Huawei Technologies RRU3201-AWS Distributed Base Station Remote Radio Unit User Manual Installation Manual

Huawei Technologies Co.,Ltd Distributed Base Station Remote Radio Unit Installation Manual

Installation Manual

HUAWEI TECHNOLOGIES Co., Ltd.RRU3201 Installation GuideV100R001Issue: 01Part Number: 31504691Date: 2009-03-15
Safety Information …………………….….…………………… 1Installation Tools ………………….………….………………..  2Space Requirements ………………….……..………………..  3Installation Modes …………………………………………......  4Installation Procedure ………….……………………………..  5Components Delivered with the RRU ……………………… 5Installing the RRU on a Metal Pole ………………………….  6Installing the RRU on a Wall ………………………………....11Installing the RRU on a U-Steel …………….………………..12Installing the RRU on an Angle Steel ……………………....12Installing the RRU Cables …………………………………….13RRU Hardware Installation Checklist ……………………….22Powering On the RRU ………………...……………………….23Reference ……………………………….………………………..24Contents
1Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved.Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents.The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations.When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use. Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations.Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work.SymbolsSafety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger.• Non-standard and improper high voltage operations may result in fire and electric shock.• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast.• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.• Power off the device before performing operations on the power supply equipment.• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down.• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. • When working at a height, be cautious about falling objects.Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.• The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation.• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.This symbol indicates that casualty or serious accident may occur if you ignore the safety instruction.This symbol indicates that serious or major injury may occur if you ignore the safety instruction.Safety InformationThis symbol indicates that the operation may be easier if you pay attention to the safety instruction.
Installation Tools2Wire cutter ESD glovesPower cable crimping pliersCross screwdriver(M3~M6) Straight screwdriver(M3~M6)Adjustable wrench(with the diameter of at least 32mm)Torque screwdriverLong measuring tapeVacuum cleanerCable peelerMarking pen(with the diameter of no more than 10mm)MultimeterESD glovesCombination wrench(21mm~21mm)for pole installation(17mm~17mm) for wall installationWire cutterHeat gunPercussion drill(Ø14)KnifeClaw hammerPower cable crimping pliersLevel bar
Space Requirements (Unit: mm)abcdRRU DimensionsRecommended Clearance for a Single RRU Minimum Clearance for a Single RRURecommended Clearance for Multiple Centralized RRUs eMinimum Clearance for Multiple Centralized RRUs3285485170≥300≥800≥300≥600≥500100600200400300≥500≥500≥300562≥800≥500300300200562800300
Installation ModesOn a metal pole On a wall On a U-steelOn an angle steelThe following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed.Metal pole Angle steel U-steelThe following figures show the installations of multiple RRUs on the metal poles.The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and Installation Components to the Tower460mm~114mm63mm~80mm63mm~80mm30mm~50mm50mm~100mm
Installation ProcedureComponents Delivered with the RRUFixture assembly for installing the RRUFront of the RRU Back of the RRUCover plate Attachment plateM10x110 BoltMain fixtureAuxiliary fixtureexpansion bolt5StartPrepare the installation(slide5)EndInstall the RRU on a metal pole(slide6~10)Install the RRU on a wall(slide11)Install the RRU on an angle steel(slide12)Install the RRU on a U-steel(slide12)Install the cables of the RRU (slide13~21)Power on the RRU(slide23)Check the installation(slide22)
Installing the RRU on a Metal PoleInstalling a Single RRU in Ordinary ModeaInstall the main fixture.Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture.1. Before installing the main fixture, ensure that the contact piece on the fixture is fixed.2. When installing the main fixture, keep the arrow on the main fixture upward. ArrowIt is recommended that the bottom of the main fixture be 1200 mm to 1600 mm above the ground for easy maintenance.6Ensure that the arrow on the auxiliary fixture is upward.Installation position for the auxiliary fixture.You may fit one end of the auxiliary fixture on one dual-nut bolt assembly before installation. And then fit the other end on the other dual-nut bolt assembly during the installation.
Installing the RRU on a Metal PoleUse an adjustable wrench (21 mm) to tighten the nut. In this way, the main and auxiliary fixtures are securely mounted on the pole.Install the RRU on the main fixture.The screw is a non-fixed one and is for removing the RRU.The RF port at the bottom of the RRU does not have load bearing capacity. Do not place the RRU on the ground on its bottom during the installation.When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. The fastening torque is 35 N• m to 40 N• m. 7
Installing the RRU on a Metal PoleInstalling Two RRUs in Back-To-Back ModebInstall the second RRU on the main fixture.Install the main fixture of another RRU. Ensure that the main and auxiliary fixtures are perfectly fitted.Reinstall the cover plate and attachment plate on the second RRU to interchange their positions.Install an RRU first. For details, see page 6 Installing a Single RRU in Ordinary Mode.RRU installed in ordinary modeRRU installed in reverse modeCabling cavityEnsure that the cabling cavities of the two RRUs face the same direction when installing the RRUs.M6x168M6x16
Installing Multiple RRUs in Centralized ModecInstalling the RRU on a Metal PoleInstall another RRU on the second main fixture.Reinstall the attachment plate on the back and cover plate on one side to interchange their positions.Install an RRU on a main fixture. Install another main fixture.M6x169M6x16The screw is a non-fixed one and is for removing the RRU.
Installing the RRU on a Metal PoleInstalling Multiple RRUs in Centralized ModecInstall a third main fixture.Install a third RRU on the third main fixture.The following figures show the installation positions for a fourth RRU.10The screw is a non-fixed one and is for removing the RRU.
Installing the RRU on a WallPlace the auxiliary fixture on the wall at the installation position and then mark the anchor points by using a marking pen.Drill holes at the anchor points and then install the expansion bolt assemblies.Fit the auxiliary fixture on the expansion bolts downward, and then tighten the bolts by using a combination wrench (17 mm).Install the main fixture.Install the RRU.It is recommended that the bottom of the auxiliary fixture be 1200 mm to 1600 mm above the ground.Do not hammer the bolt entirely into the expansion tube, and leave 20 mm to 30 mm of the bolt outside the wall.11When RRUs are installed on a wall, the specifications of the wall are as follows: 1. When a single RRU is installed on the wall at the back, the wall must have the load capacity of 1.25 kN bolt stress;2. When a single RRU is installed on the wall at the side, the wall must have the load capacity of 2.0 kN bolt stress.3. When three RRUs are installed on the wall at the side, the wall must have the load capacity of 6.0 kN bolt stress.After the expansion bolt is removed, dispose of the plastic tube.M10x65 boltSpring washer 10Plastic tubeFlat washer 10Expansion tube
Installing the RRU on a U-SteelThe procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole.Installing the RRU on an Angle SteelThe procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal pole.U-steelFour installation modesAngle steel12
Installing the RRU CablesCable Connections of a Single RRUaThe RET/MON port on the RRU is multi-functional, and can be installed with either AISG multi-wire cable or alarm cable. When the length of the AISG multi-wire cable is not enough, you can choose the optional AISG extension cable. 13PGND cableFeeder jumperFeederPower cableCPRI optical cableAISG multi-wire cableAlarm cableAISG extension cableAntennaBBU
Installing the RRU CablesCable Connections of Multiple RRUsb14For detail information of the cable, see Cable List on Page 15 and 16.PGND cableFeeder jumperPower cableCPRI optical cableBBUAntennaAntennaAntenna
Installing the RRU CablesThe connectors labeled 1A and 1B are connected to port labeled CPRI_W on the RRUDLC connectorCPRI optical cableThe connectors labeled 2A and 2B are connected to port labeled CPRI0, CPRI1 or CPRI2 on the LBBP board of the BBU.DLC connectorThe blue OT terminal is connected to socket labeled NEG(-)0 in the RRU cabling cavity. And the black OT terminal is connected to socket labeled RTN(+)0.Two OT terminalsPower cableExternal power supplyBare wireFeeder or antennaDIN male connectorPorts labeled ANT_TX/RXA and ANT_RXB on the RRUDIN male connectorAntenna jumperNearest grounding barOT terminalGrounding bolt on the RRUOT terminalPGND cableConnected to…Connector TypeCableCable Listc15
Installing the RRU CablesPort labeled RET/MON on the RRUWaterproof DB9 connectorAISG multi-wire cableStandard AISG male connector of the AISG extension cable or RCUStandard AISG female connectorExternal alarm devicesEight cord end terminalsPort labeled RET/MON at the bottom of the RRUDB9 male connectorAlarm cableStandard AISG male connector of the RCUStandard AISG female connectorStandard AISG female connector of the AISG multi-wire cableStandard AISG male connectorAISG extension cableConnected to…Connector TypeCablecCable List16
Installing the RRU CablesdOpening and Closing the Cover Plate of the RRU Cabling Cavity•Open the cover plate of the RRU cabling cavity •Close the cover plated of the RRU cabling cavity1. The screw on the cover plate is tightened until the fastening torque is 14 N.m.2. The screws on the cover plate are tightened in the order shown in the preceding figure.eCabling Cavity of the RRU17Waterproof fillerCover plate ofThe cablingcavityCablingcavity Cable trough for thePower cableCable trough for the optical cable
安装RRU线缆fCable Connections of the RRUFor details on how to add the OT terminals to the power cable, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU.The tape is wrapped spirally upwards, downwards, and then upwards again in three layers. For every two adjacent tape layers, the tape on the upper layer overlaps about half the width of the tape on the lower layer.1. Press the strap on the exposed shielding layer of the power cable tightly. Ensure that the lower edge of the exposed shielding layer does not exceed the position shown in the figure.2. The shielding layer of the power cable at the end connecting to the power18Shielding layer of the power cable First wrap the joint with the waterproof tape, and then wrap the joint with the PVC insulating tape.StrapGroundingboltOT terminalPGND cablePGND cableFeeder jumperPower cableCPRI optical cableAISG extension cable
Installing the RRU CablesgRRU+APM30/APM30HRRU power cableCPRI optical cable1. The RRU power cable is connected to one group of the LOAD4 to LOAD9 terminals of the PDU.2. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and  then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30/APM30H.19RRU Power cableShielding layerPGND cable
Installing the RRU CableshRRU+APM30(+24V)RRU power cableCPRI optical cable1. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and   then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30.2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.20RRU Power cableShielding layerPGND cable
Installing the RRU CablesiRRU+TMCShielding layer of the RRU power cable1. When connecting the RRU power cable to the DCDU-03C, you must add an OT terminal to the shielding layer. Then, fix the OT terminal to the corresponding PGND terminal of the DCDU-03C. For details on how to add an OT terminal, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU.2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.21LOAD0RRU power cableCPRI optical cable
RRU Hardware Installation ChecklistThe connectors of signal cables are intact.9Set the power switch to OFF and check the input voltage (-48 V DC power supply: -36 V DC to -57 V DC. AC power supply: 150 V AC to 300 V AC). Set the power switch to ON and check the RUN LED (the RUN LED is ON for 1s and OFF for 1s).11All labels, tags, and nameplates are correct, legible, and complete. All the labels at both ends of the cables, jumpers and feeders are legible.10The working grounding and protection grounding of the base station and the lightning protection grounding of the building share one group of grounding conductors.8The power cable and PGND cable are not short-circuited or reversely connected and are not damaged or broken.7The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped.6No joint lies in the middle of the power cable or the PGND cable.5Waterproof check: The empty cable troughs in the cabling cavity of the RRU are waterproofed. The cover plate is tightly buckled on the cabling cavity of the RRU. The RF ports that are not connected with RF cables are capped and waterproofed.4The cover plate is fastened to the RRU cabling cavity.3The RRU is properly installed.2The position for each equipment conforms to the engineering design and meets the space requirement. Sufficient space is reserved for equipment maintenance.1ItemsNo.22
Powering On the RRUThe RRU should be powered on in 24 hours after being unpacked. The power off duration of the RRU cannot exceed 24 hours during maintenance.23
ReferenceLift the RRU and installation components to the tower.aTie one end of a rope to the installation components and the other end to the rope for binding the RRU.Steering ropeLifting rope24
Reference1. Installer A climbs onto the tower. Then, fixes the pulley to the support of the tower platform and leads the lifting rope through the pulley. 2. Installer C uses a lifting rope to bind the RRU and installation components as shown in the preceding figure and then ties a knot in the steering rope at the handle of the RRU.3. Installer B pulls the lifting rope downwards, and at the same time, installer C pulls the steering rope away from the tower to prevent the RRU and installation components from colliding with the tower.4. Installers A holds the RRU and installation components and unties the ropesLift the RRU and installation components to the tower.a25Lift the RRU and installation components to the tower.ABCSteering ropeLiftingropePulley
ReferenceOT terminals on the power cable:To assemble the OT terminals, perform the following steps:Adding OT Terminals to the Power Cable of the RRUbDetermine lengths of power cables for different operations according to the scales on the inner side of the cover plate of the cabling cavity.Based on the determined length, remove the jacket and shielding layer off the power cable.Remove the jacket of a specified length from each wire.Add an OT terminal to each wire.Remove about 15 mm jacket off the power cable to expose the shielding layer.26-48V DC power cableShielding layer GND wire-48V power wireOT terminals
ReferenceAdding OT Terminals to the Power Cable of the RRUbAssemble an OT terminal on the power cable at the end connecting to the power supply device.27Heat-shrinkable tube PVC insulating tape OT terminal on the shielding layer
ReferencePin Assignment of the RRU AISG Extension cablecBrown+24VTwisted pairWhite/brownX2.6X1.6RS485 AGreenX2.5X1.5RS485 BTwisted pairWhite/greenX2.3X1.3OrangeDC Return ATwisted pairWhite/orangeX2.7X1.7Blue+12VTwisted pairWhite/blueX2.1X1.1InstructionWire TypeWire ColorPin of the AISG female connectorPin of the AISG male connectorPin Assignment for the Wires of the RRU Alarm CabledX9X8X7X6X5X4X3X2Cord End TerminalAPM TX+BrownRS485_RX+X1.5APM TX-Twisted pairWhite/brownRS485_RX-X1.3APM RX+GreenRS485_TX+X1.8APM RX-Twisted pairWhite/greenRS485_TX-X1.6GNDOrangeGNDX1.4SWITCH_INPUT1+Twisted pairWhite/orangeSWITCH_INPUT1+X1.7GNDBlueGNDX1.4SWITCH_INPUT0+Twisted pairWhite/blueSWITCH_INPUT0+X1.2LabelWire TypeWire ColorPin NameDB9 waterproof Connector28
HUAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian LonggangShenzhen 518129People’s Republic of Chinawww.huawei.comIssue: 01Part Number: 31504691Date: 2009-03-15

Navigation menu