New Centurion Solutions NCS04010910 HANDHELD SECURITY DEVICE User Manual Project 623
New Centurion Solutions, Inc. HANDHELD SECURITY DEVICE Project 623
Contents
- 1. Users Manual
- 2. Installation Manual
- 3. Assembly Manual
Installation Manual
Elliott Tech, LLC OREP Installation Manual OREP New Centurion Solutions Project Number: 776 Reference: 776-91-07-REV-OREP_INSTALLATION_MANUAL.docx Original Document: March 1, 2011 Revision A: March 16, 2011 Prepared for: New Centurion Solutions, Inc. Greg Williams 3011 Spring Garden St. Suite E Greensboro, NC 27403 (336) 617-5410 GWilliams@newcenturionsolutions.com Prepared by: Elliott Tech, LLC 346 Raleigh Street Holly Springs, NC 27540 (919) 342-6899 (888) 631-1795 Fax s.elliott@elliotttech.com THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx Revision Page Rev Description FCC Notification Section THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx Contents 1. Equipment List ................................................................................................................................. 4 2. Installation Instructions .................................................................................................................. 6 3. FCC Notification ............................................................................................................................ 11 THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 1. 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx EQUIPMENT LIST A. OREP assembly (1) B. Hardware to attach to OREP Bracket (4) C. Solar Bracket & Hardware (1) D. Bracket Hardware (2) E. Solar Panel (1) F. G. TN-Male to N-Male Pigtail 2 ft (2) H. Lightning Surge Protector (1) I. J. Tripod Base (1) K. Hardware to attach tripod to base (3) L. Mast (1) M. Antenna 3db (1) N. Antenna Bracket (1) Mounting Base-Treated Plywood (1) Panel Hardware (2) THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx O. U-Bolt and mast attachment hardware (1) P. OREP Bracket (1) Q. U-Bolts, nuts, washers (2 sets) R. TN-Male to N-Male Pigtail 2 ft (2) S. T. 12V Battery (1) Battery Box (1) U. Battery Restraining Strap (2) THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 2. 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx INSTALLATION INSTRUCTIONS To begin, check the parts available against the equipment list, identifying any missing parts. If all parts are accounted for, proceed to the instructions below to begin installing the OREP. Step 1: Identify the Mounting Base-Treated Plywood (I). Place the plywood on the ground laying flat. Identify the Tripod Base (J), open its legs until fully extended, and center it on the plywood. Mark the points for the drill holes with a pencil and set aside the base. Drill 1/8” holes where they are marked on the plywood. Identify the Hardware to attach to OREP Bracket (B). Push the screws up through the drilled holes from the bottom of the plywood, and align the tripod base with the screws. Push the screws through the holes in the tripod base and secure with a washer and nut (from Hardware to attach to OREP Bracket (B)) on each screw. Make sure hardware is secure before proceeding to the next step. Step 2: Place Mast (L) down through the center of the Tripod Base (J). Tighten screws at the top and center of the Tripod Base (J) to secure the Mast (L). THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx Step 3: Place Antenna 3db (M) through hole in Antenna Bracket (N) and secure at base of antenna. Step 4: Identify the U-Bolt and mast attachment hardware (O). Secure the antenna-bracket assembly to the mast by sliding a u-bolt through each hole in the bracket (from previous step) and around the mast. Secure the u-bolt on the mast with two nuts (included with u-bolt). Step 5: Place the OREP assembly (A) on the OREP Bracket (P) with the legs facing away. Identify the Hardware to attach to OREP Bracket (B). Insert four screws into the OREP enclosure holes and push through the holes in the bracket. Secure the OREP to the bracket by attaching four nuts to the screws on the backside of the bracket. THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx Step 6: Note the OREP bracket has two curved half-moon shaped areas on the back of it. These areas allow the bracket to seat flushly on the mast. Identify the UBolts, nuts, washers (Q), and while holding the OREP-bracket assembly on the mast, place one u-bolt around the mast and feed through the matching holes in the OREP bracket. Secure this u-bolt with two nuts and two washers. Repeat the process for the other ubolt. Ensure both ubolts are tightened snugly. Step 7: Take TN-Male to N-Male Pigtail cable (U) and attach to OREP (A) and secure. Take open end and attach to Light Surge (H) and secure. Take open end Light Surge (H) and 2nd cable (U) and secure together. Take open end Light Surge (U) and secure to bottom of antenna (M). THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx Step 8: Take Inmate 23 4#20 Female Panel Receptacle (G) and secure to OREP as shown. Step 9: Next, place the Solar Bracket (C) approx. 8-10” below the Repeater Bracket. Make sure the bracket is securely attached with two U Bolts (D). Step 10: Now attach the accompanying part of the Solar Bracket to the part already attached to the mast. Angle it at a 45 degree angle and secure tightly. Use the pictures above to confirm proper placement. Step 11: Now attach the Solar Panel to the bracket. Confirm that the panel is angled properly and securely fastened. Use the pictures above for reference. THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. OREP Installation Manual Step 12: Take open end Receptacle (G) Attach bare wire to battery (T) negative side. Step 13: Place assembled battery (T) 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx and strip wire cover to show bare wire. White wire to positive side and black wire to inside battery box (S) Step 14: Set under middle of tripod (J) on mounting base (I) Complete OREP Assembly THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. 10 OREP Installation Manual 3. 776-91-07-REV-A_OREP_INSTALLATION_MANUAL.docx FCC NOTIFICATION NOTE: THE MANUFACTURER IS NOT RESPONSIBLE FOR ANY RADIO OR TV INTERFERENCE CAUSED BY UNAUTHORIZED MODIFICATIONS TO THIS EQUIPMENT. SUCH MODIFICATIONS COULD VOID THE USER’S AUTHORITY TO OPERATE THE EQUIPMENT. THIS DEVICE COMPLIES WITH PART 15 OF THE FCC RULES. OPERATION IS SUBJECT TO THE FOLLOWING TWO CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTERFERENCE, AND (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDESIRED OPERATION. THE INFORMATION CONTAINED HEREIN IS PROPRIETARY TO NEW CENTURION SOLUTIONS, INC. AND SHALL NOT BE REPRODUCED OR DISCLOSED IN WHOLE OR IN PART FOR ANY DESIGN OR MANUFACTURE EXCEPT WHEN SUCH USER POSSESSES DIRECT, WRITTEN AUTHORIZATION FROM NEW CENTURION SOLUTIONS, INC. 11
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : No Page Count : 11 Language : en-US Tagged PDF : Yes Title : Project 623 Author : Scott Elliott Subject : 623_SRS_Acroprint Creator : Microsoft® Office Word 2007 Create Date : 2011:03:16 12:24:40 Modify Date : 2011:03:16 12:24:40 Producer : Microsoft® Office Word 2007EXIF Metadata provided by EXIF.tools