ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 2
ZTE Corporation LTE Remote Radio Unit part 2
ZTE >
Contents
- 1. User manual part 1
- 2. User manual part 2
- 3. User manual part 3
User manual part 2
ZTE ZXSDR 588922 FDD-L TE Integrated eNodeB Engineering Installation Guide - Operation Tool b Use a a12 percussion drill to drill holes at the marked positions on the Mask wall, and use a vacuum cleaner to remove the dust. Tape C Use a claw hammer to knock the expansion bolts into the holes, and Low tape fasten the nuts clockwise to make the bolts fully expand in the wall. Marking pen . Level Mar d Loosen the nuts counterclockwise, and remove the nuts, spring F'X SC'eWS- percussion drill washers, and flat washers. Vacuum cleaner 2 _ _ _ Adaptor Install the fixing clip on the wall. Adjustable wrench Claw hammer Installing the Fixing Clip on the Wall. Socket wrench Install the installation bracket on the RRU. M6 internal hexagonal wrench Secure the vertical fastening screws. M6 internal hexagonal wrench Secure the bracket fastening screws. M6 internal hexagonal wrench I Drilling Specification Follow the installation diagram to mark the drilling position on the l? Note: It is recommended that you use a level wall. Steps ruler to keep the holes ‘t - . . horlzontal when marklng 0 Nut 6 Spring washer 0 Flat washer Drill holes on the wall and install the d””'"9 “0'95- expansion bolts. Use four M6x20 screws to install the installation bracket on the ZXSDR B88922. ’ ’ a Mark holes on the wall in accordance with the drilling specification. Fastening Spring washer Q Flat washer 4/ M10X100 "’ expansion bolt II. “’ 20mm~30mm ,_ [ND e-e-ef‘ I!» . uowweu'MMM/ltdutl Losougz-ssbgfl-r :|a_|_ EullIO'tl'd ‘uauzualls ‘qmos 9208 lloal-lH ‘99 “ON iSSSJPPVl Note: When installing the M6><20 screws, first fasten the screws about 70% of the depth, then fasten the screws in accordance with the diagonal sequence. ZTE ZXSDR 338922 FDD—L TE Integrated eNodeB Engineering Installation Guide - 4 Mount the ZXSDR B88922, on which the installation bracket is installed, on the fixing clip. b Secure the two screws of the 7ZXSDR 858922 Installed on installation bracket on the the Wall. fixing clip. 5Adjust the vertical angle of the ZXSDR 358922. Note: The angle between the ZXSDR 838922 and the wall must be between 0° and 20°. 3 Loosen the vertical fastening screws until the ZXSDR 388922 can be adjusted vertically. b Adjust the vertical angle UO'wOO'atl'MMMI/Zdull LUQOLLQZ'SSbQQ-i- :|a_|_ EUIlID'EI'd ‘uaqzuaus ‘umos peoa qoal-gH ‘99 “ON :ssaippvl of the zxsnn 338922. GP Antenna Installation (Optional) C Secure the vertical fastening screws. lnStallation T°°|s 6 Operation Tool - - Installing the GPS Antenna Installation _ Adjust the horizontal angle of the ZXSDR 338922. Component on the RRU. cross screwdnver t? Note: The horizontal angle adjustment range for the ZXSDR 888922 must be Installing the GPS Antenna on the GPS _ between “30° and 30° Antenna Installation Component. cross screwdrlver 3 Adjust the horizontal angle of the ZXSDR BSB922. Steps ZTE 1 Remove the two M6x20 screws from the GPS antenna mounting part. 2Mount the GPS antenna onto the GPS antenna mounting part. 3 Mount the GPS antenna assembly onto the ZXSDR 338922 with two MGX16 screws. Cable List Item Local Equipment Interconnected Equipment Connector Type OT terminal OT terminal - Local grounding terminal of . Grounding Groundln bar Interconnected Port ZXSDR 888922 9 Cable External View _— Connector Type DC power input connector Bare wire The power interface of the DC power supply. Terminals lmemmecmd Pm ZXSDR 858922 need to be fabricated on site. DC power cable External View ZXSDR 888922 FDD—L TE Integrated eNodeB Engineering Installation Guide - AC power cable Connector Type Power input connector Three—flat—bottom plug Interconnected Port Power interface of the ZXSDR 888922 DC power supply. Terminals need to be fabricated on site. External View Optical fiber Connector Type LC LC Interconnected Port OPT interface of the ZXSDR 888922 Core network or neighbor device External View Antenna feeder cable Connector Type N—type connector N—type connector Interconnected Port Antenna port of the ZXSDR 888922 Antenna RF port External View D—type 15—pin (three rows) Connector Type straight cable welding circle Bare wire connector Monitoring MON interface of the ZXSDR . . . Mon|tor|n devtce cable Interconnected Port 8 S 8 922 9 External View Connector Type N—type connector N—type connector Interconnected Port GPS port of the ZXSDR 858922 GPS antenna RF F‘O"t GPS cable Externa| View k—fl Connector Type 8—pin RJ45 connector 8—pin RJ45 connector ETH interface of the ZXSDR PC, core network, neighbor Interconnected Port . . . 888922 devtce, or peripheral deVice Ethernet cable External View UO'WOO'GH'MMMI/ dull LOSOLLQZ-SSL-Qih Hat Euiqg'a'd ‘uaqzueqs ‘utnos peoa uoat-iH ‘99 “oN ZSSaJppVI ZTE ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide - Cable Installation ZXSDR 888922 Cable Installation Illustration ‘ } 9 0 3 Cut a proper length of the grounding cable, and peel off the external C Use a hot-air blower to heat the heat-shrinkable tube. Use the same method to crimp end B on a grounding terminal. Steps ”1/— 1 Remove the two grounding screws from the grounding point of the ZXSDR 388922. ./ \ sheath at end A to expose the wires. H b Put a heat-shrinkable tube on end A, and crimp it on a grounding terminal. 0 Ethernet cable 6 GPS cable Grounding cable 0 DC/AC power cable 9 6 Monitoring cable Optical fiber 3 Antenna feeder cable 0 fi' Installing the Grounding Cable 2Install end A of the grounding cable on the grounding point of the ZXSDR 388922. Installation Tools ‘/ Operation Tool I Crimp an OT terminal. Hydraulic clamp ; Fix a protection grounding cable. Cross screwdriver ‘ Adjustable wrench The grounding cable consists of 16 mm2 yellow/green fire-resistant multi-strand wires. End A is a dual-hole grounding terminal while end B is a single-hole grounding terminal. The grounding cable is made on site. Figure illustrates how to make a grounding cable. j) J?) Qfl—‘d J;— 0 o o UO'WOO GIZ'MMM/liduu L090£LQZ'99L-99+ net euiuo'a'd ’uauzuaus ‘umos peoa qOBJ-IH ‘99 “oN :ssaippvl 0 E— ZTE _ ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide - 3 Remove the dust on the copper grounding busbar, install end B on the 3 Lead the power cable into the tube-shaped terminals, and crimp them copper grounding busbar, and put anti-rust paint around the grounding tightly. screws on the copper grounding busbar. \ 4 Paste labels on the two ends of the grounding cable. The grounding \ \ H’ a cable is installed successfully. ~ Installing the POWGF Cable 4 Connect the power cable to a power connector. Installation Tools 3 Insert the power cable with crimped tube-shaped terminals into a Operation Tool power plug, and press the crimping part. . Ruler Tailor cables. Wire stripper/paper knife $ Crimp tubularterminals. Crimping pliers II. Rinsulate the shielding layer. Black insulation tape - Fix the power cable to the shell. Black ties = Tailor black ties. Diagonal pliers . Remove cables from the DC power connector. Flathead screwdriver The following describes how to make a power cable: 1 Loosen the power cable sheath counterclockwise, and lead end A of the power cable into the cable sheath. b Loosen the screw for the grounding interface of the power connector, .(c A E twist the shielding layer of the power cable into a strip, and connect \ it to the grounding interface of the power connector. Tighten the screw for the grounding interface. A — __ a B ll. 2 Use a cable stripper to peel the cable. answjfiamiwn Stripping Dlagram) emumo :mm 5 Fasten the nut at the end of the power cable sheath clockwise. UO'WOO'GiZ'MMMl/ dull LOSOLLQZ-SSL-Qih Zlai EUND'H'd ‘uaqzuaqs ‘qmos paoa llGGHH ‘99 “oN :sse.|ppvl ii)? mu (Length Scale) 1 :1 55 Steps (0 D 10 ED 30 40 50 50 70 . . . PrerequiSlte: The power cable ls made. ZTE ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide - 1 Loosen the nut at the end of the power cable sheath counterclockwise. InStallmg the OptICBI Flber ‘ Installation Tools Operation Tool Fix the optical fiber. Cross screwdriver 2 Remove the bellows. Diagonal plier Insert the power plug of the power cable into the power interface of . . the ZXSDR B88922. . 0mm" F'be’ ./ B H! 2‘ 3 Push the power cable sheath , upwards until it fastens onto ' Steps the slot of the power interface. Loosen the nut at the end of the (g Note: When the powercable ‘ optical fiber sheath counter- H sheath is completed clockwise. engaged in the slot of the 1 , power interface, two click . ‘ sounds are heard. '1/.-' 2 Insert the optical connector into the OPT1 port or 0PT2 port of - 1 h the ZXSDR B38922. 3 Push the optical fiber sheath upwards until it fastens onto the slot of the OPT1 port or 0PT2 4 Fasten the nut at the end of the port. power cable sheath clockwise. Note: When the optical fiber sheath is completed engaged in the slot of the OPT port, two click sounds are heard. UQ'WOD'GIZ'MMMI/ dull LOSOLLQZ'SSL'QiH ilal EUND'H'CI ‘UGIIZUBLIS (limos pEOH HQGHH ‘99 ION 155941le 5 Connect end B of the power cable to the power supply. 6Paste labels on the two ends of the power cable. The power cable is installed successfully.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Title : Author : Creator : Tracker's PDF-Tools Subject : Producer : PDF-XChange (PDFTools3.exe v3.60.0106) (Windows) Page Count : 6 Page Mode : UseNone Page Layout : SinglePageEXIF Metadata provided by EXIF.tools