ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 3

ZTE Corporation LTE Remote Radio Unit part 3

Contents

User manual part 3

Download: ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 3
Mirror Download [FCC.gov]ZTE BS8922L1700 LTE Remote Radio Unit User Manual part 3
Document ID3752573
Application IDwiX+PImHIvhR6XQwzIobhg==
Document DescriptionUser manual part 3
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize381.25kB (4765568 bits)
Date Submitted2018-02-13 00:00:00
Date Available2018-02-14 00:00:00
Creation Date0000-00-00 00:00:00
Producing SoftwarePDF-XChange (PDFTools3.exe v3.60.0106) (Windows)
Document Lastmod0000-00-00 00:00:00
Document TitleUser manual part 3
Document CreatorTracker's PDF-Tools

ZTE ZXSDR 538922 FDD—L TE Integrated eNodeB Engineering installation Guide -
4 Fasten the nut at the end of the optical fiber sheath clockwise. 1 Connect end As of antenna feeder ./
cables to ANT interfaces of the
ZXSDR 388922, see the Figure. ~
2Connect end Bs of antenna feeder H
7/—
cables to the antenna installed in
separate-installation mode.
5 Connect end B of the optical fiber to the transmission device at the 3 Perform 1+3+3 waterproof handling
opposite end. for the cable connectors. For
6 detailed information, refer to
Paste labels at the two ends of the optical fiber. The optical fiber is Appendix Awaterproof Handling.
installed successfully.
_ 4 Paste labels on the two ends of
Installmg Antenna Feeder Cables antenna feeder cables. The G
. . . antenna feeder cables are “nstalled
Prerequnsnte: The ZXSDR 388922 is connected to an antenna successfully '
installed in separate-installation mode.
Installation Tools
Operation Tool Installing the Monitoring Cable
UO'WOO'GH'MMMI/ duu LOSOLLQZ-SSL-Qih Zlai Eugqg'a'd ‘uaqzuaqs ‘qmos paoa qoax-gH ‘99 “ON :ssa.|ppvl
Fasten feeder connectors. Cross—head screwdriver/Torque wrench Installation T00|S
PVC adhesive tape 0 . T I
Waterproof feeder connectors. Waterproof cement perahon _ _ 0° .
. Fasten monitoring cable. Cross—head screwdriver
UItraonet—proof tape
Antenna Feeder Cable Monltorlng Cable
A B
A B
Steps
1 Connect and As of antenna feeder cables to ANT interfaces of the End B Of the monltorlng cable 's a bare W|re, and needs to be
zxsnR 333922, see the Figure _ connected on site. For a description of the signal definitions and
cable connections, refer to Table.
ZTE
Pin No. at End A Signal Name
Signal Description
Cable Color at End B
MONITOR interface RS485 bus
1 MON_RS485A _ .. Red
Signal, positive
2 MON_RS4BSB MONITOR interface RS485 bus Black
Signal, negative
3 Drnyode7|n1+ Dry contact input, positive Brown
8 GND Grounding Yellow
4 Dry7N0de7In2+ Dry contact input, positive Blue
10 GND Grounding White
Steps
1 Connect end A of the
monitoring cable to the
MON interface of the
ZXSDR 388922.
2Connect end B of the
monitoring cable to a
monitoring device.
3 Paste labels on the two
ends of the monitoring
cable. The monitoring
cable is installed
successfully.
Installing the GPS Cable
Prerequisite: The GPS antenna is installed.
Installation Tools
Operation
Tool
Fasten GPS cable connectors.
Torque wrench
Waterproof GPS cable connectors.
PVC adhesive tape
Waterproof cement
Ultraviolet—proof tape
GPS Cable
ZXSDR 588922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
1 Connect end A of the GPS cable to the GPS interface of the ZXSDR
888922.
2Connect end B of the GPS
cable to the GPS antenna.
3 Perform 1+3+3 waterproof
handling for the GPS
cable connectors. For
detailed information, refer
to Appendix A Waterproof
Handling.
4 Paste labels on the two
ends of the GPS cable. The
GPS cable is installed
successfully.
Installing the Ethernet Cable
Installation Tools
Operation
Tool
Crimp the crystal connector at end A and B.
Ethernet cable crystal-connector crimper
Test the Ethernet cable.
Network tester
The following describes how to make an Ethernet cable:
1 Loosen the Ethernet cable sheath counterclockwise, and lead end A of
the Ethernet cable into the cable sheath.
UO'WOO'GH'MMMI/ duu LOSOLLQZ-SSL-Qih Zlai EUND'H'd ‘uauzueqs ‘qmos peoa uoax-iH ‘99 “ON :sse.|ppvl
ZTE
Ahyhfl "' B
Peel the Ethernet cable, and crimp the crystal connector at end A.
For a description of the cable connections, refer to Table.
No. Cable Color at End A Cable Color at End B
1 White/Orange White/Orange
2 Orange Orange
3 White/Green White/Green
4 Green Blue
5 Blue White/Blue
6 White/Blue Green
7 White/Brown White/Brown
8 Brown Brown
3 Fasten the nut at the end of the Ethernet cable sheath clockwise.
' J
Crimp the crystal connector at end B of the Ethernet cable.
5 Use a network tester to verify that the wires of the Ethernet cable are
crimped and connected properly. The Ethernet cable is made
successfully.
Steps
1 Loosen the nut at the end of the Ethernet cable sheath counterclockwise.
fl/i
Insert end A of the Ethernet cable into the ETH interface of the ZXSDR
358922.
ZXSDR 588922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
3 Push the Ethernet cable sheath upwards until it fastens onto the slot
of the ETH interface.
(3) Note: When the Ethernet cable sheath is completely engaged
in the ETH interface, two click sounds are heard.
4 Fasten the nut at the end of the
Ethernet cable sheath clockwise.
5 Connect the other end of the
Ethernet cable to the transmission
device at the oppositeend.
6Paste labels on the two ends of
the Ethernet cable. The Ethernet cable is installed successfully.
Waterproof Handling
Waterproof Handling Requirement
Item Requirement
Antenna feeder cable 1+3+3 waterproof handling
GPS cable 1+3+3 waterproof handling
The following procedure describes how to waterproof a feeder
connector.
UO'WOO'GiZ'MMMi/ duu LOSOLLQZ-SSL-Qih Zlai EUND'H'd ‘uauzuaqs ‘umos paoa HGGHH ‘99 “oN :ssa.|ppvl
ZTE _ ZXSDR 388922 FDD-L TE Integrated eNodeB Engineering Installation Guide -
Steps
Wrap three layers of ultraviolet-proof tape in the
1 Wrap one layer of insulating tape from bottom to following manner: from bottom to top, from top to
top, see Figure 0 . bottom, and from bottom to top, see Figure 0 ,
9,ando.
2 Wrap three layers of waterproof tape in the
following manner: from bottom to top, from top to
bottom, and from bottom to top, see Figure 9 ,
9,3nd0.
Expand the waterproof tape, remove the release
paper, and paste one end of the tape 20—50 mm
below the connector. Make sure that the tape layer 4 Use ultraviolet-proof cable ties to bind the two
faces inwards. ends of the tape tightly . Use ultraviolet-proof cable
ties to bind the two ends of the tape tightly, see
Stretch the waterproof tape with even force to make Figure 9 .
its width 50% to 75% of its original width. Keep the
stretching force and wrap the tape from bottom to Concentrator Installation(0ptiona|)
top in overlapping mode, namely, each layer of the
0 Ultraviolet—proof
cable tie
tape covers half of the previous layer. Prerequisite: The cables are installed.
Installation Tools
When the tape is wrapped 20—50 mm above the Operation Tool
conned”? use the same methOd t° wrap the tape Fasten a Concentrator on the ZXSDR 858922 Cross-head screwdriver
from top to bottom until the tape is 20—50 mm
below the connector, then, wrap the tape from
bottom to top. . Myst,
Concentrator
UO'WOO'GH'MMMI/ dull LOSOLLQZ-SSL-Qih Zlai Eugug'a'd ‘uaqzuaqs ‘umos peoa uoax-gH ‘99 “oN ZSSaJppVI
After the waterproof tape is wrapped properly,
squeeze the tape by hand to make the layers stick
firmly to the cable and connector. Y/ \
ZTE
Steps
1 Clamp a concentrator to the 2 Fasten the two captive screws
ZXSDR 338922, and fix it on the on the front of the concentrator.
ZXSDR B58922 with the screws The concentrator is installed
on the two sides of it. successfully.
_ '_
Installing the Waterproof Cover
A waterproof cover protects the device from water and ensures proper air
tightness. This procedure uses a waterproof cover for the power supply
as an example to describe how to install and remove a waterproof cover.
Steps for Installing the Waterproof Cover
2Pull the outer enclosure, and
install the inner enclosure
onto the power interface, until
two click sounds are heard.
1 Push the elastic barrier to
unlock the inner and outer
enclosures.
ZXSDR 388922 FDD-L TE Integrated eNodeB Engineering Installation Guide -
0 Inner enclosure
9 Outer enclosure
0 Protruding part
of the power
interface
3 Cover the inner enclosure
with the outer enclosure,
until a click sound is heard.
(g Note: 0 If the outer enclosure cannot be
installed, verify that the fasteners of the
inner enclosure are in position, and
install the outer enclosure again.
0 After the outer enclosure is installed,
slightly pull the outer enclosure to verify
that the waterproof cover is properly
installed.
0 Inner enclosure
6 Outer enclosure
Steps for Removing the Waterproof Cover
4 Unlock the inner and outer enclosures
by referring to the right Figure.
“I
5Pull the outer enclosure properly, and press the fasteners of the inner
enclosure to remove the waterproof cover.
0 Inner enclosure
6 Outer enclosure
UO'WOO'GH'MMMI/ duu LOSOLLQZ-SSL-Qih Hat Euiug'a'd ‘uaqzuaus ‘umos peoa uoai-iH ‘99 “oN :sse.|ppvl
ZTE
Installation Check
ZXSDR 588922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
Item
No.
Requirement
Equipment
installation
The installation components are installed in proper order, and the
equipment is fixed securely without swaying.
The independent pole is equipped with a lightning rod, and the
equipment is within the protection scope of 45 degrees and grounded
reliably.
Cable
installation
The wire lugs and bare wires of the power cable and the grounding
cable are wrapped with tubes or insulating tape. There are no exposed
copper wiresThe copper lug type is consistent with the cable diameter.
Grounding
and
waterproof
handling
13
Rust and stains on the grounding terminal of the protective grounding
cable are removed before the cable is connected. After the cable is
connected, anticorrosion and antirust measures are taken properly.
14
All cable connectors are wrapped for waterproof purposes. Insulating
tape and waterproof tape are wrapped tightly and sequentially.
15
The protective grounding cable of the equipment is installed properly,
and cannot be cascaded with other protective grounding cables. The
protective grounding cable is connected to the nearest copper
grounding bar.
The power supply is connected properly, and the terminals of the
power cable and grounding cable are crimped tightly. The copper lugs
are fastened on binding posts through flat washer and spring washer.
Cable
installation
The surplus grounding cable and power cable are cut off. All cables
are complete and their insulating layers are in good condition. It is
prohibited to splice two cables.
The power cable, signal cables, and fiber pigtails are bundled by
category and routed separately, with a spacing of 5 cm between each
other.
AII cable connectors are connected securely. AII DIN—type connectors
and N-type connectors are fastened properly.
The bending radius of all cables satisfy the requirement.
Unused optical cables, optical channels, and sockets are equipped with
protective caps.
10
Black cable ties and white cable ties cannot be interchanged. White
cable ties are used indoors and must be cut off at the end, without
leaving any sharp edge. Black cable ties are used outdoors, and must
be cut off at the end with a 3—5 mm margin in case of expansion due to
high temperature.
11
All cable labels are correct and pasted in the same direction.
12
The outdoorfeeder cable and GPS cable are grounded in accordance
with relevant specifications.
output voltage of the
Equipment Power—on
ZXSDR B38922 Power-On Procedure
Sta rt
4— Troubleshoot the problem
Whet1er the No
power supply is
normal
Yes 4—
Po
wer on the equipment Troubleshoot the problem
input voltage of the
Wheher the
Power off the equipment
equipment is
normal
Yes
Whether the
status of indicators
is normal
No
uowoo'eiZ'MMM/lrdiiu iosougzsswm lei. eumo'a'd ‘uelizuavs W108 P908 twat-m '99 'ON isseippvl
ZTE _
Power-On Steps:
1 Connect the power supply equipment to the junction box of the
ZXSDR 858922, or switch on the air circuit breaker of the
lightning protection box.
2 Observe the indicators to determine whether the ZXSDR 388922
is powered on successfully.
@ Note: The following describes the status of indicators when the
ZXSDR B38922 is operating properly:
0 RUN (operating status indicator): flashing (lit for 0.3 s and not lit for
0.3 s)
ALM (fault indicator): not lit
0.3 s)
VSWR (SWR indicator): not Iit
ACT (cell status indicator): lit
0.3 s)
Closure
Before leaving the installation site, make sure that the following jobs
are completed:
I Put away the tools.
Put away the installation tools.
I Recycle redundant materials.
Recycle excess materials and hand them to the customer.
I Clean up the installation site.
Remove trash from the installation site to keep a clean
environment.
I Complete the installation report.
Fill in the installation report and submit it to the person in charge.
0PT1IETH (link status indicator): flashing (lit for 0.3 s and not lit for
0PT2 (link status indicator): flashing (lit for 0.3 s and not lit for 0.3 s)
REF (clock reference indicator): flashing (lit for 0.3 s and not lit for
ZXSDR 588922 FDD—L TE Integrated eNodeB Engineering Installation Guide -
uowoo'eu'MMM/lrduu lOSOLLQZ‘SSL‘Qw lei. eumo'a'd ‘ueuzuaus W108 P908 wast-m '99 'ON isseippvl

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Title                           : 
Author                          : 
Creator                         : Tracker's PDF-Tools
Subject                         : 
Producer                        : PDF-XChange (PDFTools3.exe v3.60.0106) (Windows)
Page Count                      : 7
Page Mode                       : UseNone
Page Layout                     : SinglePage
EXIF Metadata provided by EXIF.tools
FCC ID Filing: Q78-BS8922L1700

Navigation menu