CARRIER Home Generator Manual L0810472
User Manual: CARRIER CARRIER Home Generator Manual CARRIER Home Generator Owner's Manual, CARRIER Home Generator installation guides
Open the PDF directly: View PDF
.
Page Count: 20
| Download | |
| Open PDF In Browser | View PDF |
Air=cooled Generator
tery C
Installation Guidelines
TABLE
Table of Contents
o___F
CONTENTS
Table of Contents ................................inside Front Cover
1.1
Section | - General information ............................... IFC
1.1 Introduction ..........................................................
IF(;
This battery charger supplies a trickle charging current and voltage to maintain
the charge on the generator starting battery inside the generator
enclosure.
The charger will not replenish
a fully discharged
battery. It is intended
to be connected
to a 120VAC generator backed-up
circuit only. If it is not connected
to a generator
backed-up
circuit the battery could go
"dead" while the generator
is running
for extended
periods of time.
1.2
Battery
1.2.1
Charger
Compatibility
Determination
Switch
.................................
1
of Generator/Translkr
Model
Type
........................................
1
Section 2 - Load Shed Transfer Switch
Installation
2.1
Load
2.1.1
Shed
....................................................
Transl_r
Wiring
and
Translkr
Switch
Switch
2.1.2
Wiring
2.1.3
Operational
(RTSS)
Connections
and
Installation
......
2
at the
.............................................
Connections
Testing
2
iNTRODUCTiON
at the
Generator
2
......
.......................................
Figure
2
1.1 -- Charger as Supplied
indicating
input and Output
Wiring
2
Section 3 - Standard or Service Entrance Transfer
Switch installation
3.1
Standard
Transl_r
Entrance
Rated
3.1.1
Wiring
Switch
Transl_r
and
Translkr
Charger
3.1.3
Wiring
3.1.4
Operational
4.1.1
Wiring
and
Translkr
4.1.2
Charger
4.1.3
Wiring
4.1.4
Operational
at the
Generator
4
......
Testing
5
6
................................. 6
at the
AC Input
.............................................
at the
Generator
DC Output
6
..........................................
Connections
3
3
.......................................
Connections
Mounting
and
Service
...........
..........................................
installation
Switch
(RTSE)
3
at the
Connections
Testing
Section 4 - GenReady
or
Installation
.............................................
Mounting
and
(RTSN)
Switch
Connections
Switch
3.1.2
......................................
7
......
.......................................
7
8
Section 5 - Interconnection Diagrams ..........................9
Section 6 - Notes .............................................................16
_
WARNING
_"
Z_ This battery charger must be properly installed
and wired for correct operation of all 2008
model line Air-cooled Standby Generators.
Failure to do so will result in a dead battery
condition at the generator.
NOTE:
For authorized service, reference
the dealer Iocator number found
in the generator owner's manual
or on the generator.
This installation
guide should be used in conjunction with the "Installation
and Owner's
Manual"
that
is furnished
with the Air-cooled
Standby
Generator
and the Installation
and appropriate
transfer
switch manual.
Please review all manuals
prior to installation
of the generator
and transfer
switch. This battery charger is not required
with
the Liquid-cooled
Generator
product
line. This
battery
charger
is not required
for Air-cooled
Standby
Generators
prior to the 2008 model line.
This unit is not compatible
with other generator
manufacturer's
products.
Section 1 - General Information
GENERAL
Battery ChargerInstallation Guidelines
NFORMATON
Future
product
reflected
in the
updates
written
BATTERY CHARGER
1.2
These
Installation
Guidelines
are designed
to familiarize personnel
with the installation
process
for the
battery
charger
required
for the air-cooled
generator
only. It does not replace
or supersede
any information
contained
in any of the written
documents
shipped
with the unit.
This booklet
should
only be used
in
conjunction
with
the Owner's
Manual,
Installation
Guide
and other
technical
documents
shipped
with
the unit.
COMPATiBiLiTY
This
battery
all
2008
For
all
generators
switch
enclosure
For
these
•
Type
Switch
Description
RTSD
Pre-wire
center
with
8 circuit
RTSF
Pre-wire
with
10 circuit
ST100R10C
load
Pre-wire
load
RTSP
Pre-wire
ST100R14C
load
with
12 circuit
14 circuit
Pre-wire
with
load center
RTSS
KGALT0101200
SR200RDPM
Power
Shed
center
16 circuit
Manager
LTS
with 16 circuit
- Load
load
Standard
KGATX
RTSE
SRXXXRD
KGATD
Service
005448-0
005449-0
KGATD0101RSP
NOTE:
Switch
Entrance
Rated
GenReady
Type
is the
first
four
(4) digits
and
that
MUST
be
with
a transfer
already
this
installed
charger
were
NOT
the
supplied
charger
installed
is NOT
according
DETERMiNATiON OF GENERATOR/
TRANSFER SWITCH MODEL TYPE
1.2.1
to Section
Stop
Here
Battery
charger
is included
and pre-wired
the translkr
switch.
Discard
this charger.
further
installation
is required
with
No
Stop
Here
No
Stop
Here
Battery
charger
is included
and pre-wired
the translkr
switch.
Discard
this charger.
further
installation
is required
with
No
Stop
Here
Battery
charger
is included
and pre-wired
the translkr
switch.
Discard
this charger.
further
installation
is required
with
No
Stop
Here
charger
is included
charger
Proceed
and
pre-wired
Discard
this
is required
is included
with
with connections.
with
charger.
the
transikr
The
and
included
connected
battery
charger
must
be installed
The
included
battery
charger
must
be installed
and
connected
The
and
included
connected
battery
charger
must
be installed
of the
model
to
guidelines.
with
No
Battery
switch.
in
is not
Battery
charger
is included
and pre-wired
the translkr
switch.
Discard
this charger.
further
installation
is required
Battery
with
Generators.
Proceed
the translkr
switch.
further
installation
center
RTSW
ST100R16C
KGATX0216100
RTSN
SRXXXR
load
center
with
and
is
center,
Notes
center
RTSH
generators
installed
supplied
charger
switch!load
required
Standby
The Battery
charger
included
with this manual
only
needs to be used with certain
transfer
switch
configurations.
Some transfer
switch
configurations
already
have
the battery
charger
installed
in the transfer
switch.
Before
proceeding
it is necessary
to select the
transfer
switch
used from the following
table.
This
device
should
be installed
with all local
electrical
codes and/or
the latest edition
of the
National
Electrical
Code. All wiring
must be the
correct size and type, and must conform to local
codes, standards,
and regulations.
Switch
all
a transfer
already
estabHealth
to all
were
the
NOTE:
It is essential
to comply with all regulations
lished
by the Occupational
Safety
and
Administration
(OSHA) and strict adherence
local, state and national
codes is mandatory.
that
the
transfer
and
Air-cooled
center,
needed.
the equipment.
Always
read all accompanying
documentation
carefully
before
attempting
to install
any
generator,
transfer
switch
or related
equipment.
is compatible,
line
switch/load
with
and/or
modifications
will be
documentation
included
with
charger
model
number
and
can
be
found
on
the
2
3
3
4
data
label
inside
the
switch.
q
INSTALLATION
Section 2 - Load Shed Transfer Switch Installation
Battery Charger Installation Guidelines
2.]
LOAD SHED TRANSFERSWITCH
•
2.1.2 WIRING AND CONNECTIONS
_ENERATO_
1.
Crimp
spade lugs onto all three low voltage wires,
15B, 0, and 23 (Purchased
or supplied
separately).
Connect
the low voltage
wires,
15B, 0, and 23 to
the terminal
strip on the controller
(Figure
2.2).
(RTSS) INSTALLATION
•
2.1.]
WIRING
AND CONNECTIONS
AT THE
TRAN_
2.
Connect
the 15B, 0, and 23 low voltage
control
wires
to the load shed controller
connector
J5 per the wiring diagram.
Wires should
be sized according
to the
following
table.
Figure
2.2 -Wires
AT THE
Connection
of Charger DC Output
in Generator
Control Panel
CHARGER
DC OUTPUT
{TRANSFER
SWITCH
TO GENERATOR)
WIRE SIZE CHART
Maximum
Wire
Length
Run
Recommended
Size (stranded
Wire
copper)
35
feet
(10.67m)
No.
16 AWG.
60
feet
(18.29m)
No.
14 AWG.
90
feet
(27.43m)
No.
12 AWG.
NOTE:
The
charger
switch
(Figure
is
already
2, I).
mounted
in
the
transfer
NOTE:
See
RTSS
"Interconnection
tions.
Figure
Installation/Wiring
Diagrams"
2.1 --
Diagram
section
for
in the
connec-
2.].
Wiring
Connections
Switch
at the Transfer
1.
2.
3.
If already
connected,
disconnect
the battery
in
the generator.
Remove the negative cable first followed by the positive cable. Take care not to short
the cables together.
Ensure
power is applied
to the battery charger
input.
Connect
a volt meter across
the battery
leads.
The voltage reading should be between 12.8 VDC
and 13.8 VDC (Figure 2.3).
Figure
Charger
2
PERATI NAL TE TiN
2.3 -- Measurement
of Charger
with Battery Disconnected
Output
Section 3 = Standard or Service Entrance Transfer Switch Installation
iNSTALLATiON
Battery ChargerInstallation Guidelines
4.
If the voltage is within range installation
of the
battery charger is complete.
If the voltage is not
within
range verify all wiring
and sizing and
retest.
5.
Re-connect
the battery cables. Positive
followed by the negative cable.
cable
3.
Run the other side of the fuse holder
120VAC
Hot) along with the neutral from the neutral
lug
to the generator
(see Figures 3.1 and 3.5).
NOTE:
first
See the appropriate
RTSN or RTSE
Wiring Diagram for connections,
Installation/
STANDARD TRANSFER SWITCH
3.1
Figure
(RTSN)
OR(RTSE)
SERVICE
3.1 -- RTSN Fuse Block installation
Neutral Connection
and
ENTRANCE RATED TRANSFER
SWITCH INSTALLATION
•
3.]A
WiRiNG
AND CONNECTIONS
AT THE
TRANSFER SWITCH
Choose
the appropriate
option.
NOTE:
See the appropriate
RTSN or RTSE
Wiring Diagram in the "Interconnection
section for connections.
Installation/
Diagrams"
Option ] - Protected Load Provided in Load
Center
1.
2.
)
Install a 15Abreaker
in the load center (Purchased
or supplied
separately).
The breaker
must be on
a generator
backed-up
circuit or the battery
in
the generator
will not maintain
its charge during
extended
run periods.
Run the 120VAC hot wire and neutral wires to the
generator.
NOTE:
See the appropriate
RTSN or RTSE
Wiring Diagram in the "Interconnection
section
for connections.
Figure
3.2 -- RTSN Fuse Block installation
Connection
T1
Installation/
Diagrams"
Option 2 - Protected Load Provided in the RTS,
Fuse Block Installation
NOTE:
This section
is only appropriate
RTSE transfer
switches,
1.
2.
for 2008
RTSN
or
Mount the optional 5amp 600V fuse and holder
in the transfer
switch.
(Purchased
or supplied
separately).
Pre-2008
transfer
switches will not
have holes pre-drilled
for the fuse holder. In this
case, it is necessary
to drill holes in the enclosure
to mount the fuse holder (see Figures
3.1 and
3.4).
Connect one side of the fuse to terminal
(T1) of
the transfer
switch using a spade lug. Pre-2008
transfer
switches
will not have the spade
lug
attached
to terminal
T1. The spade terminal
is
available
separately
if required
(see Figures 3.2
and 3.4).
3
iNSTALLATION
Section 3 - Standard or Service Entrance Transfer Switch installation
Battery Charger Installation Guidelines
Figure
3.3 --
Figure
RTSN Fuse Block installation
Completed
3.4 --
Figure
RTSE Fuse Block installation
Connection
3.5 -- RTSE Neutral
Connection
When
Figure
RTSE Fuse Block Installation
Completed
When
T1
•
3.1.2
1.
Remove
erator
2.
The battery
charger
can be located
anywhere
within the controls
area on the generator.
It is
convenient
to mount
the charger
on the verticat surface
on right-hand
side of the controller
(Figure 3.7).
Clean the surface
where the charger
is to be
mounted
prior to mounting
with a damp cloth
and wait for the area to dry.
Remove the adhesive
covering
on the backside
of the charger and firmly press the charger into
place as shown. Once mounted
the charger may
be removed for inspection
by separating
the hook
& loop mounting
(Figure 3.8).
3.
4.
4
3.6 --
CHARGER MOUNTING
the cover
over the controller
in the gen-
iNSTALLATiON
Section 3 = Standard or Service Entrance Transfer Switch Installation
Battery ChargerInstallation Guidelines
Figure
3.7 -- Mounting
Location
Generator
of Charger
in
Figure
.
Figure
3.8Removal of Adhesive
Covering
Hook and Loop for Mounting
on
3.1.3
WIRING AND CONNECTIONS AT THE
_ENERATOR
.
Attach
the positive
and negative
battery
charger
leads
to the terminal
strip in the controller.
The
positive
lead is either a red wire or is marked
with
a (+) or (15B)
designation.
The negative
lead is
black and/or
marked
with a (-) or (0) designation.
The positive
lead attaches
to the terminal
labeled
"15B".
Note that there will be two wires
attached
to the "15B" terminal
when
the full installation
is completed.
one for the
switch.
labeled
One
common
for
Dress
Figure
Identify
the DC output
wires
on the battery
charger and crimp
spade
lugs onto both the positive
and negative
lead (purchased
or supplied
separately)
(see Figure
1.1).
1.
4.
the battery
charger
and
connection
to the transfer
The negative
lead
"0" (Figure
3.9).
attaches
to the
terminal
Connection
of Charger DC Output
in Generator
Centre/Panel
Using wire nuts
attach
the 120VAC
input
wires
from the battery
charger
to the generator
backedup
120VAC
circuit
from
the
transfer
switch
(Figure 3.10).
Figure
•
3.9 -Wires
3.10 -- Connection
Wires in Generator
all wires
neatly
of Charger AC Input
Control Pane/
(Figure
3.11).
3.11 -- Completed
Charger Connections
on Generator
Control Panel
Q_
INSTALLATION
Section 4 - GenReady Installation
Battery Charger installation Guidelines
4.1
NOTE:
See the appropriate
RTSN
or RTSE
Wiring
Diagram
in the "Interconnection
section
for connections.
Installation/
Diagrams"
3.
4.
5.
If already
connected,
disconnect
the battery
in
the generator.
Remove the negative cable first followed by the positive cable. Take care not to short
the cables together.
Ensure
power is applied to the battery charger
input.
Connect
a volt meter across
the battery
leads.
The voltage reading should be between 12.8VDC
and 13.8VDC (Figure 3.12).
If the voltage is within range installation
of the
battery charger is complete.
If the voltage is not
within
range verify all wiring
and sizing and
retest.
Re-connect
the battery cables. Positive
followed by the negative cable.
Figure
3.12
-- Measurement
of Charger
with Battery Disconnected
NOTE:
See the GenReady
the "Interconnection
nections.
OPERATIONAL TESTING
2.
cable
4.1.1
WiRiNG
Installation/Wiring
Diagram
in
Diagrams"
section
for con-
AND CONNECTIONS
AT THE
TRAN_
1.
2.
3.
Install a 15A breaker in the bottom portion of the
load center (Purchased
or supplied
separately).
The breaker
must be on a generator
backed-up
circuit or the battery
in the generator
will not
maintain
its charge during extended
run periods
(Figure 4.1 ).
Run the 120VAC hot wire and neutral wires to the
generator.
Run the low voltage wires, 15B, 0, and 23 to the
generator
(Figure 4.2)
first
Figure
4.1 --
GenReady
Battery
Breaker
Charger
Installation
Output
Figure
6
GENREADY INSTALLATION
4.2 --
GenReady
Charger
Connections
for
Section 4 - GenReady Installation
iNSTALLATiON
Battery ChargerInstallation Guidelines
O
4.1.2
1.
Remove the cover over the controller
in the generator
The battery
charger
can be located
anywhere
within the controls
area on the generator.
It is
convenient
to mount
the charger
on the vertical surface
on right-hand
side of the controller
(Figure 4.3).
2.
Figure
CHARGER MOUNTING
4.3 -- Mounting
Location
Generator
Figure
of Charger
4.4 -- Removal of Adhesive
Covering
Hook and Loop for Mounting
on
in
4.1.3
WIRING
AND CONNECTIONS
AT THE
GENERATOR
1.
.
.
4.
Clean
the surface
where
the charger
is
mounted
prior
to mounting
with a damp
and wait for the area to dry.
to be
cloth
Remove
the adhesive
covering
on the backside
of the charger
and firmly
press
the charger
into
place as shown.
Once mounted
the charger
may
be removed
for inspection
by separating
the hook
& loop mounting
(Figure
4.4).
Identify
the DC output
wires
on the battery
charger and crimp
spade
lugs onto both the positive
and negative
lead (see Figure
1.1).
Attach
the positive
and negative
battery
charger
leads to the terminal
strip in the controller.
The
positive
lead is either
a red wire or is marked
with a (+) or (15B) designation.
The negative
lead
is black
and/or
marked
with a (-) or (0) designation. The positive
lead attaches
to the terminal
labeled
"15B".
The negative
lead attaches
to the
terminal
labeled
"0". Note that there
will be two
wires
attached
to both
the "0" and
the "15B"
terminals
when
the full installation
is completed
(Figure
4.5).
Figure
4.5 -Wires
Connection
of Charger DC Output
in Generator
Control Panel
7
INSTALLATION
Section 4 - GenReady Installation
Battery Charger instaUation Guidelines
.
Using wire nuts
attach
the 120VAC
input
wires
from the battery
charger
to the generator
backedup
120VAC
circuit
from
the
transfer
switch
(Figure
4.6).
Figure
4.6 -- Connection
wires in generator
of charger AC input
control panel
_J_DPERATI
1.
2.
3.
4.
5.
If already
connected,
disconnect
the battery
in
the generator.
Remove the negative cable first followed by the positive cable. Take care not to short
the cables together.
Ensure
power is applied
to the battery charger
input.
Connect
a volt meter across
the battery
leads.
The voltage reading should be between
12.8VDC
and 13.8VDC (Figure 4.8.
If the voltage is within range installation
of the
battery charger is complete.
If the voltage is not
within
range verify all wiring and sizing and
retest.
Re-connect
the battery cables. Positive
followed by the negative cable.
Figure
4.
Dress
all wires
neatly
(Figure
4.7).
NOTE:
See the GenReady
connections.
Figure
8
Installation/Wiring
Diagram
4.7 -- Completed
Charger Connections
on Generator
Control Panel
for
NAL TE TIN
4.8 -- Measurement
of Charger
with Battery Disconnected
cable
first
Output
Section
5 -
Interconnection
iNSTALLATION
Diagrams
Battery Charger installation
Guidelines
RTSS Diagram - Drawing No. 0G8774-A
oo
co
<[z
co I
--
D
_w
DZ
Wz_
Z_
_zS_
z>-
_
WH_
W
D
D_Z_
03;
x.
\
D_
_wZ_
_
0dW
_w_W
o_ w_
O
_W
wo
z
z_
LoW
z
_Z
_W_
_W_
z_WD
W
_
D
Z
_
Ow_O
_w_
z_O_
o
_oWw
--D
_w
_
w _
o
L_d
z
i'
W
t4
!
Section
5 -
Interconnection
iNSTALLATiON
Diagrams
Battery CEarger instaUation Guidelines
GenReady Diagram - Drawing No. 0G4744-C
L5
z
<_
Od
0
L
Z
<[
oo
co
d
QI
L
z
z
r-
Wz_
sS
0
s_
_z_B
zW_
0_
S_d
_z
_W
_W
s3_
@
o
z
w
%
W
_
Section 6 -
Notes
Battery Charger instaUation Guidelines
t6
Section 6 -- Notes
Battery ChargerinstaUation Guidelines
t7
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 20 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 4, 0, 0, 13 Create Date : Sat Nov 01 04:16:08 2008 Author : Title : Subject :EXIF Metadata provided by EXIF.tools