Geotech PFAS Free Portable Bladder Pump Installation And Operation Manual
User Manual: Pdf Geotech PFAS Free Portable Bladder Pump
Open the PDF directly: View PDF .
Page Count: 36
Download | |
Open PDF In Browser | View PDF |
PFAS Free Portable Bladder Pump Installation and Operation Manual Rev 5/8/18 Part # 11150324 Table of Contents Section 1: System Description ........................................................................... 4 Function and Theory ......................................................................................... 4 System Components ......................................................................................... 5 Bladder Assembly ............................................................................................. 5 Pump Housing ................................................................................................... 5 Intake screen ..................................................................................................... 5 Optional Drop Tube Intake Assembly ............................................................... 5 Section 2: System Installation ............................................................................ 6 Safety Cable ...................................................................................................... 6 Pump Controller ................................................................................................ 6 Pump Tubing Lines ........................................................................................... 6 Reverse Coil Method ......................................................................................... 7 Optional Drop Tube Intake Assembly ............................................................... 7 Section 3: System Operation .............................................................................. 8 Flowrates ........................................................................................................... 8 Example Flow Rates ......................................................................................... 9 Selecting an Air Source ................................................................................... 10 Volume of Tubing ............................................................................................ 10 Air Volume of Bladder Pumps ......................................................................... 10 Determining PSI .............................................................................................. 12 Section 4: System Maintenance ....................................................................... 13 Bladder Removal Steps ................................................................................... 13 Bottom Intake Assembly.................................................................................. 15 Bottom Intake Reassembly ............................................................................. 15 Bladder Reassembly ....................................................................................... 16 Replacement Parts .......................................................................................... 20 Section 5: System Troubleshooting ................................................................ 21 Section 6: System Specifications .................................................................... 22 Section 7: Replacement Parts List .................................................................. 24 1.66 Bladder Pump Components .................................................................... 24 .850 Bladder Pump Components .................................................................... 26 .675 Bladder Pump Components .................................................................... 28 EC Declaration of Conformity .......................................................................... 32 The Warranty ...................................................................................................... 33 1 DOCUMENTATION CONVENTIONS This document uses the following conventions to present information: An exclamation point icon indicates a WARNING of a situation or condition that could lead to personal injury or death. You should not proceed until you read and thoroughly understand the WARNING message. WARNING A raised hand icon indicates CAUTION information that relates to a situation or condition that could lead to equipment malfunction or damage. You should not proceed until you read and thoroughly understand the CAUTION message. CAUTION A note icon indicates NOTE information. Notes provide additional or supplementary information about an activity or concept. NOTE 2 In order to ensure that your pump has a long service life and operates properly, adhere to the cautions below and read this manual before use. For long-term storage greater than one week, care should be taken to clean and dry all pump components. This will help with long-term reliability. Deionized water or a siliconebased lubricant can be used on the O-ring seals to promote longevity and elasticity. Pump operation and decontamination should be performed to standard operating procedures. Operation of system utilizing non-Geotech manufactured equipment could result in equipment failure or malfunction and may void the warranty. This includes air and fluid tubing. Avoid operating the system without securely anchoring safety cable attached to down well components. Always wear nitrile powderless gloves and be mindful of contaminated fluids contacting your person and entering the environment when operating any ground water sampling device. Do not operate this equipment if it has visible signs of significant physical damage other than normal wear and tear. WARNING Notice for consumers in Europe: This symbol indicates that this product is to be collected separately. The following applies only to users in European countries: This product is designated for separate collection at an appropriate collection point. Do not dispose of as household waste. For more information, contact the seller or the local authorities in charge of waste management. 3 Section 1: System Description Function and Theory The PFAS Free Portable Bladder Pump is designed specifically for sampling per- and polyfluoroalkyl substances (PFAS) such as perfluorooctanoic acid (PFOA) and perfluorooctane sulfonate (PFOS) in groundwater. PFAS compounds are synthetic chemicals used in firefighting foams, stain resistant carpets, and other repellant/non-stick applications. A chemically stable substance with low volatility, PFAS compounds are not absorbed well in soil and can migrate to water sources. The PFAS Free Portable Bladder pump is made with PFAS free materials such as 316 Stainless Steel, high-density polyethylene (HDPE), and Buna-Nitrile to provide representative water samples for testing. The PFAS Free Portable Bladder Pump is proven to not contribute any PFAS substances to samples. Complete pump, tubing and safety cable have been soak tested and laboratory analyzed under ‘EPA 537 Modified’ method. The samples from those tests showed non-detect for all 25 PFAS analytes. (See Section 6: System Specifications) The pump is ideal for both gentle low-flow sampling and higher flow rate purging. Timed ON/OFF cycles of compressed air alternately squeeze the flexible bladder to displace water out of the pump to the surface and then exhaust the air allowing the pump to refill. Fluid enters the pump through the fluid inlet check valve at the bottom of the pump body via hydrostatic pressure. The bladder then fills with fluid. Compressed air enters the space between the bladder and the interior of the pump housing. The intake check valve (bottom) closes and the discharge check valve (top) opens. Compressed air squeezes the bladder, pushing the fluid to the surface (see Figure 1-1). The discharge check valve prevents back flow from the discharge tubing. Operated by the Bladder Pump Controller (BP Controller) or Geocontrol PRO, this cycle automatically repeats. Compressed air does not contact the sample. The bladder prevents contact between the pump drive air and the fluid sample. Figure 1-1: Bladder Pump Operation 4 Figure 1-1:the Bladder Pump Operationand/or portable air Read and understand portable generator compressor user manual for proper installation and operation, and Earth grounding instructions. If using portable compressed gas tanks, exercise proper caution, use safety protection devices as outlined by the supplier, and observe any additional safety requirements mandated by local jurisdiction. System Components A Geotech Portable Bladder Pump consists of four components: - Bladder Assembly - Pump Housing - Internal Tube Assembly - Intake Screen Assembly * Optional: Drop Tube Intake Assembly. See Section 7: Replacement Parts List. Bladder Assembly The bladders are made from extruded Polyethylene (PE) to provide a long life and to ensure undisturbed samples in PFAS sampling applications. The internal bladders are easily replaceable, see Section 4: System Maintenance. Pump Housing The bladder pump housing is constructed of electro polished 316 Stainless Steel. The black Buna Nitrile O-rings provide the high-pressure seals between the end caps and the housing tube. Intake screen The intake filter screen is constructed of 316 Stainless Steel and is easily removable for field maintenance. The intake filter screen protects and extends the life of the bladder material (see Warranty). Optional Drop Tube Intake Assembly An optional drop tube can be used to sample from depths below the specified maximum sampling depth. The Drop Tube Assembly connects a remote intake to the pump through a tube connected to the pump inlet. The intake depth can be any custom length of tubing. The pump assembly itself must be submerged below the water level. This means the depth to water cannot exceed the maximum pumping depth of the pump. If using a drop tube assembly not provided by Geotech, ensure all materials are PFAS testing approved. Use of unapproved materials may contaminate samples. 5 Section 2: System Installation The user must determine site-specific parameters such as water level, recharge rate, and adherence to low flow purging guidelines. Read the following before installation to prevent damage to the bladder pump. Safety Cable Before deploying any sampling pump, secure a safety cable from an anchoring point at or near the wellhead to the top of the pump. When testing in PFAS contaminated environments, ensure the safety cable does not have any nonstick or repellant coating as these coatings may be made with PFAS materials and will contaminate testing samples. Ensure all safety cables are PFAS testing approved before use. Pump Controller Geotech PFAS Free Portable Bladder Pumps can be operated with Geotech’s Geocontrol PRO, BP Controller 300 PSI, or BP Controller 500PSI. Be sure to consult the user guide of the controller you are using. Use of an air source and controller not supplied by Geotech could result in pressure buildup and unexpected pressure storage in the pump and airline. Operation of the pump is not recommended with equipment other than that provided by Geotech. The Geocontrol PRO is an easy-to-use portable compressor and logic unit specifically designed to operate Geotech’s PFAS Free Portable Bladder Pumps. In the case that a PFAS Free Portable Bladder Pump is deployed deeper than 155’ (47 m) with a Geocontrol PRO, the pump’s overall flow rate will decrease. To obtain full bladder volumes in this scenario, use the Bladder Pump Controller 300PSI. Pump Tubing Lines The Geotech PFAS Free Portable Bladder Pump requires two tubing lines. One of the lines is used for the air supply and exhaust. The second line is used for discharge fluid. See Section 6: System Specifications for tubing sizes. Failure to attach air and fluid lines to the appropriate ports could result in damage to the bladder. 6 Reverse Coil Method When lowering the pump into the well, it is important to reverse the natural bend of the coiled tubing so that the tubing will straighten out as it is lowered (see figure 2-1). As the pump and tubing are lowered into the well, the direction of the bend should be reversed from the direction in which it is coiled. If the tubing is allowed to uncoil naturally and the natural bend not interrupted, the tubing will continue its coil into the well. Using the reverse coil method will avoid difficulty in lowering the pump into the well, especially when the well is not vertical, or has come out of alignment for any reason. Figure 2-1: Reverse Coil Method Optional Drop Tube Intake Assembly If a Drop Tube Intake Assembly is employed, a third tubing line is necessary to connect from the bottom of the bladder pump to the top of the drop tube intake. For deployment of optional Drop Tube Intake Assembly, attach desired length of drop tube between the intake’s hose barb and hose barb on bottom of pump. For added security, a safety cable may be installed to support the drop tube intake to the bottom of pump. Send the drop tube intake down the well followed by the drop tube tubing, then the pump, and finally the air and fluid discharge lines. 7 Section 3: System Operation Once tubing and safety cable are connected, slowly deploy the pump into the well. If depth to water is known, a mark can be placed on the tubing to indicate when the pump has reached the desired level. The pump must be fully submerged. Optimal pump performance is achieved with submergence of greater than 10’ (3m) of water column. Less submergence could result in reduced pump performance and physical damage to the bladder. Worn bladders can develop a shape memory and may not be able to fill completely without sufficient submergence. Pumping will still be achieved and the sampling event can be completed. Once the pump is at the desired level within the well, set the controller DISCHARGE and FILL timers. These settings should be such that the bladder is never over compressed. Set the pressure cycle so the fluid stream exiting the fluid line starts to fall off when the DISCHARGE timer expires. If the controller being used has a pressure gauge, you will notice the pressure level will climb and then stabilize during pumping and start to increase after all of the water has been evacuated from the pump. If you notice the pressure increasing after a pump cycle, reduce the pressurization/discharge time. Using the Example Flow Rates, set the FILL TIME to optimize the amount of fluid discharged during the pressure cycle. Both FILL TIME and DISCHARGE TIME vary depending on submergence, depth to water, tubing size, and overall tubing length. More information can be found in the user manual specific to the controller you are using. Flowrates Bladder Pump flow rates are influenced by pump size (diameter and length), pump depth and submergance, as well as controller selection (i.e. compressor performance, valve flow coefficient). A large pump at shallow depths will produce the most flow, and a small pump at maximum depths will produce the least amount of flow. Factors that increase flow: increased submergance (depth of pump below water line). a strong compressor, like the Geocontrol PRO, will enable fast pressure build up in the airline tubing and pump cavity. a clean intake screen will maximize the amount of water entering into the pump. 8 Example Flow Rates Table 3-1: Flow Rates with 25’ (7.6m) Airline @ 25 ft. (7.6 m) airline* (3 ft. (0.9 m) submergence) Pump Size: 1.66 x 36" (4 x 91 cm) 1.66 x 18" (4 x 46 cm) 0.85 x 18" (2.2 x 46 cm) 0.675 x 18" (1.7 x 46 cm) Discharge Tube Size: 1/4" ID x 3/8" OD (64 x 127 mm) .17" ID x 1/4" OD (43 x 64 mm) Flow: Approx. Geocontrol PRO Settings Fill Time: Discharge Time: 43 oz/min (1.3 L/min) 10 sec. 7 sec. 33 oz/min (1 L/min) 5 sec. 5 sec. 20 oz/min (0.6 L/min) 1 sec. 2 sec. 10 oz/min (0.3 L/min) 1 sec. 2 sec. Table 3-2: Flow Rates with 150’ (46m) Airline @ 150 ft. (46 m) airline* (3 ft. (0.9 m) submergence) Pump Size: 1.66 x 36" (4 x 91 cm) 1.66 x 18" (4 x 46 cm) 0.85 x 18" (2.2 x 46 cm) 0.675 x 18" (1.7 x 46 cm) Discharge Tube Size: 1/4" ID x 3/8" OD (64 x 127 mm) .17" ID x 1/4" OD (43 x 64 mm) Flow: Approx. Geocontrol PRO Settings Fill Time: Discharge Time: 9 oz/min (260 mL/min) 20 sec. 55 sec. 6 oz/min (175 mL/min) 15 sec. 40 sec. 2 oz/min (59 mL/min) 8 sec. 30 sec. 1 oz/min (27 mL/min) 5 sec. 25 sec. * Airline tubing size: .17”ID x ¼” OD (4 x 6 mm) Flow rates are based on 3’ (0.9 m) of pump submergence. Field environments typically provide over 10’ (3 m) of submergence, which increases flow. Speak with a Geotech representative to determine the best configuration to fulfill your sampling needs. 9 Selecting an Air Source The Geocontrol PRO is an easy-to-use portable compressor and logic unit specifically designed to operate Portable Bladder Pumps deployed down to 180’ (55 m) or less. Air consumption depends on the volume of tubing and the size of deployed Bladder Pump. Follow the general guidelines and examples below to calculate the air consumption for specific sampling configurations. Volume of Tubing TUBING LENGTH TUBE I.D. 1 ft./ 0.3 m 10 ft./ 3m 50 ft./ 15 m 100 ft./ 30 m 250 ft./ 76 m 500 ft./ 152 m 0.17 in/ 0.43 cm 0.3 in³/ 5 cm³ 3 in³/ 50 cm³ 15 in³/ 246 cm³ 30 in³/ 492 cm³ 75 in³/ 1230 cm³ 150 in³/ 2460 cm³ 0.25 in/ 0.64 cm 0.6 in³/ 10 cm³ 6 in³/ 100 cm³ 30 in³/ 492 cm³ 60 in³/ 984 cm³ 150 in³/ 2460 cm³ 300 in³/ 4920 cm³ Air Volume of Bladder Pumps BP DIAMETER 1.66 in/ 4 cm 1.66 in/ 4 cm 0.85 in/ 2.2 cm 0.675 in/ 1.7 cm BP LENGTH 36 in/ 91 cm 18 in/ 46 cm 18 in/ 46 cm 18 in/ 46 cm VOLUME (in³) 78 in³/ 1278 cm³ 39 in³/ 640 cm³ 10 in³/ 164 cm³ 6 in³/ 100 cm³ Calculation guideline: Volume of Tubing (in³/cm³) + Volume of Bladder Pump (in³/ cm³) = Air Consumption per cycle (in³/ cm³) If planning to use an air compressor, use one with a reserve tank to ensure proper air supply to the pump. If using a Nitrogen Tank, see Figure 3-1 for Nitrogen Tank Volume vs. Bladder Pump consumption. Ensure the air compressor is constructed from suitable materials for sampling PFAS compounds. 10 Figure 3-1: Tank Volume vs. BP Consumption 11 Determining PSI Determine the air pressure needed to operate the Bladder Pump based on the length of the air supply line to the pump (well depth). Use the simplified formula: 0.5 PSI (per foot) + 10 PSI (to account for tubing friction) = required PSI 0.12 bar (per meter) + 0.7 bar (to account for tubing friction) = required bar As mentioned above, the additional 10 PSI/ 0.7 bar is to account for the pump itself and friction loss along the airline tubing. When the length of the airline is 50’ (15 m) or less, there is no need for the additional pressure. The formulas stated above are not absolute, and are meant to provide baseline information. 12 Section 4: System Maintenance Geotech uses black Buna-N O-rings for the PFAS free portable bladder pumps. If you receive an O-ring from Geotech that is not black, do not use the O-ring on the bladder pump and contact a Geotech representative. Using incorrect materials while testing for PFAS compounds will contaminate testing samples. Remove the pump from the well. It is not necessary to remove the air and sample lines from the pump. Upon removal, note the pump may be filled with fluid. Bladder Removal Steps 1. Remove the bottom intake assembly and outer housing by turning the housing counter-clockwise. Use your hand or a strap wrench If the pump does not easily come off, use the wrench flats on the cap to provide leverage. The housing should twist/slide off. DO NOT grip the hose barbs. Figure 4-1: Removal of the bottom intake and outer housing 2. Remove the lower HDPE Compression Ring (#21150149) by pulling it off the end of the internal center tube assembly (18” #21150091; 36” #21150136) 13 Figure 4-2: Removal of bottom HDPE Compression Ring 3. Remove the upper HDPE Compression Ring (#21150149) by sliding it over the bladder and over the end of the internal center tube assembly. Figure 4-3: Removal of upper HDPE Compression Ring 4. Pulling from the lower end of the bladder (18” #21150055; 36” #21150140), slide the bladder off the internal center tube weldment assembly. Figure 4-4: Removal of Bladder 5. Remove all O-rings. If needed, use a flat object to help the O-ring out of the groove on the center tube weldment assembly, Do not over-stretch, damage, or puncture the O-rings in any way. 14 Figure 4-5: Removal of O-rings 6. Clean and prepare replacement parts as needed. Bottom Intake Assembly 1. Pull the Check Ball Retainer from the Bottom Intake Assembly. Figure 4-7a: Check Ball Retainer Figure 4-7b: Removing Check Ball Retainer Figure 4-7c: Check Ball Retainer Removed 2. Remove the SS Check Ball from the inside of the Bottom Intake Assembly. 3. Remove all O-rings on the assembly. If needed, use a flat object to help the O-rings out of the grooves on the Bottom Intake Assembly Do not over-stretch, damage, or puncture the O-rings in any way. 4. Clean and prepare replacement parts as needed. Bottom Intake Reassembly 1. Install O-ring (#11154057) in the groove on the Check Ball Retainer. Ensure that O-rings are not twisted. 15 Figure 4-8: Check Ball Retainer O-ring 2. Install O-rings (#11154058 & #11154056) in the grooves on the Bottom Intake Assembly. Ensure that O-rings are not twisted. Figure 4-9: O-rings on the Bottom Intake Assembly 3. Insert the SS Check ball into the Bottom Intake Assembly. SS Check Ball must be inside the Bottom Intake Assembly. The configuration shown may damage pump. 4. Push the Check Ball Retainer in ensuring the O-ring is no longer visible. Bladder Reassembly 1. Install O-ring (#11154056) on the cap of the center tube weldment assembly. 16 Figure 4-10: Cap O-ring 2. Install O-ring (#11154055) on the upper end of the center tube weldment assembly. Figure 4-11: Upper end O-ring 3. Install O-ring (#11150455) on the lower end of the center tube weldment assembly. Figure 4-12: Lower O-ring 17 4. Add both HDPE Compression rings onto the center tube weldment. Figure 4-13: Compression rings on the center tube weldment 5. Slide bladder (18” #21150055; 36” #21150140) onto the internal center tube weldment assembly, over the O-ring (#11150455) on the bottom end of the center tube assembly, and through the HDPE Compression rings. Twisting the bladder on may help with installation. Figure 4-14: Bladder through compression rings 5A. Alternatively, if the bladder is difficult to install: a) Remove the bladder. Compression rings can remain on the center tube weldment assembly. b) Remove the bottom O-ring. c) Install bladder through HPDE Compression rings. d) Slide bladder so that the bottom O-ring groove on the center tube weldment is visible. e) Install the bottom O-ring. f) Slide bladder over the bottom O-ring. Install O-ring #11150455 Figure 4-15a: Add O-ring O-ring installed Figure 4-15b: Place bladder over O-ring *The bladder will get wrinkled. Inspect bladder for damage before proceeding. 6. Continue to slide the bladder until the bladder is over the top O-ring (#11150455) and flush with the top of the center tube weldment assembly. Do not to roll the Orings. If needed, use Deionized water or a silicone based lubricant on the O-ring seals to help the bladder slide over the O-rings. 18 Figure 4-16a: Sliding bladder on 7. Slide an HDPE Compression Ring (#21150149) over the bladder to the upper end of the center tube weldment assembly. Figure 4-17a: Compression Ring on Bladder 8. Figure 4-16b: Bladder entirely on Figure 4-17b: Compression ring secured With the upper end of the bladder secured by the HDPE Compression Ring (#21150149), slide the second compression ring over the end of the bladder until the O-ring is visible in the middle of the HDPE Compression Ring. Figure 4-18: Bottom Compression ring with visible O-ring 19 9. Replace the outer housing (18” #21150041; 36” #51150141) Be sure the outer housing is sealed against the upper cap. Figure 4-19b: Correct Installation Figure 4-19a: Incorrect Installation 10. Replace the bottom intake assembly by screwing it into the bottom of the pump. Be sure the bottom intake assembly is sealed against the outer housing. Figure 4-20a: Incorrect Installation Figure 4-20b Correct Installation Inspect O-rings and bladder for damage. Replace if torn, ripped, or excessively worn. Replacement Parts Due to the sensitivity of PFAS testing, it is important to use only PFAS testing approved materials. Use of unapproved materials, such as Viton, will contaminate samples. Additional PFAS approved replacement parts can be purchased through Geotech. See Section 7: Replacement Parts List. 20 Section 5: System Troubleshooting Read and understand the portable generator and/or portable air compressor user manual for proper installation and operation, and Earth grounding instructions. If using portable compressed gas tanks, be sure to exercise proper caution and safety protection devices as outlined by the supplier and any additional safety requirements mandated by local jurisdiction. Do not operate equipment if it has been damaged, broken, smashed, or excessively worn. Broken components pose a severe threat to the safety of the operator and his or her environment. Contact Geotech for any service or repair needs. Problem: Air in fluid line or flow cell. Solutions: Ensure timer settings on controller prevent bladder from being over pressurized. Verify HDPE collar is in place at either end of the bladder. Inspect O-rings for damage and replace if needed. Inspect bladder for cuts and holes and replace if needed. Occasionally, significant amounts of dissolved gasses can be encountered in ground water, especially in deep well areas with significant hydraulic pressures. When this fluid is exposed to atmosphere, out-gassing may occur. Refer to your Standard Operating Procedures for specifics on dealing with this situation. Problem: Not pumping any fluid (or no air). Solutions: Verify the pump is below static water level. Inspect airline tubing for kinks, cracks or breaks. Make sure there are no leaks at any fittings. Replace damaged or worn tubing. Cut tubing back and re-terminate at leaking fitting joint. Problem: Not pumping any fluid (air is coming out fluid discharge line). Solutions: Disassemble pump and inspect the O-rings and bladder. Replace either or both if damaged. Verify the pump is below static water level. If you are experiencing other problems than mentioned above, please call Geotech Technical Support for immediate assistance, (800) 833-7958. 21 Section 6: System Specifications 1.66x36" 1.66x18" Pump Housing 0.675 316 SS Pump Ends Bladder Material Polyethylene (PE) Bladder Collar Material High-Density Polyethylene (HDPE) O-Ring Material Buna-Nitrile (black) 1.66” 1.66” 40 mm 40” 40 mm 19” 101.6 cm 5.0 lbs. 48.2 cm 3.0 lbs. 2.27 Kg 11 oz. 1.36 Kg 5 oz. 310 mL 2” 150 mL 2” Outer Diameter .850" .675" 21.6 mm 17 mm 18 5⁄ 8" 18 3⁄4" 47.3 cm 47.6 cm 1.1 lbs. 50 mm 5 psi (ash)* (.3 bar) 0.83 lbs. Length w/ screen Weight Volume/Cycle Min. Well I.D. 50 mm Min. Operating Pressure Operating Pressure 100psi 7 bar Proof Pressure 200psi 14 bar Burst Pressure 300 psI 21 bar 200’ 61 m Max. Sampling Depth Operating Temperature 0.85 32°F (0°C) to 212°F (100°C) ambient air or fluid temperature Tubing Size .17" ID x .25" OD (4 mm ID x 6 mm OD) Air Line 0.25" ID x .375" OD Discharge Line (6 mm ID x 10MM OD) *ash = above static head 22 .17" ID x .25" OD (4 mm ID x 6 mm OD) System Specifications, continued: IP rating: (NA) Submersible to 500’ (152 m) of water column. Special care must be taken to avoid burns and exposure to outgassing of volatiles when pumping fluids at elevated temperatures. Special air source considerations need to be taken into account 9000’ (2.75 km) above mean sea level (AMSL). The PFAS Free Portable Bladder Pump is proven to not contribute any PFAS substances to samples. Complete pump, tubing and safety cable have been soak tested and laboratory analyzed under ‘EPA 537 Modified’ method. The samples from those tests showed non-detect for all 25 PFAS analytes Perfluorooctanesulfonate (PFOS) Perfluorooctanoic acid (PFOA) Perfluorobutanesulfonate (PFBS) Perfluorobutyric acid (PFBA) Perfluorodecanesulfonate (PFDS) Perfluorodecanoic acid (PFDA) Perfluorododecanoic acid (PFDoA) Perfluoroheptanesulfonate (PFHpS) Perfluoroheptanoic acid (PFHpA) Perfluorohexanesulfonate (PFHxS) Perfluorohexanoic acid (PFHxA) Perfluorononanesulfonate (PFNS) Perfluorononanoic acid (PFNA) Perfluorooctanesulfonamide (PFOSA) Perfluoropentanesulfonate (PFPeS) Perfluoropentanoic acid (PFPeA) Perfluorotetradecanoic acid (PFTeDA) Perfluorotridecanoic acid (PFTrDA) Perfluoroundecanoic acid (PFUdA) 2,3,3,3-Tetrafluoro (PFPrOPrA) (GenX) Fluorotelomer sulfonate 4:2 (4:2 FTS) Fluorotelomer sulfonate 6:2 (6:2 FTS) Fluorotelomer sulfonate 8:2 (8:2 FTS) N-ethylperfluoro-1-octanesulfonamidoacetic acid N-methylperfluoro-1-octanesulfonamidoacetic acid 23 Section 7: Replacement Parts List 1.66 Bladder Pump Components 18” model shown 24 Bladder Pump, 1.66, Portable Stainless Steel, Screened Length: 18” (81150051) or 36” (81150052) Item Qty Description Part No. 1 § BLADDER, PE, 1.66 x 18,PBP, EA 21150055 1 § BLADDER, PE, 1.66 x 36,PBP, EA 21150140 1 § BLADDER, PE, 1.66 x 18,PBP,12PK 21150056 1 § BLADDER, PE, 1.66 x 36,PBP,12PK 21150139 2 1 HOUSING, SS6, 1.66 x 18,PBP 21150041 2 § 51150141 3 1 4 1 HOUSING, SS6, 1.66 x 36,PBP HOSEBARB, SS6, MOD, 1/4 X 1/4 MPT MODIFIED DISCHARGE HOSEBARB, SS6, .170 X 1/8 MPT AIR LINE 5 2 RING, COMPRESSION, HDPE 1.66 BP, CE 21150149 6 1 BALL, SS6, 3/8" 17500081 7 2 O-RING, 2MM X 23MM, BUNA-N 11150455 8 2 O-RING, 2.5MM X 36MM, BUNA-N 11154056 11150106 21150019 9 1 ASSY, HANGER, 166, PBP, SFTY CB, PFAS FREE CE 51150144 10 1 CAP UPPER WELDMENT, SS, 1.66, 18”,PBP CE 21150091 10 § CAP UPPER WELDMENT, SS, 1.66, 36”,PBP CE 21150136 11 1 PLUG, BALL RETAINER, 1.66 PBP CE 21150096 12 1 O-RING, #014, BUNA-N 11154057 13 1 BALL, SS6, 1/2" 17500082 14 1 O-RING, 2MM X 20MM, BUNA-A 11154058 15 1 CAP LOWER, SS, 1.66, PRTBL BP, CE 21150094 16 1 SCREEN, INTAKE, 1.66, SS6, PBP, CE 21150095 17 1 DISC, SS6, 1.66, PBP 21150148 18 1 RING, SNAP, SS6, INTERNAL, 1.66 BP PORTABLE 11150051 19 1 51150145 20 § 21 § ASSY, BOTTOM INTAKE, 1.66 PPB, PFAS FREE, CE ASSY, LOWER CAP, 1.66 BP, PFAS FREE DROP TUBE, CE DROP TUBE, CAP LOWER, 1.66 PBP, CE SS 22 § HOSEBARB, SS6, 1/2 X 3/8 MPT 16600217 23 § 87050504 24 § 25 1 TUBING, PE, 1/2 X 5/8, FT POLYETHYLENE ASSY, INTAKE, 1.66” SS, DROP TUBE, WITH ½” HOSEBARB, INTAKE, 1.66”, DROP TUBE MANUAL, PBP, PFAS FREE CE SPARE PARTS KIT, 1.66, PBP, PFAS FREE, CE [Items 5 (2), 6, 7 (2), 8 (2), 12, 13, 14, 16, 17, 18] KIT, 1.66 PBP, O-RING SET, CE O-RING SERVICE KIT, PFAS FREE 11150324 1 § § § = Sold Separately 25 51150146 21150098 51150078 21150113 51150079 91150022 .850 Bladder Pump Components 26 Bladder Pump, .850, Stainless Steel, Screened - 81150055 Item Qty Description Part No. 1 1 BLADDER, PE, .85 BP, EA 21150100 1 § BLADDER, PE, .85, CE, 12PK 21150099 2 1 HOSEBARB, SS6, MOD, .170 X 1/8 NPT DISCHARGE 11150118 3 1 HOSEBARB, SS6, .170 X 10/24 AIR 17200245 4 2 BALL, SS6, 1/4" 17500079 5 1 CAP UPPER WELDMENT, SS6, .85 BP 21150045 6 2 RING, COMPRESSION, HDPE, .850, CE, BP 21150150 7 2 O-RING, #017, BUNA-N 11150470 8 4 O-RING, #012, BUNA-N 11150471 9 1 HOUSING, SS6, .850, BP 21150047 10 1 ASSY, BOTTOM INTAKE, .85 BP 51150147 11 1 CAP, LOWER, SS6, .850, BP 21150046 12 1 SCREEN, INTAKE, SS6, .85 BP 21150050 13 1 DISC, SS6, .85 BP 21150049 14 1 RING, SNAP, SS6, INTERNAL, .85 BP 11150053 15 § ASSY, LOWER CAP, .850 BP, DROP TUBE, CE, W/ 1/4" HOSEBARB 51150148 16 § DROP TUBE, CAP LOWER, .850 BP, CE SS 21150109 17 § HOSEBARB, SS6, 1/4 X 1/8 MPT 17200072 18 § TUBING, PE, 1/4 X 3/8, FT POLYETHYLENE 87050502 19 § ASSY, INTAKE, .850 BP, DROP TUBE, CE, W/ 1/4" HOSEBARB 51150069 20 § INTAKE, DROP TUBE, .850 BP, CE, SS 21150111 Not Shown: § 1 MANUAL, PBP, PFAS FREE CE 11150324 § SPARE PARTS KIT, .85, BP, CE [Items 4 (2), 6 (2), 7 (2), 8 (4), 12, 13, 14] 51150150 § KIT, .85 BP, O-RING SET, CE, O-RING SERVICE KIT [Items 7 (2), 8 (4)] 91150024 = Sold Separately 27 .675 Bladder Pump Components 28 Bladder Pump, .675, Stainless Steel, Screened - 81150056 Item Qty Description Part No. 1 1 BLADDER, PE, .675, EA 21150102 1 § BLADDER, PE, .675, CE, 12PK 21150101 2 1 HOUSING, SS6, .675, BP 21150032 3 2 HOSEBARB, SS6, .170 X 10/24 AIR 17200245 4 1 WELDMENT, INNER, SS6, .675 BP 51150125 5 2 O-RING, #014, BUNA-N 11154057 6 2 O-RING, #107, BUNA-N 11150468 7 2 RING, COMPRESSION, HDPE, .675 BP, CE 21150151 8 1 O-RING, #009, BUNA-N 1150469 9 1 ASSY, BOTTOM INTAKE, .675, BP 51150151 10 1 RETAINER, BALL, .675 BP, TACO 21150087 11 1 BALL, SS6, 1/4" 17500079 12 1 CAP, LOWER, SS6, .675 BP 21150031 13 1 SCREEN, INTAKE, SS6, .675 BP 11150317 14 1 DISC, SS6, .675 BP 21150033 15 1 RING, SNAP, SS, .675 BP 11150182 16 § ASSY, LOWER CAP, .675 BP, DROP TUBE, CE 51150152 17 § DROP TUBE, CAP LOWER, .675 BP, CE SS 21150110 18 § HOSEBARB, SS6, 1/4 X 1/8 MPT 17200072 19 § TUBING, PE, 1/4 X 3/8, FT POLYETHYLENE 87050502 20 § ASSY, INTAKE .675 BP, DROP TUBE CE 51150070 21 § INTAKE, DROP TUBE, .675 BP, CE, SS 21150112 Not Shown: § 1 MANUAL, PBP, PFAS FREE CE 11150324 § SPARE PARTS KIT, .675, BP, CE [Items 5(2), 6 (2), 7(2), 8, 10, 11, 13, 14, 15] 51150154 § KIT, .675 BP, O-RING SET, CE O-RING SERVICE KIT [Items 5 (2), 6 (2), 8] 91150025 = Sold Separately 29 Notes 30 DOCUMENT REVISIONS EDCF# Project 1526 Project 1629 DESCRIPTION Release, StellaR Updated Bladder Re-assembly instructions, added .850 and .675 sizes, updated part numbers list – StellaR, TA 31 REV/DATE 2/6/2017 4/24/2018 EC Declaration of Conformity Manufacturer: Geotech Environmental Equipment, Inc. 2650 E 40th Avenue Denver, CO 80205 Declares that the following products, Product Name: Geotech Portable Bladder Pump, PFAS Free, CE Model(s): 1.66” Bladder Pump, 18” & 36” lengths Year of manufacture: 2017 .850” Bladder Pump .675” Bladder Pump Year of manufacture: 2018 Conform to the protection requirements of 2006/42/EC Machinery Directive by application of the following standards: EN 809+A1/AC:2010 EN 61010-1: 2010 Year of affixation of the CE Marking: 2017 Production control follows the ISO 9001:2015 regulations and includes required safety routine tests. This declaration issued under the sole responsibility of Geotech Environmental Equipment, Inc. Joe Leonard Product Development Serial number ________________ 32 The Warranty For a period of one (1) year from date of first sale, product is warranted to be free from defects in materials and workmanship. Geotech agrees to repair or replace, at Geotech’s option, the portion proving defective, or at our option to refund the purchase price thereof. Geotech will have no warranty obligation if the product is subjected to abnormal operating conditions, accident, abuse, misuse, unauthorized modification, alteration, repair, or replacement of wear parts. User assumes all other risk, if any, including the risk of injury, loss, or damage, direct or consequential, arising out of the use, misuse, or inability to use this product. User agrees to use, maintain and install product in accordance with recommendations and instructions. User is responsible for transportation charges connected to the repair or replacement of product under this warranty. Equipment Return Policy A Return Material Authorization number (RMA #) is required prior to return of any equipment to our facilities, please call our 800 number for appropriate location. An RMA # will be issued upon receipt of your request to return equipment, which should include reasons for the return. Your return shipment to us must have this RMA # clearly marked on the outside of the package. Proof of date of purchase is required for processing of all warranty requests. This policy applies to both equipment sales and repair orders. FOR A RETURN MATERIAL AUTHORIZATION, PLEASE CALL OUR SERVICE DEPARTMENT AT 1-800-833-7958 Model Number: ________________ Serial Number: ________________ Date of Purchase: ________________ Equipment Decontamination Prior to return, all equipment must be thoroughly cleaned and decontaminated. Please make note on RMA form, the use of equipment, contaminants equipment was exposed to, and decontamination solutions/methods used. Geotech reserves the right to refuse any equipment not properly decontaminated. Geotech may also choose to decontaminate the equipment for a fee, which will be applied to the repair order invoice. 33 Geotech Environmental Equipment, Inc. 2650 East 40th Avenue Denver, Colorado 80205 (303) 320-4764 ● (800) 833-7958 ● FAX (303) 322-7242 email: sales@geotechenv.com website: www.geotechenv.com In the EU Geotech Equipos Ambientales Calle Francesc I Ferrer, Guardia Local 19, Mollet del Valles, Barcelona 08100, España Tlf: (34)93 5445937 email: ventas@geotechenv.com website: http://spanish.geotechenv.com Printed in the United States of America
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Author : Geotech Create Date : 2018:05:08 15:47:21-06:00 Keywords : Rev, 5/8/18, Part, #, 11150324 Modify Date : 2018:05:09 08:34:49-06:00 Language : en-US Tagged PDF : Yes XMP Toolkit : Adobe XMP Core 5.6-c015 84.159810, 2016/09/10-02:41:30 Format : application/pdf Creator : Geotech Title : Geotech PFAS Free Portable Bladder Pump Installation and Operation Manual Description : Geotech PFAS Free Portable Bladder Pump Manual Subject : Rev 5/8/18 Part # 11150324 Creator Tool : Microsoft® Word 2016 Metadata Date : 2018:05:09 08:34:49-06:00 Producer : Microsoft® Word 2016 Document ID : uuid:3dfe7725-227d-5a4f-9ec9-9eab0ef6181a Instance ID : uuid:37bf43cf-cc05-c445-94a1-497f491f7d15 Page Count : 36EXIF Metadata provided by EXIF.tools