Trango Systems A600 Altum AC600 User Manual Altum AC EXT Installation Quick Start Guide

Trango Systems Inc Altum AC600 Altum AC EXT Installation Quick Start Guide

Contents

Installation Manual

Download: Trango Systems A600 Altum AC600 User Manual Altum AC EXT Installation Quick Start Guide
Mirror Download [FCC.gov]Trango Systems A600 Altum AC600 User Manual Altum AC EXT Installation Quick Start Guide
Document ID2517471
Application IDXso6h6g2JBMWltydRtpjcw==
Document DescriptionInstallation Manual
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize37.91kB (473852 bits)
Date Submitted2015-01-29 00:00:00
Date Available2015-01-29 00:00:00
Creation Date2015-01-28 14:58:26
Producing SoftwareMicrosoft® Word 2013
Document Lastmod2015-01-28 14:58:26
Document TitleAltum AC EXT Installation Quick Start Guide
Document CreatorMicrosoft® Word 2013
Document Author: Kelley

Altum AC Installation Quick Start Guide
Overview
The Altum AC comes in three different configurations; A600-EXT, A600-19, and A600-25. This guide
will illustrate how to install the Altum AC unit after configuring the unit on the bench.
Installing A600-25
U-Bolt
U-Bolt
Bracket
Mounting Bracket
Hex Nut
2.
Install the Altum AC radio unit by sliding the (4)
protruding threads on the back plate through the
mating holes on the mounting bracket. Secure the
unit with the (4) 10-32 kep nuts. Skip to step 3.
In the A600-25 box you will find the following parts:
 (1) U-Bolt with hex nuts
 (1) Mounting Bracket
 (1) Port Plug
 (1) U-Bolt bracket
 (1) Port Plate with captive screws
 (4) 10-32 kep nuts
 (1) POE injector
1.
For easiest installation install the mounting
bracket onto the 1.5-2.5 inch diameter pole
using the U-bolt and the U-bolt bracket. Tilt
the bracket to the approximate desired angle
before tightening the hex nuts onto the U-bolt.
LT-9065 Installation Quick Start Guide Revision A
Kep Nuts
2.
Installing A600-19
In the A600-19 box you will find the following parts:
 (1) U-Bolt with hex nuts
 (2) ¼-20 hex head screws
 (1) Mounting Bracket
 (1) Altum AC 19 dBi unit
 (1) Port Plug
 (1) Port Plate with (2) captive screws
 (1) POE injector
1.
Install the A600-19 radio using the ¼-20 hex
head screws. Skip to step 3.
¼-20 hex head
Screw
Installing A600-EXT
Install the Mounting Bracket by feeding
the U-Bolt through the holes and
tightening using the included hex nuts.
Hex Nuts
U-Bolt
Mounting
Bracket
LT-9065 Installation Quick Start Guide Revision A
In the A600-EXT box you will find the following parts:
 (2) U-Bolt with hex nuts
 (2) Mounting Brackets
 (1) Port Plug
 (1) Port Plate with (2) captive screws
 (1) POE injector
 (1) Connector Sealing Tape Packet
4.
1.
Feed the U-bolts through the mounting
brackets and then through the back plate
before securing using the hex nuts.
Hex Nut
Install the Port Plug as seen below.
Port Plug
U-Bolt
U-Bolt
Bracket
5.
Feed the Ethernet cable(s) through and
attach the Port Plate using the (2) captive
screws. Tighten until snug.
6.
Port Plate
Getting Altum AC Ready for Power Up
3. Plug in The Ethernet cables and install them
into the port plug as shown.
Note: The LAN port is on the “right” side as
you look into the unit, while the WAN port is
on the “left”
Captive Screw
Port Plug
7.
Plug the Ethernet cables into the POE
injector power supply as shown below.
Note: the POE and LAN ports are also
labeled on the power supply.
Ethernet Cable
LT-9065 Installation Quick Start Guide Revision A
9.
LAN
POE to
Radio
8.
(Optional) Remove the caps from the Nconnectors and attach (2) 2.4 GHz wifi
antennas with N-Male connectors.
For EXT model only. Remove the
SMA-RP connector caps and attach
cables to the external antenna. Make
sure to use cables with SMA-RP or
damage/low signal levels may result.
Apply Connector Sealing Tape around
the connections to seal from weather.
NOTE: Altum AC must be installed by
trained personnel to ensure
compliance with local/regional
building codes and Wireless
regulations.
Note: Do not remove connector caps
unless you will be using the 2.4 GHz radio.
2.4 GHz
Antenna
About Trango Systems, Inc.
Trango Systems, Inc., was founded in 1996 and
is headquartered in San Diego County,
California. The company designs and
manufactures innovative licensed and
LT-9065 Installation Quick Start Guide Revision A
unlicensed microwave backhaul equipment for
customers in over 70 countries and is ISO
9001:2008 certified.
LT-9065 Installation Quick Start Guide Revision A

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.5
Linearized                      : No
Page Count                      : 5
Language                        : en-US
Title                           : Altum AC EXT Installation Quick Start Guide
Author                          : Kelley
Creator                         : Microsoft® Word 2013
Create Date                     : 2015:01:28 14:58:26-08:00
Modify Date                     : 2015:01:28 14:58:26-08:00
Producer                        : Microsoft® Word 2013
EXIF Metadata provided by EXIF.tools
FCC ID Filing: NCY-A600

Navigation menu