Huawei Technologies RRU3201-AWS Distributed Base Station Remote Radio Unit User Manual Installation Manual

Huawei Technologies Co.,Ltd Distributed Base Station Remote Radio Unit Installation Manual

Installation Manual

Download: Huawei Technologies RRU3201-AWS Distributed Base Station Remote Radio Unit User Manual Installation Manual
Mirror Download [FCC.gov]Huawei Technologies RRU3201-AWS Distributed Base Station Remote Radio Unit User Manual Installation Manual
Document ID1117818
Application ID00VJL9JLcnUl/2+cn74rfQ==
Document DescriptionInstallation Manual
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize278.94kB (3486776 bits)
Date Submitted2009-06-02 00:00:00
Date Available2009-08-30 00:00:00
Creation Date2009-03-04 09:08:04
Producing SoftwareAcrobat Distiller 6.0 (Windows)
Document Lastmod2009-03-04 09:08:04
Document TitleMicrosoft PowerPoint - RRU3201 Installation Guide.ppt
Document CreatorPScript5.dll Version 5.2
Document Author: w55941

RRU3201 Installation Guide
V100R001
Issue: 01
Part Number: 31504691
Date: 2009-03-15
HUAWEI TECHNOLOGIES Co., Ltd.
Contents
Safety Information …………………….….…………………… 1
Installation Tools ………………….………….……………….. 2
Space Requirements ………………….……..……………….. 3
Installation Modes …………………………………………...... 4
Installation Procedure ………….…………………………….. 5
Components Delivered with the RRU ……………………… 5
Installing the RRU on a Metal Pole …………………………. 6
Installing the RRU on a Wall ………………………………....11
Installing the RRU on a U-Steel …………….………………..12
Installing the RRU on an Angle Steel ……………………....12
Installing the RRU Cables …………………………………….13
RRU Hardware Installation Checklist ……………………….22
Powering On the RRU ………………...……………………….23
Reference ……………………………….………………………..24
Safety Information
Following All Safety Precautions
Before any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.
When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Complying with the Local Safety Regulations
When operating the device, comply with the local safety regulations. The safety precautions provided in the
documents are supplementary. You must comply with the local safety regulations.
Qualified Personnel Only
The personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning work.
Symbols
This symbol indicates that casualty or serious accident may occur if you ignore
the safety instruction.
This symbol indicates that serious or major injury may occur if you ignore the
safety instruction.
This symbol indicates that the operation may be easier if you pay attention to the
safety instruction.
Safety of Personnel
• The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
• Non-standard and improper high voltage operations may result in fire and electric shock.
• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
• Power off the device before performing operations on the power supply equipment.
• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.
• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
• When working at a height, be cautious about falling objects.
Device Safety
• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
• The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved.
Installation Tools
Percussion drill(Ø14)
Heat gun
Claw hammer
Power cable crimping pliers
ESD gloves
Cross screwdriver(M3~M6)
Knife
Wire cutter
Vacuum cleaner
Straight screwdriver(M3~M6)
Cable peeler
Adjustable wrench
(with the diameter of at least 32mm)
Combination wrench
Level bar
Power
cable crimping pliers
Multimeter
Torque screwdriver
(21mm~21mm)for pole installation
(17mm~17mm) for wall installation
Wire cutter
Marking
pen
(with the diameter of no more than 10mm)
Long measuring tape
ESD gloves
Space Requirements (Unit: mm)
RRU Dimensions
170
285
485
Recommended Clearance
for a Single RRU
≥300
Minimum Clearance for a
Single RRU
200
00
≥6
400
100
00
≥3
≥
80
60
300
≥500
Recommended Clearance for e Minimum Clearance for
Multiple Centralized RRUs
Multiple Centralized RRUs
562
≥300
562
200
00
≥5
300
≥
80
00
≥5
80
300
300
≥500
Installation Modes
On a metal pole
On a wall
On an angle steel
On a U-steel
The following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed.
60mm~114mm
~
~
50mm~100mm
63mm~80mm
Metal pole
Angle steel
U-steel
The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and
Installation Components to the Tower
The following figures show the installations of multiple RRUs on the metal poles.
Installation Procedure
Start
Prepare the
installation
(slide5)
Install the RRU on a
metal pole
(slide6~10)
Install the RRU on a
wall
(slide11)
Install the RRU on
an angle steel
(slide12)
Install the RRU on a
U-steel
(slide12)
Install the cables of
the RRU
(slide13~21)
Check the
installation
(slide22)
Power on the RRU
(slide23)
End
Components Delivered with the RRU
expansion
bolt
Cover plate
Attachment plate
M10x110
Bolt
Main
fixture
Auxiliary
fixture
Fixture assembly for
installing the RRU
Front of the RRU
Back of the RRU
Installing the RRU on a Metal Pole
Installing a Single RRU in Ordinary Mode
Install the main fixture.
1. Before installing the main fixture, ensure that the contact piece
on the fixture is fixed.
2. When installing the main fixture, keep the arrow on the main
fixture upward.
It is recommended that the bottom of the main fixture be 1200
mm to 1600 mm above the ground for easy maintenance.
Arrow
Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture.
Ensure that the
arrow on the
auxiliary fixture is
upward.
Installation position
for the auxiliary
fixture.
You may fit one end of the auxiliary fixture on one dual-nut bolt assembly before installation. And then fit the other end
on the other dual-nut bolt assembly during the installation.
Installing the RRU on a Metal Pole
Use an adjustable wrench (21 mm) to tighten the nut. In this way, the main and auxiliary
fixtures are securely mounted on the pole.
When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. The fastening
torque is 35 N• m to 40 N• m.
Install the RRU on the main fixture.
The screw is a non-fixed
one and is for removing
the RRU.
The RF port at the bottom of the RRU does not have load bearing capacity.
Do not place the RRU on the ground on its bottom during the installation.
Installing the RRU on a Metal Pole
Installing Two RRUs in Back-To-Back Mode
Install an RRU first. For details, see
page 6 Installing a Single RRU in
Ordinary Mode.
Install the main fixture of another RRU.
Ensure that the main and auxiliary fixtures
are perfectly fitted.
Reinstall the cover plate and attachment plate on
the second RRU to interchange their positions.
M6x16
M6x16
Install the second RRU on the
main fixture.
Ensure that the cabling cavities of the two RRUs face the same
direction when installing the RRUs.
RRU installed in
reverse mode
RRU installed in
ordinary mode
Cabling
cavity
Installing the RRU on a Metal Pole
Installing Multiple RRUs in Centralized Mode
Reinstall the attachment plate on the back and cover
plate on one side to interchange their positions.
M6x16
M6x16
Install an RRU on a main
fixture.
Install another main fixture.
Install another RRU on the second main fixture.
The screw is a nonfixed one and is for
removing the RRU.
Installing the RRU on a Metal Pole
Installing Multiple RRUs in Centralized Mode
Install a third main fixture.
Install a third RRU on the third main fixture.
The following figures show the installation positions for a fourth RRU.
10
The screw is a nonfixed one and is for
removing the RRU.
Installing the RRU on a Wall
Place the auxiliary fixture
on the wall at the
installation position and
then mark the anchor
points by using a marking
pen.
Drill holes at the anchor points and then install the
expansion bolt assemblies.
M10x65 bolt
Spring washer 10
Plastic tube
Flat washer 10
Expansion tube
After the expansion bolt is removed,
dispose of the plastic tube.
It is recommended that the bottom of the
auxiliary fixture be 1200 mm to 1600 mm
above the ground.
Do not hammer the bolt entirely into the expansion tube, and leave 20
mm to 30 mm of the bolt outside the wall.
When RRUs are installed on a wall, the specifications of the wall are as follows:
1. When a single RRU is installed on the wall at the back, the wall must have the load capacity of 1.25 kN bolt stress;
2. When a single RRU is installed on the wall at the side, the wall must have the load capacity of 2.0 kN bolt stress.
3. When three RRUs are installed on the wall at the side, the wall must have the load capacity of 6.0 kN bolt stress.
Fit the auxiliary fixture on the
expansion bolts downward, and
then tighten the bolts by using a
combination wrench (17 mm).
Install the main
fixture.
11
Install the RRU.
Installing the RRU on a U-Steel
U-steel
Four installation modes
The procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole.
Installing the RRU on an Angle Steel
Angle steel
The procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal pole.
12
Installing the RRU Cables
Cable Connections of a Single RRU
PGND cable
Feeder jumper
Power cable
CPRI optical cable
Alarm cable
AISG multi-wire cable
Feeder
AISG extension cable
Antenna
BBU
The RET/MON port on the RRU is multi-functional, and can be installed with either AISG multi-wire cable or
alarm cable. When the length of the AISG multi-wire cable is not enough, you can choose the optional AISG
extension cable.
13
Installing the RRU Cables
Cable Connections of Multiple RRUs
BBU
For detail information of the cable, see Cable List on Page 15 and 16.
14
Antenna
Antenna
PGND cable
Feeder jumper
Power cable
CPRI optical cable
Antenna
Installing the RRU Cables
Cable List
Cable
Connector Type
Connected to…
PGND cable
OT terminal
Grounding bolt on the RRU
OT terminal
Nearest grounding bar
DIN male connector
Ports labeled ANT_TX/RXA and
ANT_RXB on the RRU
DIN male connector
Feeder or antenna
Two OT terminals
The blue OT terminal is connected to
socket labeled NEG(-)0 in the RRU
cabling cavity. And the black OT
terminal is connected to socket labeled
RTN(+)0.
Bare wire
External power supply
DLC connector
The connectors labeled 1A and 1B are
connected to port labeled CPRI_W on
the RRU
DLC connector
The connectors labeled 2A and 2B are
connected to port labeled CPRI0,
CPRI1 or CPRI2 on the LBBP board of
the BBU.
Antenna jumper
Power cable
CPRI optical cable
15
Installing the RRU Cables
Cable List
Cable
Connector Type
Connected to…
AISG
extension
cable
Standard AISG male
connector
Standard AISG female connector of the AISG
multi-wire cable
Standard AISG
female connector
Standard AISG male connector of the RCU
Waterproof DB9
connector
Port labeled RET/MON on the RRU
Standard AISG
female connector
Standard AISG male connector of the AISG
extension cable or RCU
DB9 male connector
Port labeled RET/MON at the bottom of the RRU
Eight cord end
terminals
External alarm devices
AISG multiwire cable
Alarm cable
16
Installing the RRU Cables
Opening and Closing the Cover Plate of the RRU Cabling Cavity
• Open the cover plate of the RRU
• Close the cover plated of the RRU cabling
cabling cavity
cavity
1. The screw on the cover plate is tightened until the fastening torque is 14 N.m.
2. The screws on the cover plate are tightened in the order shown in the preceding figure.
Cabling Cavity of the RRU
Cable trough for
the optical cable
Cabling
cavity
Cable trough for the
Power cable
Cover plate of
The cabling
cavity
Waterproof filler
17
安装RRU线缆
Cable Connections of the RRU
Grounding
bolt
OT terminal
Shielding layer of
the power cable
Strap
PGND cable
PGND cable
First wrap the joint
with the waterproof
tape, and then wrap
the joint with the
PVC insulating tape.
Feeder jumper
Power cable
CPRI optical cable
AISG extension cable
The tape is wrapped spirally upwards, downwards,
and then upwards again in three layers. For every two
adjacent tape layers, the tape on the upper layer
overlaps about half the width of the tape on the lower
layer.
1. Press the strap on the exposed shielding layer of the
power cable tightly. Ensure that the lower edge of the
exposed shielding layer does not exceed the position
shown in the figure.
2. The shielding layer of the power cable at the end
connecting to the power
For details on how to add the OT terminals to the power cable, see pages 26 to 27
Adding OT Terminals to the Power Cable of the RRU.
18
Installing the RRU Cables
RRU+APM30/APM30H
Shielding layer
RRU Power
cable
PGND
cable
RRU power cable
CPRI optical cable
1. The RRU power cable is connected to one group of the LOAD4 to LOAD9 terminals of the PDU.
2. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and
then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30/APM30H.
19
Installing the RRU Cables
RRU+APM30(+24V)
Shielding layer
RRU Power
cable
PGND
cable
RRU power cable
CPRI optical cable
1. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and
then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30.
2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.
20
Installing the RRU Cables
RRU+TMC
LOAD0
Shielding layer of the RRU
power cable
RRU power cable
CPRI optical cable
1. When connecting the RRU power cable to the DCDU-03C, you must add an OT terminal to the shielding layer.
Then, fix the OT terminal to the corresponding PGND terminal of the DCDU-03C. For details on how to add an OT
terminal, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU.
2. The RRU power cable is connected to one group of the LOAD0 to LOAD5 terminals of the DCDU-03C.
21
RRU Hardware Installation Checklist
No.
Items
The position for each equipment conforms to the engineering design and meets
the space requirement. Sufficient space is reserved for equipment maintenance.
The RRU is properly installed.
The cover plate is fastened to the RRU cabling cavity.
Waterproof check: The empty cable troughs in the cabling cavity of the RRU are
waterproofed. The cover plate is tightly buckled on the cabling cavity of the RRU.
The RF ports that are not connected with RF cables are capped and
waterproofed.
No joint lies in the middle of the power cable or the PGND cable.
The lugs at both ends of the power cable or the PGND cable are securely
soldered or crimped.
The power cable and PGND cable are not short-circuited or reversely connected
and are not damaged or broken.
The working grounding and protection grounding of the base station and the
lightning protection grounding of the building share one group of grounding
conductors.
The connectors of signal cables are intact.
10
All labels, tags, and nameplates are correct, legible, and complete. All the labels
at both ends of the cables, jumpers and feeders are legible.
11
Set the power switch to OFF and check the input voltage (-48 V DC power supply:
-36 V DC to -57 V DC. AC power supply: 150 V AC to 300 V AC). Set the power
switch to ON and check the RUN LED (the RUN LED is ON for 1s and OFF for
1s).
22
Powering On the RRU
The RRU should be powered on in 24 hours after being unpacked. The power off duration of the RRU cannot
exceed 24 hours during maintenance.
23
Reference
Lift the RRU and installation components to the tower.
Tie one end of a rope to the installation components and the other end to the rope for
binding the RRU.
Lifting rope
Steering rope
24
Reference
Lift the RRU and installation components to the tower.
Lift the RRU and installation components to the tower.
Pulley
Steering
rope
Lifting
rope
1. Installer A climbs onto the tower. Then, fixes the pulley to the support of the tower platform and leads the lifting
rope through the pulley.
2. Installer C uses a lifting rope to bind the RRU and installation components as shown in the preceding figure
and then ties a knot in the steering rope at the handle of the RRU.
3. Installer B pulls the lifting rope downwards, and at the same time, installer C pulls the steering rope away from
the tower to prevent the RRU and installation components from colliding with the tower.
4. Installers A holds the RRU and installation components and unties the ropes
25
Reference
Adding OT Terminals to the Power Cable of the RRU
OT terminals on the power cable:
-48V DC power cable
-48V power wire
OT terminals
Shielding layer
GND wire
To assemble the OT terminals, perform the following steps:
Determine lengths of power cables for
different operations according to the
scales on the inner side of the cover
plate of the cabling cavity.
Based on the determined length,
remove the jacket and shielding layer
off the power cable.
Remove the jacket of a specified
length from each wire.
Add an OT terminal to each wire.
Remove about 15 mm jacket off the
power cable to expose the shielding
layer.
26
Reference
Adding OT Terminals to the Power Cable of the RRU
Assemble an OT terminal on the power cable at the end connecting to the power supply
device.
Heat-shrinkable tube
PVC insulating tape
27
OT terminal on the
shielding layer
Reference
Pin Assignment of the RRU AISG Extension cable
Pin of the AISG
male connector
Pin of the AISG female
connector
Wire Color
Wire Type
Instruction
X1.1
X2.1
White/blue
Twisted pair
+12V
Twisted pair
DC Return A
Twisted pair
RS485 B
Blue
X1.7
X2.7
White/orange
Orange
X1.3
X2.3
White/green
X1.5
X2.5
Green
X1.6
X2.6
White/brown
RS485 A
Twisted pair
+24V
Brown
Pin Assignment for the Wires of the RRU Alarm Cable
DB9 waterproof
Connector
Pin Name
Wire Color
Wire Type
Cord End
Terminal
Label
X1.2
SWITCH_INPUT0+
White/blue
Twisted pair
X2
SWITCH_INPUT0+
X1.4
GND
Blue
X3
GND
X1.7
SWITCH_INPUT1+
White/orange
X4
SWITCH_INPUT1+
X1.4
GND
Orange
X5
GND
X1.6
RS485_TX-
White/green
X6
APM RX-
X1.8
RS485_TX+
Green
X7
APM RX+
X1.3
RS485_RX-
White/brown
X8
APM TX-
X1.5
RS485_RX+
Brown
X9
APM TX+
Twisted pair
Twisted pair
Twisted pair
28
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People’s Republic of China
www.huawei.com
Issue: 01
Part Number: 31504691
Date: 2009-03-15

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : No
Page Count                      : 31
XMP Toolkit                     : XMP toolkit 2.9.1-13, framework 1.6
About                           : uuid:3246de78-f240-42c1-8002-f1289e86399e
Producer                        : Acrobat Distiller 6.0 (Windows)
Creator Tool                    : PScript5.dll Version 5.2
Modify Date                     : 2009:03:04 09:08:04+08:00
Create Date                     : 2009:03:04 09:08:04+08:00
Document ID                     : uuid:43df8922-d52b-4e73-a7bf-785cab3e25e7
Format                          : application/pdf
Title                           : Microsoft PowerPoint - RRU3201 Installation Guide.ppt
Creator                         : w55941
Author                          : w55941
EXIF Metadata provided by EXIF.tools
FCC ID Filing: QISRRU3201-AWS

Navigation menu