Huawei Technologies GRFU-1900 GSM Radio Frequency Unit User Manual Commissioning Guide
Huawei Technologies Co.,Ltd GSM Radio Frequency Unit Commissioning Guide
Installation Guide
BTS3900(A) GSM V300R008 Commissioning Guide Issue 02 Date 2009-04-20 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any assistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: http://www.huawei.com Email: support@huawei.com Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are the property of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but the statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. BTS3900(A) GSM Commissioning Guide Contents Contents About This Document.....................................................................................................................1 1 Changes in BTS3900(A) GSM Commissioning Guide.......................................................1-1 2 General Requirements for the Commissioning...................................................................2-1 2.1 Commissioning Resources..............................................................................................................................2-2 2.2 Commissioning Prerequisites..........................................................................................................................2-3 3 Commissioning Procedure.......................................................................................................3-1 4 Commissioning the BTS (Transmission Available)............................................................4-1 4.1 Starting the LMT.............................................................................................................................................4-2 4.2 Checking the Transmission and Networking..................................................................................................4-4 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT................................................................................................................................................................4-5 4.2.2 Checking the Transmission Between Cascaded BTSs...........................................................................4-6 4.2.3 Checking the Transmission Between BTSs in Ring Topology..............................................................4-8 4.3 Checking Software Version and Data Configuration....................................................................................4-11 4.3.1 Checking the Board Configuration and Status on the LMT.................................................................4-11 4.3.2 Checking the Current Software Version on the LMT..........................................................................4-13 4.3.3 Checking the Consistency Between Hardware Installation and Data Configuration...........................4-14 4.4 Checking the Alarm Information of the BTS (on the LMT).........................................................................4-19 4.5 Commissioning the BTS Services.................................................................................................................4-22 4.5.1 Testing the CS Services........................................................................................................................4-23 4.5.2 Commissioning PS Services.................................................................................................................4-25 4.6 Checking the BTS Environment Alarms.......................................................................................................4-26 4.6.1 BTS Environment Alarm Types...........................................................................................................4-26 4.6.2 Checking the Environment Monitoring Alarms on the LMT..............................................................4-28 5 Commissioning the BTS (Transmission Unavailable).......................................................5-1 5.1 Starting the Site Maintenance Terminal..........................................................................................................5-2 5.1.1 Setting the IP Address of the Site Maintenance Terminal PC...............................................................5-2 5.1.2 Locally Connecting the SMT PC to the BTS.........................................................................................5-3 5.1.3 Logging in to the BTS at the Local End.................................................................................................5-3 5.2 Configuring the Basic Data of the BTS..........................................................................................................5-5 5.2.1 Obtaining the Site Management Rights.................................................................................................5-6 Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. BTS3900(A) GSM Commissioning Guide Contents 5.2.2 Configuring the Boards of the BTS on the SMT...................................................................................5-7 5.2.3 Configuring Logical Objects of the BTS on the SMT.........................................................................5-11 5.3 Checking the Active Software Version on the SMT.....................................................................................5-23 5.4 Checking the Transmission Between the BBU and RFU on the BTS Side..................................................5-25 5.5 Checking the Running Status of the BTS......................................................................................................5-26 5.5.1 Checking the State of the BTS LEDs...................................................................................................5-26 5.5.2 Checking the Alarm Information of the BTS on the SMT...................................................................5-29 5.6 Checking the Hardware Connection of the BTS...........................................................................................5-32 6 Optional Commissioning Tasks..............................................................................................6-1 6.1 Commissioning the Antenna System..............................................................................................................6-2 6.1.1 Measuring the VSWR............................................................................................................................6-2 6.1.2 Monitoring the Output Power of TRXs..................................................................................................6-3 6.1.3 Checking the Antenna Connection.........................................................................................................6-5 6.2 Performing the Loopback Test........................................................................................................................6-6 6.2.1 Performing the Carrier Loopback Test...................................................................................................6-6 6.2.2 Performing Channel Loopback Tests.....................................................................................................6-8 6.3 Checking the DIP Switch Settings of the Boards............................................................................................6-9 6.4 Locally Checking the Transmission Between the BBU and the BSC...........................................................6-10 6.5 Checking the Transmission Between Cascaded TRXs.................................................................................6-12 6.6 Checking TRXs in Ring Topology................................................................................................................6-14 7 FAQs for BTS Commissioning................................................................................................7-1 7.1 Failed Communication Between the SMT and the BTS.................................................................................7-2 7.2 Faulty E1 Link.................................................................................................................................................7-2 7.3 Failure of an MS to Search the Network.........................................................................................................7-6 7.4 Service Dialing Failure....................................................................................................................................7-7 7.5 Low GPRS Data Transmission Rate...............................................................................................................7-7 8 Commissioning Record Data Sheet........................................................................................8-1 9 Communication Ports Used by the GBTS.............................................................................9-1 ii Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide Figures Figures Figure 3-1 Commissioning procedure (transmission available)...........................................................................3-2 Figure 3-2 Commissioning procedure (transmission unavailable).......................................................................3-4 Figure 4-1 Login dialog box of the BSC6000 Local Maintenance Terminal.......................................................4-2 Figure 4-2 BSC Management dialog box ............................................................................................................4-3 Figure 4-3 Login dialog box of the M2000 client................................................................................................4-3 Figure 4-4 iManager M2000 Mobile Element Management System window ....................................................4-4 Figure 4-5 Check whether the link between the BBU and the BSC is normal....................................................4-6 Figure 4-6 Check whether the link between the BBU and the RFU is normal....................................................4-6 Figure 4-7 Cascaded BTSs on the LMT...............................................................................................................4-7 Figure 4-8 Site Device Panel tab page.................................................................................................................4-8 Figure 4-9 Connection between ring topology BTSs...........................................................................................4-9 Figure 4-10 Maintain Ring Network dialog box..................................................................................................4-9 Figure 4-11 Confirm dialog box.........................................................................................................................4-10 Figure 4-12 Result of the ring topology switchover (1).....................................................................................4-10 Figure 4-13 Result of the ring topology switchover (2).....................................................................................4-10 Figure 4-14 Site Device Panel tab page.............................................................................................................4-12 Figure 4-15 Query Board Information dialog box.............................................................................................4-13 Figure 4-16 Query Board Running Software Version dialog box ....................................................................4-14 Figure 4-17 Relation between data configuration and physical connection of the BTS3900 monitoring boards .............................................................................................................................................................................4-15 Figure 4-18 Relation between data configuration and physical connection of the BTS3900A monitoring boards .............................................................................................................................................................................4-16 Figure 4-19 Site Device Panel tab page.............................................................................................................4-17 Figure 4-20 Query Board Information dialog box.............................................................................................4-18 Figure 4-21 Site Device Panel tab page.............................................................................................................4-20 Figure 4-22 Filter Alarm Condition dialog box.................................................................................................4-21 Figure 4-23 Alarm Detail Information dialog box.............................................................................................4-21 Figure 4-24 BSS Help System...........................................................................................................................4-22 Figure 4-25 Modify Administrative State dialog box........................................................................................4-24 Figure 4-26 Basic Attributes of Site Board (1)..................................................................................................4-30 Figure 4-27 Basic Attributes of Site Board (2)..................................................................................................4-31 Figure 4-28 Query Board Information dialog box.............................................................................................4-32 Figure 4-29 Basic Attributes of Site Board (3)..................................................................................................4-33 Figure 5-1 Site Maintenance Terminal system window.......................................................................................5-4 Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. iii BTS3900(A) GSM Commissioning Guide Figures Figure 5-2 Communication failed dialog box...................................................................................................... 5-4 Figure 5-3 Set Communication Port Parameter dialog box................................................................................. 5-5 Figure 5-4 Warning message for obtaining the site management right................................................................5-6 Figure 5-5 Site Management Right dialog box....................................................................................................5-6 Figure 5-6 Board Configuration window.......................................................................................................... 5-8 Figure 5-7 Topology Configuration window.....................................................................................................5-8 Figure 5-8 Deploy DRRU dialog box ................................................................................................................. 5-9 Figure 5-9 Topology Configuration window....................................................................................................... 5-9 Figure 5-10 Board Configuration window ........................................................................................................5-10 Figure 5-11 Parameter Management dialog box.............................................................................................5-11 Figure 5-12 Site Configuration dialog box (1)...................................................................................................5-12 Figure 5-13 Site Configuration dialog box (2)...................................................................................................5-13 Figure 5-14 Site Configuration dialog box (3)...................................................................................................5-14 Figure 5-15 Site Configuration dialog box (4)...................................................................................................5-15 Figure 5-16 Site Configuration dialog box (5)...................................................................................................5-16 Figure 5-17 User Error dialog box.....................................................................................................................5-17 Figure 5-18 Site Configuration dialog box (6)...................................................................................................5-18 Figure 5-19 Configured cell and channels..........................................................................................................5-19 Figure 5-20 Site Opstart dialog box...................................................................................................................5-20 Figure 5-21 Cell Opstart dialog box...................................................................................................................5-20 Figure 5-22 BT Opstart dialog box....................................................................................................................5-21 Figure 5-23 RC Attributes Management dialog box..........................................................................................5-21 Figure 5-24 RC Opstart successfully dialog box................................................................................................5-22 Figure 5-25 Board Management window...........................................................................................................5-22 Figure 5-26 Board Management window (1).....................................................................................................5-23 Figure 5-27 Topology Management window.....................................................................................................5-24 Figure 5-28 Board Information dialog box (1) ..................................................................................................5-24 Figure 5-29 Board Information dialog box (2)...................................................................................................5-25 Figure 5-30 Board Management window ..........................................................................................................5-30 Figure 5-31 Topology Management window.....................................................................................................5-31 Figure 5-32 Board Alarm Information dialog box.............................................................................................5-31 Figure 6-1 Please select RC to test dialog box.....................................................................................................6-3 Figure 6-2 RF Performance Test dialog box........................................................................................................6-3 Figure 6-3 Test TRX Loopback dialog box......................................................................................................... 6-7 Figure 6-4 Test Channel Loopback dialog box....................................................................................................6-8 Figure 6-5 Site Device Attributes dialog box.....................................................................................................6-10 Figure 6-6 Physical loopback of E1/T1 at the DDF...........................................................................................6-12 Figure 6-7 Site Device Panel tab page...............................................................................................................6-13 Figure 6-8 Connection between TRXs in ring topology....................................................................................6-14 Figure 6-9 Site Device Attributes dialog box.....................................................................................................6-15 Figure 6-10 Set RXU Chain Break Point dialog box.........................................................................................6-16 Figure 6-11 Setting breakpoint successfully......................................................................................................6-16 iv Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide Figures Figure 6-12 Status of the disconnected TRX ring topology...............................................................................6-17 Figure 6-13 Split RXU Chain dialog box...........................................................................................................6-17 Figure 6-14 Splitting RXU chain successfully...................................................................................................6-18 Figure 6-15 TRX ring topology in splitting state...............................................................................................6-18 Figure 6-16 Combine RXU Chain dialog box....................................................................................................6-19 Figure 6-17 Combining RXU chain successfully...............................................................................................6-20 Figure 6-18 RXU ring in combined state...........................................................................................................6-21 Figure 6-19 RXU Ring in normal state..............................................................................................................6-22 Figure 7-1 Crossed pair connection......................................................................................................................7-3 Figure 7-2 E1 link between the BTS and the BSC (1).........................................................................................7-3 Figure 7-3 E1 link between the BTS and the BSC (2).........................................................................................7-4 Figure 7-4 Physical loopback of E1/T1 on the BTS side.....................................................................................7-5 Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. BTS3900(A) GSM Commissioning Guide Tables Tables Table 2-1 Tools required for the commissioning of the BTS3900/BTS3900A...................................................2-2 Table 3-1 Commissioning procedure (transmission available)............................................................................3-2 Table 3-2 Commissioning procedure (transmission unavailable)........................................................................3-5 Table 4-1 Monitoring boards of the BTS3900 and the BTS3900A...................................................................4-28 Table 5-1 TRX types configured on the BTS3900 GSM or the BTS3900A GSM..............................................5-7 Table 5-2 Normal states of the LEDs on the board and modules in the BBU....................................................5-27 Table 5-3 Normal states of the LEDs on the DRFU...........................................................................................5-27 Table 5-4 Normal states of the LEDs on the GATM.........................................................................................5-28 Table 5-5 Normal states of the LEDs on the FAN unit......................................................................................5-28 Table 5-6 Normal states of the LEDs on the PMU.............................................................................................5-28 Table 5-7 Normal states of the LEDs on the PSU..............................................................................................5-29 Table 5-8 Checklist for the connection of the power cables and grounding cables...........................................5-32 Table 5-9 Checklist for the connection of the signal cables...............................................................................5-33 Table 6-1 Parameter required in RF performance test..........................................................................................6-4 Table 7-1 Possible causes and handling suggestions for failed communication between the SMT and the BTS ...............................................................................................................................................................................7-2 Table 7-2 Meaning of the state of the LIU LEDs (UELP used)..........................................................................7-5 Table 7-3 Meaning of the state of the LIU LEDs (UELP not used)....................................................................7-6 Table 7-4 Possible causes and handling suggestions for service dialing failure..................................................7-7 Table 7-5 Description of the DIP switch SW2 on the GTMU.............................................................................7-7 Table 8-1 Data sheet for BTS commissioning......................................................................................................8-1 Table 9-1 The Communication Port Used by GBTS............................................................................................9-1 Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. vii BTS3900(A) GSM Commissioning Guide About This Document About This Document Overview This document describes the procedures for commissioning and verifying the BTS3900/ BTS3900A GSM after it is installed. The commissioning and verification procedures ensure that the BTS3900/BTS3900A GSM operates as required. The BTS3900/BTS3900A commissioning scenarios include the transmission available scenario and transmission unavailable scenario. Version The following table lists the product versions related to this document. Product Name Version BTS3900 GSM (hereinafter referred to as BTS3900) V300R008 BTS3900A GSM (hereinafter referred to as BTS3900A) V300R008 Intended Audience This document is intended for: Field engineers Technical support engineers Organization 1 Changes in BTS3900(A) GSM Commissioning Guide This describes the changes in the “BTS3900(A) GSM Commissioning Guide”. 2 General Requirements for the Commissioning The general requirements for the commissioning are the commissioning prerequisites and commissioning resources. 3 Commissioning Procedure This describes the commissioning procedure of the BTS. According to the transmission situation between the BSC and BTS, the commissioning procedure of the BTS can be classified into two types: commissioning procedure in transmission available scenario and commissioning procedure in transmission unavailable scenario. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. BTS3900(A) GSM Commissioning Guide About This Document 4 Commissioning the BTS (Transmission Available) This describes how to commission the BTS when the transmission cable between the BSC and the BTS is properly connected. 5 Commissioning the BTS (Transmission Unavailable) This describes how to commission the BTS in the transmission unavailable scenario. The commissioning of the BTS consists of two phases. In the initial phase of the commissioning, the transmission cable between the BSC and the BTS is not properly connected. Commission the BTS at the local end. In the later phase of the commissioning, the transmission cable between the BSC and the BTS is properly connected. Commission the BTS on the BSC side. 6 Optional Commissioning Tasks The optional commissioning tasks are the VSWR check, output power of the TRX check, loopback test check, settings of the DIP switches on the board check, transmission between the BBU and the BSC on the BTS side check, transmission between cascaded TRXs check, and TRX ring topology check. 7 FAQs for BTS Commissioning This describes the fault symptoms and cause analysis in the BTS commissioning. 8 Commissioning Record Data Sheet This describes the data sheet that is used to record the process and result of the BTS commissioning. 9 Communication Ports Used by the GBTS Conventions Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Indicates a hazard with a high level of risk, which if not avoided,will result in death or serious injury. Indicates a hazard with a medium or low level of risk, which if not avoided, could result in minor or moderate injury. Indicates a potentially hazardous situation, which if not avoided,could result in equipment damage, data loss, performance degradation, or unexpected results. Indicates a tip that may help you solve a problem or save time. Provides additional information to emphasize or supplement important points of the main text. General Conventions Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide About This Document The general conventions that may be found in this document are defined as follows. Convention Description Times New Roman Normal paragraphs are in Times New Roman. Boldface Names of files, directories, folders, and users are in boldface. For example, log in as user root. Italic Book titles are in italics. Courier New Examples of information displayed on the screen are in Courier New. Command Conventions The command conventions that may be found in this document are defined as follows. Convention Description Boldface The keywords of a command line are in boldface. Italic Command arguments are in italics. [] Items (keywords or arguments) in brackets [ ] are optional. { x | y | ... } Optional items are grouped in braces and separated by vertical bars. One item is selected. [ x | y | ... ] Optional items are grouped in brackets and separated by vertical bars. One item is selected or no item is selected. { x | y | ... }* Optional items are grouped in braces and separated by vertical bars. A minimum of one item or a maximum of all items can be selected. [ x | y | ... ]* Optional items are grouped in brackets and separated by vertical bars. Several items or no item can be selected. GUI Conventions The GUI conventions that may be found in this document are defined as follows. Convention Description Boldface Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK. Multi-level menus are in boldface and separated by the ">" signs. For example, choose File > Create > Folder . Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. BTS3900(A) GSM Commissioning Guide About This Document Format Description Key Press the key. For example, press Enter and press Tab. Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt +A means the three keys should be pressed concurrently. Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A means the two keys should be pressed in turn. Mouse Operations The mouse operations that may be found in this document are defined as follows. Action Description Click Select and release the primary mouse button without moving the pointer. Double-click Press the primary mouse button twice continuously and quickly without moving the pointer. Drag Press and hold the primary mouse button and move the pointer to a certain position. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 1 Changes in BTS3900(A) GSM Commissioning Guide Changes in BTS3900(A) GSM Commissioning Guide This describes the changes in the “BTS3900(A) GSM Commissioning Guide”. 02(2009-04-20) Second commercial release Compared with issue 01 (2009-02-16) of V300R008, no contents are deleted. The changes are as follows: The solution to trouble is added. For details, see 5.2.3 Configuring Logical Objects of the BTS on the SMT, 4.2.3 Checking the Transmission Between BTSs in Ring Topology, 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT and 5.2.1 Obtaining the Site Management Rights. 01 (2009-02-16) Initial commercial release Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 1-1 BTS3900(A) GSM Commissioning Guide 2 General Requirements for the Commissioning General Requirements for the Commissioning About This Chapter The general requirements for the commissioning are the commissioning prerequisites and commissioning resources. 2.1 Commissioning Resources Before the commissioning, you must arrange for the tools, obtain the information about the site to be commissioned, and download the correct software for the boards in the BTS3900/ BTS3900A. 2.2 Commissioning Prerequisites Before the commissioning, you must check the operating status of the BTS3900/BTS3900A and BSC. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 2-1 BTS3900(A) GSM Commissioning Guide 2 General Requirements for the Commissioning 2.1 Commissioning Resources Before the commissioning, you must arrange for the tools, obtain the information about the site to be commissioned, and download the correct software for the boards in the BTS3900/ BTS3900A. Tools Table 2-1 describes the tools and instruments required for the commissioning. Table 2-1 Tools required for the commissioning of the BTS3900/BTS3900A Tools Qua ntity Specification PC Optional. The PC is used for the commissioning on the BTS side when the transmission between the BSC and BTS is unavailable. For details on the configuration, see Configuration Requirements for the Site Maintenance Terminal PC. For details on how to install and use the SMT application, see BTS3900A GSM Site Maintenance Terminal User Guide. Multimeter Mandatory Power Meter Mandatory. The power meter is used to measure the output power of TRXs. Site Master Mandatory. The Site Master is used to measure the VSWR. GSM MSs for testing Mandatory. The MSs are used for the BTS service commissioning and antenna system commissioning. The requirements for the GSM MS for testing are as follows: Ethernet cable The UE is configured with the SIM card. The MS is registered with the HLR on the network. Optional. The Ethernet cable is used to connect the SMT PC to the BBU when the transmission is unavailable. NOTE If the SMT PC is installed with the windows 98 operating system, the type of the Ethernet cables should be crossover cable. 2-2 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 2 General Requirements for the Commissioning Tools Qua ntity Specification Serial port cable Optional. The serial port cable is used when you query the IP address of the board on the BTS side. The auxiliary cables are listed as follows: Flat-head screwdriver One commissioning cable connected to the serial Ethernet port One extended serial port cable Optional. The flat-head screwdriver is used to remove the Ethernet cable when the transmission between the BSC and the BTS is unavailable. When removing the Ethernet port, you must use a flat-head screwdriver to press the RJ45 connector and then remove the RJ45 connector. Light emitting diode (LED) Optional. The LEDs are used to determine the RX or TX end of the E1 line. Information About the Base Station Before the commissioning, you must obtain the following information about the base station: Information on BTS networking and related configuration, including the BTS type, transmission mode, networking mode, and cell configuration. BTS3900/BTS3900A data configured on the BSC side. Board Software When the transmission is unavailable, download the matching software for the boards to the SMT PC before the commissioning. The software for the boards in the BTS3900/BTS3900A is as follows: RFU software GTMU software GATM software PMU software 2.2 Commissioning Prerequisites Before the commissioning, you must check the operating status of the BTS3900/BTS3900A and BSC. Hardware Requirements The BTS3900/BTS3900A cabinet is installed and the cables are connected. The BTS3900/BTS3900A has passed the hardware installation check before it is powered on. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 2-3 2 General Requirements for the Commissioning BTS3900(A) GSM Commissioning Guide The BTS3900/BTS3900A is powered on. For details, see Powering On the BTS3900A or Powering On the BTS3900. The BSC is installed. The system commissioning is complete, and the system is running normally. Software Requirements 2-4 The data of the BTS3900/BTS3900A is configured on the BSC. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure Commissioning Procedure This describes the commissioning procedure of the BTS. According to the transmission situation between the BSC and BTS, the commissioning procedure of the BTS can be classified into two types: commissioning procedure in transmission available scenario and commissioning procedure in transmission unavailable scenario. Context To solve common problems that occur during the commissioning, see 7 FAQs for BTS Commissioning. In this document, RFUs are classified into two types: DRFUs and GRFUs. Commissioning procedure in transmission available scenario Procedure In the transmission available scenario, the transmission cables between the BSC and the BTS are properly connected before the commissioning. Generally, the commissioning is performed on the BSC6000 LMT. If the commissioning can not be performed on the LMT independently, contact engineers on the BTS side to perform the commissioning task. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 3-1 BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure Figure 3-1 Commissioning procedure (transmission available) Run Remote operation Run the BSC LMT Check the Transmission and Networking Check the software version and the data configuration Check the alarm information of the BTS Cooperation of Commission the BTS services local and remote operation Check the BTS environment alarms End Table 3-1 Commissioning procedure (transmission available) No. 3-2 Operation Procedure Operation on the BSC LMT Mandat ory/ Optiona Run the BSC LMT software. For details, see 4.1 Starting the LMT. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Mandato ry Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure No. Mandat ory/ Optiona Check the transmission and networking to ensure that the transmission between the BBU and BSC, BBU and RFU, cascaded BBUs, and cascaded RFUs is normal. For details, see 4.2 Checking the Transmission and Networking. Mandato ry Check the software version and configuration data. For details, see 4.3 Checking Software Version and Data Configuration. Mandato ry Check the alarm information of the BTS. For details, see 4.4 Checking the Alarm Information of the BTS (on the LMT). Mandato ry Operation on the BTS side. Commission the antenna system. The commissioning consists of the following items: output power of the TRXs, voltage standing wave ratio (VSWR), and connection between the antenna system and BTS. For details, see 6.1 Commissioning the Antenna System. Optional Operation on the BSC LMT Perform the channel loopback test on the LMT to ensure the normal operation of the signaling channel and service channel. For details, see 6.2 Performing the Loopback Test. Optional Operation requiring for the cooperatio n of the BTS side and BSC side. Commission the CS services and PS services. For details, see 4.5 Commissioning the BTS Services. Mandato ry Check the environment monitoring alarm. For details, see 4.6.2 Checking the Environment Monitoring Alarms on the LMT. Mandato ry Operation Procedure Commissioning procedure in transmission unavailable scenario In transmission unavailable scenario, the BTS commissioning consists of two phases: In the initial phase of the commissioning, the transmission cables between the BSC and the BTS are not properly connected. Commission the BTS at the local end. In the later phase of the commissioning, the transmission cable between the BSC and the BTS is properly connected. Commission the BTS on the LMT. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 3-3 BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure Figure 3-2 Commissioning procedure (transmission unavailable) Run Local operation before the transmission is available Run the Site Maintenance Terminal Configure the basic data of the site Check the active software version Check the transmission between the BBU and the RFU locally Check the operation of the BTS Check the hardware connections of the BTS Wait till the transmission is available Remote operation after the transmission is available Run the BSC LMT Check the transmission and networking Check the consistency between hardware installation and data configuration Check the alarm information of the BTS Cooperation of the local and remote operation after the transmission is available Commission the BTS services Check the BTS environment alarms End 3-4 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure Table 3-2 Commissioning procedure (transmission unavailable) No. Operation Procedure Run the Site Maintenance Terminal. For details, see 5.1 Starting the Site Maintenance Terminal. Mandato ry Configure the basic data of the BTS such as boards of the BTS and logical objects of the site to ensure that the SMT can support the local commissioning tasks. For details, see 5.2 Configuring the Basic Data of the BTS. Mandato ry Check the active software version. For details, see 5.3 Checking the Active Software Version on the SMT. Mandato ry Check the transmission between the BBU and RFU. For details, see 5.4 Checking the Transmission Between the BBU and RFU on the BTS Side. Mandato ry Check the running status of the BTS. The procedure for checking the running status of the BTS involves checking the state of LEDs and alarm information. For details, see 5.5 Checking the Running Status of the BTS. Mandato ry Check the hardware connection of the BTS. For details, see 5.6 Checking the Hardware Connection of the BTS. Mandato ry Commission the antenna system. The commissioning consists of the following items: output power of the TRXs, VSWR, and connection between the antenna system and the BTS. For details, see 6.1 Commissioning the Antenna System. Optional Operation on the BTS side. Mandat ory/ Optiona Wait till the transmission is available. 10 Issue 02 (2009-04-20) Operation on the BSC LMT Run the BSC LMT software. For details, see 4.1 Starting the LMT. Mandato ry Check the transmission and networking to ensure that the transmission between the BBU and BSC, BBU and RFU, cascaded BBUs, and cascaded RFUs is normal. For details, see 4.2 Checking the Transmission and Networking. Mandato ry Check the software version and configuration data. For details, see 4.3 Checking Software Version and Data Configuration. Mandato ry Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 3-5 BTS3900(A) GSM Commissioning Guide 3 Commissioning Procedure No. Operation Procedure Mandat ory/ Optiona 11 Check the alarm information of the BTS. For details, see 4.4 Checking the Alarm Information of the BTS (on the LMT). Mandato ry 12 Perform the channel loopback test on the LMT to ensure the normal operation of the signaling channel and service channel. For details, see 6.2 Performing the Loopback Test. Optional Commission the CS services and PS services. For details, see 4.5 Commissioning the BTS Services. Mandato ry Check the environment monitoring alarm. For details, see 4.6.2 Checking the Environment Monitoring Alarms on the LMT. Mandato ry 13 14 Operation requiring for the cooperatio n of the BTS side and BSC side. ----End 3-6 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Commissioning the BTS (Transmission Available) About This Chapter This describes how to commission the BTS when the transmission cable between the BSC and the BTS is properly connected. 4.1 Starting the LMT You can directly log in to the LMT, or log in to the LMT through the M2000 client. 4.2 Checking the Transmission and Networking This describes how to check the transmission and networking. The purpose of checking the transmission and networking is to ensure that the BTS3900A transmission cables and hardware are correctly installed. The items to be checked consist of the transmission between the BBU and the BSC, the transmission between the BBU and the RFU, the transmission between the cascaded BTSs, and the transmission between the BTSs in ring topology. 4.3 Checking Software Version and Data Configuration This describes how to check software version and data configuration to ensure the correctness of the software version and configuration data. The items to be checked are the configuration and status of the board, the software version information, and the consistency between the hardware installation and the data configuration. 4.4 Checking the Alarm Information of the BTS (on the LMT) This describes how to check the alarm information of the BTS on the BSC6000 Local Maintenance Terminal. If an alarm is generated, you need clear the alarm based on the suggestions in the BSS Help System. 4.5 Commissioning the BTS Services This describes how to use an MS to test whether the BTS supports CS services and PS services. 4.6 Checking the BTS Environment Alarms This describes how to check the BTS environment alarms. It also describes how to monitor the operating environment of the BTS. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-1 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide 4.1 Starting the LMT You can directly log in to the LMT, or log in to the LMT through the M2000 client. Context CAUTION Do not modify the system time when the LMT application is running. Otherwise, critical errors may occur on the system. If you have to modify the server time, stop the LMT application first. The default user name and password for the first login are both admin. After you log in to the system for the first time, you are required to change the password. The new password should comply with the default password policy. Procedure Directly log in to the LMT. 1. Choose Start > All Programs > Huawei Local Maintenance Terminal > BSC6000V900B008Cxx > BSC6000 Local Maintenance Terminal. The BSC6000 Local Maintenance Terminal window is displayed, as shown in Figure 4-1. – If you can find the target BSC for login from the BSC Name drop-down list, go to Step 5. – If you cannot find the target BSC for login from the BSC Name drop-down list, go to Step 2. Figure 4-1 Login dialog box of the BSC6000 Local Maintenance Terminal 2. 4-2 Click 4-2. . The BSC Management dialog box is displayed, as shown in Figure Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-2 BSC Management dialog box 3. Type the IP address of the BSC, the name of the BSC, and the remarks (optional) in corresponding fields. Then, click Add. 4. Click Close to return to the Login dialog box, as shown in Figure 4-1. 5. Type the user name and the password in the Name and Password text boxes. Select the BSC name from the BSC Name drop-down list, and set User Type to Local User. Then, click OK. Log in to the BSC LMT through the M2000 client. 1. Choose Start > All Programs > iManager M2000 Client > M2000 Client. The Login dialog box is displayed, as shown in Figure 4-3. Figure 4-3 Login dialog box of the M2000 client Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-3 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide 2. Enter user name in User Name, enter the password in Password, and enter IP address of the server in Server. Click Login. 3. In the iManager M2000 Mobile Element Management System window, choose Topology > Main Topology, as shown in Figure 4-4. Main Topology is displayed on the left side of the dialog box. Figure 4-4 iManager M2000 Mobile Element Management System window 4. Choose Physical Root on the Main Topology tab page, right-click the BSC that the BTS belongs to, and choose Maintenance Client from the displayed shortcut menu. The BSC6000 Local Maintenance Terminal window is displayed. ----End 4.2 Checking the Transmission and Networking This describes how to check the transmission and networking. The purpose of checking the transmission and networking is to ensure that the BTS3900A transmission cables and hardware are correctly installed. The items to be checked consist of the transmission between the BBU and the BSC, the transmission between the BBU and the RFU, the transmission between the cascaded BTSs, and the transmission between the BTSs in ring topology. 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT This describes how to check the transmission between the BBU and the BSC and the transmission between the BBU and the RFU. 4.2.2 Checking the Transmission Between Cascaded BTSs This describes how to check the transmission between cascaded BTSs when there are cascaded BTSs on site. The following description takes the level 3 cascaded BTSs as an example, and describes how to check the transmission between cascaded BTSs. 4-4 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) 4.2.3 Checking the Transmission Between BTSs in Ring Topology This describes how to check the transmission between BTSs in ring topology. The following description is based on three BTSs in ring topology. 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT This describes how to check the transmission between the BBU and the BSC and the transmission between the BBU and the RFU. Procedure Step 1 Choose BSC Maintenance > Maintain Transmission and Signaling > Maintain LAPD Link on the LMT. The Maintain LAPD Link dialog box is displayed. Step 2 Select the link and site to be queried, and click Query. The result is displayed on the Query Result window. If... Then... OML links and RSL links are normal End the checking task. OML links or RSL links are faulty Check for the related alarm, for example, 1000 LAPD_OML Fault alarm. Then rectify the fault according to the alarm help. The possible causes of the faulty links are as follows: The BTS does not work properly. The transmission cables between the BSC and the RFU or BBU are damaged, or the ports to which the transmission cables are connected are faulty. NOTE If the BTS data has just been configured on the LMT, you should reset the BBU first. After the BBU detects the information sent by the BSC and initiates the link setup procedure, the OML link can be detected. ----End Example Issue 02 (2009-04-20) Check whether the OML link between the BBU and the BSC is normal. If the state of the OML link is normal, the BBU is properly connected to the BSC, as shown in Figure 4-5. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-5 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-5 Check whether the link between the BBU and the BSC is normal Check whether the RSL link between the BBU and the RFU is normal. If the state of the RSL link is normal, the BBU is properly connected to the RFU, as shown in Figure 4-6. Figure 4-6 Check whether the link between the BBU and the RFU is normal 4.2.2 Checking the Transmission Between Cascaded BTSs This describes how to check the transmission between cascaded BTSs when there are cascaded BTSs on site. The following description takes the level 3 cascaded BTSs as an example, and describes how to check the transmission between cascaded BTSs. Prerequisite 4-6 The physical connection between cascaded BTSs on the BTS side is complete. The BTS is in TDM or HDLC transmission mode. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Context Figure 4-7 shows the cascaded BTSs in the BSC6000 Local Maintenance Terminal window. Figure 4-7 Cascaded BTSs on the LMT Procedure Step 1 Check whether cascaded BTSs are configured on the LMT. If... Then... Cascaded BTSs are configured Go to Step 2. Cascaded BTSs are not configured See the BSC Initial Configuration Guide to configure the BTSs. Step 2 In the left pane of the BSC6000 Local Maintenance Terminal window, select the level 2 BTS and level 3 BTS respectively. Check whether each board on the Site Device Panel tab ipage s displayed in green, as shown in Figure 4-8. If the board is displayed in green, you can infer that the board is functional. End this task. If the board is not displayed in green, you can infer that the transmission between cascaded BTSs is abnormal. Go to Step 3. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-7 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-8 Site Device Panel tab page Step 3 On the BTS side, check the physical connection between the BBU of the level 1 BTS and BBU of the level 2 BTS. Normally, the T1 of the first E1/T1 of the level 2 BTS should be connected to the R2 of the second E1/T1 of the level 1 BTS, and the R1 of the first E1/T1 of the level 2 BTS should be connected to the T2 of the second E1/T1 of the level 1 BTS. If the link is normal, the status of the LIU1 LED on the level 1 BTS and the LIU0 LED on the level 2 BTS changes from ON disconnected to OFF connected. If the link is still not normal, contact Huawei technical support engineers on the BTS side for troubleshooting. Step 4 On the BTS side, see Step 3 to check the physical connection between the BBU of the level 2 BTS and BBU of the level 3 BTS. ----End 4.2.3 Checking the Transmission Between BTSs in Ring Topology This describes how to check the transmission between BTSs in ring topology. The following description is based on three BTSs in ring topology. Prerequisite The physical connection between BTSs in ring topology on the BTS side is complete. Context 4-8 Figure 4-9 shows the connection between BTSs in ring topology. A, B, C, and D show the positions where the link may be broken during the ring topology transmission. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-9 Connection between ring topology BTSs BTS0 BSC BTS1 BTS2 In this document, set the forward port to port 0 and reverse port to port 1. Procedure Step 1 Check whether of BTSs in ring topology are configured on the LMT. If... Then... The ring topology is configured Go to Step 2. The ring topology is not configured Configure the ring topology. For details, see the BSC Initial Configuration Guide. Step 2 In the BSC6000 Local Maintenance Terminal window, choose BTS Maintenance > Maintain Site > Maintain Ring Network, and the Maintain Ring Network dialog box is displayed. Step 3 In the Setting text box, select Site Type and level 2 BTS, and click Query. The query results are displayed in the Result area, as shown in Figure 4-10. Port 0 serves as the working port. Query Result shows Ring Topology Parameter Query Success. The query result indicates that the link setup is successful and the OML receives the related data configuration. Figure 4-10 Maintain Ring Network dialog box Step 4 Check the switchover of the forward ring port and the reverse ring port on the LMT. 1. Issue 02 (2009-04-20) In the Query Result area, right-click the level 2 BTS. A dialog box is displayed. Click Switch. The Confirm dialog box is displayed, as shown in Figure 4-11. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-9 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-11 Confirm dialog box 2. ClickYes, the Switchover Success dialog box is displayed. The level 2 BTS and level 3 BTS reset automatically. 3. After the level 2 and level 3 BTS are reset, query the information about the ring topology of the level 2 and level 3 BTSs. Figure 4-12 shows the query result. The level 3 BTS is successfully connected in the reverse direction, and the working port is changed from port 0 to port 1. You can infer that the BTS can perform the switchover from the forward ring port to the reverse ring port. Figure 4-12 Result of the ring topology switchover (1) 4. Step 5 Disconnect the BTSs in ring topology manually, and check the automatic switchover of BTSs in ring topology. When the physical connection between BTSs in ring topology is disconnected, the lower-level BTS at the disconnected point works in the reverse link, and the upper-level BTS works in the forward link. 1. On the BTS side, disconnect the transmission cable between the level 1 BTS and level 2 BTS. The level 2 BTS resets automatically. 2. After the reset of the level 2 BTS is complete, see Step 2 and Step 3 to query the information about ring topology. Figure 4-13 shows the query result. The working port of the level 2 BTS is changed from port 0 to port 1. You can infer that the automatic switchover of the lower-level BTS is complete. Figure 4-13 Result of the ring topology switchover (2) 4-10 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) CAUTION In normal situations, after Step 4 or Step 5 is performed, the cascaded BTSs will automatically switch over to the forward link. If the BTSs fail to switch over to the forward link automatically, check the connections of the transmission cables, for example, the connections of the TX and RX ends of the E1 cable. ----End 4.3 Checking Software Version and Data Configuration This describes how to check software version and data configuration to ensure the correctness of the software version and configuration data. The items to be checked are the configuration and status of the board, the software version information, and the consistency between the hardware installation and the data configuration. 4.3.1 Checking the Board Configuration and Status on the LMT This describes how to check the configuration and status of the BTS boards. 4.3.2 Checking the Current Software Version on the LMT This describes how to check the current software version of the boards and modules of the BTS. 4.3.3 Checking the Consistency Between Hardware Installation and Data Configuration This describes how to check the consistency between hardware installation and data configuration. The consistency is confirmed by checking the configuration and board status on the LMT. 4.3.1 Checking the Board Configuration and Status on the LMT This describes how to check the configuration and status of the BTS boards. Procedure Step 1 Click Site Device Panel to check the configured boards, as shown in Figure 4-14. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-11 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-14 Site Device Panel tab page Step 2 Check the status of boards: The green color indicates that the board is Normal. The red color indicates that the board is Faulty. The white color indicates that the board is Passive, that is, the board has no input power. Step 3 Check the board status further: Right-click the board to be queried, and then choose Query Board Information from the shortcut menu. The Query Board Information dialog box is displayed, as shown in Figure 4-15. 4-12 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-15 Query Board Information dialog box Step 4 Check whether Board State is Actively Normal in the Query Board Information dialog box. If the status is Faulty, go to Step 5 to check the alarm information. Step 5 See 4.4 Checking the Alarm Information of the BTS (on the LMT) to check the alarm information and clear the alarm according to the BSS Alarm Reference. ----End 4.3.2 Checking the Current Software Version on the LMT This describes how to check the current software version of the boards and modules of the BTS. Procedure Step 1 In the BSC6000 Local Maintenance Terminal window, choose BTS Maintenance > Query Board Running Software Version. The Query Board Running Software Version dialog box is displayed. Step 2 Select BTS3900/BTS3900A under Site Type, and select the site to be queried under Candidate Sites, and then add the site to the Selected Sites area. Click Start to query the software version of the BTS3900/BTS3900A boards, as shown in Figure 4-16. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-13 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-16 Query Board Running Software Version dialog box Step 3 If the software version is correct, end this task. If the software version is incorrect, update the software version through the loading and activation function of the LMT. For details, see the BSC LMT User Guide. ----End 4.3.3 Checking the Consistency Between Hardware Installation and Data Configuration This describes how to check the consistency between hardware installation and data configuration. The consistency is confirmed by checking the configuration and board status on the LMT. Context CPRI connections: The port numbers SFP0 to SFP5 in the RXU topological structure area on the LMT correspond to the ports CPRI0 to CPRI5 on the panel of the BBU. Slots for the RFUs: On the LMT, the RFUs are configured in subrack 3. The slot numbers of the RFUs are based on the configuration sequence of the TRXs, starting from slot 0. In actual installation, the installation slot of the RFU is determined by the actual requirements. The relations between the data configuration and the physical connections of monitoring boards connected to RS485 ports are described as follows: – 4-14 Figure 4-17 shows the relation between data configuration and physical connection of the BTS3900 monitoring boards. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-17 Relation between data configuration and physical connection of the BTS3900 monitoring boards Monitoring Port Relation Between Data Configuration and Physical on the GTMU Connection – Issue 02 (2009-04-20) MON0 In subrack 2, the DEMU in slot 0, DPMU in slot 2, FMUs in slot 8 and 9, and GATM in slot 16 are all connected to the MON0 port on the GTMU physically. Physical connections: The monitoring signal cable connects the MON0 port on the GTMU and one monitoring board, and the other monitoring boards are connected to this board in cascaded mode. MON1 In subrack 2, the DEMU in slot 1, DPMU in slot 3, FMUs in slot 10 and 11, GATM in slot 17 are all connected to the MON1 port on the GTMU physically. Physical connections: The monitoring signal cable connects the MON1 port on the GTMU and one monitoring board, and the other monitoring boards are connected to this board in cascaded mode. Figure 4-18 shows the relation between data configuration and physical connection of the BTS3900A monitoring boards. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-15 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-18 Relation between data configuration and physical connection of the BTS3900A monitoring boards Monitoring Port Relation Between Data Configuration and Physical on the GTMU Connection MON0 In subrack 2, the DEMU in slot 0, DPMU or APMU in slot 2, DTCU in slot 6, FMUs or FMUAs in slot 8 and 9, and GATM in slot 16 are all connected to the MON0 port on the GTMU physically. Physical connections: The monitoring signal cable connects the MON0 port on the GTMU and one monitoring board, and the other monitoring boards are connected to this board in cascaded mode. MON1 In subrack 2, the DEMU in slot 1, DPMU or APMU in slot 3, DTCU in slot 7, FMUs or FMUAs in slot 10 and 11, and GATM in slot 17 are all connected to the MON1 port on the GTMU physically. Physical connections: The monitoring signal cable connects the MON1 port on the GTMU and one monitoring board, and the other monitoring boards are connected to this board in cascaded mode. NOTE Connection between the MON0 port and the two FMUs or FMUAs: The FMU or FMUA in slot 9 is connected to the MON0 port through the FMU or FMUA in slot 8. Connection between the MON1 port and the two FMUs or FMUAs: The FMU or FMUA in slot 11 is connected to the MON1 port through the FMU or FMUA in slot 10. A maximum of two DEMUs, DPMUs, APMUs, DTCUs, and GATMs can be configured for each BTS, while a maximum of four FMUs or FMUAs can be configured. Procedure Step 1 In the BSC6000 Local Maintenance Terminal window, click the Site Device Panel tab page to check the board configuration of the BTS. Step 2 Check the boards status. If the configured boards are operational, the boards are shown in green, as shown in Figure 4-19. If the boards are shown in red, the boards are faulty. 4-16 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-19 Site Device Panel tab page Step 3 Check board status further: Right-click the board to be queried, and then choose the Query Board Information dialog box from the shortcut menu. The Query Board Information dialog box is displayed. Step 4 Check whether the Board State is Active Normal in the Board Information tab page, as shown in Figure 4-20. If it is Active Normal, the hardware installation and data configuration of the boards are consistent. If it is Faulty, check for the related alarms. For details about how to handle the alarms, see the BSS Alarm Reference. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-17 BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-20 Query Board Information dialog box TIP If... Then... The number of BBUs installed is different from the number of BBUs configured The system reports E1 Local Alarm. More RFUs are installed than those configured The system reports SFP Port Inconsistency Alarm. Fewer RFUs are installed than those configured The system reports SFP Port Inconsistency Alarm and TRX Communication Alarm. A board other than the BBU and RFU is configured but The system reports **** Communication not installed. Alarm, such as Fan Subassembly Communication Alarm and PMU Communication Alarm. 4-18 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) If... Then... A board other than the BBU and RFU is installed but not configured No alarm is reported. ----End 4.4 Checking the Alarm Information of the BTS (on the LMT) This describes how to check the alarm information of the BTS on the BSC6000 Local Maintenance Terminal. If an alarm is generated, you need clear the alarm based on the suggestions in the BSS Help System. Procedure Step 1 Choose BTS in the navigation bar on the left pane of the BSC6000 Local Maintenance Terminal. In the displayed Site Device Panel tab page, check whether alarms related to the BTS boards exist. Check the status of boards: The green color indicates that the board is Normal. The red color indicates that the board is Error, and an alarm exists. Figure 4-21 shows the Site Device Panel tab page. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-19 BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-21 Site Device Panel tab page If... Then... No alarm is generated Repeat 1 to check the alarm information of other BTSs. An alarm is generated Go to 2. Check the alarm generated on this BTS through Alarm Maintenance. Clear the alarm based on the troubleshooting suggestions. Step 2 Alarm maintenance: Check the alarms of the BTS. 4-20 1. Choose Alarm Maintenance > Browse Alarm. The Browse Alarm dialog box is displayed. 2. Right-click an alarm, and choose Filter Alarms... from the shortcut menu. The Filter Alarm Condition dialog box is displayed, as shown in Figure 4-22. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-22 Filter Alarm Condition dialog box 3. Choose the Site to be queried, and click OK. 4. Double-click an alarm. The Alarm Detail Information dialog box is displayed, as shown in Figure 4-23. Figure 4-23 Alarm Detail Information dialog box Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-21 4 Commissioning the BTS (Transmission Available) 5. BTS3900(A) GSM Commissioning Guide Click Alarm Detail, and the BSS Help System is displayed, as shown in Figure 4-24. Handle the alarm according to the BSS Alarm Reference. Figure 4-24 BSS Help System ----End 4.5 Commissioning the BTS Services This describes how to use an MS to test whether the BTS supports CS services and PS services. Prerequisite The transmission between the BSC and the BTS is normal, and the transmission between the BSC and the LMT is normal. The current software version and data configuration are correct. No alarm related to disruption of BTS services is reported on the LMT. 4.5.1 Testing the CS Services This describes how to test the CS services by making test calls between two MSs or between an MS and a PSTN phone. 4.5.2 Commissioning PS Services This describes how to commission PS services by website browsing and file downloading through an MS. A laptop is required to monitor the commissioning. You need to commission only the BTS that is configured with the GPRS or EGPRS services. 4-22 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) 4.5.1 Testing the CS Services This describes how to test the CS services by making test calls between two MSs or between an MS and a PSTN phone. Prerequisite Two test MSs which support GSM are registered with the HLR. The logical cells to be checked are activated. The BSC functions properly. Procedure Step 1 Power on one test MS, and check that the MS automatically searches for the GSM network. If... Then... The testing MS fails to find the GSM network Check that the test MS is configured with the SIM card and the SIM card supports authentication and encryption. The test MS finds the GSM network Go to Step 2. Step 2 Lock the testing MS on a frequency in a logical cell under the BTS. If... Then... The test lasts at least 40n minutes (n is the number of carriers) Go to Step 3. Conduct the call test on a special TCH. The test lasts less than 40n minutes Go to Step 4. Conduct the call test directly. Step 3 Set the state of the TRX TCH. 1. Issue 02 (2009-04-20) On the LMT, choose BTS Maintenance > Modify Administrative State. The Modify Administrative State dialog box is displayed, as shown in Figure 4-25. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-23 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-25 Modify Administrative State dialog box 2. Change the status of all the TRX TCHs in the cell from Unlocked to Locked. If the operation succeeds, the Succeeded in modifying the administrative state. message is displayed in the Operation Result area. 3. Lock the testing MS on a specific frequency. Change the state of one or two TCHs on the frequency from Locked to Unlocked. Then, conduct the call tests on this TCH. Step 4 Conduct the call test as follows: 1. Make a call from one MS to the other, and hook on after the conversation. 2. Make a call from one MS to a PSTN phone, and hook on after the conversation. 3. Make a call from a PSTN phone to one MS, and hook on after the conversation. NOTE It is recommended that each type of test calls be conducted for more than five times to ensure the results. If time permits, it is recommended that one call test be conducted for each the channels of all the TRXs. For detailed operations, see Step 3. Step 5 Ensure that all calls are successful, the conversion is normal, and voice quality is clear. 4-24 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) If... Then... Mobile-originated call succeeds 1. Check the LEDs and alarms. If an alarm is generated on the BTS side, clear the alarm. 2. If an alarm is generated on the BSC side, contact BSC technical support engineers to handle it. 3. After the fault is rectified, go to Step 1 to test the CS services for another time. Mobile-originated call succeeds, and mobile-terminated call fails The data configuration on the BSC side is improper. Contact BSC technical support engineers for troubleshooting. Step 6 Test short message service (SMS) as follows: Use two testing MSs to send SMS messages to each other, and ensure that all the SMS messages are successfully sent and received. Step 7 Choose a proper operation procedure based on actual conditions. If... Then... Step 3 is performed 1. Repeat Step 3 through Step 6 to verify the CS services of other TCHs on the same frequency. 2. Repeat steps Step 2 through Step 6 to test the CS services in other logical cells at the site. Step 3 is not performed Repeat Step 2, and Step 4 through Step 6 to verify the CS services in other logical cells at the site. ----End 4.5.2 Commissioning PS Services This describes how to commission PS services by website browsing and file downloading through an MS. A laptop is required to monitor the commissioning. You need to commission only the BTS that is configured with the GPRS or EGPRS services. Prerequisite One test MS that supports GSM and PS services is registered with the HLR. The BTS cell to be checked is configured with the GPRS or EGPRS services. The logical cell to be checked is activated. The computer and the BSC work properly. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-25 BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Procedure Step 1 Activate the GPRS or EGPRS data service with the MS. Then, commission PS services through multi-service testing. The PS service test involves sending multimedia message, browsing websites, and downloading files. Step 2 Check whether the MS can successfully send multimedia messages, browse webpages, and download files. If... Then... One of the three PS service tests is successful The hardware on the BTS side meets the requirements for PS services. All the three PS service tests fail Check whether the test MS works properly, for example, the test MS is configured with the SIM card or the SIM card supports authentication and encryption. Step 3 Repeat Step 1 through Step 2 to test PS services in other cells under the BTS. ----End 4.6 Checking the BTS Environment Alarms This describes how to check the BTS environment alarms. It also describes how to monitor the operating environment of the BTS. 4.6.1 BTS Environment Alarm Types This describes the various types of environment alarms of the BTS. The alarms consist of the fire alarm, smoke alarm, infrared alarm, water alarm, temperature alarm, humidity alarm, airconditioner alarm, door status alarm, and burglar alarm. 4.6.2 Checking the Environment Monitoring Alarms on the LMT This describes how to check the environment monitoring alarms. Checking the environment monitoring alarms is implemented through simulating the environment factors that may generate alarms, thus checking whether the physical connections of the BTS can report and clear the alarms. Note that the BTS technical support engineers should assist in checking the Boolean environment monitoring alarm. 4.6.1 BTS Environment Alarm Types This describes the various types of environment alarms of the BTS. The alarms consist of the fire alarm, smoke alarm, infrared alarm, water alarm, temperature alarm, humidity alarm, airconditioner alarm, door status alarm, and burglar alarm. 4-26 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) NOTE Critical alarm: devices or resources may be unusable, and restoration should be performed at once. Major alarm: The QoS of devices or resources severely deteriorates, and measures should be taken as soon as possible. The thresholds of temperature alarm and humidity alarm are subject to the local climate and terrain conditions and should be specified on the basis of the field requirements. Fire Alarm The fire alarm is the environment alarm generated when the equipment room is on fire. This is a critical alarm. Smoke Alarm The smoke alarm is an environment alarm generated when the smoke density in the equipment room reaches a predefined threshold. This is a critical alarm. Infrared Alarm The infrared alarm is an environment alarm generated when an infrared facility is taken into the equipment room or is in the infrared detection range of the cabinet. This is a major alarm. Water Alarm The water alarm is an environment alarm generated when water immersion occurs in the equipment room. This is a major alarm. Temperature Alarm The temperature alarm consists of the overtemperature alarm and the undertemperature alarm. This is a major alarm. The overtemperature alarm is generated when the ambient temperature is higher than the predefined upper threshold of the temperature. The undertemperature alarm is generated when the ambient temperature is lower than the predefined lower threshold of the temperature. Humidity Alarm The humidity alarm consists of the high humidity alarm and the low humidity alarm. This is a major alarm. The high humidity alarm is generated when the environment humidity is higher than the predefined upper threshold of the humidity. The low humidity alarm is generated when the environment humidity is lower than the predefined lower threshold of the humidity. Air-Conditioner Alarm The air-conditioner alarm is generated when the air-conditioner is not running properly or the AC power supply is not normal. This is a major alarm. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-27 BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Door Status Alarm The door status alarm is an environment alarm generated when the door of the equipment room or the door of the cabinet is opened. This is a major alarm. Burglar Alarm The burglar alarm is generated when the infrared alarm or door status alarm occurs. This is a critical alarm. 4.6.2 Checking the Environment Monitoring Alarms on the LMT This describes how to check the environment monitoring alarms. Checking the environment monitoring alarms is implemented through simulating the environment factors that may generate alarms, thus checking whether the physical connections of the BTS can report and clear the alarms. Note that the BTS technical support engineers should assist in checking the Boolean environment monitoring alarm. Context The BTS3900 GSM supports the monitoring boards of the DEMU, DPMU, FMU, and GATM. Besides the monitoring boards of the BTS3900 GSM, the BTS3900A GSM also supports the APMU, FMUA, and DTCU. Table 4-1 describes the detailed configuration. Table 4-1 Monitoring boards of the BTS3900 and the BTS3900A Slot in Subrack 2 1 1 6 7 BTS3900 GSM G G M M M M BTS3900A GSM M M M M A A T T U U M M M M M M A A M M M M U U T T M M M M M M U U A A M M G G Procedure 4-28 Commissioning the Boolean alarm (Door Open Alarm of the DEMU) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Alarm switch enabled and alarm switch valid level are required to be noted when checking the Boolean alarm both on the SMT and the LMT. The following part takes the Door Open Alarm of the DEMU as an example to describe the procedure for testing the Boolean alarm. NOTE 1. Trigger conditions of the Door Open Alarm: When the cabinet door of the BTS is open, the DEMU reports Door Open Alarm; when the cabinet door of the BTS is closed, the Door Open Alarm is cleared. Disable the Door Open Alarm and configure the alarm valid level: When the Door Open Alarm is disabled, the DEMU does not report the Door Open Alarm. In other words, the Door Open Alarm is shielded. Alarm valid level configuration specifies the valid level of the door sensor alarm, which is determined by the attribute of the field Gate Magnetism. On the LMT, choose Alarm Maintenance > Browse Alarm. Check the alarm information in the displayed Browse Alarm dialog box. Check whether the Door Open Alarm can be reported normally by opening the cabinet door of the BTS and be cleared normally by closing the cabinet door of the BTS. – If the alarm can be reported and cleared normally, end the checking task. – If the alarm cannot be reported, go to Step 2 to check the data configuration of the Gate Magnetism. TIP If the valid level of the door sensor alarm on site is inconsistent with the valid level of the door sensor alarm based on the data configuration, the reported alarms are opposite. For example, if the valid level of the door sensor alarm on site is high and the configured valid level is low, then: When the cabinet door of the BTS is closed, the DEMU reports the Door Open Alarm; when the cabinet door of the BTS is open, the Door Open Alarm is cleared. Issue 02 (2009-04-20) 2. In the BSC6000 Local Maintenance Terminal window, right-click the site to be queried and choose Configure Site Board Attributes. The Configure Site Board Attributes dialog box is displayed. 3. Click Configure Site Board Attributes, the Site Device Attributes dialog box is displayed. 4. Right-click DEMU, choose Configure Site Board Attributes. The Basic Attributes of Site Board dialog box is displayed. 5. Click the Configure Site Board Attributes tab. Then set Board Parameter Configuration Enabled to Yes. Click Special Alarm Switch Enabled to check whether Gate Magnetism(Disabled) is selected, as shown in Figure 4-26. – In normal conditions, the check box Gate Magnetism(Disabled) is deselected, which means it is enabled and the Door Open Alarm is reported once the alarm is generated. – If the check box Gate Magnetism(Disabled) is selected, deselect the check box. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-29 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Figure 4-26 Basic Attributes of Site Board (1) 6. 4-30 Click Special Alarm Switch Valid Level Configuration in the Basic Attributes of Site Board dialog box. Check whether the configuration of the Gate Magnetism(Low Level) is consistent with the actual alarm switch valid level of the Gate Magnetism, as shown in Figure 4-27. If the alarm switch valid level of the field Gate Magnetism is high level, then – In normal conditions, the check box Gate Magnetism(Low Level) is deselected, which means the Door Open Alarm is reported at a high level. – If the check box Gate Magnetism(Low Level) is selected, deselect the check box. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) Figure 4-27 Basic Attributes of Site Board (2) 7. When the checking is complete, check whether the Door Open Alarm can be reported normally by opening the cabinet door of the BTS and be cleared normally by closing the cabinet door of the BTS. – If the alarm can be reported and cleared normally, end the checking task. – If the alarm cannot be reported, reconnect the related monitoring signal cable. For details, see the BTS3900 Quick Installation Guide or the BTS3900A Quick Installation Guide. Commissioning the alarm reported through the RS485 port (temperature monitoring alarm of the DTCU) The following part takes the temperature monitoring of the DTCU as an example to describe the commissioning of the temperature monitoring alarm of the monitoring board. NOTE Trigger conditions of Temperature Too High Alarm: When the actual temperature of DTCU exceeds the High Temperature Alarm Threshold, the DTCU reports the Temperature Too High Alarm. Trigger condition of Temperature Too Low Alarm: When the actual temperature of DTCU exceeds the Low Temperature Alarm Threshold, the DTCU reports the Temperature Too Low Alarm. On the LMT, choose Alarm Maintenance > Browse Alarm. Check the alarm information in the displayed Browse Alarm dialog box. 1. On the LMT, query the ambient temperature of the BTS DTCU. (1) In the BSC6000 Local Maintenance Terminal window, select the site to be queried. Right-click the monitoring board to be queried on the Site Device Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-31 4 Commissioning the BTS (Transmission Available) BTS3900(A) GSM Commissioning Guide Panel tab page and choose Query Board Information. The Query Board Information dialog box is displayed. (2) Click the Running Parameter tab, and then click Query on the Running Parameter tab. The query is successful, and the running status of the board is displayed in the dialog box. The current Environment Temperature is 28.0℃, as shown in Figure 4-28. Figure 4-28 Query Board Information dialog box 2. On the LMT, set the High Temperature Alarm Threshold to a value lower than the normal temperature to trigger the alarm. (1) In the BSC6000 Local Maintenance Terminal window, right-click the site to be queried and choose Configure Site Board Attributes. The Configure Site Board Attributes dialog box is displayed. (2) Click Configure Site Board Attributes, the Site Device Attributes dialog box is displayed. (3) Right-click DTCU and choose Configure Site Board Attributes. The Basic Attributes of Site Board dialog box is displayed. 4-32 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 4 Commissioning the BTS (Transmission Available) (4) Click Configure Site Board Attributes tab. Then set Board Parameter Configuration Enabled to Yes and set High Temperature Alarm Threshold to 25.0, as shown in Figure 4-29. Figure 4-29 Basic Attributes of Site Board (3) (5) Click OK to complete the setting of the temperature alarm threshold. 3. Check the alarm information of the DTCU. For details, see 4.4 Checking the Alarm Information of the BTS (on the LMT). If the DTCU reports Temperature Too High Alarm, the ambient temperature alarm can be reported normally. If the alarm cannot be reported normally, reconnect the related monitoring signal cables. For details, see the Quick Installation Guide. 4. Set High Temperature Alarm Threshold again to clear Temperature Too High Alarm. For details, see Step 2. ----End Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 4-33 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Commissioning the BTS (Transmission Unavailable) About This Chapter This describes how to commission the BTS in the transmission unavailable scenario. The commissioning of the BTS consists of two phases. In the initial phase of the commissioning, the transmission cable between the BSC and the BTS is not properly connected. Commission the BTS at the local end. In the later phase of the commissioning, the transmission cable between the BSC and the BTS is properly connected. Commission the BTS on the BSC side. 5.1 Starting the Site Maintenance Terminal This describes how to start the SMT. To start the SMT, you need to set the IP address of the SMT PC, connect the SMT PC to the BTS, and then log in to the SMT. 5.2 Configuring the Basic Data of the BTS This describes how to configure the basic data of the BTS such as the BTS boards and logical objects of the site. If the commissioning is performed on the BTS side, other commissioning tasks can be performed only after the configuration of the basic data of the BTS. 5.3 Checking the Active Software Version on the SMT This describes how to check the software versions of the boards and modules in the BTS in the Site Maintenance Terminal System window. 5.4 Checking the Transmission Between the BBU and RFU on the BTS Side This describes how to check the transmission between the BBU and the RFU on the BTS side. By checking the link status of the BBU and RFU, you can rectify the fault caused by abnormal connection, thus ensuring normal communication between the BBU and the RFU. 5.5 Checking the Running Status of the BTS This describes how to check the running status of the BTS. Check the running status of the BTS involves checking the status of LEDs and alarm information on the SMT. 5.6 Checking the Hardware Connection of the BTS This describes how to check the hardware connection of the BTS by checking the connection of power cables, grounding cables, and all kinds of signal cables. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-1 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide 5.1 Starting the Site Maintenance Terminal This describes how to start the SMT. To start the SMT, you need to set the IP address of the SMT PC, connect the SMT PC to the BTS, and then log in to the SMT. 5.1.1 Setting the IP Address of the Site Maintenance Terminal PC This describes how to set the IP address of the SMT PC to the same network segment as the IP address (192.168.0.72/255.255.255.0) of the BTS. 5.1.2 Locally Connecting the SMT PC to the BTS This describes how to connect the Site Maintenance Terminal (SMT) PC to the ETH port on the main control module of the BTS through an Ethernet cable. After they are connected, you can operate and maintain the BTS on the SMT. 5.1.3 Logging in to the BTS at the Local End This describes how to log in to the BTS. You can run the SMT to directly log in to the BTS at the local end. 5.1.1 Setting the IP Address of the Site Maintenance Terminal PC This describes how to set the IP address of the SMT PC to the same network segment as the IP address (192.168.0.72/255.255.255.0) of the BTS. Prerequisite The TCP/IP protocol is installed on the SMT PC. Procedure Step 1 To set the IP address of the PC, perform the following steps where the Windows XP operating system is taken as an example: On Windows XP, choose Start > Setting > Control Panel . Step 2 Double-click Network Connections in the displayed Control Panel window. Right-click Local Area Connection in the displayed dialog box. Step 3 Choose Properties from the shortcut menu. The Local Area Connection Properties dialog box is displayed. Step 4 Select Internet Protocol (TCP/IP), and click Properties. The Internet Protocol (TCP/IP) Properties dialog box is displayed. Step 5 Select Use the following IP address. Step 6 Enter the correct IP address, subnet mask, and default gateway. Ensure that the IP address of the SMT PC is in the same network segment as the IP addresses (192.168.0.72/255.255.255.0) of the BTS so that a maintenance channel on the BTS side can be established. Step 7 Click OK to complete the settings. ----End 5-2 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) 5.1.2 Locally Connecting the SMT PC to the BTS This describes how to connect the Site Maintenance Terminal (SMT) PC to the ETH port on the main control module of the BTS through an Ethernet cable. After they are connected, you can operate and maintain the BTS on the SMT. Prerequisite The IP address and subnet mask of the SMT PC are set correctly. The IP address is in the same network segment as the IP address (192.168.0.72/255.255.255.0) of the BTS. Procedure Step 1 Connect the SMT PC to the BTS through an Ethernet cable. One end is connected to the ETH port on the main control board of the basic cabinet, and the other end is connected to the Ethernet port on the SMT PC (usually a portable PC). Step 2 Open the MS-DOS Prompt dialog box. If the PC is Windows 2000/XP operating system based, choose Start > Run on the SMT. In the Run dialog box, run the cmd command. The MS-DOS Prompt dialog box is displayed. Step 3 Run ping 192.168.0.72 to verify the network connection between the computer and the BTS. NOTE The IP address of the BTS is 192.168.0.72. If the information similar to that in the following example is returned, the SMT PC and the BBU can communicate normally. Pinging 192.168.0.72 with 32 bytes of data: Pinging 192.168.0.72 with 32 bytes of data: Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Reply from 192.168.0.72: bytes=32 time=1ms TTL=253 Ping statistics for 192.168.0.72: Packets: Sent = 4, Received = 4, Lost = 0 (0% loss), Approximate round trip times in milli-seconds: Minimum = 1ms, Maximum = 1ms, Average = 1ms If the SMT PC and the BBU fail to communicate, the possible reason is as follows: – The GTMU is faulty. – The Ethernet cable is faulty, or its connectors are loose. – The Ethernet port on the SMT PC is faulty. – The BTS is resetting. – The IP address is incorrect. ----End 5.1.3 Logging in to the BTS at the Local End This describes how to log in to the BTS. You can run the SMT to directly log in to the BTS at the local end. Prerequisite Issue 02 (2009-04-20) The SMT PC is properly connected to the BTS. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-3 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide The latest software of the SMT is installed in the SMT PC. Procedure Step 1 Start the SMT. If the SMT PC communicates with the BTS normally, a window is displayed, as shown in Figure 5-1. The SMT is successfully started. If the SMT PC cannot communicate with the BTS, the Communication failed dialog box is displayed, as shown in Figure 5-2. Go to Step 2. Figure 5-1 Site Maintenance Terminal system window Figure 5-2 Communication failed dialog box Step 2 Click Yes. 5-4 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) The Set Communication Port Parameter dialog box is displayed, as shown in Figure 5-3. Figure 5-3 Set Communication Port Parameter dialog box Step 3 In the Select Communication Port area, click Network Port. In the Configure IP area, set the IP address to 192.168.0.72. Step 4 Click OK. The Site Maintenance Terminal System window is displayed, as shown in Figure 5-1. Step 5 In the Site Maintenance Terminal System window, click User, and select User Login. Enter User Name (Omc by default) and User Password (omc by default). Logging in to the BTS succeeds. ----End 5.2 Configuring the Basic Data of the BTS This describes how to configure the basic data of the BTS such as the BTS boards and logical objects of the site. If the commissioning is performed on the BTS side, other commissioning tasks can be performed only after the configuration of the basic data of the BTS. 5.2.1 Obtaining the Site Management Rights This describes how to obtain the site management rights. Before configuring the BTS board and site logical objects, you must obtain the site management rights after logging into the BTS at the local end. 5.2.2 Configuring the Boards of the BTS on the SMT This describes how to configure the TRX boards and other boards of the BTS. 5.2.3 Configuring Logical Objects of the BTS on the SMT This describes how to configure logical objects of the BTS. The BTS logical object configuration consists of the cell configuration, carrier binding, and activation of cell configuration data. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-5 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide 5.2.1 Obtaining the Site Management Rights This describes how to obtain the site management rights. Before configuring the BTS board and site logical objects, you must obtain the site management rights after logging into the BTS at the local end. Prerequisite You have logged in to the BTS successfully through the SMT. Procedure Step 1 In the Site Maintenance Terminal System window, select Site, and double-click Site Management Right. The Site Management Right dialog box is displayed. Step 2 Click Obtain. The Warning Message dialog box is displayed, as shown in Figure 5-4. Figure 5-4 Warning message for obtaining the site management right Step 3 Click OK, and wait for the response. If the obtaining succeeds, a dialog box is displayed, as shown in Figure 5-5. If the engineers are configuring or managing the BTS data on the LMT, you cannot obtain the site management rights successfully. In this case, wait till the engineers finish the operation on the LMT, and then repeat Step 2 and Step 3 to obtain the site management rights. Figure 5-5 Site Management Right dialog box 5-6 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Step 4 Click Close to close the Site Management Right dialog box. CAUTION After the commissioning task in the transmission unavailable scenario is complete, you should release the site management rights. Otherwise, the BTS cannot be monitored on the LMT in fifteen minutes. The procedure for releasing the site management rights is as follows: Click Release in the Site Management Right dialog box. When Releasing site management right successfully. is displayed, click Close to close the dialog box. ----End 5.2.2 Configuring the Boards of the BTS on the SMT This describes how to configure the TRX boards and other boards of the BTS. Context Table 5-1 shows the types of TRXs that can be configured on the BTS3900 GSM or BTS3900A GSM. Table 5-1 TRX types configured on the BTS3900 GSM or the BTS3900A GSM BTS Type TRX Type BTS3900 GSM DRRU, DRFU, GRRU, and GRFU BTS3900A GSM DRRU, DRFU, GRRU, and GRFU NOTE The following description takes one DRFU of the CPRI0 port as an example to describe the configuration of the TRX board. One DRFU of the CPRI0 port is configured on the first level of the SPF0 link. Procedure Step 1 Click Board in the navigation pane. The Board Configuration and Board Management windows are displayed. Step 2 Double-click Board Configuration. The Board Configuration window is displayed, as shown in Figure 5-6. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-7 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-6 Board Configuration window NOTE In the transmission unavailable scenario, no site information is configured, thus, there is only the GTMU in the Board Configuration window. The status of the GTMU is Active abnormal. Step 3 Double-click GTMU. The Topology Configuration window is displayed, as shown in Figure 5-7. Figure 5-7 Topology Configuration window Step 4 Click Add RRU. Set the parameters in the Deploy DRRU dialog box, as shown in Figure 5-8. Set Card Type to DRFU, Card No. to 0, SFP No. to 0, and Hop No. to 1. These values are taken only as an example in this section. 5-8 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-8 Deploy DRRU dialog box NOTE Card Type refers to the DRRU, DRFU, MRRU, GRRU, MRFU, or GRFU. The card number starts from 0 in sequence. The SFP number ranges from 0 to 5 and each number refers to the SFP port where the board is configured. The hop number ranges from 1 to 6 and each number refers to the level of the TRXs under the same SFP number. Step 5 ClickOK. The configuration of the RF module is complete. Figure 5-9 shows the Topology Configuration window. Figure 5-9 Topology Configuration window Step 6 Click Close to return to the Board Configuration window. Right-click the slot where the board is configured, and choose the board to be configured from the shortcut menu. Configure the APMU/DPMU, FMU, and GATM as shown in Figure 5-10. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-9 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-10 Board Configuration window Step 7 Set the parameters: On the SMT, the parameter of DEMU cannot be set. The parameters of DEMU and DPMU are set by default, therefore, no parameter setting is required. Step 8 Configure the APMU: The APMU is added for the BTS3900A GSM. Perform the following steps to configure the new types of APMU, such as APM100 and APM30. 5-10 1. Click Board in the navigation pane. The Board Configuration and Board Management windows are displayed. 2. Double-click Board Management. The Board Management window is displayed. 3. In the Board Management window, right-click APMU, and then click Parameter Management. The Parameter Management dialog box is displayed. 4. In the Parameter Management dialog box, click Parameter Set. Select APM30 or other boards under APMU Type according to the configuration data, as shown in Figure 5-11. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-11 Parameter Management dialog box Step 9 Click Close to end the board configuration of the BTS. ----End 5.2.3 Configuring Logical Objects of the BTS on the SMT This describes how to configure logical objects of the BTS. The BTS logical object configuration consists of the cell configuration, carrier binding, and activation of cell configuration data. Context NOTE The following part describes the configuration and binding of carriers based on one DRFU configured with two carriers. Procedure Step 1 Add a cell. Click Site0, and double-click Site Configuration in the Function area. The Site Configuration dialog box is displayed, as shown in Figure 5-12. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-11 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-12 Site Configuration dialog box (1) Step 2 Click Site0, and then click Add Subobject. In the Object Attributes area, specify Object No. and Object Name. In the Object Operation area, Cell0 is added, as shown in Figure 5-13. 5-12 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-13 Site Configuration dialog box (2) Step 3 Bind the carrier. Click Cell0, and select the TRX to be configured in the Boardtype drop-down list box. Set the board type to DRFU, as shown in Figure 5-14. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-13 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-14 Site Configuration dialog box (3) Step 4 Click Add Subobject. In the Object Attributes area, specify Object No., Object Name, Board No., and Pass No.. Carrier0 is added in the Object Operation area. The carrier is bound to pass 0 of the TRX whose board number is 0, as shown in Figure 5-15. Pass 0 is also called carrier A. The number of paths at an RFU depends on the number of carriers configured for the RFU. 5-14 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-15 Site Configuration dialog box (4) Step 5 Configure the second carrier: Set Object Name to Carrier1, Board No. to 0, and Pass No. to 1, as shown in Figure 5-16. The DRFU 0 is configured with two carriers. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-15 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-16 Site Configuration dialog box (5) 5-16 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) NOTE The procedure for adding carriers for other TRX boards is the same as adding carrier for the DRFU. The GRFU can be configured with 6 carriers, that is, there are 6 pass numbers ranging from 0 to 5 for the same board number. The GRRU can be configured with 8 carriers, that is, there are 8 numbers ranging from 0 to 7 for the same board number. The GRRU has two tributaries: tributary A and tributary B. For other TRXs, there is only one tributary. Therefore, you can configure the carrier according to the configuration data. The SMT provides the self-check function. When an invalid value is specified, the User Error dialog box is displayed, as shown in Figure 5-17. Figure 5-17 User Error dialog box Step 6 Click Site0. The Set button is available. Click Set, Configuring cell succeeded is available, as shown in Figure 5-18. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-17 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-18 Site Configuration dialog box (6) Step 7 Close the dialog box. The configured cell is displayed in the navigation pane, as shown in Figure 5-19. The data is configured but not activated. To activate the data, go to Step 8. 5-18 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-19 Configured cell and channels Step 8 Choose Site0 > Site Opstart > OK. The Site Opstart dialog box is displayed, as shown in Figure 5-20. If... Then... Site Opstart successfully. is displayed Click close to perform the next step. Site startup fails 1. Repeat Step 8. If the operation succeeds, go to Step 9. If the operation still fails, go to 8.2. 2. Check whether there is any inconsistent data configuration. If there is, modify the inconsistent data configuration. If the data configuration is correct, contact the BTS technical support engineers for troubleshooting. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-19 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-20 Site Opstart dialog box Step 9 Choose Cell0 > Cell Opstart > OK. The Cell Opstart dialog box is displayed, as shown in Figure 5-21. If... Then... Cell Opstart successfully. is displayed Click close to perform the next step. Cell startup fails See Step 8 for further operation. Figure 5-21 Cell Opstart dialog box Step 10 The site configuration takes effect. Step 11 Make the attributes of other TRXs take effect: Choose BT0 > BT Opstart > OK. The BT Opstart dialog box is displayed, as shown in Figure 5-22. 5-20 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) If... Then... BT Opstart successfully. is displayed Click close to perform the next step. BT startup fails See Step 8 for further operation. Figure 5-22 BT Opstart dialog box Step 12 Choose RC0 > RC Attributes Management. Specify frequency in ARFCN, and click Set. Getting RC attributes succeeded is displayed. Click Close. Repeat the procedure of Step 12 to set the frequencies of other TRXs. Figure 5-23 shows the RC Attributes Management dialog box. Figure 5-23 RC Attributes Management dialog box Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-21 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Step 13 Choose RC0 > RC Opstart > OK. The RC Opstart dialog box is displayed, as shown in Figure 5-24. If... Then... RC Opstart successfully. is displayed Click Close. Repeat Step 13 to make the frequency settings of other RCs take effect. RC startup fails See Step 8 for further operation. Figure 5-24 RC Opstart successfully dialog box Step 14 SFP Port Inconsistency Alarm is cleared. Since the transmission is unavailable, LAPD Alarm persists, and the status of the GTMU is Active abnormal, as shown in Figure 5-25. Figure 5-25 Board Management window 5-22 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) ----End 5.3 Checking the Active Software Version on the SMT This describes how to check the software versions of the boards and modules in the BTS in the Site Maintenance Terminal System window. Procedure Step 1 In the left pane of the Site Maintenance Terminal System window, select Board. In the right pane of the window, double-click Board Management. The Board Management window is displayed, as shown in Figure 5-26. Figure 5-26 Board Management window (1) Step 2 Select a board or a module to be checked. If... Then... The DRFU is to be viewed Go to Step 3. The GTMU, GATM, or PMU is to be viewed Go to Step 4. Step 3 Double-click GTMU in the Board Management window. The Topology Management window is displayed, as shown in Figure 5-27. Right-click DRFU0, and then click Board Information. The query is successful. The Board Information dialog box is displayed, as shown in Figure 5-28. Check the software version. If the version needs to be upgraded, reload and activate the version, and then close the dialog box. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-23 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide Figure 5-27 Topology Management window Figure 5-28 Board Information dialog box (1) Step 4 Take the GTMU as an example. Right-click GTMU, and choose Board Information from the shortcut menu. The Board Information dialog box is displayed, as shown in Figure 5-29. Check the software version. If the software version is not correct, upgrade the software version. For details, see the Software Upgrade Guide. 5-24 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-29 Board Information dialog box (2) ----End 5.4 Checking the Transmission Between the BBU and RFU on the BTS Side This describes how to check the transmission between the BBU and the RFU on the BTS side. By checking the link status of the BBU and RFU, you can rectify the fault caused by abnormal connection, thus ensuring normal communication between the BBU and the RFU. Context In this document, RFUs are classified into two types: DRFUs and GRFUs. Procedure Step 1 Check the status of the CPRI0 LED on the GTMU panel of the BBU and the status of the CPRI0 and CPRI1 LEDs in the RFU panel. If... Then... All the LEDs are in the on in green status The communication between the CPRI0 port on the BBU and the RFU is normal. Go to Step 4. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-25 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) If... Then... Some LEDs are not in the on in green status The communication between the CPRI0 port on the BBU and the RFU is faulty. Go to Step 2. NOTE The status of the LED corresponding to the CPRI port that is not in use should be OFF. Step 2 Check the connection between the RFU and the BBU. 1. Check that one end of the CPRI signal cable is securely connected to the CPRI0 port on the RFU, and the other end is securely connected to the CPRI port on the BBU. 2. Check the SFP male connectors at both ends of the CPRI signal cable. If the connector is faulty, replace it. 3. If the LEDs is still in the on in green status, replace the optical module of the CPRI port. Step 3 Check the connection between the cascaded RFUs. 1. Check that the signal cables between cascaded RFUs are securely connected to the CPRI0 and CPRI1 ports. 2. Check the SFP male connectors at both ends of the signal cables between cascaded RFUs. If the connector is faulty, replace it. 3. If the LEDs is still in the on in green status, replace the optical module connected to the CPRI port. Step 4 Repeat Step 1 through Step 3 to check the transmission between other CPRI ports on the GTMU panel and other RFUs. ----End 5.5 Checking the Running Status of the BTS This describes how to check the running status of the BTS. Check the running status of the BTS involves checking the status of LEDs and alarm information on the SMT. 5.5.1 Checking the State of the BTS LEDs To determine the running status of the BTS boards or modules, you need to check the state of the LEDs on them. The LEDs are distributed on the following boards or modules: GTMU (mandatory), UBFA, UPEU, RFU, GATM (optional), FAN unit, PMU, PSU (AC/DC), and PSU (DC/DC). 5.5.2 Checking the Alarm Information of the BTS on the SMT This describes how to check the BTS alarms on the SMT. If an alarm is generated, you need to clear the alarm according to the handling suggestions on the SMT. 5.5.1 Checking the State of the BTS LEDs To determine the running status of the BTS boards or modules, you need to check the state of the LEDs on them. The LEDs are distributed on the following boards or modules: GTMU (mandatory), UBFA, UPEU, RFU, GATM (optional), FAN unit, PMU, PSU (AC/DC), and PSU (DC/DC). 5-26 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Prerequisite The output power of the TRX is within the normal range, and the RFU operates properly. Context The PSU (AC/DC) that converts 220 V AC power into -48 V DC power is used when the external 220 V AC power input is used. The PSU (DC/DC) that converts +24 V AC power into -48 V DC power is used when the external +24 V AC power input is used. Procedure Step 1 Check the state of the LEDs on the boards or modules in the BBU. Table 5-2 lists the normal states of the LEDs on the boards or modules. Table 5-2 Normal states of the LEDs on the board and modules in the BBU Board or Module LED Color Normal State GTMU RUN Green Blinking (ON for 1s and OFF for 1s) ALM Red OFF ACT Green ON LIU0 to LIU3 Green LEDs LIU0 to LIU3 represent the four E1 links. If the links are connected normally, LIU LEDs are OFF. If the links are not connected to the BSC yet or the transmission is unavailable, LIU LEDs are ON. CPRI0 to CPRI5 Green When CPRI0 to CPRI5 ports are not in use, the LEDs are OFF. When the BBU is normally connected to the RFU, the corresponding LED is ON. UBFA STATE Green Blinking (ON for 1s and OFF for 1s) UPEU RUN Green ON Step 2 Check the state of the LEDs on the RFU panel. Table 5-3 takes the DRFU as an example to list the normal states of the LEDs on the RFU panel. Table 5-3 Normal states of the LEDs on the DRFU Issue 02 (2009-04-20) LED Color Normal State RUN Blinking (ON for 1s and OFF for 1s) ALM OFF ACT ON steady: The DRFU works properly. VSWR Red OFF Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-27 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) LED Color Normal State CPRI0 Green If the DRFU is normally connected to the BBU or another RFU, the LED is ON. If the DRFU is not connected, the LED is OFF. CPRI1 Green If the DRFU is normally connected to the BBU or another RFU, the LED is ON. If the DRFU is not connected, the LED is OFF. NOTE The LEDs on other RFUs have the same states as those on the DRFU, but the silkscreens of some LEDs are different. Step 3 Check the status of the LEDs on the GATM panel. Table 5-4 lists the normal status of the LEDs. Table 5-4 Normal states of the LEDs on the GATM LED Color Normal State RUN Green Blinking (ON for 1s and OFF for 1s) ACT Green ON: The AISG link is available. Green Blinking quickly: The AISG link is in transmission status. Red OFF ALM Step 4 Check the states of the LEDs on the FAN unit panel. Table 5-5 lists the normal states of the LEDs. Table 5-5 Normal states of the LEDs on the FAN unit LED Color Normal State RUN Green Blinking (ON for 1s and OFF for 1s) ALM Red OFF Step 5 Check the state of the LEDs on the PMU panel. Table 5-6 lists the normal states of the LEDs on the PMU. Table 5-6 Normal states of the LEDs on the PMU LED Color Normal State RUN Green Blinking (ON for 1s and OFF for 1s) ALM Red OFF Step 6 Check the state of the LEDs on the PSU (AC/DC) or PSU (DC/DC) panel. Table 5-7 lists the normal states of the LEDs on the PSU. 5-28 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Table 5-7 Normal states of the LEDs on the PSU PSU LED Color Normal State PSU (AC/DC) Power input LED (top) Green ON Power protection LED (middle) Yellow OFF Power failure LED (bottom) Red OFF Power input LED (left) Green ON Power protection LED (middle) Yellow OFF Power failure LED (right) Red OFF PSU (DC/DC) Step 7 If the LEDs on the boards or modules are not in the normal state, check the alarm information on the SMT and rectify the faults according to the suggestions displayed. ----End 5.5.2 Checking the Alarm Information of the BTS on the SMT This describes how to check the BTS alarms on the SMT. If an alarm is generated, you need to clear the alarm according to the handling suggestions on the SMT. Procedure Step 1 In the left pane of the Site Maintenance Terminal System window, choose Board. In the right pane of the window, double-click Board Management. The Board Management window is displayed, as shown in Figure 5-30. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-29 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-30 Board Management window Step 2 Check the type of the board or module where alarms are generated. If... Then... The board or module is RFU Go to Step 3 to query the alarms. The board or module is GTMU, UBFA, UPEU, UEIU, Go to Step 4 to query the alarms. GATM, or PMU Step 3 In the Board Management window, double-click GTMU. The Topology Management window is displayed, as shown in Figure 5-31. 5-30 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) Figure 5-31 Topology Management window Step 4 Right-click the board or module to be queried, and choose Board Alarm. The Board Alarm Information dialog box is displayed. Click the red grid, then the details about the alarm are displayed in the right pane, as shown in Figure 5-32. Figure 5-32 Board Alarm Information dialog box Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-31 BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) NOTE Each red grid represents an alarm. Step 5 Perform the next operation according to the result displayed in the Board Alarm Information dialog box. If... Then... No alarm is generated Close the Board Alarm Information dialog box. Repeat steps Step 2 through Step 5 and query alarms generated in other boards or modules. An alarm is generated Clear the alarm based on the troubleshooting suggestions. NOTE When the transmission is unavailable, which indicates that the BTS is not connected to the BSC, certain alarms are generated in common cases. These alarms are theE1 Local Alarm of the GTMU, the SW Not Activated Alarm, the LAPD Alarm, and the SFP Port Inconsistency Alarm. The SFP Port Inconsistency Alarm is reported only when the TRX is connected but not configured or is configured but not connected. ----End 5.6 Checking the Hardware Connection of the BTS This describes how to check the hardware connection of the BTS by checking the connection of power cables, grounding cables, and all kinds of signal cables. Procedure Step 1 For checking the connection of power cables and grounding cables, see Table 5-8. Table 5-8 Checklist for the connection of the power cables and grounding cables 5-32 SN Check Item The unused connectors of the power cables are capped. The PGND cable is green and yellow. The DC grounding cable is black. The -48 V DC power cable is blue. The cross-sectional area of the PGND cable is 16 mm2. All the power cables and grounding cables are copper-core cables. The outer diameter of the external power cables and grounding cables is about 11 mm. The power cables and grounding cables are not short-circuited or reversely connected. The power cables and grounding cables are bound separately from other cables. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 5 Commissioning the BTS (Transmission Unavailable) SN Check Item Labels are attached to both ends of the power cables and grounding cables. The power cables and grounding cables are not damaged or broken. There are no connectors or joints on the power cables or grounding cables. There are no breaking equipment, such as switches and fuses, in the electrical connection of the grounding system. 10 The redundant part of the power cables or grounding cables is stripped off rather than coiled. 11 The lugs on both ends of the power cables or grounding cables are soldered or crimped securely. 12 Bare wires and lug handles at the wiring terminals are tightly wrapped with insulating tapes or heat-shrinkable tubes. 13 The flat washers and spring washers are well mounted on all wiring terminals. 14 The diameter of the positive pole of the primary power supply connected to the earth complies with the standard requirements. 15 The working grounding and protection grounding of the BTS and the surge protection grounding of the building share one group of grounding conductors. 16 The grounding grids of the tower, equipment room, and distribution transformer (if the distance between the transformer and the equipment room is less than 30 m) constitute an integrated grounding grid. Step 2 See Table 5-9 to check the connection of all the signal cables. Table 5-9 Checklist for the connection of the signal cables Issue 02 (2009-04-20) SN Check Item The connectors of the E1 cables are tight and secure. The connectors of the E1 cables are intact. The E1 cables or RF cables are not damaged or broken. The connectors of the RF cables are fixed in position to prevent the possible false connection from causing abnormal voltage standing wave ratio (VSWR). The horizontal RF cables are clamped to the cable trough. The proper cable surpluses are reserved at the connectors. All cables are neatly bound with ties installed at even intervals, to a proper tightness, and in the same direction. Extra cable ties are cut off. All cuts are smooth without sharp projections. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 5-33 5 Commissioning the BTS (Transmission Unavailable) BTS3900(A) GSM Commissioning Guide SN Check Item The cable layout facilitates maintenance and future capacity expansion. 10 All the labels and tags at both ends of the cables are legible. 11 The unused ports are covered with dust-proof covers and matching plugs. 12 The indoor 1/2-inch jumpers are distributed according to the layer and sector. 13 The indoor 1/2-inch jumpers are kept straight for 300 mm at their joints with the cabinet. ----End 5-34 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Optional Commissioning Tasks About This Chapter The optional commissioning tasks are the VSWR check, output power of the TRX check, loopback test check, settings of the DIP switches on the board check, transmission between the BBU and the BSC on the BTS side check, transmission between cascaded TRXs check, and TRX ring topology check. 6.1 Commissioning the Antenna System This describes how to commission the antenna system. You must check whether the VSWR is normal, whether the output power of the TRX is normal, and whether the antenna is connected properly. If an RET antenna is configured, you need to commission it. 6.2 Performing the Loopback Test This describes how to perform the loopback test. The loopback test is optional. Before testing CS and PS services, you must check the transmission links of the signaling channels and traffic channels in the BTS. Loopback tests can be classified into the carrier loopback test and the channel loopback test. 6.3 Checking the DIP Switch Settings of the Boards This describes how to check whether the settings of the DIP switches on the board are correct. You can perform this task by checking whether the attribute values corresponding to the DIP switches meet the actual requirements on the LMT. 6.4 Locally Checking the Transmission Between the BBU and the BSC This describes how to check the status of the LEDs on the GTMU panel, how to check the connections of the E1 cable and E1 surge protection transfer cable. It also describes how to clear the fault caused by improper connections to ensure that the BBU communicates properly with the BSC. 6.5 Checking the Transmission Between Cascaded TRXs This describes how to check the transmission between cascaded TRXs. The following description is based on three levels of cascaded TRXs. 6.6 Checking TRXs in Ring Topology This describes how to check TRXs in ring topology on site. The following description is based on level 3 of TRXs in ring topology. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-1 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks 6.1 Commissioning the Antenna System This describes how to commission the antenna system. You must check whether the VSWR is normal, whether the output power of the TRX is normal, and whether the antenna is connected properly. If an RET antenna is configured, you need to commission it. 6.1.1 Measuring the VSWR This describes how to measure whether the VSWR is less than or equal to 1.5. If the VSWR is less than or equal to 1.5, the transmission of the antenna system is normal. To measure the VSWR, perform the following steps where the Site Master is taken as an example. 6.1.2 Monitoring the Output Power of TRXs This describes how to obtain the output power of the TRX, which indicates the running status of the TRXs. 6.1.3 Checking the Antenna Connection This describes how to check the antenna connections with an MS. You can lock the MS on a cell frequency and perform the dialing test. If the MS dialing test is successful, the antenna is properly connected. 6.1.1 Measuring the VSWR This describes how to measure whether the VSWR is less than or equal to 1.5. If the VSWR is less than or equal to 1.5, the transmission of the antenna system is normal. To measure the VSWR, perform the following steps where the Site Master is taken as an example. Prerequisite The BTS is powered off. NOTE If you have checked the VSWR before powering on the BTS, you do not need to perform this task. Procedure Step 1 Measure the VSWR at the antenna port by using the Site Master. If... Then... The VSWR is less than or equal to 1.5 The transmission of the antenna system is operational. Record the VSWR in the Commissioning Record Data Sheet. If the VSWR is greater than 1.5 The transmission of the antenna system is faulty. Go to Step 2. Step 2 Use the Site Master to locate the fault point of the abnormal VSWR on the jumper or feeder. When a fault point is found, check whether the connections are secure at the fault point, and whether the connectors are intact. If the connector is faulty, replace it. 6-2 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks NOTE The fault points are usually at the connection point between the jumper and the feeder or between the jumper and the antenna. ----End 6.1.2 Monitoring the Output Power of TRXs This describes how to obtain the output power of the TRX, which indicates the running status of the TRXs. Procedure Step 1 Connect the power meter to the ANT port on the RFU. Step 2 In the navigation bar of the Site Maintenance Terminal System window, choose Site. In the browse window, double-click RF Specification Test. The Please select RC to test dialog box is displayed. Select the board to be tested, as shown in Figure 6-1. Figure 6-1 Please select RC to test dialog box Step 3 Click OK. The RF Specification Test dialog box is displayed, as shown in Figure 6-2. Figure 6-2 RF Performance Test dialog box Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-3 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Step 4 Set the parameters listed in Table 6-1. Then, click User-defined Message. Then, click Start Test to initiate the test on the output power of the TRXs. NOTE The parameters not involved in Table 6-1 can use the default values. Table 6-1 Parameter required in RF performance test Group Box Type Parameter Setting Description Testing Items Select Transmitter, and retain the default settings of the dropdown list. Antenna Mode Set the corresponding antenna mode and Card No. based on the actual configuration. Power Type Set Power Type according to the actual configuration. Channel Type Select Cell No., RC No., and Channel No. based on the actual configuration. AC Setting Select Band based on actual configuration. Set Static power to 0. Step 5 Check the output power displayed in the power meter. Determine whether the output power of the TRX is within the normal range. If... Then... The output power is within the normal Record the power in the 8 Commissioning Record range Data Sheet. The output power is beyond the normal 1. Check whether the connection between the power meter and the cable is secure. range 2. Check whether the power meter is correctly set. If any fault exists, clear it. 3. Check whether the RFU is correctly configured and can transmit power. 4. Replace the RFU in which the TRX does not transmit power normally. NOTE The output power displayed in the power meter is the power of the BTS with power sharing disabled. The permissible offset of the power is ±1 dBm. The TX output power displayed on the power meter is only that of a single carrier, rather than the total power of all the carriers in the RFU module. Step 6 Repeat steps Step 2 through Step 5 to check the output power of all the carriers at the site. ----End 6-4 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks 6.1.3 Checking the Antenna Connection This describes how to check the antenna connections with an MS. You can lock the MS on a cell frequency and perform the dialing test. If the MS dialing test is successful, the antenna is properly connected. Prerequisite The BTS is powered on and works normally. The transmission between the BSC and the BTS is normal. The antenna system is connected to the cabinet. The test MS is registered in the HLR. Procedure Step 1 Power on one test MS, and check that the MS automatically searches for the GSM network. If... Then... The test MS fails to find the GSM network Check whether the test MS has a SIM card. If the test MS does not have a SIM card, insert the SIM card in the MS. Check whether the SIM card supports authentication and encryption. If the SIM card does not support authentication or encryption, replace it. Check whether the test MS is functional. If the test MS is faulty, replace it. The test MS finds the GSM network Go to Step 2. Step 2 Lock the test MS on a frequency in a logical cell under the BTS. Step 3 Perform the dialing test using the test MS. Then, check whether the antenna corresponding to the frequency is connected properly according to the test results. If... Then... The dialing test is successful You can infer that the feeder corresponding to the frequency is connected properly. Go to Step 4. The dialing test is not successful You can infer that the antenna system on the frequency may be connected improperly. Check the antenna connection and adjust the antenna. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-5 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks NOTE You are advised to do as follows to ensure the accuracy of test results: Make test calls within the power range of -30 dBm to -70 dBm under the tower. Perform the dialing test for more than five times. Step 4 Repeat steps Step 2 through Step 3 to check the antenna connections on all the frequencies of the BTS. ----End 6.2 Performing the Loopback Test This describes how to perform the loopback test. The loopback test is optional. Before testing CS and PS services, you must check the transmission links of the signaling channels and traffic channels in the BTS. Loopback tests can be classified into the carrier loopback test and the channel loopback test. Prerequisite The transmission between the BSC and the BTS is normal. The current software version and data configuration on the LMT are correct. No alarm related to disruption of BTS services is reported. 6.2.1 Performing the Carrier Loopback Test This describes how to perform the carrier loopback test. Before testing CS and PS services, you must check the transmission links of the signaling channels in the BTS. 6.2.2 Performing Channel Loopback Tests This describes how to perform channel loopback tests. Before testing CS and PS services, you must check that the transmission links of the traffic channels in the BTS are proper. 6.2.1 Performing the Carrier Loopback Test This describes how to perform the carrier loopback test. Before testing CS and PS services, you must check the transmission links of the signaling channels in the BTS. Context The BIU loopback test is performed to test the link transmission of the TRX timeslots on the BTS DBUS. Procedure Step 1 On the BSC6000 Local Maintenance Terminal window, choose BTS Maintenance > Maintain TRX > Test TRX Loopback. The Test TRX Loopback dialog box is displayed, as shown in Figure 6-3. 6-6 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-3 Test TRX Loopback dialog box Step 2 Set the parameters in the Location and Setting areas. That is, set Type to BIU Loop Test, and set Site, Cell, and TRX as required. NOTE The maximum Duration of the BIU loop test is the default value, which is 10s. In most cases, the default value is used. Step 3 Click Start to perform the test. The result is displayed in the Test Result area, as shown in Figure 6-3. If... Then... The BER is 0% The signaling channel is normal. The BER is not 0% The signaling channel is abnormal. Record the number of the faulty TRX, and contact Huawei BTS technical support engineers for troubleshooting. NOTE During the test, you can click Stop to stop the test. The Succeeded in stopping the TRX loop test. message is displayed in the Test Result area. Step 4 Repeat steps Step 1 through Step 3 to perform the loopback test on the other TRXs. ----End Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-7 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks 6.2.2 Performing Channel Loopback Tests This describes how to perform channel loopback tests. Before testing CS and PS services, you must check that the transmission links of the traffic channels in the BTS are proper. Context The BIU loopback test is performed to test the timeslot transmission over the TRX traffic channel on the DBUS in the BTS. Procedure Step 1 On the BSC6000 Local Maintenance Terminal window, choose BTS Maintenance > Maintain TRX > Test Channel Loopback. The Test Channel Loopback dialog box is displayed, as shown in Figure 6-4. Figure 6-4 Test Channel Loopback dialog box Step 2 Set the parameters in the Location and Setting areas. That is, set Type to BIU Loop Test, and set Site, Cell, TRX and Channelas required. 6-8 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks NOTE The maximum Duration of the BIU loop test is the default value, which is 10s. In most cases, the default value is used. Step 3 Click Start. The Confirm dialog box is displayed. Click Yes to perform the test. The result is displayed in the Test Result area, as shown in Figure 6-4. If... Then... The BER is 0 per mille The service channel is normal. The BER is not 0 per mille The service channel is abnormal. Record the number of the faulty TRX, and contact Huawei BTS technical support engineers for troubleshooting. NOTE During the test, you can click Stop to stop the test. The Succeeded in stopping the TRX loop test. message is displayed in the Test Result area. Step 4 Repeat steps Step 1 through Step 3 to perform the loopback test on the other channels. ----End 6.3 Checking the DIP Switch Settings of the Boards This describes how to check whether the settings of the DIP switches on the board are correct. You can perform this task by checking whether the attribute values corresponding to the DIP switches meet the actual requirements on the LMT. Prerequisite The BTS is in TDM transmission mode. The transmission between the BSC and the BTS is normal. Procedure Step 1 Query the information of the GTMU: In the BSC6000 Local Maintenance Terminal window, select the target site. Right-click GTMU on the Site Device Panel tab page, and choose Query Board Information. The Query Board Information dialog box is displayed. Step 2 Click the Running Parameter tab, and then click Query on the Running Parameter tab page. The query is successful, and the running status of the board is displayed in the dialog box. Step 3 Check whether Attribute Value of E1/T1 Capability and Impedance Capability consistent with the actual condition, as shown in Figure 6-5. If the attribute values are consistent with the actual condition, end the task. If the attribute values are not consistent with the actual condition, see the BTS3900 Quick Installation Guide or the BTS3900A Quick Installation Guide to set the corresponding DIP switches on the BTS side again. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-9 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-5 Site Device Attributes dialog box ----End 6.4 Locally Checking the Transmission Between the BBU and the BSC This describes how to check the status of the LEDs on the GTMU panel, how to check the connections of the E1 cable and E1 surge protection transfer cable. It also describes how to clear the fault caused by improper connections to ensure that the BBU communicates properly with the BSC. Prerequisite 6-10 The BBU is connected to the BSC through an E1/T1 cable. The BBU and the BSC are successfully powered on. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Procedure Step 1 Check whether the settings of DIP switch meet the field requirements. if not, modify the settings of DIP switch as required. Step 2 Check the status of the LEDs LIU0 to LIU3 on the panel of the GTMU in the BBU. The LEDs LIU0 to LIU3 correspond to link 1 to 4 of the E1/T1 cable. Each link has one TX line and one RX line. If... Then... The LEDs are OFF The E1/T1 links are normal. End this task. The LEDs are ON or ON for 0.125s and OFF The E1/T1 links are abnormal. Go to Step 3. for 0.125s NOTE You need check the status of only the LIU LEDs corresponding to the E1/T1 line in use. The LIU LEDs corresponding to the unused E1/T1 cables are ON. If the BBU is in non cascaded, there is only one E1/T1 link between the BBU and the BSC and the corresponding LED is LIU0. If the LIU0 LED is OFF, it indicates the communication between the BBU and the BSC is normal. Otherwise, the communication is abnormal. If the two BBUs are cascaded, the second E1/T1 link of level 1 BBU is connected to the first E1/T1 link of level 2 BBU. Check the LIU1 LED and LIU0 LED on level 1 BBU and level 2 BBU respectively to verify whether the physical link is operational. If multiple BBUs are cascaded, check the LEDs of the corresponding links. If the BBU and the BSC form a ring, check the LIUs corresponding to the links in the ring to verify whether the communication is normal. For the connections of multiple BBUs and the LEDs to be checked, see that of the two BBUs in cascading connection. Step 3 Check the connections and connectors at both ends of the cables. If the connector is damaged, replace it. If... Then... The UELP is configured Check whether the E1/T1 cable is connected properly to the OUTSIDE port on the UELP. Check whether the E1 surge protection transfer cable is connected properly to the INSIDE port on the UELP. Check whether the E1 surge protection transfer cable is connected properly to the E1/T1 on the GTMU. The UELP is not configured Check whether the E1/T1 cable is connected properly to the E1/T1 port on the GTMU. Step 4 At the DDF on the BTS side, check the soldering conditions for the connectors of the E1/T1 link where the communication is abnormal. Ensure sound jointing, since poor jointing may cause poor E1/T1 connection. Step 5 Perform a physical loopback test on the E1/T1 cable where the communication is abnormal. Check whether the transmission of the E1/T1 cable is normal on the BTS side. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-11 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks 1. For a pair of E1s/T1s connecting the BTS and BSC through the DDF, the A port is connected to the C port, and the B port is connected to the D port. In the loopback test, disconnect the A port from the C port, and the B port from the D port, and then connect the A port to the B port, as shown in Figure 6-6. In this way, the TX end and RX end of the E1/T1 line is connected and the physical loopback is formed on the BTS side. Figure 6-6 Physical loopback of E1/T1 at the DDF 2. 3. Check the status of the LIU LEDs on the GTMU panel again. If... Then... The LEDs are OFF The E1/T1 connections are normal on the BTS side. The problem may be that the connection between the BTS and the BSC or the connections on the BSC side are faulty. End the check, and contact the BSC technical support engineer to clear the fault. The LEDs are ON or ON for 0.125s and OFF for 0.125s The cable connections on the BTS side are faulty. Clear the fault on the BTS side. Set the E1s/T1s at the DDF on the BTS side from physical loopback to normal connection. Ensure that the connections are sound. Step 6 Check the E1/T1 connections at the DDF. Ensure that the TX and RX ends of the E1 cables are connected properly. NOTE Do as follows to distinguish the E1 RX end from the E1 TX end: Connect a pin of an LED to the wire of the E1/T1 cable, and the other pin to the shielding layer of the E1/ T1 cable. If the LED is ON, this end is the TX end. If the LED is OFF, this end is the RX end. ----End 6.5 Checking the Transmission Between Cascaded TRXs This describes how to check the transmission between cascaded TRXs. The following description is based on three levels of cascaded TRXs. Prerequisite The physical connection between cascaded TRXs on the BTS side is complete. 6-12 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Procedure Step 1 In the navigation tree in the left pane of the BSC6000 Local Maintenance Terminal window, select the BTS, and check whether the status of the three cascaded TRXs on the Site Device Panel tab page is green, as shown in Figure 6-7. If the TRXs are displayed in green, you can infer that the TRXs are functional. End this task. If the TRXs are displayed in other colors, you can infer that the transmission between cascaded TRXs is abnormal. Go to Step 2. Figure 6-7 Site Device Panel tab page Step 2 If the status of the level 2 TRX and level 3 TRX is red, you can infer that the link between the level 1 TRX and level 2 TRX is faulty. The system reports SFP Port Inconsistency Alarm. Check whether the connection between the TRXs on the BTS side is normal, or clear the alarm based on the BSS Alarm Reference. Step 3 If the status of the level 3 TRX is red, you can infer that the link between the level 2 TRX and level 3 TRX is faulty. The system reports SFP Port Inconsistency Alarm. Check the Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-13 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks transmission between the TRXs on the BTS side, or clear the alarm based on the BSS Alarm Reference. ----End 6.6 Checking TRXs in Ring Topology This describes how to check TRXs in ring topology on site. The following description is based on level 3 of TRXs in ring topology. Prerequisite The physical connection between TRXs in ring topology on the BTS side is complete. The configuration of the TRXs in ring topology on the BSC side is complete. Figure 6-8 shows the connection between TRXs in ring topology. A, B, C, and D indicate the positions where the link may be broken during the ring topology transmission. Context Figure 6-8 Connection between TRXs in ring topology DRFU DRFU R x 1 in R x1 out DRFU R x 1 in AN T1 R x1 out AN T1 R x 1 in R x 2 in R x 2 in R x2 out C P R I_ 0 C P R I_ 0 C P R I_ 1 C P R I_ 1 RST R x2 out AN T2 RST R x1 out AN T1 R x 2 in R x2 out AN T2 C P R I_ 0 RUN A LM RUN A LM ACT V SW R ACT V SW R CP RL0 C PR L 1 CP RL0 C PR L 1 C P R I_ 1 RST PW R PW R RUN A LM ACT V SW R CP RL0 C PR L 1 AN T2 PW R RFU0 BBU RFU1 RFU2 The GTMU reports SFP Port Inconsistency Alarm when the ring topology is used in physical connection but not in data configuration, or when the ring topology is used in data configuration but not in physical connection. CAUTION Do not set breakpoints on the LMT when the TRXs are cascaded through the SFP high-speed signal cable. Otherwise, the board will be seriously damaged. You can directly connect and disconnect the signal cable between the cascaded TRXs to check the connection between them. Procedure Step 1 Check whether the TRX ring topology is configured on the LMT. 6-14 If... Then... The ring topology is configured Go to Step 2. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide If... 6 Optional Commissioning Tasks Then... The ring topology is not configured Configure the ring topology. For details, see the BSC Initial Configuration Guide. Step 2 Change the TRX ring topology test to TRX cascaded test. The purpose of setting breakpoints on the LMT is to simulate the scenario that faults occur on the transmission link. In this way, you can check whether the TRXs are automatically switched to chain topology and whether the alarm is reported. 1. in the BSC6000 Local Maintenance Terminal window, right-click the target site, and choose Configure Site Board Attributes. The Site Device Attributes dialog box is displayed. 2. Click Configure Site Board Attributes. The Site Device Attributes dialog box is displayed, as shown in Figure 6-9. Figure 6-9 Site Device Attributes dialog box 3. Issue 02 (2009-04-20) Right-click the RXU chain, and choose Set Break Point. The Set RXU Chain Break Point dialog box is displayed. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-15 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks 4. Set the breakpoint to disconnect the level 3 TRX, as shown in Figure 6-10. Figure 6-10 Set RXU Chain Break Point dialog box 5. Click OK to return to the Site Device Attributes dialog box. The breakpoints marked with red cross are displayed, as shown in Figure 6-11. Figure 6-11 Setting breakpoint successfully 6. 6-16 Click OK, and then click Finish to return to the BSC6000 Local Maintenance Terminal window. The level 3 TRX is disconnected, and the Site Device Panel tab page displays the faulty state, as shown in Figure 6-12. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-12 Status of the disconnected TRX ring topology 7. Right-click the site, and choose Configure Site Board Attributes from the shortcut menu. The Configure Site Boards Attributes dialog box is displayed. 8. Click Configure Site Board Attributes, the Site Device Attributes dialog box is displayed. 9. Right-click the RXU chain, and choose Combine or Separate RXU Chain. The Split RXU Chain dialog box is displayed, as shown in Figure 6-13. Figure 6-13 Split RXU Chain dialog box 10. Set Please select a point to split this RXU Chain to 2. Click OK, and then return to the Site Device Attributes dialog box. The level 3 TRX is configured under the RXU link. The start port is SFP1, as shown in Figure 6-14. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-17 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-14 Splitting RXU chain successfully 11. Click OK, and then click Finish to return to the BSC6000 Local Maintenance Terminal window. Figure 6-15 shows the data configuration on the Site Device Panel tab page. The GTMU reports the SFP Port Inconsistency Alarm. Figure 6-15 TRX ring topology in splitting state 6-18 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks NOTE After Step 2.11 is performed, the status of the RFU is Faulty, and the TRX Communication Alarm is reported. Wait one to two minutes, and the TRX Communication Alarm is cleared, and the state of the RFU is Normal. Step 3 Change the TRX cascaded test to TRX ring topology test. The purpose of removing breakpoints on the LMT is to simulate the scenario that the faults on the transmission link. In this way, you can check whether the TRXs are automatically switched to ring topology and whether the alarm is automatically cleared. 1. In the BSC6000 Local Maintenance Terminal window, right-click the target site and choose Configure Site Board Attributes. The Site Device Attributes dialog box is displayed. 2. Click Configure Site Board Attributes. The Site Device Attributes dialog box is displayed. 3. Right-click the RXU chain, and choose Combine or Separate RXU Chain. The Combine RXU Chain dialog box is displayed. 4. Set Chain No. and Please select the RXU chains to be combined, as shown in Figure 6-16. The following description takes combining RXU chain 1 to RXU chain 0 as an example. Figure 6-16 Combine RXU Chain dialog box 5. Issue 02 (2009-04-20) Click OK, and return to the Site Device Attributes dialog box. The RXU Chain becomes RXU Ring, as shown in Figure 6-17. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-19 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-17 Combining RXU chain successfully 6. 6-20 Click OK, and then click Finish to return to the BSC6000 Local Maintenance Terminal window. Figure 6-18 shows the status of boards on the Site Device Panel tab page. SFP Port Inconsistency Alarm is cleared. The level 3 TRX, however, is in the disconnected state due to the breakpoint. Therefore, TRX Communication Alarm is reported. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-18 RXU ring in combined state 7. In the BSC6000 Local Maintenance Terminal window, right-click the target site and choose Configure Site Board Attributes, and the Site Device Attributes dialog box is displayed. 8. Click Configure Site Board Attributes. The Site Device Attributes dialog box is displayed. 9. Right-click the RXU chain, and choose Set Break Point. The Set RXU Chain Break Point dialog box is displayed. 10. Delete breakpoints: Set Break Point 1 Position and Break Point 2 Position to NULL. 11. Click OK, and return to the Site Device Attributes dialog box. The two breakpoints marked with red cross are cleared. 12. Click OK, and then click Finish to return to the BSC6000 Local Maintenance Terminal window. All the alarms are cleared, and the status of each board is normal, as shown in Figure 6-19. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 6-21 BTS3900(A) GSM Commissioning Guide 6 Optional Commissioning Tasks Figure 6-19 RXU Ring in normal state NOTE After Step 3.12 is performed, the status of the RFU is Faulty, and the TRX Communication Alarm is reported. Wait one to two minutes, and the TRX Communication Alarm will be cleared, and the status of the RFU is Normal. ----End 6-22 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning FAQs for BTS Commissioning About This Chapter This describes the fault symptoms and cause analysis in the BTS commissioning. 7.1 Failed Communication Between the SMT and the BTS This describes the symptom of the communication failure between the SMT and the BTS and analyzes the cause of the failed communication. It also provides the fault handling suggestions. 7.2 Faulty E1 Link This describes the fault symptom and analyzes the cause of the faulty E1 link. It also provides the fault handling suggestions. 7.3 Failure of an MS to Search the Network This describes the fault symptom and analyzes the cause of the failure of an MS to search the network. 7.4 Service Dialing Failure This describes the fault symptom and analyzes the cause of the service dialing failure. It also provides the fault handling suggestions. 7.5 Low GPRS Data Transmission Rate This describes the fault symptom and analyzes the cause of low GPRS data transmission rate. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 7-1 BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 7.1 Failed Communication Between the SMT and the BTS This describes the symptom of the communication failure between the SMT and the BTS and analyzes the cause of the failed communication. It also provides the fault handling suggestions. Fault Symptom Log in to the BTS on the SMT fails. The result of running the ping commands shows that the connection between the SMT PC and the BTS cannot be established. Cause Analysis and Handling Suggestions Table 7-1 lists the possible causes and related suggestions to handle the fault. Table 7-1 Possible causes and handling suggestions for failed communication between the SMT and the BTS Fault Cause Handling Suggestion The Ethernet cable is faulty. Check the connection of the Ethernet cable. Check whether the RJ45 connectors on both ends are functional. If the RJ45 connector is faulty, replace it. The IP address of the SMT PC is incorrect. Check whether the IP address of the SMT PC is on the same network segment as that of the board. 7.2 Faulty E1 Link This describes the fault symptom and analyzes the cause of the faulty E1 link. It also provides the fault handling suggestions. Fault Symptom Alarms related to the E1/T1 link are reported, or the upper link is faulty. Analysis When the E1 links are faulty, the cause may be one of the following: The physical connection of cable is faulty. The crossed pair connection exists. The BER in transmission is high. Handling Suggestion 1. 7-2 Check the connections and connectors at both ends of the E1 link. Ensure that the connections are reliable and the connectors are functional. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 2. Check for the crossed pair connection on the LMT. 3. Perform a physical loopback test to check whether the transmission of the E1 cable is normal on the BTS side. 4. Check the transmission channels to ensure that all the transmission channels are available. Example One: Detection of Crossed Pair Connection NOTE The detection method in this example is applicable to check for the improper E1 connection between the BTS and the BSC or the improper E1 connection on the BSC side. This detection method also can be used to check the improper T1 connection. The crossed pair connection refers to the incorrect RX and TX connections between two pairs of E1 cables, as shown in Figure 7-1. Figure 7-1 Crossed pair connection E1 A E1 B RX TX TX RX TX RX RX TX E1 A E1 B Perform the loopback method on the BSC side to check for crossed pair connection. Perform different steps according to different E1 connection modes. NOTE Loopback test: Set the port on the BTS side to the directly physical loopback mode. Send the test data, which carries the E1 port number, to the TX end of the E1 from the BSC side. After the loopback, check whether the received port information is the same as the transmitted one. If yes, you can infer that the E1 cable is correctly connected. If not, you can infer that the crossed pair connection occurs. E1 link between the BTS and the BSC (1): BTS→DDF on the BTS side→DDF on the BSC side→BSC, as shown in Figure 7-2. Figure 7-2 E1 link between the BTS and the BSC (1) E1/T1 A0 C0 E1/T1 Issue 02 (2009-04-20) A1 C1 E1/T1 B0 BTS E1/T1 D0 DDF0 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. E1/T1 E1/T1 B1 D1 DDF1 BSC 7-3 BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 1. Check for the crossed pair connection on the E1 cable between the DDF on the BSC side and the BSC. (1) Perform a physical loopback on each E1 cable at the DDF subrack of the BSC, as shown in Figure 7-2. Connect port C1 and port D1 (2) Run CHK E1T1CRS to query the results. If the results of all the ports are NOT CROSS, you can infer that the E1 cable is correctly connected on the BSC side. If the results are CROSS EXIST, correctly connect the E1 cable to this port. (3) Restore the E1 connections between the BSC and the DDR. That is, connect port C1 to port A1 and connect port D1 to port B1. 2. Check for the crossed pair connection on the E1 cable at the DDF subrack of the BSC. That is, connect port A1 and port B1. The detection method is similar to that in 1. 3. Check for the crossed pair connection on the E1 cable between the DDF subrack of the BTS and the DDF subrack of the BSC. That is, connect port C0 and port D0. The detection method is similar to that in 1. 4. Check for the crossed pair connection on the E1 cable at the DDF subrack of the BTS. That is, connect port A0 and port B0. The detection method is similar to that in 1. E1 link between the BTS and the BSC (2): BTS→DDF on the BSC side→BSC, as shown in Figure 7-3. Figure 7-3 E1 link between the BTS and the BSC (2) E1/T1 E1/T1 E1/T1 BTS 1. E1/T1 DDF BSC Check for the crossed pair connection on the E1 cable between the DDF subrack of the BSC and the BSC. (1) Perform a physical loopback on each E1 cable at the DDF subrack of the BSC, as shown in Figure 7-2. Connect port C and port D. (2) Run CHK E1T1CRS to query the results. If the results of all the ports are NOT CROSS, you can infer that the E1 cable is correctly connected on the BSC side. If the results are CROSS EXIST, correctly connect the E1 cable to this port. (3) Restore the E1 connections between the BSC and the DDR subrack. That is, connect port C to port A and connect port D to port B. 2. Check for the crossed pair connection on the E1 cable at the DDF subrack of the BSC. That is, connect port A and port B. For details, see 1. Example Two: Check for UELP Faults Through Physical Loopback Test NOTE The physcial loopback test in this example is applicable to check for the improper E1 connection on the BTS side. 7-4 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 1. Ensure that the E1/T1 cable is securely connected to the OUTSIDE port on the UELP, and that the connectors are in sound condition. If the connector is damaged, replace it. 2. Ensure that the E1 transfer cable is securely connected to the INSIDE port on the UELP and the E1/T1 port on the GTMU, and that the connectors are in sound condition. If the connector is damaged, replace it. 3. Perform the physical loopback test and troubleshoot the fault in the UELP. (1) Perform a physical loopback on the BTS side. In general, for a pair of E1s/T1s connecting the BTS and BSC through the DDF, port A0 is connected to port C0, and port B0 is connected to port D0. In the loopback test, disconnect port A0 from port C0, and port B0 from port D0, and then connect port A0 to port B0, as shown in Figure 7-4. In this way, the physical loopback is formed on the BTS side. Figure 7-4 Physical loopback of E1/T1 on the BTS side E1/T1 A0 C0 E1/T1 A1 C1 E1/T1 B0 BTS E1/T1 D0 E1/T1 B1 DDF0 E1/T1 D1 DDF1 BSC (2) You need check the state of the LIU LEDs corresponding to the E1/T1 in use, as shown in Table 7-2. Table 7-2 Meaning of the state of the LIU LEDs (UELP used) If... Then... The LEDs are OFF The cable connections on the BTS side are operational. The fault of the UELP is cleared. The testing task on the BTS side is complete. The LEDs are ON or ON for 0.125s and OFF for 0.125s The cable connections on the BTS side are faulty. Clear the fault of the UELP. (3) Disconnect the E1 transfer cable and the E1/T1 cable. Then, directly connect the E1/ T1 cable to the E1/T1 port on the GTMU. (4) When the UELP is not used, determine whether the E1/T1 link is normal based on the state of the LIU LEDs on the GTMU panel, as listed in Table 7-3. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 7-5 BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning Table 7-3 Meaning of the state of the LIU LEDs (UELP not used) If... Then... The LEDs are OFF The UELP is faulty. a. Check whether the connection between the UELP and the backplane of the BBU is reliable. b. Replace the UELP. The LEDs are ON or ON for 0.125s and OFF for 0.125s The UELP is functional, but the E1 link on the BTS side is faulty. (5) Reconnect the E1/T1 cable to the OUTSIDE port on the UELP and ensure that the connection is proper. (6) Reconnect the E1/T1 cable to the INSIDE port on the UELP and the E1/T1 port on the GTMU, and ensure that the connection is proper. CAUTION After the physical loopback test, set the E1/T1 at the DDF on the BTS side from physical loopback to normal connection. Ensure that the connections are sound. 7.3 Failure of an MS to Search the Network This describes the fault symptom and analyzes the cause of the failure of an MS to search the network. Fault Symptom An MS fails to find the network. Cause Analysis The possible causes are as follows: Cell parameters such as CGI, BCCH, TA, and BSIC are improperly configured. The MS does not support the frequency band of this base station. The downlink signals are weak. Therefore, the MS is unable to locate the cell. The downlink interference is strong. The MS is unable to locate the cell or receive the correct downlink system information. The cell radius is small. NOTE When the MS fails to find the network, pay attention to the output power of the local cell and the radio network coverage. 7-6 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 7.4 Service Dialing Failure This describes the fault symptom and analyzes the cause of the service dialing failure. It also provides the fault handling suggestions. Fault Symptom Service dialing failure may occur in either of the following cases: Location update failure Service dialing failure Cause Analysis and Handling Suggestion Table 7-4 lists the possible causes and related suggestions. Table 7-4 Possible causes and handling suggestions for service dialing failure Cause of the Fault Handling Suggestion The MS is faulty. Replace the MS with a new one. The CS domain or the PS domain on the CN side is not ready. Keep the CS domain and the PS domain ready. 7.5 Low GPRS Data Transmission Rate This describes the fault symptom and analyzes the cause of low GPRS data transmission rate. Fault Symptom During the service test, the following problems may occur: low GPRS data rate in the PS domain of the newly added BTS, or a high BER on the Abis interface. Cause Analysis The possible causes are as follows: The E1 cable is not properly grounded. You can enable the grounding status of the E1 cable by setting the DIP switch SW2 on the GTMU. Table 7-5 describes the DIP switch SW2. Table 7-5 Description of the DIP switch SW2 on the GTMU Setting of DIP Bit Issue 02 (2009-04-20) Description ON ON ON ON The E1 cable is grounded. OFF OFF OFF OFF The E1 cable is not grounded. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 7-7 BTS3900(A) GSM Commissioning Guide 7 FAQs for BTS Commissioning 7-8 If... Then... Only one end of the E1 cable is grounded, The E1 cable is grounded properly. Both ends of the E1 cable are grounded, The E1 cable is not grounded properly. The data configuration negotiated between the BSC and the BTS is not consistent. The cell signals are weak. The MS capability is limited. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 8 Commissioning Record Data Sheet Commissioning Record Data Sheet This describes the data sheet that is used to record the process and result of the BTS commissioning. Table 8-1 Data sheet for BTS commissioning Site Name BTS Model Commissioning Time Commissioning Engineer Scenario □ Transmission available scenario □ Transmission unavailable scenario Commissioning Result □ Successful □ Failed Commissioning Item Commissioning Preparation Phase Conclusion Handling Exceptional Case The resources required for commissioning are available. The commissioning requirements are met. Commis sioning Phase Transmis sion Unavaila ble Phase You have logged in to the BTS through the SMT. The BTS board and logical objects are available. The current software version is correct. Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 8-1 BTS3900(A) GSM Commissioning Guide 8 Commissioning Record Data Sheet The transmission between the BBU and the RXU is normal. No other alarms are reported except the alarms related to the transmission. The hardware connections are correct. Site management rights are released. The transmission between the BBU and the BSC is available. Transmis sion Availabl e Phase (on the LMT) The transmission between the BBU and the RXU and the transmission between the BBU and the BSC is normal. The transmission between cascaded BTSs is normal. The transmission between BTSs in ring topology is normal. The board configuration is correct and the boards are in normal operation. The current software version is correct. The hardware installation and the data configuration are consistent with each other. No alarms related to the BTS are reported. The CS service test is successful. The PS service test is successful. The environment monitoring alarm is reported normally. Optional Commiss ioning Task 8-2 The VSWR is correct. Record the value of the VSWR. The output power of the TRX is normal. Record the value of the output power per carrier. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Issue 02 (2009-04-20) BTS3900(A) GSM Commissioning Guide 8 Commissioning Record Data Sheet The antenna system is properly connected. The result of the carrier loopback test is normal. The result of the channel loopback test is normal. The DIP switch settings are correct. Commis sioning Result Unsolved Problems Impact Unsolved Problems After Commissioning Issue 02 (2009-04-20) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 8-3 BTS3900(A) GSM Commissioning Guide 9 Communication Ports Used by the GBTS Communication Ports Used by the GBTS Table 9-1 lists the communication port used by the GBTS Table 9-1 The Communication Port Used by GBTS Issue 02 (2009-04-20) Prot ocol Side Side Ports (Liste ning) Side B Side Ports (Lau nch) Service TCP GBT 700 SMT 102465535 It will be used by SMT for local maintenance before GBTS connects in the network Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Authe nticati on 9-1
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Author : Huawei Technologies Co., Ltd. Create Date : 2009:05:12 16:42:32+08:00 Modify Date : 2009:05:12 16:42:32+08:00 Creator : XSL Formatter V4.1 R1 (4,1,2006,1206) for Windows Producer : Antenna House PDF Output Library 2.4.0 (Windows) Title : Commissioning Guide Subject : Commissioning Guide Trapped : False Page Count : 129 Page Mode : UseOutlinesEXIF Metadata provided by EXIF.tools