Nokia Solutions and Networks T5CT1 Cellular CDMA base station User Manual IHET5CT1 GLI3 Manual 1 of 6
Nokia Solutions and Networks Cellular CDMA base station IHET5CT1 GLI3 Manual 1 of 6
Contents
- 1. IHET5CT1 GLI2 Manual 1 of 6
- 2. IHET5CT1 GLI2 Manual 2 of 6
- 3. IHET5CT1 GLI2 Manual 3 of 6
- 4. IHET5CT1 GLI2 Manual 4 of 6
- 5. IHET5CT1 GLI2 Manual 5 of 6
- 6. IHET5CT1 GLI2 Manual 6 of 6
- 7. IHET5CT1 GLI3 Manual 1 of 6
- 8. IHET5CT1 GLI3 Manual 4 of 6
- 9. IHET5CT1 GLI3 Manual 5 of 6
- 10. IHET5CT1 GLI3 Manual 6 of 6
IHET5CT1 GLI3 Manual 1 of 6
SCt4812ET Optimization/ATP Manual Software Release R16.1.x.x 800 and 1900 MHz CDMA English Aug 2002 68P09255A57- 2 PRELIMINARY Notice While reasonable efforts have been made to assure the accuracy of this document, Motorola, Inc. assumes no liability resulting from any inaccuracies or omissions in this document, or from use of the information obtained herein. The information in this document has been carefully checked and is believed to be entirely reliable. However, no responsibility is assumed for inaccuracies or omissions. Motorola, Inc. reserves the right to make changes to any products described herein and reserves the right to revise this document and to make changes from time to time in content hereof with no obligation to notify any person of revisions or changes. Motorola, Inc. does not assume any liability arising out of the application or use of any product, software, or circuit described herein; neither does it convey license under its patent rights or the rights of others. It is possible that this publication may contain references to, or information about Motorola products (machines and programs), programming, or services that are not announced in your country. Such references or information must not be construed to mean that Motorola intends to announce such Motorola products, programming, or services in your country. Copyrights This instruction manual, and the Motorola products described in this instruction manual may be, include or describe copyrighted Motorola material, such as computer programs stored in semiconductor memories or other media. Laws in the United States and other countries preserve for Motorola certain exclusive rights for copyrighted material, including the exclusive right to copy, reproduce in any form, distribute and make derivative works of the copyrighted material. Accordingly, any copyrighted Motorola material contained herein or in the Motorola products described in this instruction manual may not be copied, reproduced, distributed, merged or modified in any manner without the express written permission of Motorola. Furthermore, the purchase of Motorola products shall not be deemed to grant either directly or by implication, estoppel, or otherwise, any license under the copyrights, patents or patent applications of Motorola, as arises by operation of law in the sale of a product. Usage and Disclosure Restrictions License Agreement The software described in this document is the property of Motorola, Inc. It is furnished by express license agreement only and may be used only in accordance with the terms of such an agreement. Copyrighted Materials Software and documentation are copyrighted materials. Making unauthorized copies is prohibited by law. No part of the software or documentation may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language, in any form or by any means, without prior written permission of Motorola, Inc. High Risk Activities Components, units, or third-party products used in the product described herein are NOT fault-tolerant and are NOT designed, manufactured, or intended for use as on-line control equipment in the following hazardous environments requiring fail-safe controls: the operation of Nuclear Facilities, Aircraft Navigation or Aircraft Communication Systems, Air Traffic Control, Life Support, or Weapons Systems (“High Risk Activities”). Motorola and its supplier(s) specifically disclaim any expressed or implied warranty of fitness for such High Risk Activities. Trademarks and Motorola are registered trademarks of Motorola, Inc. Product and service names profiled herein are trademarks of Motorola, Inc. Other manufacturers’ products or services profiled herein may be referred to by trademarks of their respective companies. Copyright Copyright 2002 Motorola, Inc. All Rights Reserved Printed on Recyclable Paper REV012501 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE SCt4812ET Optimization/ATP Manual Table of Contents Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Table of Contents 68P09255A57-2 Contents FCC Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FCC Part 15 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FCC Part 68 Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xviii xviii xviii xix Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xx General Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxii Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxiv Chapter 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Scope of This Document . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Document Composition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDMA LMF Product Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Online Help . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Why Optimize? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . What Is Optimization? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . When to Optimize . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2 1-2 1-2 1-3 1-3 1-3 1-3 1-5 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6 Site Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Product Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6 1-6 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF Hardware Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment Warm-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optional Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 1-7 1-8 1-8 1-8 1-9 1-9 1-9 1-12 Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13 BTS Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Major Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Cabinet Internal FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15 1-16 1-17 Sector Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22 Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Internal FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25 1-26 Chapter 2 Power Up Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Prepower-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cellsite Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Equipage Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Initial Installation of Boards/Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting Frame C-CCP Shelf Configuration Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Checking for shorts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cabling Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Initial Inspection and Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AC Power Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 2-2 2-2 2-2 2-2 2-2 2-3 2-3 2-4 2-4 2-4 Aug 2002 Table of Contents 68P09255A57-2 AC Power Up Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Applying AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power Cabinet Power Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6 2-6 2-7 DC Power Pre-test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DC Power Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Cabinet Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8 2-8 2-9 Battery Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Charge Test (Connected Batteries) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Discharge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 2-11 2-12 Heat Exchanger Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 Chapter 3 Optimization/ATP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1 Basic Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optimization Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cell-site Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cell-site Data File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS System Software Download . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Equipage Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Isolate BTS from T1/E1 Spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 3-2 3-2 3-3 3-3 3-4 3-4 3-4 Configure Channel Service Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5 Alarm and Span Line Cable Pin/Signal Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm and Span Line Cable Pin/Signal Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T1/E1 Span Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Isolate BTS from T1/E1 Spans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 3-8 3-12 3-12 LMF Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preparing the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF Operating System Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDMA LMF Home Directory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Copy CBSC CDF Files to the LMF Computer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Creating a Named HyperTerminal Connection for MMI Connection . . . . . . . . . . . . . . . . . . . . . . . . . . Folder Structure Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pinging the Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Log into and out of the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 3-13 3-13 3-14 3-14 3-16 3-18 3-19 3-20 3-21 Download Files to the LMF - Site Specific BTS Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download Files to the LMF - Master-bts-cdma Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Create BTS Specific CDF File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Update BTS Specific CDF File Device Load Version and Site Type . . . . . . . . . . . . . . . . . . . . . . . . . . Update Antenna Mapping Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................................................................................... 3-22 3-22 3-25 3-25 3-26 3-26 Operating the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Basic Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logging into a BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logging Out . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Establishing an MMI Communication Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Download Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verify GLI ROM Code Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download RAM Code and Data to MGLI and GLI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download RAM Code and Data to Non-GLI Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-28 3-28 3-29 3-31 3-32 3-33 3-35 3-35 3-36 System Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-38 Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY iii Table of Contents 68P09255A57-2 Select CSM Clock Source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Enable CSMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Enable MCCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Clock Synchronization Manager System Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LFR/HSO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CSM Frequency Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Setup (GPS & LFR/HSO Verification) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPS Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LORAN-C Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-38 3-38 3-39 3-40 3-40 3-41 Calibration and Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connecting Test Equipment to the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment GPIB Address Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Supported Test Sets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Connection Charts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment Warm-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Automatic Cable Calibration Set-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manual Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set-up for TX Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set-up for Optimization/ATP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX ATP Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-49 3-49 3-49 3-49 3-50 3-51 3-53 3-53 3-53 3-55 3-59 3-65 Loss/Gain Offset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPIB Addresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Selecting Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Manually Selecting Test Equipment in a Serial Connection Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Automatically Selecting Test Equipment in a Serial Connection Tab . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Cables with a CDMA Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating TX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . Calibrating RX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . Setting Cable Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting Coupler Loss Value . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-67 3-67 3-67 3-67 3-67 3-68 3-69 3-69 3-70 3-70 3-71 3-73 3-73 3-74 Adjusting for loss . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Path Bay Level Offset Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . When to Calibrate BLOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BLO Calibration Data File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment Setup: RF Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Transmit (TX) Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Download BLO Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibration Audit Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Transmit (TX) Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Audit Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . All Cal/Audit Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Checking and Setting RFDS Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-75 3-75 3-75 3-75 3-75 3-76 3-78 3-78 3-81 3-82 3-82 3-82 3-84 3-85 3-86 3-86 3-87 iv SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 3-41 3-43 3-47 Aug 2002 Table of Contents 68P09255A57-2 RFDS TSU NAM Programming . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Explanation of Parameters Used When Programming the TSU NAM . . . . . . . . . . . . . . . . . . . . . . . . Valid NAM Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set Antenna Map Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set RFDS Configuration Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Program TSU NAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-89 3-89 3-90 3-90 3-91 3-92 3-93 3-94 Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm Reporting Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Heat Exchanger Alarm Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Door Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AC Fail Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rectifier Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Single Rectifier Failure (Three Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Multiple Rectifier Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Single Rectifier Failure (Six Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Multiple Rectifier Failure (Six Rectifier System) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Battery Over Temperature Alarm (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rectifier Over Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-96 3-96 3-96 3-97 3-97 3-97 3-98 3-98 3-98 3-99 3-99 3-100 3-102 Before Leaving the site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-103 Chapter 4 Automated Test Procedures (ATP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 ATP Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reduced ATP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ATP Test Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX/RX OUT Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CDMA 2000 Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Individual Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background: Tx Mask Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background: Rho Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background: Pilot Offset Acceptance Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background: Code Domain Power Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background: FER Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 4-2 4-2 4-3 4-4 4-4 4-4 4-5 4-6 4-6 4-8 4-8 4-9 4-10 4-11 4-11 Chapter 5 Prepare to Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1 Initializing Active Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . External Test Equipment Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reset All Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Updating BTS CAL LMF Files in the CBSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Site Span Configuration Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Set BTS Site Span Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Re-connect BTS T1 Spans and Integrated Frame Modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reestablish OMC-R Control/ Verifying T1/E1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 6 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 5-2 5-2 5-2 5-2 5-3 5-5 5-7 5-7 5-7 6-1 6-2 Table of Contents 68P09255A57-2 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Log into Cell-Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Communicate to Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Communicate to Communications Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Code Download Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Download DATA to Any Device (Card) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot ENABLE Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LPA Errors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bay Level Offset Calibration Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibration Audit Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Forward link problem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Perform Txmask Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Perform Rho or Pilot Time Offset Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cannot Perform Code Domain Power and Noise Floor Measurement . . . . . . . . . . . . . . . . . . . . . . . . Cannot Perform Carrier Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Multi-FER Test Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Problem Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Intermittent 19.6608 MHz Reference Clock/GPS Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . No GPS Reference Source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Checksum Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPS Bad RX Message Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CSM Reference Source Configuration Error . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Takes Too Long for CSM to Come INS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-CCP Backplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connector Functionality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-CCP Backplane Troubleshooting Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Digital Control Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DC Power Problems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . All tests fail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . All RX and TX paths fail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . All tests fail on a single antenna . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Module Status Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LED Status Combs All Modules (except GLI3, CSM, BBX2, MCC8/24E) . . . . . . . . . . . . . . . . . . . . . DC/DC Converter LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CSM LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GLI3 LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GLI3 Pushbuttons and Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BBX LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LPA Shelf LED Status Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Span Problems (No Control Link) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix A System Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Operation Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verification of Test Equipment Used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preliminary Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pre-Power and Initial Power Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . General Optimization Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPS Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LFR Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LPA IM Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 6-2 6-2 6-3 6-3 6-3 6-4 6-4 6-5 6-5 6-6 6-6 6-7 6-7 6-7 6-8 6-8 6-8 6-8 6-8 6-9 6-9 6-9 6-9 6-10 6-10 6-11 6-11 6-14 6-15 6-15 6-16 6-16 6-16 6-17 6-17 6-17 6-19 6-20 6-21 6-21 6-22 6-22 A-1 A-2 A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 Aug 2002 Table of Contents 68P09255A57-2 TX Bay Level Offset / Power Output Verification for 3-Sector Configurations . . . . . . . . . . . . . . . . . TX Bay Level Offset / Power Output Verification for 6-Sector Configurations . . . . . . . . . . . . . . . . . TX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-CCP Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LPAs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix B ATP Matrix Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Re-optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Usage & Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Detailed Optimization/ATP Test Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix C BBX Gain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BBX Gain Set Point . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Usage & Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix D CDMA Operating Frequency Programming . . . . . . . . . . . . . . . . . . . . . . A-10 A-15 A-17 A-17 A-18 A-19 A-20 B-1 B-2 B-2 B-2 C-1 C-2 C-2 D-1 Channel Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1900 MHz PCS Channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calculating 1900 MHz Center Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 800 MHz CDMA Channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calculating 800 MHz Center Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-2 D-2 D-2 D-3 D-4 D-5 Appendix E PN Offset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-1 PN Offset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Usage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-2 E-2 E-2 Appendix F Test Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1 Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP8921A Test Equipment Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP8921A System Connectivity Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting HP8921A and HP83236A/B GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pretest Setup for HP8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pretest Setup for HP8935 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3465 Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R3465 GPIB Address & Clock setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pretest Setup for Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4406A/E4432B Test Equipment Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Test Cable Setup using HP PCS Interface (HP83236) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Test Cable Setup using Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating HP 437 Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-2 F-2 F-2 F-6 F-6 F-7 F-7 F-7 F-10 F-10 F-11 F-12 F-16 F-19 Calibrating Gigatronics 8541C power meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-21 Appendix G Power Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-1 Calibrating Output Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Equipment Warm up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY G-2 G-2 G-2 vii Table of Contents 68P09255A57-2 Power Delta Calibration Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP8921A Power Delta Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3465 Power Delta Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP8935 Power Delta Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4406A Power Delta Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . In-Service Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-2 G-3 G-4 G-7 G-9 G-11 Appendix H Cable Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1 Intra-Cabinet Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SC 4812ET Intra-Cabinet Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-CCP Cables and Cable Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Cabinet LPA Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LPAC Cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ETIB Cables and Cable Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SPAN I/O Cable Connection Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DRDC/TRDC Cables and Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MPC Functional Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RFDS Cabling Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Alarm and Span Line Cable Pin/Signal Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RF Cabinet Parts Locator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-2 H-2 H-5 H-8 H-12 H-13 H-14 H-16 H-21 H-23 H-25 H-28 H-32 Appendix I GPIB Addressing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-1 GPIB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GPIB Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP437 Power Meter GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Gigatronics 8541C Power Meter GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Motorola CyberTest GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP8935 Test Set GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Setting HP8921A and HP83236A/B GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3465 GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RS232 GPIB Interface Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3267 Spectrum Analyzer GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3562 Signal Generator GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4406A Transmitter Tester GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4432B Signal Generator GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-2 I-2 I-2 I-3 I-4 I-4 I-6 I-7 I-8 I-8 I-9 I-11 I-12 Appendix J Downloading ROM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-1 Downloading ROM Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exception Procedure - Downloading ROM Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix K Companion Frame Optimization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optimizing the Companion Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optimizing the TX section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optimizing the RX section . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY J-2 J-2 K-1 K-2 K-2 K-3 Index-1 Aug 2002 Table of Contents 68P09255A57-2 List of Figures Figure 1-1: Null Modem Cable Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10 Figure 1-2: SC 4812ET RF Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-16 Figure 1-3: RF Cabinet Internal FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 Figure 1-4: SC 4812ET C-CCP Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-18 Figure 1-5: SC 4812ET Intercabinet I/O Detail (Rear View) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-19 Figure 1-6: SC 4812ET I/O Plate Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20 Figure 1-7: RFDS Location in an SC 4812ET RF Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-21 Figure 1-8: SC4812ET LPA Configuration with Combiners/Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-24 Figure 1-9: Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25 Figure 1-10: Power Cabinet with Batteries Installed (Doors Removed for Clarity) . . . . . . . . . . . . . . 1-26 Figure 2-1: Backplane DIP Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 Figure 2-2: AC Load Center Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5 Figure 2-3: Meter Alarm Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6 Figure 2-4: Temperature Compensation Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6 Figure 2-5: RF Cabinet Circuit Breaker Panel and 27Vdc Terminal Locations . . . . . . . . . . . . . . . . . 2-10 Figure 2-6: Heat Exchanger Blower Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 Figure 2-7: Power Cabinet Circuit Breaker Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-14 Figure 2-8: Power Cabinet AC Circuit Breakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-15 Figure 2-9: Power Cabinet DC Circuit Breakers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-16 Figure 3-1: Back and Front View of the CSU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6 Figure 3-2: 50 Pair Punch Block . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7 Figure 3-3: LMF Folder Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-18 Figure 3-4: LMF Connection Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19 Figure 3-5: BTS Ethernet LAN Interconnect Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20 Figure 3-6: CDMA LMF Computer Common MMI Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-33 Figure 3-7: CSM MMI Terminal Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-42 Figure 3-8: Cable Calibration Test Setup - CyberTest, Agilent 8935, Advantest R3465, and HP 8921A . . . 3-54 Figure 3-9: Cable Calibration Test Setup - Agilent E4406A/E4432B and Advantest R3267/R3562 3-55 Figure 3-10: TX Calibration Test Setup - CyberTest (IS-95A/B) and Agilent 8935 (IS-95A/B and CDMA2000 1X) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-56 Figure 3-11: TX Calibration Test Setup - Using Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-57 Figure 3-12: TX Calibration Test Setup - Agilent E4406A and Advantest R3567 (IS-95A/B and CDMA2000 1X) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-58 Figure 3-13: IS-95A/B Optimization/ATP Test Set-up, TRDC Shown - CyberTest and Advantest R3465 . 3-59 Figure 3-14: IS-95A/B Optimization/ATP Test Setup - HP 8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60 Figure 3-15: IS-95A/B and CDMA2000 1X Optimization/ATP Test Setup With DRDCs Agilent Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61 Figure 3-16: IS-95A/B and CDMA2000 1X Optimization/ATP Test Setup With DRDCs Advantest R3267/3562 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62 Figure 3-17: IS-95A/B and CDMA2000 1X Optimization/ATP Test Setup With TRDCs Agilent Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63 Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY ix Table of Contents 68P09255A57-2 Figure 3-18: IS-95A/B and CDMA2000 1X Optimization/ATP Test Setup With TRDCs Advantest R3267/3562 Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-64 Figure 3-19: Typical TX ATP Setup with Directional Coupler (shown with and without RFDS) . . . 3-65 Figure 3-20: Typical RX ATP Setup with Directional Coupler (shown with or without RFDS) . . . . . 3-66 Figure 3-21: Calibrating Test Equipment Setup for TX Cable Calibration (Using Signal Generator and Spectrum Analyzer) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-72 Figure 3-22: Calibrating Test Equipment Setup for RX ATP Test (Using Signal Generator and Spectrum Analyzer) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-73 Figure 3-23: Battery Over-temperature Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-101 Figure 3-24: Location of Connector J8 on the Meter Alarm Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-102 Figure 4-1: TX Mask Verification Spectrum Analyzer Display . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7 Figure 4-2: Code Domain Power and Noise Floor Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10 Figure 5-1: MGLI3/SGLI3 MMI Port Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Figure 6-1: CSM Front Panel Indicators & Monitor Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-18 Figure 6-2: GLI3 Front Panel Operating Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-20 Figure 6-3: MCC24/8E Front Panel LEDs and LED Indicators . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-22 Figure D-1: North America PCS Frequency Spectrum (CDMA Allocation) . . . . . . . . . . . . . . . . . . . . D-2 Figure D-2: North American Cellular Telephone System Frequency Spectrum (CDMA Allocation). D-4 Figure F-1: HP8921A/600 Cables Connection for 10 MHz Signal and GPIB without Rubidium . . . F-3 Figure F-2: HP8921A Cables Connection for 10 MHz Signal and GPIB with Rubidium . . . . . . . . . F-5 Figure F-3: Cable Connections for Test Set without 10 MHz Rubidium Standard . . . . . . . . . . . . . . F-8 Figure F-4: Cable Connections for Test Set with 10 MHz Rubidium Standard . . . . . . . . . . . . . . . . . F-9 Figure F-5: Agilent 10 MHz Reference Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-11 Figure F-6: Cable CalibrationUsing HP8921 with PCS Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-15 Figure F-7: Cable Calibration using Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-18 Figure F-8: Power Meter Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-19 Figure F-9: Gigatronics 8541C Power Meter Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-21 Figure G-1: Delta Calibration Setup - HP8921A to HP437B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4 Figure G-2: Delta Calibration Setup - HP8921A to HP8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-4 Figure G-3: Delta Calibration Setup - R3561L to HP437B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-6 Figure G-4: Delta Calibration Setup - R3561L to R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-7 Figure G-5: Delta Calibration Setup - HP8935 to HP437B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-8 Figure G-6: Delta Calibration Setup - HP8935 to HP8935 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-8 Figure G-7: Delta Calibration Setup - Agilent E4432B to HP437 . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-11 Figure G-8: Delta Calibration Setup - Agilent E4432B to Agilent E4406A . . . . . . . . . . . . . . . . . . . . G-11 Figure G-9: Optimization/ATP Test Setup Using RFDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-13 Figure G-10: IS-95 A/B/C Optimization/ATP Test Setup Using RFDS . . . . . . . . . . . . . . . . . . . . . . . . G-14 Figure H-1: 4812ET RF Cabinet Internal FRU Locations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-4 Figure H-2: C-CCP Shelf Cable Numbers and Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-6 Figure H-3: C-CCP Backplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-7 Figure H-4: LPAs for the SC 4812ET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-8 Figure H-5: BTS Combiner to LPA Backplane Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-9 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Table of Contents 68P09255A57-2 Figure H-6: Combiner to LPA Backplane/LPA Backplane To CIO Board Cables . . . . . . . . . . . . . . . H-10 Figure H-7: Components Located on CIO Card . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-11 Figure H-8: LPAC Interface Board Connectors and Attaching Cable Numbers . . . . . . . . . . . . . . . . H-12 Figure H-9: ETIB I/O Connectors and Attaching Cable Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-13 Figure H-10: SPAN I/O Cables and Connectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-15 Figure H-11: 3 Sector, 2 Carrier BTS Combiner DRDC/TRDC Cable Connection . . . . . . . . . . . . . . H-17 Figure H-12: BTS 2 to 1, 3 or 6 Sector Combiner DRDC/TRDC Cable Connection . . . . . . . . . . . . H-18 Figure H-13: BTS Combiner DRDC/TRDC Cable Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-19 Figure H-14: SC 4812ET BTS Combiner DRDC/TRDC Cable Connection . . . . . . . . . . . . . . . . . . . . H-20 Figure H-15: DRDC To C-CCP Cage MPC Boards Cable Connections . . . . . . . . . . . . . . . . . . . . . . H-22 Figure H-16: RFDS Component Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-23 Figure H-17: SC 4812ET BTS Combiner DRDC/TRDC RFDS Cable Connection . . . . . . . . . . . . . . H-25 Figure H-18: 50 Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-27 Figure H-19: SC 4812ET RF Cabinet Parts Locator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-32 Figure I-1: HP437 Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-2 Figure I-2: Gigatronics 8541C Power Meter Detail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-3 Figure I-3: HP8935 Test Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-5 Figure I-4: HP8921A and HP83236A/B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-7 Figure I-5: R3465 Communications Test Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-8 Figure I-6: RS232 GPIB Interface Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-8 Figure I-7: Setting Advantest R3267 GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-9 Figure I-8: Advantest R3562 GPIB Address Switch Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-10 Figure I-9: Setting Agilent E4406A GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-12 Figure I-10: Setting Agilent E4432B GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-13 Figure K-1: Cabling of SC 4812ET Companion BTS to SC 4812ET Companion BTS (3 Sector) . K-2 Figure K-2: WinLMF Display Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K-4 Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xi Table of Contents 68P09255A57-2 List of Tables xii FCC Part 68 Registered Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xix Table 1-1: CDMA LMF Test Equipment Support Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7 Table 1-2: Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-13 Table 1-3: C-CCP Shelf/Cage Card/Module Device ID Numbers (Top Shelf) . . . . . . . . . . . . . . . . . . 1-15 Table 1-4: C-CCP Shelf/Cage Card/Module Device ID Numbers (Bottom Shelf) . . . . . . . . . . . . . . 1-15 Table 1-5: BTS Sector Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22 Table 1-6: Sector Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-23 Table 2-1: Initial Installation of Boards/Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2 Table 2-2: Initial Inspection and Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 Table 2-3: AC Voltage Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4 Table 2-4: Applying AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6 Table 2-5: Power Cabinet Power Up Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7 Table 2-6: DC Power Pre-test (BTS Frame) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8 Table 2-7: RF Cabinet Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9 Table 2-8: Battery Charge Test (Connected Batteries) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11 Table 2-9: Battery Discharge Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12 Table 2-10: Heat Exchanger Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-13 Table 3-1: Pin-Out for 50-Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8 Table 3-2: T1/E1 Span Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12 Table 3-3: LMF Operating System Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13 Table 3-4: Copying CBSC CDF Files to the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15 Table 3-5: Creating a Named Hyperlink Connection for MMI Connection . . . . . . . . . . . . . . . . . . . . . 3-17 Table 3-6: LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19 Table 3-7: Pinging the Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21 Table 3-8: Logging into the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21 Table 3-9: Downloading Site Specific BTS Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22 Table 3-10: Downloading and linking master-bts-cdma directory files for device loads . . . . . . . . . 3-23 Table 3-11: Create BTS Specific CDF File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-25 Table 3-12: Update BTS Specific CDF File Device Load Version . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-26 Table 3-13: Update Antenna Mapping Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-27 Table 3-14: BTS GUI Login Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-30 Table 3-15: BTS CLI Login Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-31 Table 3-16: BTS GUI Logout Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-31 Table 3-17: BTS CLI Logout Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-32 Table 3-18: Establishing MMI Communications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-32 Table 3-19: Verify GLI ROM Code Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35 Table 3-20: Download and Enable MGLI and GLI Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35 Table 3-21: Download RAM Code and Data to Non-GLI Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36 Table 3-22: Select CSM Clock Source . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-38 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Table of Contents 68P09255A57-2 Table 3-23: Enable CSMs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-39 Table 3-24: Enable MCCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-40 Table 3-25: Test Equipment Setup (GPS & LFR/HSO Verification) . . . . . . . . . . . . . . . . . . . . . . . . . . 3-41 Table 3-26: GPS Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-43 Table 3-27: LORAN-C Initialization/Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-47 Table 3-28: IS-95A/B-only Test Equipment Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-51 Table 3-29: CDMA2000 1X/IS-95A/B Test Equipment Interconnection . . . . . . . . . . . . . . . . . . . . . . . 3-52 Table 3-30: Selecting Test Equipment Manually in a Serial Connection Tab . . . . . . . . . . . . . . . . . . . 3-68 Table 3-31: Selecting Test Equipment Using Auto-Detect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-69 Table 3-32: Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-69 Table 3-33: Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-71 Table 3-34: Calibrating TX Cables Using Signal Generator and Spectrum Analyzer . . . . . . . . . . . . 3-71 Table 3-35: Calibrating RX Cables Using a Signal Generator and Spectrum Analyzer . . . . . . . . . . 3-73 Table 3-36: Setting Cable Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-74 Table 3-37: Setting Coupler Loss Values . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-74 Table 3-38: BLO BTS.cal file Array Branch Assignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-76 Table 3-39: BTS.cal File Array (Per Sector) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-77 Table 3-40: Test Equipment Setup (RF Path Calibration) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-78 Table 3-41: BTS TX Path Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-80 Table 3-42: Download BLO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-82 Table 3-43: BTS TX Path Audit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-83 Table 3-44: All Cal/Audit Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-85 Table 3-45: Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-86 Table 3-46: RFDS Parameter Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-87 Table 3-47: Definition of Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-89 Table 3-48: Valid NAM Field Ranges . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-90 Table 3-49: Set Antenna Map Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-91 Table 3-50: Set RFDS Configuration Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-91 Table 3-51: RFDS TSIC Calibration Channel Frequencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-93 Table 3-52: RFDS Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-94 Table 3-53: Program NAM Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-95 Table 3-54: Heat Exchanger Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-97 Table 3-55: Door Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-97 Table 3-56: AC Fail Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-97 Table 3-57: Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-98 Table 3-58: Single Rectifier Fail or Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-98 Table 3-59: Multiple Rectifier Failure or Major Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-98 Table 3-60: Single Rectifier Fail or Minor Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-99 Table 3-61: Multiple Rectifier Failure or Major Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-99 Table 3-62: Battery Over Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-100 Table 3-63: Rectifier Over Temperature Alarm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-102 Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xiii Table of Contents xiv 68P09255A57-2 Table 3-64: Check Before Leaving the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-103 Table 4-1: ATP Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6 Table 4-2: Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-11 Table 5-1: External Test Equipment Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 Table 5-2: Copy Files from LMF to a Diskette . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 Table 5-3: Copy CAL Files From Diskette to the CBSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 Table 5-4: BTS Span Parameter Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 Table 5-5: Set BTS Span Parameter Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 Table 5-6: T1/E1 Span/IFM Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 Table 5-7: Terminate the LMF Session and Remove the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 Table 6-1: Login Failure Troubleshooting Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 Table 6-2: Troubleshooting a Power Meter Communication Failure . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 Table 6-3: Troubleshooting a Communications Analyzer Communication Failure . . . . . . . . . . . . . . 6-3 Table 6-4: Troubleshooting Code Download Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3 Table 6-5: Troubleshooting Data Download Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 Table 6-6: Troubleshooting Device Enable (INS) Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4 Table 6-7: LPA Errors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5 Table 6-8: Troubleshooting BLO Calibration Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5 Table 6-9: Troubleshooting Calibration Audit Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6 Table 6-10: Troubleshooting Forward Link Failure (BTS Passed Reduced ATP) . . . . . . . . . . . . . . . 6-6 Table 6-11: Troubleshooting TX Mask Measurement Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7 Table 6-12: Troubleshooting Rho and Pilot Time Offset Measurement Failure . . . . . . . . . . . . . . . . . 6-7 Table 6-13: Troubleshooting Code Domain Power and Noise Floor Measurement Failure . . . . . . . 6-7 Table 6-14: Troubleshooting Carrier Measurement Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 Table 6-15: Troubleshooting Multi-FER Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8 Table 6-16: No GLI3 Control via LMF (all GLI3s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-11 Table 6-17: No GLI3 Control through Span Line Connection (Both GLI3s) . . . . . . . . . . . . . . . . . . . . 6-12 Table 6-18: MGLI3 Control Good - No Control over Co-located GLI3 . . . . . . . . . . . . . . . . . . . . . . . 6-12 Table 6-19: MGLI3 Control Good - No Control over AMR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12 Table 6-20: MGLI3 Control Good - No Control over Co-located GLI3s . . . . . . . . . . . . . . . . . . . . . . 6-12 Table 6-21: BBX Control Good - No (or Missing) Span Line Traffic . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 Table 6-22: No MCC-1X/MCC24E/MCC8E Channel Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13 Table 6-23: No DC Input Voltage to Power Supply Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14 Table 6-24: No DC Input Voltage to any C-CCP Shelf Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14 Table 6-25: No DC Input Voltage to any C-CCP Shelf Module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 Table 6-26: RFDS Fault Isolation - All tests fail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-15 Table 6-27: RFDS Fault Isolation - All RX and TX paths fail . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-16 Table 6-28: RFDS Fault Isolation - All tests fail on single antenna path . . . . . . . . . . . . . . . . . . . . . . 6-16 Table 6-29: Troubleshooting Control Link Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-23 Table A-1: Verification of Test Equipment Used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Table A-2: Site Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Table of Contents 68P09255A57-2 Table A-3: Preliminary Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4 Table A3a: Pre-power Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 Table A3b: Pre-power Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-6 Table A-4: GPS Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-7 Table A-5: LFR Receiver Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8 Table A-6: LPA IM Reduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9 Table A-7: TX BLO Calibration (3-Sector: 1-Carrier, 2-Carrier and 4-Carrier Non-adjacent Channels) . . A-10 Table A-8: TX Bay Level Offset Calibration (3-Sector: 2-Carrier Adjacent Channels) . . . . . . . . . . A-11 Table A-9: TX Bay Level Offset Calibration (3-Sector: 3 or 4-Carrier Adjacent Channels) . . . . . . A-12 Table A-10: TX BLO Calibration (6-Sector: 1-Carrier, 2-Carrier Non-adjacent Channels) . . . . . . A-15 Table A-11: TX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17 Table A-12: RX Antenna VSWR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-17 Table A-13: CDI Alarm Input Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-18 Table B-1: SC 4812ET BTS Optimization and ATP Test Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-3 Table C-1: BBX Gain Set Point vs. Actual BTS Output (in dBm) . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2 Table D-1: 1900 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-3 Table D-2: 800 MHz TX and RX Frequency vs. Channel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-5 Table E-1: PnMaskI and PnMaskQ Values for PilotPn . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E-3 Table F-1: HP8921A/600 Communications Test Set Rear Panel Connections Without Rubidium . F-2 Table F-2: HP8921A/600 Communications Test Set Rear Panel Connections With Rubidium . . . F-4 Table F-3: System Connectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-6 Table F-4: Setting HP8921A GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-6 Table F-5: Pretest Setup for HP8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-7 Table F-6: Pretest Setup for HP8935 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-7 Table F-7: Advantest R3465 GPIB Address and Clock Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-10 Table F-8: Pretest Setup for Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-10 Table F-9: Calibrating Test Cable Setup (using the HP PCS Interface) . . . . . . . . . . . . . . . . . . . . . . . F-12 Table F-10: Procedure for Calibrating Test Cable Setup Using Advantest R3465 . . . . . . . . . . . . . . F-16 Table F-11: Power Meter Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-19 Table F-12: Calibrate Gigatronics 8541C Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-21 Table G-1: HP8921A Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-3 Table G-2: Advantest Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-5 Table G-3: HP8935 Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-7 Table G-4: Agilent E4406A Power Delta Calibration Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-9 Table G-5: In-Service Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-15 Table H-1: SC4812ET RF CABINET INTER-CONNECT CABLES . . . . . . . . . . . . . . . . . . . . . . . . . . H-2 Table H-2: SC 4812ET Series 3-Sector Duplexed Directional Coupler to RFDS Cabling Table . . . H-23 Table H-3: SC 4812ET Series 6-Sector Duplexed Directional Coupler to RFDS Cabling Table . . . H-24 Table H-4: Pin-Out for 50-Pair Punchblock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-28 Table I-1: Verify and/or Change HP437 Power Meter GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . I-2 Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xv Table of Contents xvi 68P09255A57-2 Table I-2: Verify and/or Change Gigatronics 8541C Power Meter GPIB Address . . . . . . . . . . . . . . I-3 Table I-3: Verify and/or Change Motorola CyberTest GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . I-4 Table I-4: Verify and/or Change HP8935 GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-4 Table I-5: Verify and/or Change HP8921A and HP83236A GPIB Addresses . . . . . . . . . . . . . . . . . . I-6 Table I-6: Verify and/or Change Advantest R3465 GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . I-7 Table I-7: Verify and Change Advantest R3267 GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-9 Table I-8: Verify and Change Agilent E4406A GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-11 Table I-9: Verify and Change Agilent E4432B GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-12 Table J-1: Download ROM and RAM Code to Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-3 Table K-1: Optimizing the TX section of the Companion Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K-2 Table K-2: Optimizing the RX (Main) section of the Companion Frame . . . . . . . . . . . . . . . . . . . . . . . K-3 Table K-3: Optimizing the RX (Diversity) on a Single Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K-3 Table K-4: Optimizing the RX (Diversity) on a Two Frame Companion Site . . . . . . . . . . . . . . . . . . . K-3 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 FCC Requirements FCC Requirements Content This section presents Federal Communications Commission (FCC) Rules Parts 15 and 68 requirements and compliance information for the SC4812T/ET/ET Lite series Radio Frequency Base Transceiver Stations. FCC Part 15 Requirements Part 15.19a(3) - INFORMATION TO USER NOTE This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: 1. This device may not cause harmful interference, and 2. This device must accept any interference received, including interference that may cause undesired operation. Part 15.21 - INFORMATION TO USER CAUTION Changes or modifications not expressly approved by Motorola could void your authority to operate the equipment. 15.105(b) - INFORMATION TO USER NOTE This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment OFF and ON, the user is encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xvii FCC Requirements 68P09255A57-2 FCC Part 68 Requirements This equipment complies with Part 68 of the Federal Communications Commission (FCC) Rules. A label on the GLI3 board, easily visible with the board removed, contains the FCC Registration Number for this equipment. If requested, this information must be provided to the telephone company. FCC Part 68 Registered Devices Device FCC Part 68 ID Group Line Interface (GLI3) See Note US: IHEXDNANGLI3-1X Cisco Model 1900-27 Router US: 5B1DDNDN0006 ADC KENTROX Model 537 US: F81USA-31217-DE-N NOTE The BTS equipment is always equipped with the GLI3, < US: IHEXDNANGLI3-1X>, and may be used in conjunction with one or both of the listed registered CSU devices, or another registered CSU device not listed above. The telephone company may make changes in its facilities, equipment, operations, or procedures that could affect the operation of your T1. If this happens, the telephone company will provide advance notice so that you can modify your equipment as required to maintain uninterrupted service. If this equipment causes harm to the telephone network, the telephone company will notify you in advance that temporary discontinuance of service may be required. If advance notice is not practical, the telephone company will notify you as soon as possible. Also, you will be advised of your right to file a complaint with the FCC if you believe it is necessary. If you experience trouble operating this equipment with the T1, please contact: Global Customer Network Resolution Center (CNRC) 1501 W. Shure Drive, 3436N Arlington Heights, Illinois 60004 Phone Number: (847) 632-5390 for repair and/or warranty information. You should not attempt to repair this equipment yourself. This equipment contains no customer or user-serviceable parts. Changes or modifications not expressly approved by Motorola could void your authority to operate this equipment. xviii SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Foreword 68P09255A57-2 Foreword Scope of manual This manual is intended for use by cellular telephone system craftspersons in the day-to-day operation of Motorola cellular system equipment and ancillary devices. This manual is not intended to replace the system and equipment training offered by Motorola, although it can be used to supplement or enhance the knowledge gained through such training. Obtaining Manuals To view, download, order manuals (original or revised), visit the Motorola Lifecycles Customer web page at http://services.motorola.com, or contact your Motorola account representative. If Motorola changes the content of a manual after the original printing date, Motorola publishes a new version with the same part number but a different revision character. Text conventions The following special paragraphs are used in this manual to point out information that must be read. This information may be set-off from the surrounding text, but is always preceded by a bold title in capital letters. The three categories of these special paragraphs are: NOTE Presents additional, helpful, non-critical information that you can use. Bold-text notes indicate information to help you avoid an undesirable situation or provides additional information to help you understand a topic or concept. CAUTION Presents information to identify a situation in which equipment damage could occur, thus avoiding damage to equipment. WARNING Presents information to warn you of a potentially hazardous situation in which there is a possibility of personal injury. The following typographical conventions are used for the presentation of software information: In text, sans serif BOLDFACE CAPITAL characters (a type style without angular strokes: i.e., SERIF versus SANS SERIF) are used to name a command. In text, typewriter style characters represent prompts and the system output as displayed on an operator terminal or printer. In command definitions, sans serif boldface characters represent those parts of the command string that must be entered exactly as shown and typewriter style characters represent command output responses as displayed on an operator terminal or printer. In the command format of the command definition, typewriter style characters represent the command parameters. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xix Foreword 68P09255A57-2 Reporting manual errors To report a documentation error, call the CNRC (Customer Network Resolution Center) and provide the following information to enable CNRC to open an MR (Modification Request): - the document type - the manual title, part number, and revision character - the page number(s) with the error - a detailed description of the error and if possible the proposed solution Motorola appreciates feedback from the users of our manuals. Contact us Send questions and comments regarding user documentation to the email address below: cdma.documentation@motorola.com Motorola appreciates feedback from the users of our information. Manual banner definitions A banner (oversized text on the bottom of the page, for example, PRELIMINARY) indicates that some information contained in the manual is not yet approved for general customer use. 24-hour support service If you have problems regarding the operation of your equipment, please contact the Customer Network Resolution Center for immediate assistance. The 24 hour telephone numbers are: NA CNRC EMEA CNRC ASPAC CNRC Japan & Korea CNRC LAC CNRC +1-800-433-5202 +44- (0) 1793-565444 +86-10-88417733 +81-3-5463-3550 +51-1-212-4020 For further CNRC contact information, contact your Motorola account representative. xx SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 General Safety 68P09255A57-2 General Safety Remember! . . . Safety depends on you!! The following general safety precautions must be observed during all phases of operation, service, and repair of the equipment described in this manual. Failure to comply with these precautions or with specific warnings elsewhere in this manual violates safety standards of design, manufacture, and intended use of the equipment. Motorola, Inc. assumes no liability for the customer’s failure to comply with these requirements. The safety precautions listed below represent warnings of certain dangers of which we are aware. You, as the user of this product, should follow these warnings and all other safety precautions necessary for the safe operation of the equipment in your operating environment. Ground the instrument To minimize shock hazard, the equipment chassis and enclosure must be connected to an electrical ground. If the equipment is supplied with a three-conductor ac power cable, the power cable must be either plugged into an approved three-contact electrical outlet or used with a three-contact to two-contact adapter. The three-contact to two-contact adapter must have the grounding wire (green) firmly connected to an electrical ground (safety ground) at the power outlet. The power jack and mating plug of the power cable must meet International Electrotechnical Commission (IEC) safety standards. NOTE Refer to Grounding Guideline for Cellular Radio Installations 68P81150E62. Do not operate in an explosive atmosphere Do not operate the equipment in the presence of flammable gases or fumes. Operation of any electrical equipment in such an environment constitutes a definite safety hazard. Keep away from live circuits Operating personnel must: not remove equipment covers. Only Factory Authorized Service Personnel or other qualified maintenance personnel may remove equipment covers for internal subassembly, or component replacement, or any internal adjustment. not replace components with power cable connected. Under certain conditions, dangerous voltages may exist even with the power cable removed. always disconnect power and discharge circuits before touching them. Do not service or adjust alone Do not attempt internal service or adjustment, unless another person, capable of rendering first aid and resuscitation, is present. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xxi General Safety 68P09255A57-2 Use caution when exposing or handling the CRT Breakage of the Cathode-Ray Tube (CRT) causes a high-velocity scattering of glass fragments (implosion). To prevent CRT implosion, avoid rough handling or jarring of the equipment. The CRT should be handled only by qualified maintenance personnel, using approved safety mask and gloves. Do not substitute parts or modify equipment Because of the danger of introducing additional hazards, do not install substitute parts or perform any unauthorized modification of equipment. Contact Motorola Warranty and Repair for service and repair to ensure that safety features are maintained. Dangerous procedure warnings Warnings, such as the example below, precede potentially dangerous procedures throughout this manual. Instructions contained in the warnings must be followed. You should also employ all other safety precautions that you deem necessary for the operation of the equipment in your operating environment. WARNING xxii Dangerous voltages, capable of causing death, are present in this equipment. Use extreme caution when handling, testing, and adjusting. SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Revision History 68P09255A57-2 Revision History Manual Number 68P09255A57- 2 Manual Title SC4812ET Optimization/ATP Manual Software Release R16.1.x.x Version Information The following table lists the manual version, date of version, and remarks on the version. Revision bars printed in page margins (as shown to the side) identify material which has changed from the previous release of this publication. Version Level Date of Issue Mar 2002 Preliminary manual submitted for engineering markup Jul 2002 LMF software updates. Preliminary manual submitted for DV&V evaluation Aug 2002 Remarks SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY xxiii 1 Chapter 1 Introduction Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-1 Introduction 68P09255A57-2 Introduction Scope of This Document This document provides information pertaining to the optimization and audit tests of Motorola SC 4812ET Base Transceiver Subsystem (BTS) equipment frames equipped with trunked high-power Linear Power Amplifiers (LPAs) and their associated internal and external interfaces. Also covered is software release 2.16.1.X and can support the following versions of SC 4812ET BTS sites: - 1X Packet Backhaul BTS - 1X Circuit BTS - 1X Packet backhaul BTS The 1X packet BTS has a packet backhaul network interface which provided via a pair of external routers together with a GLI upgrade (GLI3) that can handle voice (IS-95A/B, 1X) and data (IS-95B, 1X). This BTS equipment is configured with all 1X cards (BBX-1X andMCC1X) or a mix of 1X cards and non-1X cards (BBX2 and MCC8E/24E). This configuration is compliant with all applicable cdma2000 1X specifications. It provides the forward link and reverse link RF functions to support 2G features and 3G-1X features (i.e., high capacity voice & high bit rate data). The 1X circuit BTS has a split backhaul (circuit/packet pipe) network interface that can handle circuit based voice (IS-95A/B, 1X) and data (IS-95B) as well as packet based data (1X). This document assumes the following prerequisites: The BTS frames and cabling have been installed per the BTS Hardware Installation Manual which covers the physical “bolt down” of all SC series equipment frames, and the specific cabling configurations. Document Composition This document covers the following major areas: Introduction, consisting of preliminary background information (such as component and subassembly locations and frame layouts) to be considered by the Cell Site Field Engineer (CFE) before optimization or tests are performed. Preliminary Operations, consisting of cabinet power up and power down procedures. Optimization/calibration, covering topics of Local Maintenance Facility (LMF) connection to the BTS equipment, Global Positioning System (GPS) Verification, test equipment setup, downloading all BTS processor boards, RF path verification, Bay Level Offset (BLO) calibration and calibration audit, and Radio Frequency Diagnostic System (RFDS) calibration. Acceptance Test Procedures (ATPs), consisting of ATP tests executed by the LMF and used to verify all major transmit (TX) and receive (RX) performance characteristics on all BTS equipment. Preparing to leave the site, presents instructions on how to properly exit customer site, ensure that all equipment is operating properly, and all work is complete according to Motorola guidelines. 1-2 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Introduction 68P09255A57-2 Basic troubleshooting, consisting of procedures for installation, calibration, transmit and receive tests, backplane problems, GPS failures, and module connectors. Appendices contain pertinent Pseudorandom Noise (PN) Offset, frequency programming, output power data tables, data sheets that are filled out manually by the CFE at the site, an optimization/ATP test matrix, BBX gain set point information, CDMA operating frequency information, PN Offset programminginformation, information on test equipment preparation, manual cable calibration procedures, power Delta calibration procedures, RF cabinet interconnect cable information, procedures for checking changing GPIB addresses, and proceduress for downloading ROM Code from the LMF. CDMA LMF Product Description The Code Division Multiple Access (CDMA) LMF is a graphical user interface (GUI) based LMF. This product is specifically designed to provide cellular communications field personnel the vehicle to support the following CDMA BTS operations: Installation Maintenance Calibration Optimization The LMF also provides Command Line Interface (CLI) capability. Activate the CLI by clicking on a shortcut icon on the desktop. The CLI cannot be launched from the GUI, only from the desktop icon. Online Help Task oriented online help is available in the LMF by clicking on Help from the menu bar. Why Optimize? Proper optimization and calibration assures: Accurate downlink RF power levels are transmitted from the site. Accurate uplink signal strength determinations are made by the site. What Is Optimization? Optimization compensates for the site-specific cabling and normal equipment variations. Cables that interconnect the BTS and Duplexer assemblies (if used), for example, are cut and installed at the time of the BTS frame installation at the site. Site optimization guarantees that the combined losses of the new cables and the gain/loss characteristics and built-in tolerances of each BTS frame do not accumulate, causing improper site operation. Optimization identifies the accumulated loss (or gain) for all receive and transmit paths at the BTS site, and stores that value in a database. The RX path starts at the ancillary equipment frame RFDS RX directional coupler antenna feedline port, through the RX input port Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-3 Introduction 68P09255A57-2 on the rear of the frame, through the DDRCs, Multicoupler Preselector Card (MPC), and additional splitter circuitry, ending at a CDMA Channel Processor (C-CCP) backplane Broad Band Transceiver (BBX) slot in the C-CCP shelf. A transmit path starts at the BBX, through the C-CCP backplane slot, travels through the LPA/Combiner TX Filter and ends at the rear of the input/output (I/O) Panel. If the RFDS option is added, then the TX path continues and ends at the top of the RFDS TX directional coupler antenna feedline port installed in the ancillary equipment frame. 1-4 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Introduction 68P09255A57-2 These values are factored in by the BTS equipment internally, leaving only site specific antenna feed line loss and antenna gain characteristics to be factored in by the CFE when determining site Effective Radiated Power (ERP) output power requirements. Each C-CCP shelf BBX board is optimized to a specific RX and TX antenna port. (One BBX board acts in a redundant capacity for BBXs 1-12, and is optimized to all antenna ports). A single value is generated for each path, thereby eliminating the accumulation of error that would occur from individually measuring and summing the gain and loss of each element in the path. When to Optimize New Installations After the initial site installation, the BTS must be prepared for operation. This preparation includes verifying hardware installation, initial power up, and GPS verification. Basic alarm tests are also addressed. A calibration audit of all RF transmit paths is performed to verify factory calibration. A series of ATP CDMA verification tests are covered using the actual equipment set up. An ATP is also required before the site can be placed in service. Site Expansion Optimization is also required after expansion of a site. Periodic Optimization Periodic optimization of a site may also be required, depending on the requirements of the overall system. Repaired Sites Verify repair(s) made to the BTS by consulting an Optimization/ATP Test Matrix table. This table outlines the specific tests that must be performed anytime a BTS subassembly or RF cable associated with it is replaced. NOTE Aug 2002 Refer to Appendix B for detailed basic guideline tables and detailed Optimization/ATP Test Matrix. SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-5 Documentation 68P09255A57-2 Documentation Site Documents The following documents are required to perform optimization of the cell site equipment: Site document (generated by Motorola systems engineering), which includes: - General site information - Floor plans - Power levels - Site PN - Site paging and traffic channel allocation - Board placement - Site wiring lists - Cell-site Data Files (CDF) Demarcation Document (Scope of Work Agreement) Equipment manuals for non-Motorola test equipment. Product Documentation For other information, refer to the following manuals: CDMA LMF Operator’s Guide; 68P64114A78 CDMA RFDS Hardware Installation manual; 68P64113A93 CDMA RFDS User’s Guide Equipment Manuals for non-Motorola test equipment SC4812ET Field Replacable Units Guide Motorola part number 68P09253A48 SC 4812ET RF & Power Cabinet Hardware Installation Manual Motorola part number 68P09253A94 LMF CLI Commands R16.X Motorola part number 68P09253A56 1-6 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Test Equipment 68P09255A57-2 Test Equipment Overview The LMF is used in conjunction with Motorola recommended test equipment, and it is a part of a “calibrated test set.” To ensure consistent, reliable, and repeatable optimization test results, only recommended test equipment supported by the LMF must be used to optimize the BTS equipment. Table 1-1 outlines the supported test equipment that meets the technical criteria required for BTS optimization. Table 1-1: CDMA LMF Test Equipment Support Table Item Description Hewlett Packard, model HP 8921A Cellular communications analyzer (includes 83203B CDMA interface option) Agilent E4406A Analyzer with Agilent E4432B Generator Used for both IS-95A/B and CDMA 2000 testings Advantest R3267 Analyzer with Advantest R3562 Generator Used for both IS-95A/B and CDMA 2000 testings Hewlett Packard, model HP 83236A PCS interface for PCS band Hewlett Packard, model HP 8935 Cellular communications analyzer Motorola CyberTest Cellular communications analyzer Advantest R3465 with 3561 CDMA option Cellular communications analyzer Gigatronix 8541C Power meter HP437B Power meter To ensure consistent, reliable, and repeatable optimization test results, test equipment meeting the following technical criteria should be used to optimize the BTS equipment. You can, of course, substitute test equipment with other test equipment models supported by the LMF meeting the same technical specifications. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-7 Test Equipment 68P09255A57-2 LMF Hardware Requirements An LMF computer platform that meets the following requirements (or better) is recommended: Notebook computer 266 MHz (32-bit CPU) Pentium processor 4 GB internal hard disk drive Color display with 1024 x 768 pixel resolution and capability to display more than 256 colors Memory requirements: - Minimum required RAM: 96 MB - Recommended RAM: - 128 MB for Windows 98 SE - 256 MB for Windows 2000 CD ROM drive and 3 1/2 inch floppy drive 56 kbps V.90Modem Serial port (COM 1) Parallel port (LPT 1) PCMCIA Ethernet interface card (for example, 3COM Etherlink III) with a 10Base-T-to-coax adapter Windows 98SE operating system or Windows 2000 operating system NOTE If 800 x 600 pixel resolution is used, the LMF window must be maximized after it is displayed. Test Equipment Guidelines To ensure consistent, reliable, and repeatable optimization test results, test equipment meeting the following technical criteria should be used to optimize the BTS equipment. You can, of course, substitute test equipment with other test equipment models supported by the LMF meeting the same technical specifications. NOTE During manual testing, you can substitute test equipment with other test equipment models not supported by the LMF, but those models must meet the same technical specifications. The customer has the responsibility of accounting for any measurement variances and/or additional losses/inaccuracies that can be introduced as a result of these substitutions. Before beginning optimization or troubleshooting, make sure that the test equipment needed is on hand and operating properly. Test Equipment Calibration Optimum system performance and capacity depend on regular equipment service, calibration, and characterization prior to BTS optimization. Follow the original equipment manufacturer (OEM) recommended maintenance and calibration schedules closely. 1-8 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Test Equipment 68P09255A57-2 Test Cable Calibration Equipment test cables are very important in optimization. Motorola recommends that the cable calibration be run at every BTS with the test cables attached. This method compensates for test cable insertion loss within the test equipment itself. No other allowance for test cable insertion loss needs to be made during the performance of tests. Another method is to account for the loss by entering it into the LMF during the optimization procedure. This method requires accurate test cable characterization in a shop. The cable should be tagged with the characterization information prior to field optimization. Equipment Warm-up After arriving at the a site, the test equipment should be plugged in and turned on to allow warm up and stabilization to occur for as long as possible. The following pieces of test equipment must be warmed-up for a minimum of 60 minutes prior to using for BTS optimization or RFDS calibration procedures. Communications test set Rubidium time base Power meter Test Equipment List The following pieces of test equipment are required during the optimization procedure. Common assorted tools like screwdrivers and frame keys are not listed but are still required. Read the owner’s manual on all of the following major pieces of test equipment to understand their individual operation prior to use in optimization. NOTE Always refer to specific OEM test equipment documentation for detailed operating instructions. 10BaseT/10Base2 Converter Ethernet LAN transceiver (part of CGDSLMFCPQ1700) PCMCIA Ethernet Adpater + Ethernet UTP adapter: 3COM model Etherlink III 3C589B Transition Engineering model E-CX-TBT-03 10BaseT/10Base2 converter NOTE Xircom model PE3-10B2 or equivalent can also be used to interface the LMF Ethernet connection to the frame. RS-232 to GPIB Interface National Instruments GPIB-232-CT with Motorola CGDSEDN04X RS232 serial null modem cable (see Figure 1-1) or equivalent; used to interface the LMF to the test equipment. Standard RS-232 cable can be used with the following modifications: Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-9 Test Equipment 68P09255A57-2 - This solution passes only the three minimum electrical connections between the LMF and the GPIB interface. The control signals are jumpered as enabled on both ends of the RS-232 cable (9-pin D). TX and RX signals are crossed as null modem effect. Pin 5 is the ground reference. - Short pins 7 and 8 together, and short pins 1, 4, and 6 together on each connector. Figure 1-1: Null Modem Cable Detail 9-PIN D-FEMALE GND RX TX RTS CTS RSD/DCD DTR DSR 9-PIN D-FEMALE ON BOTH CONNECTORS SHORT PINS 7, 8; SHORT PINS 1, 4, & 6 GND TX RX RTS CTS RSD/DCD DTR DSR FW00362 Model SLN2006A MMI Interface Kit Motorola Model TRN9666A null modem board. Connectors on opposite sides of the board must be used as this performs a null modem transformation between cables. This board can used for 10-pin to 8-pin, 25-pin to 25-pin and 10-pin to 10-pin conversions. Motorola 30-09786R01 MMI cable or equivalent ; used to interface the LMF serial port connection to GLI3, CSM and LPA debug serial ports. 25 pin D to 25 pin D serial cable from PC to null modem board. Communications System Analyzer The communication system analyzer is used during optimization and testing of the RF communications portion of BTS equipment and provides the following functions: (1) Frequency counter (2) RF power meter (average and code domain) (3) RF Signal generator (capable of CDMA modulation) (4) Spectrum analyzer (5) CDMA code domain analyzer The following types of communication system analyzers are currently supported by the LMF: HP8921A/600 Analyzer - Including 83203B CDMA Interface, manual control system card, and 83236A/B PCS Interface for 1900 MHz BTSs. Advantest R3465 Analyzer - Including R3561L test source unit Advantest R3267 Analyzer - Including R3562 test source unit Agilent E4406A Analyzer - including E4432 test source unit HP8935 Analyzer CyberTest Communication Analyzer GPIB Cables Hewlett Packard 10833A or equivalent; 1 to 2 meters (3 to 6 feet) long used to interconnect test equipment and LMF terminal. 1-10 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Test Equipment 68P09255A57-2 Power Meter One of the following power meters is required for TX calibration and audit if an HP8921A or Advantest R3465 analyzer is used: Hewlett Packard Model HP HP437B with HP8481A power sensor Gigatronix model 8541C with model 80601A power sensor Timing Reference Cables Two BNC-male to BNC-male RG316 cables; 3 meters (10 ft.) long, used to interconnect the HP8921A/600 or Advantest R3465 communications analyzer to the CSM front panel timing references in the BTS. NOTE Two Huber & Suhner 16MCX/11BNC/K02252D or equivalent; right angle MCX-male to standard BNC-male RG316 cables; 3m long are required to interconnect the HP8921A/600 communications analyzer to SGLN4132A and SGLN1145A CSM board timing references. BNC “T” adapter with 50 ohm termination. NOTE This BNC “T” adapter (with 50 ohm termination) is required to connect between the HP 8921A/600 (or Advantest R3465) EVEN SECOND/SYNC IN and the BNC cable. The BNC cable leads to the 2-second clock connection on the TIB. Erroneous test results may occur if the “T” adapter with the 50 ohm termination is not connected. Digital Multimeter Fluke model 8062A with Y8134 test lead kit or equivalent; used for precision DC and AC measurements, requiring 4-1/2 digits. Directional Coupler Narda model 30661 30 dB (Motorola part no. 58D09732W01) coupler terminated with two Narda Model 375BN-M loads, or equivalent. RF Attenuators 20 dB fixed attenuators, 20 W (Narda 768-20); used with test cable calibrations or during general troubleshooting procedures. Narda Model 30445 30 dB (Motorola Part No. 58D09643T01) coupler terminated with two Narda Model 375BN-M loads, or equivalent. Miscellaneous RF Adapters, Loads, etc As required to interface test cables and BTS equipment and for various test set ups. Should include at least two 50 Ohm loads (type N) for calibration and one RF short, two N-type female-to-female adapters. High-impedance Conductive Wrist Strap Motorola model 42-80385A59; used to prevent damage from Electrostatic Discharge (ESD) when handling or working with modules. RF Load (at least three for trunked cabinets) 100 W non-radiating RF load; used (as required) to provide dummy RF loading during BTS transmit tests. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-11 Test Equipment 68P09255A57-2 RF Network Box (and calibrated cables) Motorola model SGLN5531A 18:3 Passive Antenna Interface used to interface test equipment to the BTS receive and transmit antenna inputs during optimization/ATP or general troubleshooting procedures. Optional Equipment Frequency Counter Stanford Research Systems SR620 or equivalent. If direct measurement of the 3 MHz or 19.6608 MHz references is required. Spectrum Analyzer Spectrum Analyzer (HP8594E with CDMA personality card) or equivalent; required for tests other than standard Receive band spectral purity and TX LPA IM reduction verification tests performed by the LMF. Local Area Network (LAN) Tester Model NETcat 800 LAN troubleshooter (or equivalent); used to supplement LAN tests using the ohm meter. Span Line (T1/E1) Verification Equipment As required for local application RF Test Cable (if not Provided with Test Equipment) Motorola model TKN8231A; used to connect test equipment to the BTS transmitter output during optimization or during general troubleshooting procedures. Oscilloscope Tektronics model 2445 or equivalent; for waveform viewing, timing, and measurements or during general troubleshooting procedure. 2-way Splitter Mini-Circuits model ZFSC-2-2500 or equivalent; provide the diversity receive input to the BTS High Stability 10 MHz Rubidium Standard Stanford Research Systems SR625 or equivalent. Required for CSM and Low Frequency Receiver/High Stability Oscillator (LFR/HSO) frequency verification. 1-12 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 Abbreviations and Acronyms 68P09255A57-2 Abbreviations and Acronyms Table 1-2: Abbreviations and Acronyms Acronym ACLC ASU AMR ATP BBX BLO BTS CBSC C-CCP CCD cdf CDMA CE CHI CLI CIO CMR CSM CSU DBPF DBM DLM DMAC DRDC DSP EMPC FRU FSI FWTIC GFCI GLI 2 GPS GUI HSO IFM I&Q ISB Aug 2002 Definition AC Load Center Antenna Selection Unit Alarm Monitor Reporting Acceptance Test Plan Broadband Transceiver Bay Level Offset Base Transceiver Subsystem Centralized Base Station Controller Combined CDMA Channel Processor CDMA Clock Distribution command data file Code Division Multiple Access Channel Element Concentration Highway Interface Command Line Interface Combiner Input/Output Cellular Manual Revision Clock Synchronization Manager Clock Synchronization Unit Dual Bandpass Filter Debug Monitor Download Manager Digital Metering and Alarm Control (also see MAP) Duplexer/RX Filter/Directional Coupler Digital Signal Processor Expansion Multicoupler Preselector Card Field Replaceable Unit Frame Status Indicator Fixed Wireless Terminal Interface Card Ground Fault Connection Interrupt Group Line Interface II Global Positioning System Graphical User Interface High Stability Oscillator Integrated Frame Modem Interphase and Quadrature InterShelf Bus . . . continued on next page SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-13 Abbreviations and Acronyms 68P09255A57-2 Table 1-2: Abbreviations and Acronyms Acronym LAPD LFR LMF LORAN LPA MAP MCC MGLI MM MMI MPC oos OMCR PC PDA PN QPSK RFDS RGPS RSSI SCAP TCH TCP TMPC TSIC TSI 1-14 Definition Link Access Protocol “D” LORAN-C Frequency Receiver Local Maintenance Facility LOng RAnge Navigational Linear Power Amplifier Meter Alarm Panel (also refered to as DMAC) Multi-Channel CDMA Master Group Line Interface Mobility Manager Man Machine Interface Multicoupler Preselector Card Out-of-Service Operations Maintenance Center - Radio Personal Communication System Personal Communication System Controller Pseudo-random Noise Quadrature Phase Shift Keyed Radio Frequency Diagnostic Subsystem Remote Global Positioning System Received Signal Strength Indicator Super Cell Application Protocol Traffic Channel Traffic Channel Traffic Channel Traffic Channel Time Slot Interchanger SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 BTS Overview 68P09255A57-2 BTS Overview The SC 4812ET BTS consists of an RF Cabinet that is an outdoor, weatherized version of the SC 4812T. The RF cabinet is powered by 27 Vdc and each cabinet has the capability to support up to 4 carriers (at 3 sector) or 2 carriers (at 6 sector). The RF Cabinet houses the fan modules, C-CCP, LPA modules, LPA trunking backplane, Bandpass 2:1 & 4:1 Combiners, Duplexer/Receive Filter/Directional Couplers (DRDC) and a DC Power distribution assembly. The Power Cabinet (PC) provides +27 Vdc distribution and battery backup for the SC 4812ET. The Power Cabinet houses batteries, battery heaters, rectifiers, an AC Load Center (ACLC), a power distribution assembly, and two duplexed GFCI convenience outlets. C-CCP Shelf Card/Module Device ID Numbers All cards/modules/boards in the frames at a single site, assigned to a single BTS number, are also identified with unique Device ID numbers dependent upon the Frame ID number in which they are located. Refer to Table 1-3 and Table 1-4 for specific C-CCP Shelf Device ID numbers. Table 1-3: C-CCP Shelf/Cage Card/Module Device ID Numbers (Top Shelf) Frame Card/Module ID Number (Left to Right) Power Power Power AMR GLI3 (PS-1) (PS-2) (PS-3) -1 -1 MCC BBX BBX -R MPC/ EMPC -1 R1 101 101 101 101 102 103 104 105 106 101 102 103 104 105 106 R101 201 201 201 201 202 203 204 205 206 201 202 203 204 205 206 R201 301 301 301 301 302 303 304 305 306 301 302 303 304 305 306 R301 Table 1-4: C-CCP Shelf/Cage Card/Module Device ID Numbers (Bottom Shelf) Frame Card/Module ID Number (Left to Right) HSO/ CSM CSM CCD CCD LFR -1 -2 AMR GLI3-2 MCC 10 11 12 10 MPC/ EMPC -2 12 101 101 102 102 102 107 108 109 110 111 112 107 108 109 110 111 112 201 201 202 202 102 207 208 209 210 211 212 207 208 209 210 211 212 301 301 302 302 102 307 308 309 310 311 312 307 308 309 310 311 312 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 11 SW Aug 2002 BBX 1-15 BTS Overview 68P09255A57-2 Major Components The major components that make up the Motorola SC 4812ET are illustrated in this section: the RF Cabinet (see Figure 1-2) and the Power Cabinet (see Figure 1-9). Figure 1-2: SC 4812ET RF Cabinet RF I/O Area Cover Plate Main Door Rear Conduit Panel LPA Door (Can only be opened after Main Door is open) Rear DC Conduit Panel Rear I/O Door FW00189 1-16 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 BTS Overview 68P09255A57-2 RF Cabinet Internal FRUs Figure 1-3 shows the location of the Internal Field Replaceable Units (FRUs). A brief description of each Internal FRU is found in the following paragraphs. Figure 1-3: RF Cabinet Internal FRUs EBA ETIB CCP Fans RFDS C-CCP Shelf 5 RU Rack Space Combiner Cage OPTIONAL AREA DC Power Dist. Punch Block (back) Circuit Breaker Panel DRDC LPA Trunking Backplane LPAs FW00163 Duplexer/RX Filter Directional Coupler The DRDC combines, in a single module, the functions of antenna duplexing, receive band pass filtering, and surge protection (see Figure 1-7). Combiner Cage (2:1, 4:1, or Band pass Filter) The Combiner Cage holds the transmit band pass filters, 2:1 combiners, or 4:1 combiners, depending on system configuration. Aug 2002 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-17 BTS Overview 68P09255A57-2 Combined CDMA Channel Processor Shelf The C-CCP shelf contains the following (see Figure 1-4): High Stability Oscillator (HSO) or Low Frequency Receiver (LFR) card (1) Clock Synchronization Manager (CSM) cards (2) CDMA Clock Distribution (CCD) cards (2) Power Supply cards (2 minimum, 3 maximum) Multicoupler Preselector Cards (MPC) or Expansion Multicoupler Preselector Cards (EMPC) (2) Alarm Monitoring and Reporting (AMR) cards (2) Multi Channel CDMA (MCC8E, MCC24E or MCC-1X) cards (up to 12) Broadband Transceiver (BBX2 or BBX-1X) cards (up to 13) Combined Input/Output (CIO) card (1) Group Line Interface (GLI3) cards (2) BBX Switch card (1) Modem (optional) Filler Panels (as required) Fan Module (3) Figure 1-4: SC 4812ET C-CCP Shelf SC 4812ET RF Cabinet ETIB EBA MPC/EMPC-1 5 RU RACK SPACE MPC/EMPC-2 Switch BBX2-12 BBX2-1 1 BBX2-10 BBX2-9 BBX2-8 BBX2-7 MCC24-12 MCC24-1 1 MCC24-10 MCC24-9 MCC24-8 MCC24-7 GLI3 AMR MODEM CCD CSM CSM HSO/LFR CCD CIO BBX2-6 BBX2-R BBX2-5 BBX2-4 BBX2-3 BBX2-2 BBX2-1 MCC24-6 MCC24-5 MCC24-4 MCC24-3 MCC24-2 GLI3 MCC24-1 AMR Power Supply Power Supply Power Supply 19 mm Filter Panel RFDS NOTE: MCCs may be MCC8Es, MCC24Es or MCC-1Xs. BBXs may be BBX2s or BBX-1Xs. REF FW00304 Punch Block The Punch Block is the interface point of the RF Cabinet between the T1/E1 span lines, the Customer I/O, alarms, multi-cabinet timing (RGPS and HSO), and Pilot Beacon control (optional). (see Figure 1-6). 1-18 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002 BTS Overview 68P09255A57-2 Span I/O Board The Span I/O Board provides the interface for the span lines from the CSU to the C-CCP backplane (see Figure 1-6). RF Diagnostic Subsystem The RFDS provides the capability for remotely monitoring the status of the SC 4812ET RF Transmit and Receive paths (Figure 1-7). Heat Exchanger The Heat Exchanger provides cooling to the internal compartment of the RF Cabinet. The fan speed of the heat exchangers adjusts automatically with temperature. The Heat Exchanger is located in the primary front door of the RF Cabinet. SC 4812ET Interface Board (ETIB) & LPA Control Brd (LPAC) The ETIB is an interconnect board showing status LEDs for the RF Cabinet, as well as providing secondary surge protection. The LPAC board provides the interface for the LPA connection. SC 4812ET Trunking Backplane The Trunking Backplane contains a complex passive RF network that allows RF signals to share the resources of a bank of four LPAs. It also provides DC Power and digital interconnect. Figure 1-5: SC 4812ET Intercabinet I/O Detail (Rear View) RF CABINET (Rear View) Exp. Punch Block RF Expansion Punch Block Microwave 27V RF GPS RFDS Expansion 1-3 Sector Antennas 27V Ret LAN 4-6 Sector Antennas 2 Sec Tick RF CABINET (Rear Door closed) 19 MHz Clock FW00147 Ground Cable Lugs Expansion 1 Expansion 2 Aug 2002 DC Conduit RGPS RFGPS Pilot Beacon Span/Alarm SPAN I/O SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY 1-19 BTS Overview 68P09255A57-2 Figure 1-6: SC 4812ET I/O Plate Diagram 20 Pair Punchblock (RGPS) 1A 2A 3A 1B 2B 3B 4A 5A 6A 4B 5B 6B 50 Pair Punch Block (Alarms/Spans) RGD/RGPS 2A 3A 1B Power Input +27V Microwave RF Expansion Ports 1A RGD Board RF GPS 2B LAN 3B IN OUT Remote ASU 4A 5A 6A 4B 5B 6B 19 MHz Spans Modem Alams Antenna’s Power Input 27V Ret 2 Sec GND Lugs FW00171 1-20 SC4812ET Optimization/ATP Manual Software Release R16.1.x.x PRELIMINARY Aug 2002
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No Modify Date : 2002:11:01 17:08:57-05:00 Create Date : 2002:11:01 17:08:39-05:00 Producer : Acrobat Distiller 4.05 for Windows Page Count : 46EXIF Metadata provided by EXIF.tools