ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 2

ZTE Corporation LTE Remote Radio Unit part 2

Contents

User manual part 2

Download: ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 2
Mirror Download [FCC.gov]ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 2
Document ID3752572
Application IDwiX+PImHIvhR6XQwzIobhg==
Document DescriptionUser manual part 2
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize361.38kB (4517197 bits)
Date Submitted2018-02-13 00:00:00
Date Available2018-02-14 00:00:00
Creation Date0000-00-00 00:00:00
Producing SoftwarePDF-XChange (PDFTools3.exe v3.60.0106) (Windows)
Document Lastmod0000-00-00 00:00:00
Document TitleUser manual part 2
Document CreatorTracker's PDF-Tools

ZTE ZXSDR 588922 FDD-L TE Integrated eNodeB Engineering Installation Guide -
Operation Tool b Use a a12 percussion drill to drill holes at the marked positions on the
Mask wall, and use a vacuum cleaner to remove the dust.
Tape C Use a claw hammer to knock the expansion bolts into the holes, and
Low tape fasten the nuts clockwise to make the bolts fully expand in the wall.
Marking pen
. Level Mar d Loosen the nuts counterclockwise, and remove the nuts, spring
F'X SC'eWS- percussion drill washers, and flat washers.
Vacuum cleaner 2 _ _ _
Adaptor Install the fixing clip on the wall.
Adjustable wrench
Claw hammer
Installing the Fixing Clip on the Wall. Socket wrench
Install the installation bracket on the RRU. M6 internal hexagonal wrench
Secure the vertical fastening screws. M6 internal hexagonal wrench
Secure the bracket fastening screws. M6 internal hexagonal wrench
I Drilling Specification
Follow the installation
diagram to mark the
drilling position on the
l?
Note: It is recommended
that you use a level
wall.
Steps ruler to keep the holes
‘t - . .
horlzontal when marklng 0 Nut 6 Spring washer 0 Flat washer
Drill holes on the wall and install the d””'"9 “0'95-
expansion bolts. Use four M6x20 screws to install the installation bracket on the ZXSDR
B88922. ’ ’
a Mark holes on the wall in accordance with the drilling specification.
Fastening
Spring washer Q
Flat washer 4/
M10X100
"’ expansion bolt II. “’
20mm~30mm
,_ [ND e-e-ef‘ I!» .
uowweu'MMM/ltdutl Losougz-ssbgfl-r :|a_|_ EullIO'tl'd ‘uauzualls ‘qmos 9208 lloal-lH ‘99 “ON iSSSJPPVl
Note: When installing the M6><20 screws, first fasten the screws about 70% of the
depth, then fasten the screws in accordance with the diagonal sequence.
ZTE ZXSDR 338922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
4 Mount the ZXSDR B88922, on which the installation bracket is
installed, on the fixing clip.
b Secure the two screws of the 7ZXSDR 858922 Installed on
installation bracket on the the Wall.
fixing clip.
5Adjust the vertical angle
of the ZXSDR 358922.
Note: The angle between
the ZXSDR 838922 and
the wall must be between
0° and 20°.
3 Loosen the vertical
fastening screws until
the ZXSDR 388922 can
be adjusted vertically.
b Adjust the vertical angle
UO'wOO'atl'MMMI/Zdull LUQOLLQZ'SSbQQ-i- :|a_|_ EUIlID'EI'd ‘uaqzuaus ‘umos peoa qoal-gH ‘99 “ON :ssaippvl
of the zxsnn 338922. GP Antenna Installation (Optional)
C Secure the vertical fastening screws. lnStallation T°°|s
6 Operation Tool
- - Installing the GPS Antenna Installation _
Adjust the horizontal angle of the ZXSDR 338922. Component on the RRU. cross screwdnver
t? Note: The horizontal angle adjustment range for the ZXSDR 888922 must be Installing the GPS Antenna on the GPS _
between “30° and 30° Antenna Installation Component. cross screwdrlver
3 Adjust the horizontal angle of the ZXSDR BSB922. Steps
ZTE
1 Remove the two M6x20
screws from the GPS
antenna mounting part.
2Mount the GPS antenna onto
the GPS antenna mounting
part.
3 Mount the GPS antenna assembly onto the ZXSDR 338922 with two
MGX16 screws.
Cable List
Item Local Equipment Interconnected Equipment
Connector Type OT terminal OT terminal
- Local grounding terminal of .
Grounding Groundln bar
Interconnected Port ZXSDR 888922 9
Cable
External View _—
Connector Type DC power input connector Bare wire
The power interface of the DC power supply. Terminals
lmemmecmd Pm ZXSDR 858922 need to be fabricated on site.
DC power
cable
External View
ZXSDR 888922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
AC power
cable
Connector Type
Power input connector
Three—flat—bottom plug
Interconnected Port
Power interface of the ZXSDR
888922
DC power supply. Terminals
need to be fabricated on site.
External View
Optical
fiber
Connector Type
LC
LC
Interconnected Port
OPT interface of the ZXSDR
888922
Core network or neighbor
device
External View
Antenna
feeder
cable
Connector Type
N—type connector
N—type connector
Interconnected Port
Antenna port of the ZXSDR
888922
Antenna RF port
External View
D—type 15—pin (three rows)
Connector Type straight cable welding circle Bare wire
connector
Monitoring MON interface of the ZXSDR . . .
Mon|tor|n devtce
cable Interconnected Port 8 S 8 922 9
External View
Connector Type N—type connector N—type connector
Interconnected Port GPS port of the ZXSDR 858922 GPS antenna RF F‘O"t
GPS cable
Externa| View k—fl
Connector Type 8—pin RJ45 connector 8—pin RJ45 connector
ETH interface of the ZXSDR PC, core network, neighbor
Interconnected Port . . .
888922 devtce, or peripheral deVice
Ethernet
cable
External View
UO'WOO'GH'MMMI/ dull LOSOLLQZ-SSL-Qih Hat Euiqg'a'd ‘uaqzueqs ‘utnos peoa uoat-iH ‘99 “oN ZSSaJppVI
ZTE ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide -
Cable Installation
ZXSDR 888922 Cable Installation Illustration
‘ }
9 0
3 Cut a proper length of the grounding cable, and peel off the external
C Use a hot-air blower to heat the heat-shrinkable tube.
Use the same method to crimp end B on a grounding terminal.
Steps
”1/—
1 Remove the two grounding screws from the grounding point of the
ZXSDR 388922.
./ \ sheath at end A to expose the wires.
H b Put a heat-shrinkable tube on end A, and crimp it on a grounding terminal.
0 Ethernet cable
6 GPS cable
Grounding cable 0
DC/AC power cable 9
6 Monitoring cable
Optical fiber 3
Antenna feeder cable 0
fi'
Installing the Grounding Cable 2Install end A of the grounding cable on the grounding point of the
ZXSDR 388922.
Installation Tools ‘/
Operation Tool I
Crimp an OT terminal. Hydraulic clamp ;
Fix a protection grounding cable. Cross screwdriver ‘
Adjustable wrench
The grounding cable consists of 16 mm2 yellow/green fire-resistant
multi-strand wires. End A is a dual-hole grounding terminal while
end B is a single-hole grounding terminal. The grounding cable is
made on site. Figure illustrates how to make a grounding cable.
j) J?)
Qfl—‘d J;—
0 o o
UO'WOO GIZ'MMM/liduu L090£LQZ'99L-99+ net euiuo'a'd ’uauzuaus ‘umos peoa qOBJ-IH ‘99 “oN :ssaippvl
0 E—
ZTE _ ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide -
3 Remove the dust on the copper grounding busbar, install end B on the 3 Lead the power cable into the tube-shaped terminals, and crimp them
copper grounding busbar, and put anti-rust paint around the grounding tightly.
screws on the copper grounding busbar. \
4 Paste labels on the two ends of the grounding cable. The grounding \ \ H’ a
cable is installed successfully. ~
Installing the POWGF Cable 4 Connect the power cable to a power connector.
Installation Tools 3 Insert the power cable with crimped tube-shaped terminals into a
Operation Tool power plug, and press the crimping part.
. Ruler
Tailor cables. Wire stripper/paper knife $
Crimp tubularterminals. Crimping pliers II.
Rinsulate the shielding layer. Black insulation tape -
Fix the power cable to the shell. Black ties =
Tailor black ties. Diagonal pliers .
Remove cables from the DC power connector. Flathead screwdriver
The following describes how to make a power cable:
1 Loosen the power cable sheath counterclockwise, and lead end A of
the power cable into the cable sheath.
b Loosen the screw for the grounding interface of the power connector,
.(c A E twist the shielding layer of the power cable into a strip, and connect
\ it to the grounding interface of the power connector. Tighten the
screw for the grounding interface.
A — __ a
B ll.
2 Use a cable stripper to peel the cable.
answjfiamiwn Stripping Dlagram) emumo :mm 5 Fasten the nut at the end of the power cable sheath clockwise.
UO'WOO'GiZ'MMMl/ dull LOSOLLQZ-SSL-Qih Zlai EUND'H'd ‘uaqzuaqs ‘qmos paoa llGGHH ‘99 “oN :sse.|ppvl
ii)? mu (Length Scale) 1 :1 55
Steps (0
D 10 ED 30 40 50 50 70 . . .
PrerequiSlte: The power cable ls made.
ZTE ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide -
1 Loosen the nut at the end of the power cable sheath counterclockwise. InStallmg the OptICBI Flber
‘ Installation Tools
Operation Tool
Fix the optical fiber. Cross screwdriver
2 Remove the bellows. Diagonal plier
Insert the power plug of the power cable into the power interface of . .
the ZXSDR B88922. . 0mm" F'be’
./ B
H!
2‘
3 Push the power cable sheath ,
upwards until it fastens onto ' Steps
the slot of the power interface.
Loosen the nut at the end of the
(g Note: When the powercable ‘ optical fiber sheath counter- H
sheath is completed clockwise.
engaged in the slot of the 1 ,
power interface, two click . ‘
sounds are heard.
'1/.-'
2 Insert the optical connector into
the OPT1 port or 0PT2 port of
- 1 h
the ZXSDR B38922.
3 Push the optical fiber sheath
upwards until it fastens onto the
slot of the OPT1 port or 0PT2
4 Fasten the nut at the end of the port.
power cable sheath clockwise.
Note: When the optical fiber
sheath is completed engaged
in the slot of the OPT port,
two click sounds are heard.
UQ'WOD'GIZ'MMMI/ dull LOSOLLQZ'SSL'QiH ilal EUND'H'CI ‘UGIIZUBLIS (limos pEOH HQGHH ‘99 ION 155941le
5 Connect end B of the power cable
to the power supply.
6Paste labels on the two ends of
the power cable. The power cable
is installed successfully.

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Title                           : 
Author                          : 
Creator                         : Tracker's PDF-Tools
Subject                         : 
Producer                        : PDF-XChange (PDFTools3.exe v3.60.0106) (Windows)
Page Count                      : 6
Page Mode                       : UseNone
Page Layout                     : SinglePage
EXIF Metadata provided by EXIF.tools
FCC ID Filing: Q78-BS8922L1700

Navigation menu