Nimbus WIMI300 MINI-PCIE WIFI MODULE User Manual

Nimbus, Inc. MINI-PCIE WIFI MODULE

User Manual

OEM/I t t I t ll ti M lOEM/Integrators Installation ManualVersion 1.1April 07. 2014This document is confidential and subject to change
1 The RF module limited to OEM installation ONLY•1. The RF module limited to OEM installation ONLY. •The OEM integrator is responsible for the compliance to all the rules that apply to the product into which this certified •RF module is integrated.•2. This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may•not cause harmful interference, and (2) this device must accept any interference received, including interference that may •cause undesired operation.•3. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the •FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.•This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the qp g q y gy ,•instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will •not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which •can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or •more of the following measures:•Reorient or relocate the receiving antenna•-Reorient or relocate the receiving antenna.•- Increase the separation between the equipment and receiver.•- l Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.•- l Consult the dealer or an experienced radio/TV technician for help.•FCC Caution•Any changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate this equipment. This transmitter must not be co-located or operating in conjunction with any other antenna or ransmitter.•Radiation Exposure Statement•This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be •installed and operated with minimum distance 20cm between the radiator & your body.2010-01-08 This document is confidential and subject to change 2
This device is intended only for OEM integrators under the following conditions:•This device is intended only for OEM integrators under the following conditions:•The antenna must be installed such that 20 cm is maintained between the antenna and users, and The transmitter module may •not be co-located with any other transmitter or antenna. As long as 2 conditions above are met, further transmitter test will not •be required. However, the OEM integrator is still responsible for testing their end-product for any additional compliance •requirements required with this module installed.••IMPORTANT NOTE:•In the event that these conditions cannot be met (for example certain laptop configurations or colocation with another •transmitter), then the FCC authorization is no longer considered valid and the FCC ID cannot be used on the final product. In•these circumstances, the OEM integrator will be responsible for re-evaluating the end product (including the transmitter) and ,g pgp(g )•obtaining a separate FCC authorization.•End Product Labeling•This transmitter module is authorized only for use in device where the antenna may be installed such that 20 cm may be •maintained between the antenna and users The final end product must be labeled in a visible area with the following:•maintained between the antenna and users. The final end product must be labeled in a visible area with the following:•“Contains FCC ID: ZD7-WiMi300”.•The grantee's FCC ID can be used only when all FCC/ IC compliance requirements are met.•Manual Information To the End User•The OEM integrator has to be aware not to provide information to the end user regarding how to•install or remove this RF module in the user's manual of the end product which integrates this module.•The end user manual shall include all required regulatory information/warning as show in this manual.•Operations in 5.15-5.25GHz band are for indoor use only.py2010-01-08 This document is confidential and subject to change 3
FeaturesKey Features :•3x3 antenna Configuration• 802.11n Network Standards (HT 40 only)• Modulation modes: BPSK, QPSK, 16QAM and 64QAM• WPS Certified- Wireless Protected Setup for easy set up and security configurationpyp yg• Optimal channel selection and connection management• Seamless channel switchunder interference• 40 MHz bandwidth support.• 300MHz PHY Rate Support and STBC Support for Extended Range• Antenna: 3x IPex Connectors (3T/3R)-UFL• Antenna: 3x IPex Connectors (3T/3R) U.FL• MAC Filtering - No Restriction Mode, White List Mode, Black List Mode; Up to 32 connections• WDS Enables network management units to collect statistics and manage the device remotely• Support Low Power ModeSt d d & C tifi tiStandard & Certifications:• FCC• RoHS Compliance2014-04-07 4This document is confidential and subject to change
SpecificationChipsetMac/BB Processor Lantiq PSB8231RF Chip Lantiq PSB8301RadioStandards 2009 IEEE 802.11a, IEEE 802.11nAntenna U.FL 3 x Ipex Connectors (3T/3R)RF connector impedance 50 ohmOperating Frequency 802.11n : 5.190 ~ 5.230GHz, 5.755 ~ 5.795GHzModulation IEEE 802.11n : OFDMCtifitiCertificationsOutput Power (Per Antenna @ -25dB EVM)802.11n HT40 : 5.190 ~ 5.230GHz  17.0 +/- 1dBm (Avg)5.755 ~ 5.795GHz  25.0 +/- 1dBm (PK)802.11a 64QAM 5/6 <= -75dBm802.11a BPSK ½ <= -88dBm802.11n HT40, 64QAM 5/6 <= -75dBm (@3 antennas)Receive Sensitivity (PER <10%),Q /(@ )802.11n HT20, 64QAM 5/6 <= -78dBm (@3 antennas)802.11n HT40, BPSK 1/2 <= -92dBm (@3 antennas)802.11n HT20, BPSK 1/2 <= -94dBm (@3 antennas)2014-04-07 5This document is confidential and subject to changeReceiver Max PowerSensitivity (PER < 10%) -20dBm
SpecificationPower SupplyInput Voltage / Average Power 3.3V / 5.5WEnvironmentalOutput Power (Per Antenna @ -25dB EVM)Temperature Humidity0 ~ 50 OC 10% to 85% Non-Condensing-20 ~ 85 OC 5% to 90% Non-CondensingUtilityDriver Support Linux 2.6.33Wireless Statistics Link quality, RSSI, noise level packet statisticsDimensionsDimensions(PCBA) 50.95mm x 32 mmManufacturing compliant Lead-free RoHS2014-04-07 6This document is confidential and subject to change
SpecificationPower SupplyInput Voltage / Average Power 3.3V / 5.5WEnvironmentalOutput Power (Per Antenna @ -25dB EVM)Temperature Humidity0 ~ 50 OC 10% to 85% Non-Condensing-20 ~ 85 OC 5% to 90% Non-CondensingUtilityDriver Support Linux 2.6.33Wireless Statistics Link quality, RSSI, noise level packet statisticsDimensionsDimensions(PCBA) 50.95mm x 32 mmManufacturing compliant Lead-free RoHS2014-04-07 7This document is confidential and subject to change
Mechanical SpecificationPCB Dimension:PCB  Dimension:•Width : 30.0mm•Height : 50.95mm•Thickness:1.0 mmThickness  1.0 mm•PCB Form Factor complied with PCI express Mini Card Electromechanical Specification Rev 1.2(Oct. 26, 2007),  Figure 2-3 : Full Mini Card2014-04-07 8This document is confidential and subject to change
Pin Out Definitions – 1 of 2Pi #NPi #NPin #NamePin #Name51 Reserved 52 +3.3V aux49 Reserved 50 GND47 Reserved 48 +1.5V45 Reserved 46 LED_WPAN#43 GND 44 LED_WLAN#41 +3.3V aux 42 LED_WWAN#3933V40GND39+3.3V aux40GND37 GND 38 USB_Dp35 GND 36 USB_Dn33 PETp0 34 GND31 PETn0 32 SMB_DATA29 GND 30 SMB_CLK27 GND 28 +1.5V25PERp026GND25PERp026GND23 PERn0 24 +3.3V aux21 GND 22 PERST#19 Reserved 20 W_DISABLE#17 Reserved 18 GNDMechanical Key15 GND 16 Reserved2014-04-07 9This document is confidential and subject to change
Pin Out Definitions – 2 of 2Pin # Name Pin # Name13 REFCLKp 14 Reserved11 REFCLKn 12 Reserved9GND 10Reserved7 CLKREQ# 8 Reserved5 Reserved 6 +1.5V3 Reserved 4 GND1 WAKE# 2 +3.3V aux2014-04-07 10This document is confidential and subject to change
Antenna SpecManufacturer : Antenna-pro www.antenna-pro.comModel NO. : KMDA5158-06SMAAt T 24 58GD lB dWiFiDi l tAntenna Type : 2.4~5.8G Dual Band WiFiDipole antenna (4 dBi(2.4 GHz), 7 dBi(5 GHz))Antenna connect : SMA (Male Rev)2014-04-07 11This document is confidential and subject to change

Navigation menu