Huawei Technologies RRU3201-2600M Distributed Base Station Remote Radio Unit User Manual Installation Guide
Huawei Technologies Co.,Ltd Distributed Base Station Remote Radio Unit Installation Guide
Installation Guide
RRU3201 V100R001C01 Installation Guide Issue: 01 Part Number: Date: 2009-08-10 HUAWEI TECHNOLOGIES Co., Ltd. Contents Safety Information …………………………………………….….…… Installation Tools ………………………………………….………….. Space Requirements …………………………………….……..……. Installation Modes ……………………………………………………. Installation Procedure …………………………………….…………. Components Delivered with the RRU …………………………….. Installing the RRU on a Metal Pole ………………..………………. Installing the RRU on a Wall ……………………………………….. 12 Installing the RRU on a U-Steel ……………….……….………….. 15 Installing the RRU on an Angle Steel …………………………….. 15 Installing the RRU Cables ………………………………………….. 16 RRU Hardware Installation Checklist …………………………….. 23 Powering On the RRU …………………………………...………….. 23 Reference ………………………………………………………..…….. 24 Change History …………………………………...………………….. 30 Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved. Safety Information Following All Safety Precautions Before any operation, read the instructions and precautions in this document carefully to minimize the possibility of accidents. The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be followed. They only provide the generic safety precautions for operations. When operating Huawei products and equipment, you must comply with safety precautions and special safety instructions related to corresponding equipment provided by Huawei. The safety precautions in the document are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of universal regulations for safety operations and safety codes on design, production, and equipment use. Complying with the Local Safety Regulations When operating the device, comply with the local safety regulations. The safety precautions provided in the documents are supplementary. You must comply with the local safety regulations. Qualified Personnel Only The personnel in charge of installation and maintenance must be trained and master the correct operating methods and safety precautions before beginning work. Symbols DANGER Indicates a hazard with a high level of risk, which if not avoided,will result in death or serious injury. WARNING Indicates a hazard with a medium or low level of risk, which if not avoided, could result in minor or moderate injury. CAUTION Indicates a potentially hazardous situation, which if not avoided,could result in equipment damage, data loss, performance degradation, or unexpected results. TIP Indicates a tip that may help you solve a problem or save time. NOTE Provides additional information to emphasize or supplement important points of the main text. Safety of Personnel • The high voltage power supply provides power for running the system. Direct contact with the high voltage power supply or contact through damp objects may result in fatal danger. • Non-standard and improper high voltage operations may result in fire and electric shock. • In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel tower and mast. • Ground the device before powering on the device. Otherwise, the personnel and device are in danger. • Power off the device before performing operations on the power supply equipment. • High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all parties to ensure that the transmitter antennas are shut down. • When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes. • Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust. • Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur. • When working at a height, be cautious about falling objects. Device Safety • Check the electrical connection of the device before operation and ensure that the device is reliably grounded. • The static electricity generated by the human body may damage the electrostatic sensitive components on the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when performing the operation. • When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss. The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards. • When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the poweroff state of the equipment is 24 hours during maintenance. Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved. Installation Tools Hammer drill ESD gloves Vacuum cleaner Heat gun Phillips screwdriver (M3~M6) Flat-head screwdriver (M3 to M6) Claw hammer Knife Wire Stripper Adjustable wrench Power cable crimping tool Cable cutter (with the diameter of at least 32 mm) Combination wrench (21mm~21mm) for pole installation Level Multimeter Torque screwdriver Marker (17mm~17mm) for pole installation Measuring tape Space Requirements (Unit: mm) a RRU Dimensions Recommended Clearance for a Single RRU Minimum Clearance for a Single RRU ≥300 200 00 ≥6 00 ≥3 400 100 ≥8 00 60 ≥500 300 Recommended Clearance for Multiple Centralized RRUs Minimum Clearance for Multiple Centralized RRUs Installation Modes On a metal pole On a wall On a U-steel On an angle steel 30mm ~ 50mm 60mm~114mm 63mm~80mm The following figure shows the specifications of the metal pole, angle steel, and U-steel where the RRU is installed. ~ ~ 50mm~100mm Metal pole 63mm ~ 80mm Angle steel U-steel z A maximum of two RRUs can be installed on a metal pole with a diameter of 60 mm to 76 mm, and the installation mode must be standard mode. Three or more RRUs must be installed on a metal pole with a diameter of 76 mm to 114 mm in a centralized way. z It is recommended that only one RRU be installed on a U-steel or angle steel. z When installed on a tower, one RRU can be installed only in standard mode or reverse mode rather than side-mounted. Two RRUs cannot be installed in back-to-back mode. The RRU can be installed on the tower. For details, see page 24 Lifting the RRU and Installation Components to the Tower. The following figures show the installations of multiple RRUs on the metal poles. 2RRU 4RRU 6RRU Installation Modes When the RRU is installed on a U-steel or angle steel, the angle between the Usteel or angle steel and the longitudinal direction cannot exceed 10 degrees. The brackets cannot be combined when the RRUs are installed on the wall. installation carrier Installation Procedure Start Install the RRU on a metal pole (page 7~11) Install the RRU on a wall (page 12~14) Install the RRU on a U-steel (page15) Install the RRU on a angle steel (page15) Install the RRU cables (page16~22) Check the installation (page 23) Power on the RRU (page 23) End Components Delivered with the RRU Cover plate Auxiliary fixture Main fixture Attachment plate M10x110 Bolt Fixture assembly for installing the RRU Front of the RRU Back of the RRU Installing the RRU on a Metal Pole a Installing a Single RRU in Ordinary Mode 1. Install the main fixture. 1. Before installing the main fixture, ensure that the contact piece on the fixture is fixed. 2. When installing the main fixture, keep the arrow on the main fixture upward. It is recommended that the bottom of the main fixture be 1200 mm to 1600 mm above the ground for easy maintenance. Arrow 2. Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main fixture. Ensure that the arrow on the auxiliary fixture is upward. Dual-nut bolt assembly You can fit the auxiliary fixture on one of the dual-nut bolt assemblies before the installation. Thus, you can simply install the auxiliary fixture by fitting the other end of it on the other dual-nut bolt assembly. Fit the auxiliary fixture into the dual-nut bolt assemblies. Installing the RRU on a Metal Pole 3. Use an adjustable wrench (with the diameter of at least 21 mm) to tighten the dual-nut bolt assemblies. In this way, the main and auxiliary fixtures are securely mounted on the pole. When tightening the nuts, ensure that the two dual-nut bolt assemblies are tightened simultaneously. The fastening torque is 40 N• m. 4. Install the RRU on the main fixture. The screw is a nonfixed one and is for removing the RRU. 1. When you perform this operation, you need to place the foam pads or paper under the RRU to avoid any damage to the shell. 2. The RF port at the bottom of the RRU does not have load bearing capacity. Do not place the RRU on the ground on its bottom during the installation. Installing the RRU on a Metal Pole Installing Two RRUs in Back-To-Back Mode 1. Install an RRU first. For details, see page 7 Installing a Single RRU in Ordinary Mode. 2. Install the main fixture of another RRU. Ensure that the main and auxiliary fixtures are perfectly fitted. 3. Reinstall the cover plate and attachment plate on the second RRU to interchange their positions. M6x16 torque: 4.7 N.M 4. Install the second RRU on the main fixture in reverse mode. Ensure that the cabling cavities of the two RRUs face the same direction when installing the RRUs Ordinary mode Reverse mode Installing the RRU on a Metal Pole c Installing Multiple RRUs in Centralized Mode 1. Reinstall the attachment plate on the back and cover plate on one side to interchange their positions. M6x16 torque: 4.7 N.M 2. Install an RRU on a main fixture. 3.Install another main fixture. 4. Install another RRU on the second main fixture. 10 Installing the RRU on a Metal Pole c Installing Multiple RRUs in Centralized Mode 5. nstall a third main fixture. 6. Install a third RRU on the third main fixture. 7. Install a fourth RRU on the main fixture. For details, see step 2 to step 4 on page 9 Installing Two RRUs in Back-To-Back Mode. 11 Installing the RRU on a Wall 1. Place the auxiliary fixture on the wall at the installation position , use a level bar to measure the levelness of the fixture, and then mark the anchor points by using a marking pen. Level bar RRU It is recommended that the bottom of the auxiliary fixture be 1200 mm to 1600 mm above the ground. 2. Drill holes at the anchor points and then install the expansion bolt assemblies. Bolt M10x65 Ø14 Plastic tube Flat washer 10 Expansion tube 90° 52~60mm Spring washer 10 After the expansion bolt is removed, dispose of the plastic tube. Do not hammer the bolt entirely into the expansion tube, and leave 20 mm to 30 mm of the bolt outside the wall. 20~30mm When RRUs are installed on a wall, the specifications of the wall are as follows: z For one RRU, the wall has a weight-bearing capacity of 76 kg. z The fastening torque of the expansion bolt reaches 30 N·m, the expansion bolt works properly, and no damages such as cracks are on the wall. 12 Installing the RRU on a Wall 3. Fit the auxiliary fixture on the expansion bolts downward, and then tighten the bolts by using a combination wrench (with the diameter of at least 17 mm). M10X65 Ensure that the arrow on the auxiliary fixture is upward. 30N•m 4. Install the main fixture. 13 Installing the RRU on a Wall 5. Install the RRU. 6. Install Multiple RRUs. 14 Installing the RRU on a U-Steel U-Steel U-steel Top view The procedure for installing the RRU on a U-steel is the same as that for installing the RRU on a metal pole. Installing the RRU on an Angle Steel Angle steel Top view The procedure for installing the RRU on an angle steel is the same as that for installing the RRU on a metal pole. 15 Installing the RRU Cables a RRU Cable Connections Cable List Cable PGND cable (16mm2 ) Antenna jumper Connector Type Connector to… OT terminal(M6) Grounding bolt on the RRU OT terminal Nearest grounding bar DIN male connector Ports labeled ANT_TX/RXA and ANT_TX/RXB on the RRU (Only the ANT_TX/RXA port supports the OOK signal). Power cable DIN male connector Feeder or antenna Two OT terminals The blue OT terminal is connected to socket labeled NEG(-)0 in the RRU (M4) cabling cavity. And the black OT terminal is connected to socket labeled RTN(+)0. CPRI optical Bare wire External power supply DLC connector The connectors labeled 1A and 1B are connected to the optical module cable on the port labeled CPRI_W on the RRU DLC connector The connectors labeled 2A and 2B are connected to port labeled CPRI0, CPRI1 or CPRI2 on the LBBP board of the BBU. Alarm cable AISG multi-wire DB9 male connector Port labeled RET/MON at the bottom of the RRU Eight cord end terminals External alarm devices Waterproof DB9 connector Port labeled RET/MON on the RRU Standard AISG female connector Standard AISG male connector of the AISG extension cable or RCU Standard AISG male connector Standard AISG female connector of the AISG multi-wire cable Standard AISG female connector Standard AISG male connector of the RCU cable AISG extension cable PGND cable Antenna jumper Power cable CPRI optical cable Alarm cable Antenna Single RRU RCU AISG multi-wire cable The RET/MON port on the RRU is multi-functional, and can be installed with either AISG multi-wire cable or alarm cable. When the length of the AISG multi-wire cable is not enough, you can choose the optional AISG extension cable. AISG extension cable BBU 16 Installing the RRU Cables Antenna Antenna Antenna Multiple RRU PGND cable Antenna jumper RCU Power cable CPRI optical cable Alarm cable AISG multi-wire cable AISG extension cable External power system External monitoring device For detail information of the cable, see Cable List on Page 17. b Open the cover plate of the RRU cabling cavity 17 Installing the RRU Cables Cabling Cavity of the RRU Cable trough for the optical cable Cabling cavity Cable trough for the power cable Cover plate of the cabling cavity Waterproof filler Cable Connections of the RRU Shielding layer of the power cable Grounding screw OT terminal PGND cable Strap PGND cable Antenna jumper Power cable CPRI optical cable AISG multi-wire cable First wrap the joint with the waterproof tape, and then wrap the joint with the PVC insulating tape. 18 Installing the RRU Cables Cable Connections of the RRU z Use the power cable clip to press the shielding layer tightly and ensure that the lower part of the shielding layer does not exceed the position shown in the preceding figure. z The grounding resistance of the PGND cable should be less than 10 ohms. The PGND cable cannot be connected to the grounding terminal. z Ground the shielding layer of the other end of the power cable. z After the cables are installed on the RRU, insert the waterproofing fillers into the idle cable holes. z When wrapping the waterproofing tape, apply even force to extend the tape until the width of the tape is 1/2 of the original width. z Wrap the joint spirally upward, downward, and then upward again. In other words, the joint is wrapped by three layers of the tape. Ensure that the upper layer of the tape covers about half of the lower layer when wrapping up the tape. z Do not remove the dustproof cap from the idle antenna port. Perform the waterproof, dustproof, and smokeproof treatment if necessary. Use the waterproof tape to wrap the joints in outdoor applications. For details on how to add the OT terminals to the power cable, see pages 26 to 27 Adding OT Terminals to the Power Cable of the RRU. For details installing the Optical Module, see page 28 Installing the Optical Module. Close the cover plate of the RRU cabling cavity 1.4N•m 1. The screw on the cover plate is tightened until the fastening torque is 1.4 N• m. 2. The screws on the cover plate are tightened in the order shown in the preceding figure. 19 Installing the RRU Cables RRU+APM30H Metal shielding layer (25mm) RRU power cable PGND cable RRU power cable CPRI optical cable 1. The RRU power cable is connected to one group of the RRU0 to RRU5 terminals of the PDU. 2. Strip the jacket off the RRU power cable for a small part, press the exposed shielding layer on the strap, and then connect the PGND cable on the strap to the nearest grounding bolt on the side in the APM30/APM30H, as shown in a , b , and c . 20 Installing the RRU Cables RRU+BBU on the wall RRU power cable CPRI optical cable BBU power cable DCDU panel facing the side, and the BBU panel facing downward zThe RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. 21 Installing the RRU Cables RRU+19-Inch cabinet LOAD0 RRU power cable CPRI optical cable z At the end of the RRU power cable connected to the DCDU-03C, you need to make the shielding layer of the power cable into an OT terminal, and then connect the OT terminal to the PGND terminal of the corresponding port on the DCDU-03C. For details about making an OT terminal, see pages 26 and 27. z The RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. RRU+TMC/TMC11H LOAD0 RRU power cable CPRI optical cable z At the end of the RRU power cable connected to the DCDU-03C, you need to make the shielding layer of the power cable into an OT terminal, and then connect the OT terminal to the PGND terminal of the corresponding port on the DCDU-03C. For details about making an OT terminal, see pages 26 and 27. z The RRU power cable is connected to LOAD0 to LOAD5 on the DCDU-03C. 22 RRU Hardware Installation Checklist No. Items The position for each equipment conforms to the engineering design and meets the space requirement. Sufficient space is reserved for equipment maintenance. The RRU is properly installed. The cover plate is fastened to the RRU cabling cavity. Waterproof check: The empty cable troughs in the cabling cavity of the RRU are waterproofed. The cover plate is tightly buckled on the cabling cavity of the RRU. The RF ports that are not connected with RF cables are capped and waterproofed. The waterproof caps are fastened. No joint lies in the middle of the power cable or the PGND cable. The lugs at both ends of the power cable or the PGND cable are securely soldered or crimped. The power cable and PGND cable are not short-circuited or reversely connected and are not damaged or broken. The power cable, PGND cable and other cables need to be bound separately. The operating grounding and protection grounding of the base station and the lightning protection grounding of the building share one group of grounding conductors. 10 The connectors of signal cables are intact and securely linked. And the signal cables are not damaged or broken. 11 All labels, tags, and nameplates are correct, legible, and complete. All the labels at both ends of the cables, jumpers and feeders should match. Powering On the RRU Start Check whether the input voltage of the RRU is normal? No Rectify the fault Yes Power on the RRU Rectify the fault Power off the RRU Check whether the status of the LEDs on the RRU is normal? Normal input voltage of the RRU: If the BBU is supplied with -48 V DC power, the external input power voltage ranges from -57 V DC to -36 V DC. Normal status of the LEDs on the RRU: RUN LED: ON for 1s and OFF for 1s ALM LED: OFF No The RRU should be powered on in 24 hours after being unpacked. The power off duration of the RRU cannot exceed 24 hours during maintenance. Yes End 23 Reference a Lift the RRU and installation components to the tower. 1. Lead the lifting rope along the lower part of the adapting piece and then bind the RRU by using the lifting rope at the handle of the RRU. Bind the main fixture and auxiliary fixture by using the lifting rope. Bind the handle of the RRU by using the pulling rope. See the following figure. Lifting rope 【 Do not fix only the handle of the RRU to the lifting rope. Steering rope Lower part of the adapting piece zWhen lifting the RRU to the tower, avoid collision of the RRU with the tower. zLift the RRU to the tower before it is installed on the metal pole, angle steel, or U-steel. 24 Reference a Lift the RRU and installation components to the tower. 2. Lift the RRU and installation components to the tower. Fixed pulley Steering rope Lifting rope z Installer A climbs up to the tower, installs the fixed pulley on the support of the tower platform, and then leads the lifting rope through the fixed pulley. z Installer C binds the RRU and installation parts using the lifting rope and fixes the handle of the RRU to the pulling rope. z Installer B pulls the lifting rope downwards. At the same time, installer C pulls the steering rope outwards to avoid collision of the RRU with the installation parts or tower. z Installers A catches the RRU and installation parts and then loosen the rope. z On a tower, multiple RRUs cannot be installed in centralized mode. 25 Reference Adding OT Terminals to the Power Cable of the RRU 1. OT terminals on the power cable: -48 V DC power cable -48 V power wire OT terminal Shielding GND wire layer To assemble the OT terminals, perform the following steps: Determine lengths of power cables for different operations according to the scales on the inner side of the cover plate of the cabling cavity. 10 20 30 40 Based on the determined length, remove the jacket and shielding layer off the power cable. 14mm 8mm Remove the jacket of a specified length from each wire. Add an OT terminal to each wire. Remove about 15 mm jacket off the power cable to expose the shielding layer. 15mm 26 Reference Adding OT Terminals to the Power Cable of the RRU 2.Assemble an OT terminal on the power cable at the end connecting to the power supply device. Determine the length on site. The recommended length is 150 mm. Stripped shielding layer in the heatshrinkable tube PVC insulating tape 27 OT terminal on the shielding layer Reference c Waterproofing the outdoor cables 1. The waterproof tape should be wrapped for an extra length of 20 mm away from the connectors at both ends. 2. The tapes are wrapped around the connector from the lower part to the upper part. When wrapped for another layer, the tapes may not be cut off. 3. Apply average force to pull the tape until the width of the tape is 1/2 of the original width before wrapping up the waterproofing tape. 4. Ensure that the upper layer of the tape covers over 50% of the lower layer when wrapping up the tape. 5. The Insulation tape should be wrapped for an extra length of 20 mm away from the edge of the waterproof tape at both ends. 6. Make sure that the last layer of the waterproof tape is wrapped from lower part to the upper part so that the rain flows along the wrapped waterproof tape. Waterproof tape 1. Wrap up the connectors with three layers of waterproofing tape Insulation tape Tightly pressed the tape 2. Wrap up the connectors with three layers of Insulation tape Cable tie Cable tie Use cable ties to fasten both ends of the tapes. Tightly pressed the tape d Installing the optical Module 28 Reference Pin Assignment of the RRU AISG Extension cable Pin of the AISG male connector Pin of the AISG female connector Wire Color Wire Type Instruction X1.1 X2.1 White/blue Twisted pair +12V Twisted pair DC Return A Twisted pair RS485 B Blue X1.7 X2.7 White/orange Orange X1.3 X2.3 White/green X1.5 X2.5 Green X1.6 X2.6 White/brown RS485 A Twisted pair +24V Brown g Pin Assignment for the Wires of the RRU Alarm Cable DB9 waterproof Connector Pin Name Wire Color Wire Type Cord End Terminal Label X1.2 SWITCH_INPUT0+ White/blue Twisted pair X2 SWITCH_INPUT0+ X1.4 GND Blue X3 GND X1.7 SWITCH_INPUT1+ White/orange X4 SWITCH_INPUT1+ X1.4 GND Orange X5 GND X1.6 RS485_TX- White/green X6 APM RX- X1.8 RS485_TX+ Green X7 APM RX+ X1.5 RS485_RX- White/brown X8 APM TX- X1.3 RS485_RX+ Brown X9 APM TX+ X1.shell Twisted pair Twisted pair Twisted pair Shield 29 Change History This describes the changes in the RRU3201 V100R001C01 Installation Guide 01 (2009-08-10) This is the draft release. 30 HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Author : y00111561 Create Date : 2012:01:13 09:45:39+01:00 Modify Date : 2012:01:13 09:45:39+01:00 XMP Toolkit : Adobe XMP Core 4.2.1-c043 52.372728, 2009/01/18-15:08:04 Metadata Date : 2012:01:13 09:45:39+01:00 Creator Tool : PScript5.dll Version 5.2 Format : application/pdf Title : Microsoft PowerPoint - RRU3201 Installation Guide-(V100R001C01_01).ppt Creator : y00111561 Document ID : uuid:95fb142e-6341-4330-820d-9f03e7da56e8 Instance ID : uuid:4eb06bc9-aad5-4518-90ee-40a3e8a1bce7 Producer : Acrobat Distiller 7.0 (Windows) Page Count : 32EXIF Metadata provided by EXIF.tools