDC BSPS power
system. It converts the input AC to DC current. The Rectifier is a plugged-in module
designed specifically for modular systems. The BSPS can house up to three basic
rectifiers
7.4.1. Installing
The following provides a step-by-step procedure for installing a rectifier.
To install a rectifier in the BSPS system:
1. Remove the blank panel from where you want to install an additional rectifier in
the rectifier shelf.
2. Insert the rectifier into its place with the upper and lower slides.
3. Secure the rectifier in place with 4 screws in the front panel.
4. Verify that the ON LED is lit.
5. If there is a load on the BSPS system, verify, via the Load Bar, that there is
current sharing in the BSPS system by the rectifier.
02030311-05
Airspan Networks Ltd.
7-15
Installing the BSPS
Hardware Installation Guide
7.4.2. Calibrating
The output current indication is indicated by an LED bar graph shown on the unit
front panel. This bar graph is used to verify current sharing operation between
modules fitted in the rack, and to indicate the percentage of the full load.
Bar graph
On LED indicator
Figure 7-8: Rectifier module front view
The calibration of the Rectifier module is simple and involves a single trimmerpotentiometer that adjusts the output voltage.
7-16
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
To calibrate the rectifier:
1. Remove the rectifier from the unit.
2. Connect the Share (+) bus to the negative pole (-) of the rectifier.
3. Using a DMM set the output voltage to 53.50 VDC.
4. Check the single rectifier using a female connector (such as the one used in the
units of the system).
Or
5. Perform provisions for the calibration on a dedicated unit.
6. Access the trimmer via the small opening at the back of the cover.
02030311-05
Airspan Networks Ltd.
7-17
Installing the BSPS
Hardware Installation Guide
7.5. Operating the System Controller
Figure 7-9 shows the features provided on the front panel of the system controller
module.
8-pin RJ-45 port
Figure 7-9: System controller front panel
7-18
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
The function of the LED’s provided on the System controller module can be defined
as follows:
LED
Color
Meaning
AC
Green
Input AC voltage is normal
DC
Green
Output DC voltage is normal
LVD
Red
State of the Low Voltage Disconnect circuit: red indicates that
the battery is disconnected
BATT
Green
Battery test has passed
FAULT
Red continuous
General fault alarm
Red blinking
Faulty rectifier detected
The following lists the buttons and their functions on the System Controller module.
Button
Function
BATT TEST
This is a manual battery test button. A pencil tip may be used to activate.
ALARM OFF
This button silences the module internal buzzer. A pencil tip may be used to
activate.
RESET
This button resets the module. A pencil tip may be used to activate.
02030311-05
Airspan Networks Ltd.
7-19
Installing the BSPS
Hardware Installation Guide
7.6. Connecting BSPS Power to BSDUs
The BSPS’s DC Distribution unit provides circuit breakers for distributing power
output to BSDUs housed in the WipLL cabinet.
The DC Distribution unit contains a switch that provides an LVD circuit bypass
option. When this switch is activated the battery is no longer protected against deep
discharge and the system controller alarm is then activated.
The distribution rack is provided with front panel and rear panel terminations for
connecting to the BSPS main power rack.
To connect the BSPS DC power supply to the BSDU:
1. Attach the shielded power cable connector (supplied) end that contains the wire
for preventing power radiation, to the BSDU’s power port—labeled POWER 48 VDC. Ensure that the black-colored (i.e., negative) half of the connector is
positioned at the top and the red-colored (i.e., positive) half at the bottom.
Screw for power cable
radiation immunity
Power port
Figure 7-10: BSDU front panel with power port and screw attachment for power
radiation immunity
2. Connect the power cable’s yellow/green lug wire, for radiation immunity, to the
BSDU chassis by using the screw attachment located alongside the power port,
as displayed in Figure 7-10.
7-20
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
3. Connect the other end of the power cable to the DC output port of the BSPS’s
DC Distribution unit (labeled LOAD).
The rack front panel is shown in Figure 7-11.
DC power connections
to BSDUs
Figure 7-11: DC Distribution Rack front view
! LOAD DC—DC connection to BSDUs
! DC EXT—extension rack DC power input connection
! BATT IN—battery input connection
! LVD BYPASS—bypass circuit breakers
! LOAD—load circuit breakers
The rack rear panel is shown in Figure 7-12.
02030311-05
Airspan Networks Ltd.
7-21
Installing the BSPS
Hardware Installation Guide
Figure 7-12: DC Distribution Rack rear view
! LVD BYPASS—LVD bypass input connection from main rack
! COMM—Main/Extension Rack Communication port
7.7. Connecting BSPS Management Cables
Connecting the BSPS’s System Controller module to the WipLL BSDU provides the
user with the ability to control the power system operating parameters, retrieving
system data, and status information.
The BSPS System Controller connects to the BSDU(s) via an RJ-45 port located on
the front panel of the controller module. This is connected to BSDU’s 9-Pin D-type
port, labeled POWER Management.
! Connectors:
BSPS: 8-pin RJ-45 (or for previous BSPS models, a 9-Pin D-type)
BSDU: 9-pin D-type female
! Connector pinouts:
7-22
BSPS’s 8-Pin RJ-45:
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
Figure 7-13: BSDU-to-BSPS management connectors via RJ-45 (BSPS) to 9-Pin Dtype (BSDU)
BSDU’s 9-pin D-type:
COM
Tx
Rx
Figure 7-14: BSDU’s 9-pin D-type Connector Pinouts
Note: See Chapter 5, “Installing the BSDU” for detailed connector pinouts.
02030311-05
Airspan Networks Ltd.
7-23
Installing the BSPS
Hardware Installation Guide
7.8. BSPS Cabinet Power Requirements
The following section describes the BSPS cabinet mains power requirements.
Warning: The following information assumes a fully populated BSPS cabinet
with main and extension power racks fitted.
Cable sizes and electrical circuit protection devices discussed in the following
section are typical for 230 Volt AC circuits only. Adjustments are required for
other applications.
! Within the BSPS cabinet protected AC mains feeds are required for the main
power rack and two power outlets.
! Both power outlets are to be installed within the cabinet on an independent radial
circuit. Sockets are to be used for the connection of ancillary test/commissioning
equipment only. The type of socket used is dependant on local electrical
requirements.
! Power within the BSPS cabinet is to be distributed from a modular AC consumer
unit fitted with a 100 amp DP isolator. The unit is to be a metal-clad type with
sufficient outputs for services in the cabinet.
! The following tables displays the protective device rating and cable specification
required for each element of the cabinet AC circuit.
Service
Fuse Rating
Cable Spec
Cabinet power input
32 amp
6 mm2
Main rack input
16 amp
2.5 mm2
Extension rack link
N/A
2.5 mm2
Power socket No.1
6 amp
1.5 mm2
Power socket No.2
6 amp
1.5 mm2
! Provision is made on the rear of the BSPS main power rack for the AC power
connection. A terminal block is provided for the link to the extension power rack
when fitted.
7-24
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
! A terminal block is provided on the rear of the power extension rack for the link
from the main power rack.
! When connecting racks to the AC mains supply loosen the grub screws on the
terminal blocks. Insert the bare copper conductor ensuring correct polarity.
Firmly tighten the screw and gently pull on each cable to ensure the grub screw
has made full contact. Ensure that bare wires are not exposed.
! The plug fitted to the BSPS cabinet power input cable is to be compatible with
the socket provided in the customers’ premises. It must comply with local
regulations for connection of products with earth leakage exceeding 3.5 mA.
! Once AC power connections to the power racks are completed fit protective
covers over the terminal blocks as shown in Figure 7-15.
Supplementary
earth
connection
Protective
cover
Figure 7-15: Fitting protective covers over terminal block
! Power cables are to be routed in the cable guide down right-hand side of the
BSPS cabinet (when viewed from the rear).
! Secure cables in position using strategically located cable ties.
02030311-05
Airspan Networks Ltd.
7-25
Installing the BSPS
Hardware Installation Guide
! Power cables external to the BSPS cabinet must be housed in trunking. The
trunking is to be secured to the wall of the equipment room. Type, securing
method and route of trunking is to be in accordance with customers’
requirements.
! A minimum separation distance of 200 mm is to be maintained between AC and
DC/signaling cables when they run parallel to each other. However these cables
may cross each other at right angles.
! Any dust/debris created during the installation of electrical equipment or cables
shall be cleared and correctly disposed of as the installation progresses.
7.8.1. BSPS Cabinet Grounding
Warning: The WipLL BSPS cabinet must be connected to the customers
building common earth point (CEP) earth before connecting AC power supplies
and installing any equipment.
! When the BSPS cabinet has been located an earth cable shall be run from the
building common earth point (CEP) to the primary earth stud of the cabinet.
! Earth cable specification is to be 6mm2. Cable color-coding is to comply with
local regulations.
! Crimp M6 x 6mm2 lug to the end of the cable to be attached to the CEP with
crimp tool ‘BMR 16U3’ (Airspan Code 1PAC10336AED).
! The required length of cable is to be measured back to the cabinet earthing stud
and the excess removed.
! Crimp M6 x 6mm2 lug to the cable end to be attached to the cabinet earth stud
using crimp tool ‘BMR 16U3’ (Airspan Code 1PAC10336AED).
! Attach the earth cable to the CEP using fastenings provided.
! Attach the earth cable to the cabinet primary earth stud using the fastenings
provided.
7-26
Airspan Networks Ltd.
02030311-05
Hardw are Installation Guide
Installing the BSPS
7.8.2. BSPS Equipment Supplementary Grounding
! Equipment housed in the BSPS cabinet must be supplementary grounded by
connecting a ground lead between each unit ground stud and the cabinet primary
ground stud.
! Cable specification is to be 2.5 mm2. Cable color-coding is to comply with local
regulations.
7.9. BSPS Troubleshooting
The table below indicates methods of solving problems that may arise during the
BSPS installation process.
Table 7-1: BSPS troubleshooting
Symptom
Possible Cause
Remedy
FAULT LED is
blinking
One or more rectifier modules
are faulty
Replace the faulty rectifier/s
FAULT LED is on
• Any breaker is left open
• Check all breakers
• Abnormal input or output
voltages
• Check line voltage and load,
rectifiers may be over-loaded
• Over temperature
• Check the temperature sensor
• LVD is open
• Check the line, general check
• Battery test failed
• Check the battery breaker, cables
and replace battery if none of this
helps
No backup time
when AC is absent
Battery is not connected
Check battery charge, connections
and circuit breaker
Load is not operating
Load is not connected
Battery is discharged or power
is low.
• Check load cables.
• Check load circuit breaker.
No current sharing
among rectifiers
(more then 2
segments difference
between any two
02030311-05
• Load is too high.
• Extension rack is not
properly connected to the
main rack.
• Decrease the load or add rectifiers
to the system.
• Check connections.
Airspan Networks Ltd.
7-27

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.3
Linearized                      : No
Create Date                     : 2003:10:19 09:54:34
Producer                        : Acrobat Distiller 4.05 for Windows
Modify Date                     : 2003:12:23 16:03:49+02:00
Page Count                      : 51
Page Mode                       : UseOutlines
EXIF Metadata provided by EXIF.tools
FCC ID Filing: PIDAIRSPAN-BSR900

Navigation menu