ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 1
ZTE Corporation LTE Remote Radio Unit part 1
ZTE >
Contents
- 1. User manual part 1
- 2. User manual part 2
- 3. User manual part 3
User manual part 1
Version: Hv2.l Serial Number: SJ—20140915104442—003 Publishing Dale: 2015—7—17 (RH) FDD—LTE Integrated eNodeB Engineering Installation Guide (ZXSDR 888922) Address No. Sim-lam Road suulh,shenzhen, P kchinu Pns'cude 5I5057 Vel: 086-755-26770801 URL hllp'//www.1|evcom (n E-mcll: 800°1le (om (n ZTE CORPORATION ZTE CORPORATION ZTE Content _ Safety Information ——————————————————————————— 3 Safety Symbols —————————————————————————————— 3 Installation Precautions —————————————————————— 4 Space Requirement —————————————————————————— 4 Hoisting ————————————————————————————————————— 5 Installation Flow ————————————————————————————— 6 Installation Preparation ——————————————————————— 6 Installation Accessories —————————————————————— 8 Unpacking and Inspection -------------------- 8 Media Requirement ————————————————————————— 9 RRU Installation Modes —————————————————————— 9 Installing the ZXSDR 888922 on a Pole ———————— 9 Installing the ZXSDR 888922 on the Wall ——————— 12 GPS Antenna Installation (Optional) ———————————— 16 Cable List —————————————————————————————————— 17 Cable Installation ———————————————————————————— 19 Installing the Grounding Cable ———————————————— 19 Installing the Power Cable ———————————————————— 21 Installing the Optical Fiber ———————————————————— 24 Installing Antenna Feeder Cables -------------- 25 Installing the Monitoring Cable ---------------- 26 Installing the GPS Cable ---------------------- 27 Installing the Ethernet Cable ------------------ 28 Waterproof Handling ------------------------- 30 Concentrator Installation (Optional) ------------ 32 Installing the Waterproof Cover ---------------- 33 Installation Check --------------------------- 35 Equipment Power—On ----------------------- 36 Closure ------------------------------------ 37 ZXSDR 588922 FDD—L TE Integrated eNodeB Engineering Installation Guide - uowoo'eu'MMM/lrduu iosougzsswm lei. eumo'u'd ‘uelizuaus W108 P908 wast-IH '99 'ON isseippvl ZTE The following describes personal health and safety information when you work with ZTE system products. To prevent accidents, read the safety information provided in this document carefully before using ZTE system products. I Local regulations supersede the information provided in this manual. Where applicable local regulations are unavailable, the information herein prevails. IAII personnel must be equipped with the knowledge of safety operations, technical training, and corresponding qualifications certified by ZTE CORPORATION. For some operations, they may need special trainings or qualifications certified by ZTECORPORATION. Safety Symbols A Electrical Hazard: There is a risk of electric shock. A Laser Hazard: Beware of strong laser beams. Do not look directly at the laser beam. A Heat Hazard: Beware of heat sources or hot surfaces that can cause burns. l Personal Protection > Remove items of jewelry, such as rings, necklaces, and watches. These items may get entangled with moving parts. Metal jewelry items are conductors that can result in electric shock. > Always wear appropriate personal protective equipment when working. > Jay attention to the hazard labels and caution or warning information on products. Never cover or remove the hazard labels and caution or warning information. > Only use the tools described in the instructions. I Installation Security > All personnel working at height must be specially-trained and certificated. Working at height must comply with local laws, regulations, and guidelines. > The device is heavy. Lifting the device without using a lifting device can result in serious personal injury. > Do not work at height or iron tower in bad weather such as rain or frog. > Falling objects can result in serious or even fatal injuries. Always wear a safety helmet. Never stand or walk under any heavy object that is being lifted. > Incorrect electrical installation can result in fire, electric shock, or explosion that is likely to be fatal. Only qualified electricians are allowed to install or modify electrical installations. > It is recommended that fibers be installed in a temperature higher than —20“C. > Switch off transmitting antennas, or reduce their output power to a safe level when working with, or staying near, these antennas. ZXSDR 388922 FDD-L TE Integrated eNodeB Engineering Installation Guide - Installation Precautio s 1 Never open the hermetic seal before or after the installation. 2The RRU body is applied with antirust coating. Make sure that the coating is not damaged during transportation and installation. 4 Do not install the device horizontally. 3Do not install the device with interfaces facing upwards. l.‘ , Space Requirement Device Dimensions Recommended Minimum (Unifi mm) Installation Space Installation Space (Unit: mm) (Unit: mm) — “ zaoo I 2200 I 2300 / v" 5600 if. 750“ ' \ "T'T'“ “P1; ' 25:0] 7772, 'as?” TV, 120 $2 Note: For mounting multiple RRUs on a pole or centralized mounting, the spacing between RRUs depends on the mounting components. UO'UJOO'GDZ MMM/liduu LOQOLLQZ-SQL-Qm net eujuo'a'd ‘uauzuaus ‘uinos pang uoaHH ‘99 “oN :ssa.|ppvl ZTE The information provided in this section is used for reference when it is necessary to hoist the RRU. Operation Tools Safety helmet Life belt Fixed pulley Hoisting rope Hauling cable Hoist the RRU 1Installer A on the tower secures the fixed pulley on the tower, and passes the hoisting rope down to the ground through the fixed pulley. Hoisting rope Handle 2Installer C on the ground I bundles the RRU tightly with a cross tie and passes "' the rope through the i handle. H |' [J cable I 3Installer B on the ground drags the hoisting rope downwards. Meanwhile, installer C pulls A the dragline outwards to protect the device from colliding with the tower when the device reaches the installation platform. 0 Fixed pulley Hauling cable ZXSDR 388922 FDD-L TE Integrated eNodeB Engineering Installation Guide - 4 Lift the properly-packed engineering materials used for tower mounting onto the tower in the manner mentioned above. Never lift the engineering materials by binding them directly to the hoisting rope. Installation Flow Installation Preparation Unpacking and inspection passed? NO Contact the local ZTE office Yes < I Pole-mounted Wall-mounted installation installation Install the GPS antenna(optional) Install cables Install the concentrator(optional) Ii Check the installation Power-on the equipment Closure Installation Preparation Tools and Instruments Illustrates the tools and instruments required for the installation: UO'UJOO'GDZ MMM/liduu LOQOLLQZ-SQL-Qm :|at EUIHO'EI'd ‘uauzuaus ‘utnos peoa uoat-iH ‘99 “oN :sserpvl - | ZXSDR 388922 FDD-L TE Integrated eNodeB Engineering Installation Guide - Installation Accessories Illustrates the installation accessories. Angle adjustment Clamp (used in Expansion bolt (used GPS antenna Name installation _ pole-mounted _in wall-mounted installation Z?:;;;igfl claw hammer snap-off knife safety glove safety helmet tape measure level ruler °°mp°nem mStaHat'O" m“) “Sta"atm" m“) °°mp°”e"'(°p"°"a‘) “9 it is! @ X “fix 0 , I! ll if Image . u.’ rope pulley Safety harness marker pen percussion drill ‘éi’éiunue'? o . "— @ @ N; ‘1 k N npacking and In pection . cross flathead o en-end ad ustable - l ' power strip screwdriver screwdriver firench erench pllers Countmg GOOds The packing boxes for the ZXSDR 888922 include crates and cartons. I Step '|.Verify that the packing boxes are in good condition. If any is broken, contact the transportation company immediately. essxas UO'UJOO'GDZ MMM/liduu LOQOLLQZ-SQL-Qm :|at euruo'a'd ‘uauzuaus ‘utnos papa uoat-rH ‘99 “oN :ssa.|ppvl diagonal pliers slip joint pliers rglr‘étggg‘fitéorgm hgfigpflg hot-air blower ”$531?“ 2.Unpaok the packing boxes and verify that the goods are consistent with the packing list. lChecklng Goods \ Check the ZXSDR 888922 and verify that: '|.There are no dents, bumps, peeling, scratches, foaming, paint stripping, or blots on the \ case. 2.The case surface is in good condition, without problems such as lacquer flaking off and hacksaw file pipe wrench scissors crE/tsrtgrcitneiaetclteor cable tie scoring. cnmper 3.AI| captive screws are tightly secured without dislocation. 4.The accessories required for the installation are correct and complete. 6) ,,,,. Arrange the inspected goods in accordance with categories. w lEquipment Handover v v 'I.After the goods are inspected, the project supervisor and the customer representative must waterproof instulating grounding _ approve and sign the Unpacking Acceptance Report. tape tape network tester regissttgrnce multimeter VSWR tester 2.Each party keeps one copy of the Unpacking Acceptance Report. The project supervisor should, within seven days, send the Unpacking Acceptance Report to the local ZTE office for filing. ZTE ZXSDR 588922 FDD-L TE Integrated eNodeB Engineering Installation Guide - Angle Adjustment installation Component 0 Fixing clip Media Requirement s'"9'e'RRU M°“"t"‘9 9 Installation bracket and p40 mm~a120 mm fastening screws 9 Installation bracket >4mm 0 Vertical fastening screws RRU Installation Modes Illustrates the ZXSDR 388922 installation modes. Steps | t H t. . . . . ”SA/fog?“ Pole-mounted Installatlon Wall-mounted '"5ta"at'°" @ Clamps are used in pole-mounted installation mode. The pole diameter is between 40 mm and 120 mm. 1 Use four M6x20 screws to install the installation bracket on the ZXSDR 388922. Image ~, fl Installing the ZXSDR 888922 on a Pole Installation Tools UO'WOD'GIZ MMM/iidutl lDQOLLQZ-SQL-gm» :|a_|_ euguo'g'd ‘ueuzuaus ‘Lfll’lOS peog uoaHH ‘99 “oN :sserpvl Operation Tool Note: When installing the M6><20 screws, first fasten the screws about 70% of . . the depth, then fasten the screws in accordance with the diagonal sequence. Install the Installation bracket on the M6 internal hexagonal wrench ZXSDR 838922. 2 Secure the vertical fastening screws. M6 internal hexagonal wrench Use clamps to install the fixing clip on the pole. Secure the bracket fastening screws. M6 internal hexagonal wrench [3] ZTE ‘ \77 ZXSDR 588922 FDD-L TE Integrated eNodeB Engineering Installation Guide - Q Q l 5 Adjust the horizontal angle of the ZXSDR B88922. ~ t @ Note: The horizontal angle adjustment range for the ZXSDR 838922 must be II. v between —30° and 30°. ~ @ 3 Adjust the horizontal angle of the ZXSDR 888922. 3 Mount the ZXSDR B88922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the 6ZXSDR BS8922 Installed installation bracket on the on a Pole. fixing clip. 4 Adjust the vertical angle of the ZXSDR B38922. i? Note: The angle between the ZXSDR 888922 and the pole must be between 0° and 20°. a Loosen the vertical fastening screws until the ZXSDR 838922 can be adjusted vertically. UO'wOO'alZ'MMMiiZdulI LUQOLLQZ-Ssbgfl-i :|a_|_ Eulqg'a'd ‘uauzuaus ‘umos peoa [pal-”4 ‘99 “ON ZSSSJppVI b Adjust the vertical angle of the ZXSDR B88922. Installing the ZXSDR 888922 on the Wall Installation Tools C Secure the vertical fastening screws.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Title : Author : Creator : Tracker's PDF-Tools Subject : Producer : PDF-XChange (PDFTools3.exe v3.60.0106) (Windows) Page Count : 7 Page Mode : UseNone Page Layout : SinglePageEXIF Metadata provided by EXIF.tools