Sunwave Communications R205 Booster User Manual Preface

Sunwave Communications Co., Ltd Booster Preface

Contents

User manual - 2

                                                                                   CrossFire   NP                                                            Installation Version 1.0
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  2  Version 1.0  Table of Contents  1.  Purpose .............................................................................................................................................................................. 3 2.  Warnings ............................................................................................................................................................................ 3 3.  Site Considerations ............................................................................................................................................................ 4 4.  Environmental ................................................................................................................................................................... 4 5.  Preparation ........................................................................................................................................................................ 5 5.1.  Unpacking and Inspection ................................................................................................................................. 5 5.2.  Tools ................................................................................................................................................................... 7 5.3.  Antenna ............................................................................................................................................................. 8 5.4.  Network Cable ................................................................................................................................................... 9 6.  Installation of the AU ....................................................................................................................................................... 10 6.1.  Mount the AU in the Rack ............................................................................................................................... 10 6.2.  Mount the AU on the Wall ............................................................................................................................... 12 7.  Installation of the EU ....................................................................................................................................................... 14 7.1.  Mount the EU in the Rack ................................................................................................................................ 14 7.2.  Mount the EU on the Wall ............................................................................................................................... 14 8.  Installation of the NPRU .................................................................................................................................................. 15 8.1.  NPRU Ceiling Installation ................................................................................................................................. 15 8.2.  NPRU Roof Wall Installation ............................................................................................................................ 18 9.  Antennas Isolation Detector ............................................................................................................................................ 22
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  3  Version 1.0   Purpose This document describes the installation procedure for CrossFire Nano Power Remote Units.      NPRU Physical Appearance    Warnings  CrossFire is not a consumer product. Please install and use CrossFire in accordance with the instructions.  Before installing or modifying any equipment of CrossFire, the entire instruction should be read and fully understood.  Only qualified personnel are authorized to install and maintain the CrossFire system.  Changes  or  Modifications  not  expressly  approved  by  the manufacturer  responsible  for  compliance  could  void  the  user’s authority to operate the equipment.  Follow Electro Static Discharge precautions to avoid any damage of PCB, PSU etc.  Keep equipment powered-off during installing or modifying.    Low pathloss cables connected to antennas are highly recommended.
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  4  Version 1.0   Site Considerations  The distance between the Tx/Rx antennas and the coverage should correspond to LOS (Line of Sight) requirements for maximum area.  NPRU complies with FCC RF exposure limits for an uncontrolled environment. This equipment must be installed and operated with a minimum distance of 30 cm between the antennas and any person’s body.  The maximum length between EU-E and NPRU is 100 meters with CAT-6A STP.  The system delay should be taken into consideration when there are neighboring BTS sites overlapping in coverage.  Pick an ideal easy-to-reach location for installation convenience.  radius of space around CrossFire equipment for convenience of maintenance and on-site inspection.  Install NPRU close to the service area for monitor and debugging.     Environmental Humidity and temperature have adverse efforts on reliability of the CrossFire system. Therefore, it is highly recommended to install the equipment in locations with stable humidity, temperature and ventilating.  The equipment has to operate at humidity level and temperature range as follow: Maximum humidity: 85% Temperature range: -10 ~ 40℃    Verify that there is a minimum of a  20cm
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  5  Version 1.0   Preparation 5.1. Unpacking and Inspection  Unpack and inspect the packages as the following procedure: 1. Open the shipping packages carefully for each unit from the protective packing sponge. 2. Ensure that all equipment and accessories have been delivered (See Table 3-1). 3. Ensure that all equipment and accessories have no damage. If there is any damage, contact your Sunwave service agent.  Description Quantity  NPRU 1  Screws M3 X 6 6  Screws M4 X 10 4  Flat Washer M6 2  Spring Washer M6 2  Screws M6 X 70 2
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  6  Version 1.0  Nylon cable ties 1  Plastic Expansion Nails 2  Screws ST6.3 X 50 2  Mounting Bracket I 1  Mounting Bracket II 2  Mounting Bracket III 1  Mounting Bracket IV 1   Accessories List
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  7  Version 1.0  5.2. Tools Electric drill, cross screw, cutter, ladder and other tools are needed for NPRU installation which are not offered from Sunwave for now. All of these tools are for customers to prepare (see table 3-2).  Description Quantity  Electric drill 1  Cross screw 1  Hammer 1  Cutter 1  Flexible ruler 1  Ladder 1  Other tools /   Tool list
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  8  Version 1.0  5.3. Antenna According to installation site conditions  and  coverage requirement, determine proper  antenna installation  configuration including distance of Tx and Rx antennas, antennas’ angle and so on.  External antennas – No limitation for available external antennas with respect to requirement as follow:  Directional or Omni Directional Wideband antennas supporting a range of 700 MHz to 2700 MHz or any single band class between 700 MHz and 2700MHz Gain: not exceed 4 dBi Impedance: 50 Ohm The isolation between Tx and Rx antennas: ≥45 dB  Note: NPRU is capable to support up to 4 frequency bands. Therefore, MIMO (2 antennas – one for Tx port and another one for Rx port) is highly recommended.   Antenna Installation Guideline The antennas should be deployed at proper location to avoid unexpected interference and metallic obstruction.  According to coverage requirement, install the antennas at designated height and turn them at appropriate angle to service area.  The antennas connected to NPRU must be installed protection distance over 30cm for human body safety which should meet FCC standard.
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  9  Version 1.0  5.4. Network Cable In the CrossFire system, NPRU is synchronized and POE powered by using network cable to be connect to EU-E at 10GE port. The maximum length between EU-E and NPRU is 100 meters with CAT-6A STP. STP cables are only specified, while UTP cables may cause reduced length and performance. The distance is end to end distance and assume the leads are connected to the EU-E at one end and the NPRU at the other end. The use of patch leads, patch panels or connectors will impact on the distance.  10GBase-T is sensitively interfered by external noise. Therefore, it must be extremely cautious to handle wiring deployment and cable tension, bending radius, cable strapping and cable placing management should be under consideration before installing NPRU.    Cable Strapping The tightness and density of strapping network cable have an obvious effect on cable performance. Thus the following items should be taken in consideration for cable wiring:   Use nylon cable ties to bundle up network cables and avoid that network cables shall not be wiring as right angle.  Bundle up network cables in a proper tightness and place the cable bunch on protect sponge.  PSANEXT occurs in a bundle of network cables. The more quantities of cables is, the more PSANEXT arise. The quantities of cables shall not be over 12 in a bunch.  Cables should be bent at any radius exceeding approximately four times the outside diameter of the cable without any heavy load.  Marking each cable is a great help for wiring deployment.
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  10  Version 1.0   Installation of the AU 6.1. Mount the AU in the Rack  Attach AU handle      Attaching a 19" Mounting Bracket 1. Attach the 19" mounting brackets at the AU front, using 4 screws M3×16 per bracket and the Phillips screwdriver. Observe the orientation of the brackets (Fig.2).     Attach sliding rails and AU to rack      Attached Sliding Rails 1. Attach the sliding rails  Ⓑ  to the rack (Fig.3) Note: the sliding rails is not included in delivery.     Place AU in Rack 2. Place the AU in the rack (Fig.4)
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  11  Version 1.0      Fix AU with Screws 3. Fix the AU using 2 screws M6×16 on both side and the Phillips screwdriver (Fig.5). Note: For rack installation, the separation of adjacent AUs shall be over 3U (1U = 44mm) without fan or 2U with fan occupied in middle.   Connect power and ground cable to AU      Connect Power Cable at Rear Side 1. Connect and lock the power cable at the AU rear side (Fig.6).      Connect Ground Cable at Rear Side 2. Connect and screw the ground wire at the AU rear side (Fig.7).
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  13  Version 1.0   Connect power and ground cable to AU    Connect power cable at rear side 1. Connect and lock the power cable at the AU rear side; see Fig.11.   Connect ground cable at rear side 2. Connect and screw the ground wire at the AU rear side; see Fig.12.
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  19  Version 1.0    Drilling Holes Diagram 2    Insert Plastic Expansion Nails 3. Insert plastic expansion nails into holes by hammer   Assemble Mounting Bracket   Assembling Bracket III Diagram 1   Assembling Bracket III Diagram 2 1. Assemble Mounting Bracket III to roof wall using ST6.3 X 50 screws.   Bracket VI to NPRU top panel 1 2.  Assemble  Mounting  Bracket  VI  to  top panel of NPRU with 4 X M4 X 10 screws.
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  21  Version 1.0    Installation Completed Diagram 6. Buckle the rotary hook side of Mounting Bracket IV to Mounting Bracket III   Unlock Rotary Hook   Unlock Rotary Hook Diagram 1 1. Press the button of hook at Bracket IV to expose top panel of NPRU for debugging and maintenance   Unlock Rotary Hook Diagram 2
CrossFire iDAS – All-Digital Transport System User Guide    © SUNWAVE SOLUTIONS LIMITED 2017  22  Version 1.0   Antennas Isolation Detector The  NPRU  provides  antennas  isolation  detector  to  optimize  the  antennas  deployment  to  meet  the  signal  coverage requirement.  Use the following procedures to detect antennas isolation: 1. Log into the NPRU WebOMT. See Crossfire NP User Guide, Chapter 3.2.3 for details. 2. Go to Maintenance > Engineering > Isolation Detector   Isolation Detector  3. Select Tx option in Isolation ANT Switch to choose which antenna transmits RF signal. 4. Enter frequency in Detecting Frequency for testing frequency band. 5. Enable Isolation Detector Switch to start isolation test. 6. Check  the  Rx1/2  Isolation  between  Tx  and  Rx  which  shall  over  45  dB  for  good  performance  in  MIMO  scenario. Otherwise change the antennas deployment – the distance of Tx/Rx and the antennas’ angle – to meet the requirement. 7. Select another Tx option in Isolation ANT Switch and repeat step 4 to 6.

Navigation menu