u blox Malmo 090103AP Wireless Communication System Module User Manual Integration Manual II

u-blox Malmo AB Wireless Communication System Module Integration Manual II

Integration Manual II

 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  1 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     Assemble Specification for cB-PBEPAi-02-0
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  2 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     Table of content 1 Objective.................................................................................................................................3 2 Assemble overview.................................................................................................................4 2.1 Bill of material (BOM).................................................................................................................4 2.1.1 Parts included in the design..................................................................................................4 2.2 Patches ..........................................................................................................................................4 2.3 Labels............................................................................................................................................4 2.4 Mechanical assemble....................................................................................................................5 2.5 Application download...................................................................................................................7 2.6 Production test ..............................................................................................................................7 2.6.1 Test instructions....................................................................................................................7 2.6.2 Test report.............................................................................................................................7
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  3 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     1  Objective This document is a document for assembly of a cB-PBEPAi-02-0 product.
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  4 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     2  Assemble overview 2.1 Bill of material (BOM) 2.1.1 Parts included in the design Mechanics, mounted PCB’s, connectors etc. The BOM is unique for every product. Document name:  cB-0188 (cB-PBEPAi-02-0) BOM Document number:   Document file:  cBProject-0810-09 cB-0188 (cB-PBEPAi-02-0) BOM.xls Revision:  1  2.2 Patches Document name:   Document number:   Document file:   Revision:   Time consumption [s]:   2.3 Labels Printed label part no:  cB-7435-01 Printed label revision:  1.0 Label document file:   Label document revision:   Label part no:
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  5 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     2.4 Mechanical assemble 1.  Open the test program named "cB-2150" and select artnr cB-0188. 2.  Enter your name 3.  Press Login. 4.  Attach the “EPA Tester” connector. 5.  Start the production and test of the board by pressing "Start".  Wait as long as the status field is YELLOW. This takes around 1 minute and maximum 2 minutes. 6.  If the status field becomes GREEN, then the board is OK. Three identical labels (cB-7435-01, BOM pos 3) are printed.  If the status field becomes RED, then the board is NOT OK. 7.  Place the front label (BOM pos 2) on the plastic top housing.  Figure 1 Front label mounted on the plastic housing 8.  Place one of the generated labels (cB-7435-01, BOM pos 3) on the back housing according to Figure 2 and one on the side according to Figure 3. The remaining label shall be used in next production step.
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  6 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01      Figure 2 Label mounted on the plastic housing back  Figure 3 Label mounted on the plastic housing side 9.  The cB-PBEPAi-02-0 is ready for the next step.
 Utfärdare / Issued by      Datum / Date  Beteckning / Ref.  Sida / Page Andreas Nielsen  2009-01-15  cBProject-0901-11  7 (7) Ärende / Subjekt  Godkänd av / Approved by Assemble Specification for cB-PBEPAi-02-0     Template update: 00-12-01     2.5 Application download This step downloads the application firmware etc. to the unit. Document name:   Document number:   Document file:   Document Revision:   Application firmware:   Application Revision:   Time consumption [s]:   2.6 Production test The test should be done when the test unit is completely assembled. 2.6.1 Test instructions Document name:   Document number:   Document file:   Revision:   Test software:   Test software rev:   Time consumption [s]:   2.6.2 Test report Detected errors from the test phase are logged in a test report, the test report could be located at the production company or the information is from the production company.  Document name:   Document number:   Document file:   Revision:

Navigation menu