IDS GeoRadar s r l ALADDIN-NA Ground Penetrating Radar User Manual ALADDIN NA
IDS Ingegneria dei Sistemi SpA Ground Penetrating Radar ALADDIN NA
user manual
- P RO/010/M1 Rev 3 - INGEGNERIA DEI SISTEMI S.p.A. Rev. 1.1 Protocol: MN/2009/061 “ALADDIN” STRUCTURE KIT USER MANUAL “ALADDIN” STRUCTURE KIT User Manual Pisa, 12/02/2010 Tot pag. N°. = 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Document Evolution Revision Date Reason of change Rev. 1.0 31/08/2009 First Edition Rev 1.1 12/02/2010 FCC Information updated Versions covered by this document K2 All version, K2FastWave 02.00.008. OUR CONTACTS IDS Ingegneria dei Sistemi S .p.A. – GeoRadar Division Via Sterpulino, 20 56121 Ospedaletto (PISA) - ITALIA Tel: +39.050.967111 Fax: +39.050.967121 inforis@ids-spa.it Customer Care department: customercare.gpr@ids-spa.it Tel.: +39.050.967122 S ales & Marketing department: sales.gpr@ids-spa.it Tel.: +39.050.967123/24/43 2 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 DISCLAIMER IDS WILL NOT BE HELD RESPONSIBLE FOR THE CONSEQUENCES OF AN IMPROPER USE OF THE EQUIPM ENT AND/OR THE SOFTWARE. THIS SOFTWARE MAY INCLUDE AUTOMATED DATA PROCESSING AND ANALYSIS TOOLS. WHILE EVERY EFFORT IS M ADE TO ENSURE THE ACCURACY OF THE INFORMATION PROVIDED BY THOSE TOOLS, THEY M UST NOT BE INTENDED AS A SUBSTITUTE FOR INTELLIGENT ANALYSIS; RATHER, THEY HAVE TO BE INTENDED AS AN ADVISOR AND THE USER MUST NOT COM PLETELY RELY ON THE RESULTS PROVIDED BY THEM TO GIVE THE COM PLETE ANSWER. IDS INGEGNERIA DEI SISTEM I SPA ASSUM ES NO LIABILITY FOR ANY DIRECT, INDIRECT, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES OR INJURIES CAUSED BY SUCH RELIANCE ON THE ACCURACY, RELIABILITY, OR TIM ELESS OF THE INFORM ATION PROVIDED BY THOSE TOOLS. ANY PERSON OR ENTITY WHO RELIES ON INFORM ATION OBTAINED FROM THE AUTOMATED DATA PROCESSING/ANALYSIS TOOLS ONLY, DOES SO AT HIS OR HER OWN RISK 3 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 SAFETY INFORMATION The equipment conforms to the following requirements set by EC regulations, including subsequent modifications, and to the legis lation set by the member states that implement these regulations: 1999/05/EEC Radio Directive Warning: this equipment is destined for use in industrial environments (Class A apparatus). In residential, commercial and light industry environments, this apparatus may generate radio interference: in this case, the user may be required to operate while taking appropriate countermeasures. The apparatus is sensitive to the presence of external electromagnetic fields, which may reduce its performance. 4 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 SAFETY INFORMATION The equipment conforms to the following requirements set by EC regulations, including subsequent modifications, and to the legis lation set by the member states that implement these regulations: 1999/05/EEC Radio Directive Warning: this equipment is destined for use in industrial environments (Class A apparatus). In residential, commercial and light industry environments, this apparatus may generate radio interference: in this case, the user may be required to operate while taking appropriate countermeasures. The apparatus is sensitive to the presence of external electromagnetic fields, which may reduce its performance. 5 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 CLEANING INFORMATION WARNING Before cleaning any external parts of the apparatus, make sure that all cables have been disconnected, including the power supply cable. If a damp cloth is used, make sure it is not too wet, to avoid any damage to the electrical components of the equipment. Wait until the equipment is totally dry before reconnecting the cables. The system should be cleaned periodically using a damp cloth. Do not use solvents or abrasive detergents. Do not apply liquid directly to the electrical contacts of the various connectors. If a specific spray is used to clean the PC TFT monitor, make sure it is not flammable; ion any case, do not spray it directly on the screen, instead, spray it onto the cleaning cloth. 6 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 BATTERIES REMOVAL INFORMATION Laptop Batteries: Manufacturer: PANASONIC Type: Li-ion Ni Characteristics: 10.65V 5.7Ah Removal instructions: 1. turn off the laptop; 2. open the drawer with the symbol of the batteries; 3. extract the battery pack pulling the tab. Radar batteries: Manufacturer: FIAMM FG21202 / SAFT MP176065 Type: rechargeable lead acid / rechargeable lithium-ion Characteristics: 12V & 12Ah / 15V & 6.8Ah Removal instructions: 1. disconnect the battery from the instrument: a. pull the connector wings; b. separate the connectors; 2. remove the battery from the cover (optional) opening the strap. 7 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 RECICLYING The crossed out wheeled bin symbol shown on the equipment indicates that the product must be recycled separately from other waste at the end of its useful life. Separate waste disposal of this product at the end of its useful life will be organised and managed by IDS. When you decide to dispose of the equipment, contact IDS and follow the system that IDS has set up to permit the separate collection of the apparatus at its life end. Adequate separate collection for its subsequent recycling, treatment and environmental friendly disposal contribute towards avoiding any unnecessary effects on the environment and to health and favour the reuse or recycling of the materials that make up the equipment. Unauthorised disposal of this product as unsorted waste by its possessor will lead to an administrative penalty foreseen by national regulations. 8 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 WARRANTY CERTIFICATE CONDITIONS 1) IDS Ingegn eria dei Sistemi S.p.A, hereinaft er referred to as IDS, warrants hardware/so ftware products fo r a period of 12 months from the delivery date to the original customer; 2) The delivery date is certified by the “ Warranty Registration Form”; 3) IDS’s hardware produ cts will be free from defects in materials workmanship under normal use and service; 4) IDS’s obligation is limited to repairing or replacing parts or equipment which are return ed to IDS, without alteration or further damag e, and which in IDS s judgment, were defective or became defective during normal use; 5) IDS’ software will have to be installed on a PC according to the requirem ent o f the IDS hardware ( see IDS User’s Guide the Software Data Acquisition); 6) IDS’ s software produ cts designed by IDS for use for IDS hardware products are warranted not to fail to execute their programming instructions due to defects during the warranty period, provided they are prop erly installed on IDS h ardware produ cts. IDS does not warrant i f the IDS so ftware will be used and operated in hardware and so ftware combinations not selected by IDS; 7) IDS does not assumes any liability for any direct, indirect, speci al, incidental or consequential damages or injuries caus ed by proper or improper op eration o f its equipment whether defective or not defective; 8) This software may include automated data p rocessing and analysis tools. While every effort is made to ensure the accu racy o f the inform ation provided by those tools, they must not be intended as a substitute for intelligent analysis; rath er, they hav e to be intended as an advisor and th e user must not completely rely on the results provid ed by them to give the complete answer. IDS assumes no liability for any direct, indirect sp ecial, incidental o r consequ ential damag es or injuries caused by such reliance on the accu racy, reliability, or timeliness of the inform ation provided by those tools. Any person or entity who relies on info rmation obtained from the automated data processing/analysis tools only, does so at his or her own risk; 9) IDS’s warranty does not extend and shall not apply to: a) Products which have been repai red or altered by other than IDS personnel; b) Products which have been subjected to misuse, neglect, accident or improper installation; c) Products in which have been installed Hardware/So ftware accessories not supplied by IDS and/or without any approval by IDS; d) Products which have been connected to equipment different from the ones supplied by IDS (except the PC data Logger which must confo rm to IDS specifications; e) Products which have been damaged by natural disaster or cal amities. 10) Befo re returning any equipment to IDS , you have to cont act the IDS Customer Care Offi ce that will authorize you to return the material to be repaired; 11) Once the parts/equipment to be rep aired arrive to IDS, IDS may inspect the defective p roducts to veri fy they are eligible for repair o r replacement. All packing must be saved for inspection purpose in order to assist IDS to understand the cause o f the d efects. IDS, will not be obliged to repair, or repl ace fo r products return ed as defective but damag ed from abuse, misuse, neglicence , accid ent loss or damage in transit; 12) The final clients, is responsible fo r ensuring the d efective p roducts retu rned to be p roperly packag ed; 13) The above warranty are sole and exclusive, and no other warranty, whether written o r oral, is expressed or implied. 9 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 IMPORTANT NOTE FOR THE US CUS TOMERS FCC ID: UFW-ALADDIN-NA This device complies with part 15 of the FCC Rules: Operation is subject to the following conditions: 1. This device may not cause harmful interference, and 2. This device must accept any interference received, Including interference that may cause undesired operation Warning: Changes or modifications to this unit not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment. Operation of this device is restricted to law enforcement, fire and rescue officials, scientific research institutes, commercial mining companies, and construction companies. Operation by any other party is a violation of 47 U.S.C. § 301 and could subject the operator to serious legal penalties. Coordination Requirements. (a) UWB imaging systems require coordination through the FCC before the equipment may be used. The operator shall comply with any constraints on equipment usage resulting from this coordination. (b) The users of UWB imaging devices shall supply detailed operational areas to the FCC Office o f Engineering and Technology who shall coordinate this information with the Federal Government through the National Telecommunications and Information Administration. The information provided by the UWB operator shall include the name, address and other pertinent contact information of the user, the desired geographical area of operation, and the FCC ID number and other nomenclature of the UWB device. This material shall be submitted to the following address: Frequency Coordination Branch., OET Federal Communications Commission 445 12th Street, SW Washington, D.C. 20554 ATTN: UWB Coordination (d) Users of authorized, coordinated UWB systems may transfer them to other qualified users and to different locations upon coordination of change of ownership or location to the FCC and coordination with existing authorized operations. (e) The NTIA/FCC coordination report shall include any needed constraints that apply to day-to-day operations. Such constraints could specify prohibited areas of operations or areas located near authorized radio stations for which additional coordination is required before operation of the UWB equipment. If additional local coordination is required, a local coordination contact will be provided. (f) The coordination of routine UWB operations shall not take longer than 15 business days from the receipt of the coordination request by NTIA. Special temporary operations may be handled with an expedited turn-around time when circumstances warrant. The operation of UWB systems in emergency situations involving the safety of life or property may occur without coordination provided a notification procedure, similar to that contained in CFR47 Section 2.405(a)-(e), is followed by the UWB equipment user. Notice: Use of this device as a wall imaging system is prohibited by FCC regulations. Accordin g to the FCC Part 15 rules, the sy stem includ es a manually op erated switch (“dead-man switch”) that causes the transmitter to cease op eration within 10 seconds of bein g released by the op erator. T he use of this switch is further exp lained in this manual; sp ecific instructions for op erating a sy stem sold in the US are id entified by the following label 10 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 INDEX 1. INTRODUCTION .....................................................................................................13 1.1 Purpose...............................................................................................................13 1.2 Field of application.............................................................................................13 1.3 Reference ............................................................................................................13 1.3.1 Referenced Documents ..........................................................................13 1.4 Acronyms and Definitions...................................................................................13 1.4.1 Acrony ms...............................................................................................13 1.4.2 Definitions..............................................................................................13 1.5 How to use this manual.......................................................................................14 2. S YS TEM COMPONENTS .......................................................................................15 3. HOW TO S ET UP THE S YS TEM...........................................................................16 3.1 Opening the case.................................................................................................16 3.2 Connecting up the system ...................................................................................20 3.2.1 How to assemble the frame to the antenna ............................................20 3.2.2 How to assemble the metric wheel to the frame ....................................21 3.2.3 Assembly of the slide on the frame........................................................21 3.2.4 How to assemble the fork and the handle on the frame .........................22 3.3 Cable connection of the system...........................................................................22 3.3.1 Comp lete list of cables ...........................................................................22 3.4 Technical advice .................................................................................................25 4. HOW TO US E THE S YS TEM.................................................................................26 4.1 Main functions ....................................................................................................26 4.2 Functioning principles using the PSG carpet.....................................................27 4.3 Work procedure using the Aladdin system .........................................................28 4.3.1 "Automatic" mode..................................................................................28 4.3.2 “M anual” M ode......................................................................................30 4.3.3 “M anual (no check)” M ode....................................................................30 11 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 PICTURES INDEX FIG. 2-1 – FINAL CONFIGURAT ION.................................................................................15 FIG. 3-1 – OPENING T HE CASE.........................................................................................16 FIG. 3-2 – REMOVING T HE BATTERY ............................................................................16 FIG. 3-3 – REMOVING T HE DAD AND T HE ANT ENNA T ROLLEY.................................17 FIG. 3-4 – REMOVING T HE BIPOLAR ANTENNA............................................................17 FIG. 3-5 – BOTT OM SECT ION...........................................................................................18 FIG. 3-6 – UPPER SECTION..............................................................................................18 FIG. 3-7 – INSERT ING T HE SUPPORT LEGS.....................................................................19 FIG. 3-8 – FIXING T HE WORKT ABLE...............................................................................19 FIG. 3-9 – FINAL SET-UP OF T HE WORKT ABLE .............................................................20 FIG. 3-10 – ASSEMBLY OF T HE FRAME ON T HE ANT ENNA..........................................20 FIG. 3-11 – ASSEMBLY OF T HE MET RIC WHEEL ON T HE FRAME................................21 FIG. 3-12 – ASSEMBLY OF T HE SLIDE ON T HE FRAME.................................................21 FIG. 3-13 – ASSEMBLY OF T HE HANDLE TO T HE FRAME.............................................22 FIG. 3-14 – FIXED CONNECT ION CABLE BETWEEN T HE BIPOLAR ANTENNA AND DAD ...........................................................................................................................23 FIG. 3-15 – CONNECT ING T HE REMOTE CONT ROL CABLE ..........................................23 FIG. 3-16 – LAN CABLE.....................................................................................................24 FIG. 3-17 – POWER CABLE ...............................................................................................24 FIG. 3-18 – MET RIC WHEEL CABLE.................................................................................24 FIG. 4-1 – OPENING WINDOW K2 SW ..............................................................................26 FIG. 4-2 – EXTERNAL DEVICE SETT INGS COMMAND...................................................27 FIG. 4-3 – SELECT ION WINDOW FOR ALADDIN PSG MODE .........................................27 FIG. 4-4 –ALADDIN PSG FIELD ........................................................................................28 FIG. 4-5 – ALADDIN SYST EM...........................................................................................29 FIG. 4-6 – PSG CARPET .....................................................................................................31 FIG. 4-7 – FEATURES OF PSG AND SLIDE .......................................................................32 12 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 1. INTRODUCTION This manual contains a complete description of the "Aladdin" structures kit, including details on how to assemble the kit hardware, use it and operate the software interface 1.1 Purpose This document is intended to be used as a guide for the installation and use of the "Aladdin" structures kit. 1.2 Field of application This product must only be used for applications in the civil engineering field. 1.3 Reference 1.3.1 Referenced Documents [RD1] MN/2006/052 (K2 Data Acquis ition Software User's guide) [RD2] MN/2005/002 (GRED 3D Data Elaboration Software). 1.4 Acronyms and Definitions 1.4.1 Acronyms K2: DAD: IDS georadar data acquisition software. radar control unit 1.4.2 Definitions Field survey: a group of field acquis itions relating to a single survey Raw data: unprocessed data obtained during a field survey. Maps: graphics showing the change in received radar signal (signal intensity in gray scale) with respect to the scanning direction. These signals must be processed to be comprehensible 13 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Survey: the name given to a collection of acquisitions, which together cover all the areas of a large investigation: typically an entire town or a large urban area. Scan: a s ingle movement of the antenna trolley from the beginning to the end of a pre-established path. Data processing: this is applied to the raw data to permit the acquired sections to be viewed in a comprehensible way. Setup: initialisation of a piece of equipment or a software process 1.5 How to use this manual This manual is divided into the following sections: Chap. 1: Introduction. Chap. 2: System composition. Chap. 3: How to set up the system. Chap. 4: How to use the system. 14 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 2. SYSTEM COMPONENTS The "Aladdin" structures kit consists of the following parts: 1. Bipolar antenna 2. Connection box 3. Trolley handle. 4. Antenna survey kit 5. Notebook PC. 6. DAD box. 7. 1 cable to connect the antenna to the DAD. 8. 1 battery. 9. 1 battery charger. 10. USB stick + acquisition software. 11. CD-ROM + GRED 3D processing software. 12. Transportation case. 13. PSG (Pad Survey Guide) carpet. SURVEY WHEEL KIT PC DAD BATTERY CABLE BIPOLAR ANTENNA BATTERY PSG LAN CABLE Fig. 2-1 – Final configuration 15 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 3. HOW TO SET UP THE SYSTEM 3.1 Opening the case When you receive the case containing the "Aladdin" structures kit, follow the procedure below: Open the protective case, remove the bottom divider and take out the antenna trolley steering handle (see Fig. 3-1). Equipment Fig. 3-1 – Opening the case If you want to remove the battery, unscrew the black screw shown in the picture (Fig. 3-2). Fig. 3-2 – Removi ng the battery Undo the Velcro that keeps the DAD unit blocked, now remove the DAD and the trolley (Fig. 3-3). 16 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 3-3 – Removi ng the DAD and the antenna trolley Remove the bipolar antenna, pushing the lever towards the foam support then lift the antenna out rotating it s lightly (see the direction of the red arrow in Fig. 3-4); when you have to replace the antenna in the case, be careful that the white pegs on the side of the antenna are blocked into the two holes inside the case (indicated with the red circle). How to remove the antenna Fig. 3-4 – Removi ng the bi polar antenna Open the bottom section (Fig. 3-4 and Fig. 3-5); this is the PC storage area; if a PC has not been supplied with your order, you can store your own PC here using the pre-cut foam to model a suitably shaped space (Fig. 3-5). The maximum space available for storing a PC is 34cm x 27cm x 5cm. 17 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 3-5 – Bottom section Undo the Velcro on separator of the top part of the case and lift up the top section (Fig. 3-6). Fig. 3-6 – Upper section Remove the two support legs and insert them in the holes in the bottom of the case (Fig. 3-7). 18 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 3-7 – Inserting the support legs Close the lid of the case, inserting the legs into the upper supports (Fig. 3-8). Fig. 3-8 – Fixing the worktable Connect the power cable to the battery then replace the lower cover onto the case to provide a second surface for sitting the material from the kit (Fig. 3-9). 19 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 3-9 – Final set-up of the worktable 3.2 Connecting up the system 3.2.1 How to assemble the frame to the antenna As we can notice from the Fig. 3-10 the procedure of assembly of the frame on the antenna is the following: • Link the frame as indicated in the pictures below and then push it up in order to connect it in the lateral white nuts. Fig. 3-10 – Assembly of the frame on the antenna 20 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 3.2.2 How to assemble the metric wheel to the frame • Screw the central nut of the metric wheel in the lateral hole located on the frame, keeping the wheel in vertical position (see Fig. 3-11). Fig. 3-11 – Assembly of the metric wheel on the frame 3.2.3 Assembly of the slide on the frame • Put the slide under the antenna fitting the two lateral holes located on the front and back side of the antenna as indicated in Fig. 3-12. The slide holds a special film PSG type (Pad Survey Guide) in order to use it only in combination with the PSG carpet (see Par 4.3.3). • Screw the four nuts to the relative holes. Fig. 3-12 – Assembly of the slide on the frame 21 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 3.2.4 How to assemble the fork and the handle on the frame • In order to assemble the handle it’s necessary to insert the fork at the end of the handle in the point indicated in Fig. 3-13 and then screw the nut. • Then connect the fork of the handle to the frame making pressure on the two white lateral nuts up to link them. Fig. 3-13 – Assembly of the handle to the frame 3.3 Cable connection of the system 3.3.1 Complete list of cables The following list contains all the structures kit cables and how they are connected: Fixed connection between the bipolar antenna and DAD (Fig. 3-14); 22 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 ANTENNA CABLE CONNECT ED T O DAD Fig. 3-14 – Fixed connection cable between the bi polar antenna and DAD Remote control cable connecting the antenna to the handle (Fig. 3-15); after inserting and tightening the handle screw to the fork connected to the antenna, connect the handle cable to the port situated on the back of antenna labelled "REMOTE" (Fig. 3-15). Fig. 3-15 – Connecting the remote control cable LAN cable connecting the PC to the DAD (Fig. 3-16); connect the large LAN connector to the port on the DAD and the other end to the smaller port on the back of the PC; 23 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 3-16 – LAN cable Cable connecting the battery power supply to the DAD (Fig. 3-17); connect the metallic connector to the DAD and the white plastic connector to the battery. Fig. 3-17 – Power cable Metric wheel cable: connect the cable of the metric wheel to the WHEEL port located on the front side of the antenna (Fig. 3-18). Fig. 3-18 – Metric wheel cable 24 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 3.4 Technical advice Pay special attention to the following technical advice to avoid operational problems: Fix the pad to the surface being investigated with adhesive tape. Avoid treading on the paper pad, this may damage it making it unusable. Block the antenna cable to the handle with Velcro when using the device so the cable doesn't get in the way 25 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 4. HOW TO USE THE SYSTEM 4.1 Main functions To access the "Aladdin" structures kit from the K2 SW, you have to open a dedicated session. Fig. 4-1 – Opening window K2 SW Step 1 Click once with the left mouse button on the "K2" icon contained in the blue bar at the top of the initial K2 SW window (see Fig. 4-1). A series of options appears, from which you have to select External device settings (see Fig. 4-2). 26 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 4-2 – External device settings command 4.2 Functioning principles using the PSG carpet Step 1 click once with the left mouse button on the “K2” icon on the blue bar of the initial K2 SW window (see Fig. 4-1), the menu that appears contains a series of commands, from which you should select External device settings (see Fig. 4-2). Step 2 this opens the window shown in Fig. 4-3, from where you can select Aladdin PSG from the External device type field if you are going to use the PSG carpet. Fig. 4-3 – Selection window for Aladdin PS G mode 27 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Step 3 in Aladdin PSG mode, you can select the acquisition coordinates (see Fig. 4-4). Fig. 4-4 –Aladdin PSG field • The following parameters can be selected in this field: Sound enabled: acquisition; activates acoustic sound during Carpet line dist.: distance between two lines on the PSG carpet. Scan step: setting the value “n” in this field, you decide to perform 1 scan every “n” lines on the PSG. Start/Stop: these are the initial and final scan coordinates to be performed on the PSG carpet. 4.3 Work procedure using the Aladdin system 4.3.1 "Automatic" mode Step 1: Assemble the system and place the pad on the surface to be investigated (see Fig. 4-5). 28 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 4-5 – Aladdin system Step 2: Start the K2 SW, perform the calibration and set the Aladdin structures kit parameters. NO TE! Using a bipolar antenna, only longitudinal scans must be performed; for a single high frequency antenna, perform both longitudinal and transversal scans Step 3: Position the antenna on the initial preset coordinate in the L (or T) direction and carefully position the antenna until the acoustic signal stops. Step 4A (Standard System): Press one of the START buttons placed on the handle or directly on the antenna ; a special acoustic signal will confirm that the START button has been pressed. Step 4B (US System): Press one of the START buttons placed on the handle or directly on the antenna and keep it pressed; a special acoustic signal will confirm that the ST ART button has been pressed. Releasing the button, will stop the collection after 10 sec. 29 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 4.3.2 “Manual” Mode Steps 1-4: Follow the same procedure described for "Automatic" mode above. Step 5: Acquis ition starts when you press the START button, independently of the position of the first horizontal line encountered. Step 6A (Standard System): Insertion of User Markers during scanning is performed by rapidly pressing the START button. Step 6B (US System): Insertion of User Markers during scanning is performed by rapidly releasing and pressing again the START button. Step 7A (Standard System): The scan is STOPPED by keeping the START button pressed Step 7B (US System): The scan is STOPPED by releasing the START button NO TE! The system keeps control of data quality (Tolerance) in both Automatic and Manual mode. In fact, if this tolerance is respected, a confirmation acoustic signal is activated; if the tolerance exceeds the pre-set percentage during the scan, an error acoustic signal is heard, the scan isn't saved and you have to repeat it. 4.3.3 “Manual (no check)” Mode Step 1-7: In this case the user must use the PSG carpet –Pad Survey Guide Guide (Fig. 4-6) with the slide applied under the frame (see Par. 3.2.3). 30 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 4-6 – PSG Carpet The PSG carpet holds alternated upper and lower guides in order to make the slide perfectly fit and for the antenna to realize straight scans. Also the slide holds a special film on its external surface removing to the minimum the friction during the drag of the antenna on PSG. Finally the PSG holds on its edge a graduated horizontal pole with the indication of numbers and letters in progressive sequence, in order to give to the user a reference point at the beginning of the scan (Fig. 4-7). 31 / 32 IDS Ingegneria Dei Sistemi S.p.A. “ALADDIN” STRUCTURE KIT User Manual Protocol: MN/2009/061 - Rev. 1.1 Fig. 4-7 – Features of PSG and slide Follow the same operative procedure used in the "Manual" procedure described above. NOTE! The main difference with respect to the "Manual" mode consists in the absence of the Tolerance control factor, therefore you are free to choose how long the scan should be (Length). This mode is useful when scans of different lengths have to be performed. 32 / 32
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Page Count : 32 XMP Toolkit : XMP toolkit 2.9.1-13, framework 1.6 About : 77290267-4eb7-11df-0000-08d73a341f11 Producer : GPL Ghostscript 8.61 Modify Date : 2010:04:20 11:05:31+02:00 Create Date : 2010:04:20 11:05:31+02:00 Creator Tool : PDFCreator Version 0.9.5 Document ID : 77290267-4eb7-11df-0000-08d73a341f11 Format : application/pdf Title : ALADDIN_NA user manual Creator : m.miniati Author : m.miniati Subject :EXIF Metadata provided by EXIF.tools