Nokia Solutions and Networks T5EJ1 1X SC480 BTS Microcell Base Station Transmitter User Manual print instructions
Nokia Solutions and Networks 1X SC480 BTS Microcell Base Station Transmitter print instructions
Contents
- 1. User Manual Part 1
- 2. User Manual Part 2
- 3. User Manual Part 3
- 4. User Manual Part 4
User Manual Part 4
Basic Troubleshooting 11 Overview The information in this chapter addresses some of the scenarios likely to be encountered by Customer Field Engineering (CFE) team members while performing BTS optimization and acceptance testing. This troubleshooting guide was created as an interim reference document for use in the field. It provides “what to do if” basic troubleshooting suggestions when the BTS equipment does not perform according to the procedures documented in the manual. Comments are consolidated from inputs provided by CFEs and information gained from experience in Motorola labs and classrooms. Table 11-1: Login Failure Troubleshooting Procedures Step Action If the GLI LED is solid RED, it implies a hardware failure. Reset GLI by re-seating it. If this persists, install GLI card in GLI slot and retry. A Red LED may also indicate no termination on an external LAN connector (power entry compartment at rear of frame). Verify that the span line is disconnected at the Span I/O card. If the span is still connected, verify the CBSC has disabled the BTS. Try to ‘ping’ the GLI. Verify the LMF is connected to the primary LAN (LAN A) at the LAN shelf below the CCP2 cage. If LAN A is not the active LAN, force a LAN switch to LAN A by following the procedure in Table 11-2. Verify the LMF was configured properly. If a Xircom parallel BNC LAN interface is being used, verify the BTS-LMF cable is RG-58 (flexible black cable less than 2.5 feet in length). Verify the external LAN connectors are properly terminated (power entry compartment at rear of frame). Verify a T-adapter is not used on LMF computer side connector when connected to the primary LAN at the LAN shelf. Try connecting to the Ethernet Out port in the power entry compartment (rear of frame). Use a TRB–to–BNC (triax–to–coax) adapter at the LAN connector for this connection. 10 Re-boot the LMF and retry. 11 Re-seat the GLI and retry 12 Verify GLI IP addresses are configured properly by following the procedure in Table 11-3. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY 11-1 11 Basic Troubleshooting – continued Table 11-2: Force Ethernet LAN A to Active State as Primary LAN Step Action If LAN A is not the active LAN, make certain all external LAN connectors are either terminated with 50Ω loads or cabled to another frame. If it has not already been done, connect the LMF computer to the stand–alone or starter frame, as applicable (Table 6-6). If it has not already been done, start a GUI LMF session and log into the BTS on the active LAN (Table 6-7). Remove the 50Ω termination from the LAN B IN connector in the power entry compartment at the rear of the stand–alone or starter frame. The LMF session will become inactive. Disconnect the LMF computer from the LAN shelf LAN B connector and connect it to the LAN A connector. If the LAN was successfully forced to an active state (the cards in any cage can be selected and statused), proceed to step 13. With the 50Ω termination still removed from the LAN B IN connector, remove the 50Ω termination from LAN B OUT connector. If more than one frame is connected to the LAN, remove the termination from the last frame in the chain. If the LAN was successfully forced to an active state (the cards in any cage can be selected and statused), proceed to step 13. With the 50Ω terminations still removed from LAN B, unseat each GLI card in each frame connected to the LAN, until all are disconnected from the shelf backplanes. 10 Reseat each GLI card until all are reconnected. 11 Allow the GLIs to power up, and attempt to select and status cards in the CCP shelves. If LAN A is active, proceed to step 13. 12 If LAN A is still not active, troubleshoot or continue troubleshooting following the procedures in 13. 13 Replace the 50Ω terminations removed from the LAN B IN and OUT connectors. 11-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Basic Troubleshooting – continued 11 Table 11-3: GLI IP Address Setting Step Action If it has not previously been done, establish an MMI communication session with the GLI card as described in Table 6-11. Enter the following command to display the IP address and subnet mask settings for the card: config lg0 current A response similar to the following will be displayed: GLI3>config lg0 current lg0: IP address is set to DEFAULT (configured based on card location) lg0: netmask is set to DEFAULT (255.255.255.128) If the IP address setting response shows an IP address rather than “Default (configured based on card location),” enter the following: config lg0 ip default A response similar to the following will be displayed: GLI3>config lg0 ip default _param_config_lg0_ip(): param_delete(): 0x00050001 lg0: ip address set to DEFAULT If the GLI subnet mask setting does not display as “DEFAULT (255.255.255.128),” set it to default by entering the following command: config lg0 netmask default A response similar to the following will be displayed: GLI3>config lg0 netmask default _param_config_lg0_netmask(): param_delete(): 0x00050001 lg0: netmask set to DEFAULT table continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY 11-3 11 Basic Troubleshooting – continued Table 11-3: GLI IP Address Setting Step Action Set the GLI route default to default by entering the following command: config route default default A response similar to the following will be displayed: GLI3>config route default default _esh_config_route_default(): param_delete(): 0x00050001 route: default gateway set to DEFAULT NOTE Changes to the settings will not take effect unless the GLI is reset. When changes are completed, close the MMI session, and reset the GLI card. Once the GLI is reset, re–establish MMI communication with it and issue the following command to confirm its IP address and subnet mask settings: config lg0 current A response similar to the following will be displayed: GLI3>config lg0 current lg0: IP address is set to DEFAULT (configured based on card location) lg0: netmask is set to DEFAULT (255.255.255.128) 11-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Basic Troubleshooting – continued 11 Cannot Communicate with Power Meter Table 11-4: Troubleshooting a Power Meter Communication Failure Step Action Verify power meter is connected to LMF with GPIB adapter. Verify cable connections as specified in Chapter 4. Verify the GPIB address of the power meter is set to the same value displayed in the applicable GPIB address box of the LMF Options window Test Equipment tab. Refer to Table 6-23 or Table 6-24 and the Setting GPIB Addresses section of Appendix B for details. Verify the GPIB adapter DIP switch settings are correct. Refer to Test Equipment Preparation section of Appendix F for details. Verify the GPIB adapter is not locked up. Under normal conditions, only 2 green LEDs must be ‘ON’ (Power and Ready). If any other LED is continuously ‘ON’, then cycle GPIB box power and retry. Verify the LMF computer COM1 port is not used by another application; for example, if a HyperTerminal window is open for MMI, close it. Reset all test equipment by clicking Util in the BTS menu bar and selecting Test Equipment > Reset from the pull–down lists. Cannot Communicate with Communications System Analyzer Table 11-5: Troubleshooting a Communications System Analyzer Communication Failure Step Action Verify analyzer is connected to LMF with GPIB adapter. Verify cable connections as specified in Chapter 4. Verify the analyzer GPIB address is set to the same value displayed in the applicable GPIB address box of the LMF Options window Test Equipment tab. Refer to Table 6-23 or Table 6-24 and the Setting GPIB Addresses section of Appendix B for details. Verify the GPIB adapter DIP switch settings are correct. Refer to Test Equipment Preparation section of Appendix F for details. Verify the GPIB adapter is not locked up. Under normal conditions, only 2 green LEDs must be ‘ON’ (Power and Ready). If any other LED is continuously ‘ON’, then cycle GPIB box power and retry. Verify the LMF computer COM1 port is not used by another application; for example, if a HyperTerminal window is open for MMI, close it. Reset all test equipment by clicking Util in the BTS menu bar and selecting Test Equipment > Reset from the pull–down lists. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY 11-5 11 Basic Troubleshooting – continued Cannot Communicate with Signal Generator Table 11-6: Troubleshooting a Signal Generator Communication Failure Step Action Verify signal generator is connected to LMF with GPIB adapter. Verify cable connections as specified in Chapter 4. Verify the signal generator GPIB address is set to the same value displayed in the applicable GPIB address box of the LMF Options window Test Equipment tab. Refer to Table 6-23 or Table 6-24 and the Setting GPIB Addresses section of Appendix B for details. Verify the GPIB adapter DIP switch settings are correct. Refer to Test Equipment Preparation section of Appendix F for details. Verify the GPIB adapter is not locked up. Under normal conditions, only 2 green LEDs must be ‘ON’ (Power and Ready). If any other LED is continuously ‘ON’, then cycle GPIB box power and retry. Verify the LMF computer COM1 port is not used by another application; for example, if a HyperTerminal window is open for MMI, close it. Reset all test equipment by clicking Util in the BTS menu bar and selecting Test Equipment > Reset from the pull–down lists. Cannot Download Table 11-7: Troubleshooting Code Download Failure Step Action Verify T1 or E1 span is disconnected from the BTS. Verify LMF can communicate with the BTS devices using the LMF Status function. Communication with GLI must first be established before trying to communicate with any other BTS device. GLI must be INS_ACT state (bright green). Verify the target card is physically present in the cage and powered-up. If the target card LED is solid RED, it implies hardware failure. Reset card by re-seating it. If LED alarm persists, replace with same type of card from another slot and retry. Re-seat card and try again. If a BBX reports a failure message and is OOS_RAM, the code load was OK. Use the LMF Status function to verify the load. If the download portion completes and the reset portion fails, reset the device by selecting the device and Reset. table continued on next page 11-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Basic Troubleshooting – continued 11 Table 11-7: Troubleshooting Code Download Failure Step Action If a BBX or an MCC remains OOS_ROM (blue) after code download, use the LMF Device > Status function to verify that the code load was accepted. 10 If the code load was accepted, use LMF Device > Download > Flash to load RAM code into flash memory. Cannot Download DATA to Any Device (Card) Table 11-8: Troubleshooting Data Download Failure Step Action Re-seat card and repeat code and data load procedure. Verify the ROM and RAM code loads are of the same release by statusing the card. Refer to Download the BTS section of Chapter 6 for more information. Cannot ENABLE Device Before a device can be enabled (placed in service), it must be in the OOS_RAM state (yellow in LMF display) with data downloaded to the device. The color of the device on the LMF changes to green once it is enabled. The four device states that can be displayed by the LMF are: Enabled (bright green, INS_ACT) Stand–by (olive green, INS_SBY – redundant CSM and GLI only) Disabled (yellow, OOS_RAM) Reset (blue, OOS_ROM) Table 11-9: Troubleshooting Device Enable (INS) Failure Step Action Re-seat card and repeat code and data load procedure. If CSA cannot be enabled, verify the CDF has correct latitude and longitude data for cell site location and GPS sync. Ensure primary CSM is in INS_ACT (bright green) state. NOTE MCCs will not enable without the CSA being INS. Verify 19.6608 MHz CSA clock is present; MCCs will not enable without it. table continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY 11-7 11 Basic Troubleshooting – continued Table 11-9: Troubleshooting Device Enable (INS) Failure Step Action BBXs should not be enabled for ATP tests. If MCCs give “invalid or no system time,” verify the CSA is enabled. Log out of the BTS, exit the LMF, restart the application, log into the BTS, and re–attempt device–enable actions. cCLPA Errors Table 11-10: cCLPA Errors Step Action If cCLPAs give continuous alarms, cycle power with the applicable DC PDA circuit breakers. Establish an MMI session with the cCLPA (Table 6-11), connecting the cable to the applicable MMI port. 2a – Type alarms at the HyperTerminal window prompt and press Enter. –– The resulting display may provide an indication of the problem. 2b – Call Field Support for further assistance. 11-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 A Appendix A: MCC–Data Only Appendix Content MCC–DO Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO Code Domain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO TX Mask . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO Pilot Time Offset . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO Rho . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MCC–DO Packet Error Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PER Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-1 A-1 A-1 A-1 A-1 A-4 A-6 A-8 A-9 A-9 A Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 MCC–DO Tests MCC–DO Testing IMPORTANT The tests in this appendix are provided for information only. The tests contained herein are not proven, and recommended equipment and equipment setup is not provided. The following acceptance tests evaluate different performance aspects of the BTS with MCC–DO. This allows the CFE to select testing to meet the specific requirements for individual maintenance and performance verification situations. The WinLMF must be version 2.16.4.0.04 or higher (with FR8000 – EV–DO manual ATP test support). Prerequisites Before attempting to run any performance verification ATP tests, all procedures outlined in previous Optimization chapters should have been successfully completed. At a minimum, successful completion of all BTS BLO calibration, and Bay Level Offset tests is recommended. Test Equipment Listed below are the recommended test equipment required to test MCC–DO. Signal Generator: S Agilent E4432B, with options UN8/(008 for upgrade) and 201/(251 for upgrade) S E4430BK–404 – CDMA2000–1xEV–DO signal studio software OR S Agilent E4438C, with options UN8/(008 for upgrade) and 201/(251 for upgrade) S E4438CK–404 – CDMA2000–1xEV–DO signal studio software Spectrum Analyzer: S Agilent E4406A), with option B78 and Firmware version A.04.21 S E4406AU–204 – 1xEV–DO measurement personality MCC–DO Code Domain The code domain power test verifies the noise floor of a carrier keyed up at a specific frequency per the CDF file. Code domain power is the power in each code channel of a CDMA Channel. The CDMA time reference used in the code domain power test is derived from the Pilot Channel and is used as the reference for demodulation of all other code channels. This test verifies that orthogonality is maintained between the code channels. When transmit diversity is enabled, this test also verifies that time alignment is also maintained. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-1 A MCC–DO Tests – continued Follow the procedure in Table A-1 to test the MCC–DO Code Domain Power. Table A-1: Procedure to Test MCC–DO Code Domain Power Step Action Click the BBX(s) on DO carrier to be tested. On the menu, click the EvDO Tests > TX>Start Manual Tx ATP. Select the appropriate carrier from the Sector/Carrier list. Click the OK button. A status report window is displayed. Test tesults are displayed in the window. Connect an MMI cable to the MCC–DO card. Open a HyperTerminal application. Open the COM to the MCC–DO MMI. Set parameters as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None When the login prompt appears, enter login mmi. 10 When MMI> appears, type in the following command: set_scwhere: S is the modem on MCC–DO card to be tested S is the sector number of the appropriate BBX (according to carrier selected in LMF) S is the appropriate channel (according to carrier selected in LMF) in the hexadecimal format 0xHHHH or NNNN format (normal decimal) S is set to 0 (zero) 11 Enable the modem on MCC–DO card by entering the following command: enable where: S is the modem selected in step 10. table continued on next page A-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-1: Procedure to Test MCC–DO Code Domain Power Step 12 Action To generate a pattern, enter the following command: fl_pattern 3 13 On the Agilent E4406, set the Code Domain: Press Measure button Press More button until Code Domain option is displayed Select Code Domain Press Meas Setup button, then press Meas Interval, enter 3. Press Meas Control button, then press Measure to set it to Cont Press Meas Control button Set Channel Type to MAC Press More button until Trig Source option is displayed Press Trig Source key and select Ext Rear option Press More button until Advanced option is displayed Select Advanced option If Chip Rate option is set to a value different than 1.228800, select Chip Rate and set it to 1.228800 S Select Active Set Th option to a value calculated using the following formula: – xcvr_gain – cable_loss – 2dB S Press Display button and set the I/Q Combined Power Bar to On S Press Display button, press Code Order button, select Hadamard option S To set appropriate frequency value, press Frequency and enter the value calculated according to the following formula: – + 0.05* [MHz] 14 Read the value of the power for each MAC channel. 15 Note the Max Inactive Ch value. The Max Inactive Ch value is –31dB or lower. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-3 A MCC–DO Tests – continued MCC–DO TX Mask Follow the procedure in Table A-2 to test the MCC–DO TX Mask. Table A-2:Procedure to Test the MCC–DO TX Mask Step Action Click the BBX(s) on DO carrier to be tested. On the menu, click the EvDO Tests > TX>Start Manual Tx ATP. Select the appropriate carrier from the Sector/Carrier list. Click the OK button. A status report window is displayed. Connect test equipment as the instructions are displayed. Connect an MMI cable to the MCC–DO card. Open a HyperTerminal application. Open the COM to the MCC–DO MMI. Set parameters as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None When the login prompt appears, enter login mmi. 10 When MMI> appears, type in the following command: set_sc where: S is the modem on MCC–DO card to be tested S is the sector number of the appropriate BBX (according to carrier selected in LMF) S is the appropriate channel (according to carrier selected in LMF) in the hexadecimal format 0xHHHH or NNNN format (normal decimal). S is set to 0 (zero) 11 Enable the modem on MCC–DO card by entering the following command: enable where: S is the modem selected in step 10. table continued on next page A-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-2:Procedure to Test the MCC–DO TX Mask Step 12 Action To generate a pattern, enter the following command: fl_pattern 3 13 On Agilent E4406, set Spectrum (Freq Domain) measurement as follows: 14 Press More button until Spectrum (Freq Domain) option is displayed Select Spectrum option Press SPAN key to set its value to 4 [MHz] To set the frequency value. press Frequency and enter the value calculated as follows: – + 0.05* [MHz] Use the formula from step 13 to calculate the four frequencies to measure the Power. 15 Press Measure button check_point_1 = freq – 750 [kHz] check_point_2 = freq + 750[kHz] check_point_3 = freq – 1980 [kHz] check_point_4 = freq + 1980 [kHz] Press MARKER key: Select 1, 2, 3, or 4 (frequency points) Check_point_1 > –40 dBm Press FUNCTION key and select Off option Press TRACE key and select Spectrum option Press NORMAL key Use the numeric keypad to enter the calculated frequency, assigning the proper unit. Note the Power value of marker Repeat step for all calculated frequency checkpoints The check point values are as follows: Check_point_2 > –40 dBm Check_point_3 > –60 dBm Check_ point_4 > –60 dBm MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-5 A MCC–DO Tests – continued MCC–DO Pilot Time Offset The pilot time offset test verifies the transmitted pilot channel element pilot time offset of a carrier keyed up at a specific frequency per the CDF file. The calibrated communications test set measures the pilot time offset in microseconds, verifying that the result is within 3 microseconds (10 microseconds for JCDMA systems) of the target pilot time offset (zero microseconds). Pilot time is defined as the estimate of CDMA System Time derived from observation of the pilot signal at the base station RF output port. Pilot time alignment error is the difference between the measured pilot time and the expected time, taking into account CDMA System Time and pilot offset. Follow the procedure in Table A-3 to test the MCC–DO Pilot Time Offset. Table A-3: Procedure to Test MCC–DO Pilot Time Offset Step Action Click the BBX(s) on DO carrier to be tested. On the menu, click the EvDO Tests > TX>Start Manual Tx ATP. Select the appropriate carrier from the Sector/Carrier list. Click the OK button. A status report window is displayed. Test results are displayed in the window. Connect an MMI cable to the MCC–DO card. Open a HyperTerminal application. Open the COM to the MCC–DO MMI. Set parameters as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None When the login prompt appears, enter login mmi. table continued on next page A-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-3: Procedure to Test MCC–DO Pilot Time Offset Step Action When MMI> appears, type in the following command: set_sc where: S is the modem on MCC–DO card to be tested S is the sector number of the appropriate BBX (according to carrier selected in LMF) S is the appropriate channel (according to carrier selected in LMF) in the hexadecimal format 0xHHHH or NNNN format (normal decimal). S is set to 0 (zero) 10 Enable the modem on MCC–DO card by entering the following command: enable where: S is the modem selected in step 10. 11 To generate a pattern, enter the following command: fl_pattern 3 12 On the Agilent E4406, set the Mod Accuracy (composite Rho) measurement: Press Measure button Press More button until Mod Accuracy (composite Rho) option is displayed Select Mod Accuracy (composite Rho) Press Meas Setup button Press More button until Trig Source option is displayed Press Trig Source key and select Ext Rear option Press More button until Advanced option is displayed Select Advanced option If Chip Rate option is set to a value different than 1.228800, select Chip Rate and set it to 1.228800 S Select Active Set Th option to a value calculated using the following formula: – xcvr_gain – cable_loss – 2dB S To set appropriate frequency value, press Frequency and enter the value calculated according to the following formula: – + 0.05* [MHz] 13 Read the value of thePilot Offset. The Pilot Offset is less than 3 microseconds MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-7 A MCC–DO Tests – continued MCC–DO Rho The Rho test verifies the transmitted pilot channel element digital waveform quality of the carrier keyed up at a specific frequency per the CDF file. Waveform quality is measured by determining the normalized correlated power between the actual waveform and the ideal waveform. Follow the procedure in Table A-4 to test the MCC–DO Rho. Table A-4: Procedure to Test MCC–DO Rho Step Action Click the BBX(s) on DO carrier to be tested. On the menu, click the EvDO Tests > TX>Start Manual Tx ATP. Select the appropriate carrier from the Sector/Carrier list. Click the OK button. A status report window is displayed. Test results are displayed in the window. Connect an MMI cable to the MCC–DO card. Open a HyperTerminal application. Open the COM to the MCC–DO MMI. Set parameters as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None When the login prompt appears, enter login mmi. When MMI> appears, type in the following command: set_sc where: S is the modem on MCC–DO card to be tested S is the sector number of the appropriate BBX (according to carrier selected in LMF) S is the appropriate channel (according to carrier selected in LMF) in the hexadecimal format 0xHHHH or NNNN format (normal decimal). S is set to 0 (zero) table continued on next page A-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-4: Procedure to Test MCC–DO Rho Step 10 Action Enable the modem on MCC–DO card by entering the following command: enable where: S is the modem selected in step 10. 11 To generate a pattern, enter the following command: fl_pattern 3 12 On the Agilent E4406, set the Mod Accuracy (composite Rho) measurement: Press Measure button Press More button until Mod Accuracy (composite Rho) option is displayed Select Mod Accuracy (composite Rho) Press Meas Setup button Press More button until Trig Source option is displayed Press Trig Source key and select Ext Rear option Press More button until Advanced option is displayed Select Advanced option If Chip Rate option is set to a value different than 1.228800, select Chip Rate and set it to 1.228800 S Select Active Set Th option to a value calculated using the following formula: – xcvr_gain – cable_loss – 2dB S To set appropriate frequency value, press Frequency and enter the value calculated according to the following formula: – + 0.05* [MHz] 13 Read the value of the Rho. Rho normalized cross coefficient ( ò ) is greater than 0.912 MCC–DO Packet Error Rate The PER test verifies PER (Packet Error Rate) of traffic channels of an XCVR carrier keyed up at a specific frequency per the current CDF file. The XCVR is keyed to generate a CDMA carrier (with pilot channel element only) of the correct level. The calibrated communications test set measures the all zero long code and verifies that the PER is not greater than 1 percent. A total number of packets to be received is dependent on Rate Set chosen. PER Prerequisites To perform the following test, the Agilent E4432B Signal Generator must have the following installed: MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-9 A MCC–DO Tests – continued S Agilent Signal Studio – 1xEV Reverse Link” (requires installation of ”Agilent IO Libraries” application) S Agilent E4432B Signal Generator with option 404 Follow the procedure in Table A-5 to test the MCC–DO Packet Error Rate. Table A-5: Procedure to Test MCC–DO Packet Error Rate Step Action Click the BBX(s) on DO carrier to be tested. On the menu, click the EvDO Tests > TX>Start Manual Tx ATP. Select the appropriate carrier from the Sector/Carrier list. Click the OK button. A status report window is displayed. Test results are displayed in the window. Connect the lap top computer to the Agilent E4432B Signal Generator and run the Agilent Signal Studio – 1x EV Reverse Link application. table continued on next page A-10 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-5: Procedure to Test MCC–DO Packet Error Rate Step Action Enter the following parameters for signal generation. Channel Configuration: RRI Channel – checked RRI Bits – 1 DRC Channel – checked Rel. gain (dB) – 3 ACK Channel – checked Rel. gain (dB) – 0 Data Channel – checked Rel. gain (dB) – 3.75 Data Channel encoder active – checked Data Channel Data rate – 9.6 kbps Data Channel bit stream – PN15 I Mask – 3FF80000000 Q Mask – 3FF00000001 Signal Generation: S Oversampling ratio – 4 S Filter Type – IS 95 Std S Mirror Spectrum – unchecked ESG Configuration: S Frequency – calculated according to the formula: + 0,05 * [MHz] Amplitude – depending on attenuation applied – overall signal value should be –122 [dBm] Sampling rate 4.1952 [MHz] Reconstruction filter 2.5 [MHz] RF Blanking – unchecked Internal Reference + Mkrs Press Time Slot Setup button and set the following parameters: ACK Channel S Active – All On S Data – 0s DRC Channel S Active – All On S Data – F (1111) S Cover – 1 Press DOWNLOAD button on the ”Agilent Signal Studio – 1xEV Reverse Link” application. table continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-11 A MCC–DO Tests – continued Table A-5: Procedure to Test MCC–DO Packet Error Rate Step Action Connect an MMI cable to the MCC–DO card. 10 Open a HyperTerminal application. 11 Open the COM to the MCC–DO MMI. Set parameters as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None 12 When the login prompt appears, enter login mmi. 13 When MMI> appears, type in the following command: set_sc where: S is the modem on MCC–DO card to be tested S is the sector number of the appropriate BBX (according to carrier selected in LMF) S is the appropriate channel (according to carrier selected in LMF) in the hexadecimal format 0xHHHH or NNNN format (normal decimal). S is set to 0 (zero) table continued on next page A-12 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY MCC–DO Tests – continued Table A-5: Procedure to Test MCC–DO Packet Error Rate Step 14 Action Enter the command to receive the PER measurements results: rl_test 1 60 dflt dflt dflt dflt dflt dflt dflt dflt dflt dflt dflt dflt dflt dflt this will set the MCC–DO to measure the PER with following parameters: Perform PER Test at 9.6 KBPS Duration 60 seconds DataOffsetNominal dflt=0dB DataOffset9k6 dflt=0dB DataOffset19k2 dflt=0dB DataOffset38k4 dflt=0dB DataOffset76k8 dflt=0dB DataOffset153k6 dflt=0dB MacIndex dflt=5 FrameOffset dflt=0 DRCGating dflt=0 Continuous transmission DRCLength dflt = 0 DRCCover dflt = 1 UATI dflt = 0x1234ABCD AckChannelGain dflt=0dB DRCChannelGain dflt=3dB 15 Read the results (after 1 minute) and calculate the PER value from the MCC–DO mmi result screen: Compute PER using the outcome of the rl_test PER = (expect–total+invalid) /expect Example output: Reverse Link Test has completed Reverse Link Test OK MODEM#1 pattern = 1 (9.6 kbps) expect = xxx total = xxx invalid = xxx 16 Receiver sensitivity is below –121.2 dBm at a signal rate of 9.6 kbps. Read the value of the PER. PER is less than 0.01 (1%) MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY A-13 A MCC–DO Tests – continued Notes A-14 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY Appendix B: Test Equipment Preparation Appendix Content MAY 2004 Test Equipment Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent R7495A Test Equipment Setup . . . . . . . . . . . . . . . . . . . . . . . . B-1 B-1 B-2 Verifying and Setting GPIB Addresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4406A Transmitter Tester GPIB Address . . . . . . . . . . . . . . . . Agilent E4432B Signal Generator GPIB Address . . . . . . . . . . . . . . . . . Advantest R3267 Spectrum Analyzer GPIB Address . . . . . . . . . . . . . . Advantest R3562 Signal Generator GPIB Address . . . . . . . . . . . . . . . . Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address Hewlett Packard HP8921A and HP83236A/B GPIB Address . . . . . . . Advantest R3465 Communications Test Set GPIB Address . . . . . . . . . Motorola CyberTest GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . HP 437 Power Meter GPIB Address . . . . . . . . . . . . . . . . . . . . . . . . . . . Gigatronics 8541C Power Meter GPIB Address . . . . . . . . . . . . . . . . . . RS232 GPIB Interface Adapter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-5 B-5 B-6 B-7 B-9 B-9 B-11 B-12 B-13 B-14 B-15 B-16 Test Equipment Connection, Testing, and Control . . . . . . . . . . . . . . . . . . . . . . . Inter–unit Connection, Testing, and Control Settings . . . . . . . . . . . . . . HP 8921A with PCS Interface Test Equipment Connections . . . . . . . . HP 8921A with PCS Interface System Connectivity Test . . . . . . . . . . . Pretest Setup for HP 8921A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pretest Setup for Agilent 8935 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Advantest R3465 Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R3465 GPIB Clock Set–up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pretest Setup for Advantest R3465 . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent 8932/E4432B Test Equipment Interconnection . . . . . . . . . . . . Agilent E4406A/E4432B Test Equipment Interconnection . . . . . . . . . Advantest R3267/R3562 Test Equipment Interconnection . . . . . . . . . . B-17 B-17 B-17 B-21 B-21 B-22 B-22 B-24 B-25 B-25 B-26 B-27 Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibration Without the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Agilent E4406A Transmitter Tester Self–alignment (Calibration) . . . . Calibrating HP 437 Power Meter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Gigatronics 8541C Power Meter . . . . . . . . . . . . . . . . . . . . B-28 B-28 B-28 B-29 B-31 Manual Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Test Cable Setup Using HP PCS Interface (HP83236) . . . . . . . . . . . . . . . . . . . . . . . . . . . Calibrating Test Cable Setup Using Advantest R3465 . . . . . . . . . . . . . B-32 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-32 B-36 Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Preparation Purpose This appendix provides information on pre–testing set–up for the following test equipment items (not required for the Cybertest test set): Agilent E7495A test equipment setup Agilent E4406A transmitter test set Agilent E4432B signal generator Advantest R3267 spectrum analyzer Advantest R3562 signal generator Agilent 8935 analyzer (formerly HP 8935) HP 8921 with PCS interface analyzer Advantest R3465 analyzer Motorola CyberTest HP 437 power meter Gigatronics 8541C power meter GPIB adapter Pre–testing set–up information covered includes verification and setting GPIB addresses, inter–unit cabling, connectivity testing, pre–test control settings, and equipment calibration for items which are not calibrated with the Calibrate Test Equipment function of the LMF. The following procedures cover verification and changing GPIB addresses for the various items of CDMA test equipment supported by the LMF. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-1 Test Equipment Preparation – continued Agilent R7495A Test Equipment Setup This test equipment requires a warm-up period of at least 30 minutes before BTS testing or calibration begins. Using the Agilent E7495A with the LMF The Agilent E7495A does not require the use of the 19MHz frequency reference; if connected, it will be ignored. The Even Sec SYNC connection is required. The Agilent E7495A signal generator is only calibrated down to –80db. In order to achieve accurate FER testing, be sure the RX setup includes at least 40db of attenuation. This will ensure the signal generator will output sufficient power to operate in the calibrated range. Set the IP Address as described in Table B-1. Table B-1: Set IP Address on Agilent E7495A test set n Step Action Use the System Button > Controls >IPAdmin to set an IP address on the E7495A as 128.0.0.49, and Netmask to 255.255.255.128. Connections It is recommended that you use a hub with BNC and RJ–45 connections. [Suggested models: Netgear model EN104 (4 port) or EN108 (8 port). Do NOT use model numbers ending with “TP”; those have no BNC connectors.] The LMF will connect to the hub which in turn is connected to the BTS and to the Agilent E7495A. Agilent E7495A to Hub – This is an Ethernet cable, RJ–45 to RJ–45. LMF to Hub – Use one of the following cables to connect the LMF to the Hub: – Ethernet cable, RJ–45 to RJ–45 (be sure that the LAN card is set for either AUTO or to use the RJ–45 only). – Coax cable between LAN card and Hub. (Use a “T” on the hub and connect a cable between the other end of the “T” and the BTS LAN connection). Hub to BTS – Use BNC “T” connector on the hub. [If your hub doesn’t have BNC ports, use a BNC to UTP adapter.] B-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY Test Equipment Preparation – continued Detecting Test Equipment Check that no other equipment is connected to the LMF. Agilent equipment must be connected to the LAN to detect it. Then perform the procedures described in Table B-2. Table B-2: Detecting Agilent E7495A Test Equipment n Step Action Click the Tools Menu. Choose Options. Check Agilent E7495A option in non–GPIB Test Equipment and enter its IP number. Click Apply and wait a moment. Click Dismiss. Power Sensor Calibration Table B-3 describes the E7495A Power Sensor Calibration. Table B-3: E7495A Power Sensor Calibration n Step Action Display the power meter screen. Zero the power meter. Make sure you are connected as shown in Figure B-1. – Press the Zero softkey. – Press the Continue softkey. Calibrate the power meter: – Press Ref CF. – Enter the reference cal factor, reading it off the label on the power sensor head. – Press Calibrate. – Connect the power sensor (see Figure B-2). – Press Continue. – Press Cal Factor. – Enter the cal factor from the label on the power sensor head. Select a cal factor that’s within the operating frequency of the base station. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-3 Test Equipment Preparation – continued Figure B-1: Agilent E7495A Pre–Power Sensor Calibration Connection Power REF 50 MHz GPIO Even Second Sync In Serial 1 Port 2 RF In Ext Ref In Sensor Use only Agilent supplied power adapter Port 1 RF Out / SWR GPS Antenna Serial 2 POWER SENSOR NOT CONNECTED Figure B-2: Agilent E7495A Power Sensor Calibration Connection POWER SENSOR CONNECTED GPIO Port 2 RF In Ext Ref In Power REF 50 MHz Even Second Sync In Serial 1 Sensor Serial 2 Use only Agilent supplied power adapter Port 1 RF Out / SWR GPS Antenna Cable Calibration Follow the directions in the WinLMF program to calibrate cables. – Calibrate the short cable (see Figure 6-12 or Figure 6-13) and two 10 dB pads to get a base line and then calibrate the TX and RX setup. Since you need at least 40 dB of loss when doing the FER test, the setup for RX is the same as TX. ATP Setup TX Path Calibration setup is shown in Test Equipment Setup (see Figure 6-17 through Figure 6-20). B-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY Verifying and Setting GPIB Addresses Agilent E4406A Transmitter Tester GPIB Address Refer to Figure B-3 and follow the procedure in Table B-4 to verify and, if necessary, change the Agilent E4406A GPIB address. Figure B-3: Setting Agilent E4406A GPIB Address Active Function Area Softkey Label Display Area System Key Bk Sp Key Enter Key Softkey Buttons Data Entry Keypad ti-CDMA-WP-00085-v01-ildoc-ftw Table B-4: Verify and Change Agilent E4406A GPIB Address Step Action In the SYSTEM section of the instrument front panel, press the System key. – The softkey labels displayed on the right side of the instrument screen will change. Press the Config I/O softkey button to the right of the instrument screen. – The softkey labels will change. – The current instrument GPIB address will be displayed below the GPIB Address softkey label. If the current GPIB address is not set to 18, perform the following to change it: 3a Press the GPIB Address softkey button. In the on–screen Active Function Area, GPIB Address will be displayed followed by the current GPIB address. . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-5 Verifying and Setting GPIB Addresses – continued Table B-4: Verify and Change Agilent E4406A GPIB Address Step 3b Action On front panel Data Entry keypad, enter the communications system analyzer GPIB address of 18. – The GPIB Address label will change to Enter. – Characters typed with the keypad will replace the current GPIB address in the Active Function Area. NOTE To correct an entry, press Bk Sp key to delete one character at a time. 3c Press the Enter softkey button or the keypad Enter key to set the new GPIB address. – The Config I/O softkey labels will reappear. – The new GPIB address will be displayed under the GPIB Address softkey label. Agilent E4432B Signal Generator GPIB Address Refer to Figure B-4 and follow the procedure in Table B-5 to verify and, if necessary, change the Agilent E4432B GPIB address. Figure B-4: Setting Agilent E4432B GPIB Address Active Entry Area Softkey Label Display Area Utility Key Softkey Buttons B-6 Numeric Keypad Backspace Key 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verifying and Setting GPIB Addresses – continued Table B-5: Verify and Change Agilent E4432B GPIB Address Step Action In the MENUS section of the instrument front panel, press the Utility key. – The softkey labels displayed on the right side of the instrument screen will change. Press the GPIB/RS232 softkey button to the right of the instrument screen. – The softkey labels will change. – The current instrument GPIB address will be displayed below the GPIB Address softkey label. If the current GPIB address is not set to 1, perform the following to change it: 3a Press the GPIB Address softkey button. – The GPIB Address label and current GPIB address will change to boldface. – In the on–screen Active Entry Area, Address: will be displayed followed by the current GPIB address. 3b On the front panel Numeric keypad, enter the signal generator GPIB address of 1. – The GPIB Address label will change to Enter. – Characters typed on the keypad will replace the current GPIB address in the Active Entry display. NOTE To correct an entry, press the backspace key at the lower right of the keypad to delete one character at a time. 3c Press the Enter softkey button to set the new GPIB address. – The new GPIB address will be displayed under the GPIB Address softkey label. Advantest R3267 Spectrum Analyzer GPIB Address Refer to Figure B-5 and perform the procedure in Table B-6 to verify and, if necessary, change the Advantest R3267 spectrum analyzer GPIB address. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-7 Verifying and Setting GPIB Addresses – continued Figure B-5: Setting Advantest R3267 GPIB Address Softkey Lable Display Area Softkey Buttons on REMOTE LED LCL Key CONFIG Key Keypad BS Key ENTR Key Table B-6: Verify and Change Advantest R3267 GPIB Address Step Action If the REMOTE LED is lighted, press the LCL key. – The LED extinguishes. Press the CONFIG key. – CONFIG softkey labels will appear in the softkey label display area of the instrument display. – The current GPIB address will be displayed below the GPIB Address softkey label. If the current GPIB address is not set to 18, perform the following to change it: 3a Press the GPIB Address softkey. A GPIB Address entry window will open in the instrument display showing the current GPIB address. 3b Enter 18 on the keypad in the ENTRY section of the instrument front panel. – Characters typed on the keypad will replace the address displayed in the GPIB Address entry window. NOTE To correct an entry, press the BS (backspace) key at the lower right of the keypad to delete one character at a time. 3c B-8 Press the ENTR key to the lower right of the keypad to set the new GPIB address. – The GPIB Address entry window closes. – The new address is displayed in the bottom portion of the GPIB Address softkey label. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verifying and Setting GPIB Addresses – continued Advantest R3562 Signal Generator GPIB Address Set the GP–IB ADDRESS switch on the rear of the Advantest R3562 signal generator to address 1 as shown in Figure B-6. Figure B-6: Advantest R3562 GPIB Address Switch Setting GPIB Address set to “1” GP–IP ADDRESS 5 4 3 2 1 Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address Refer to Figure B-7 and follow the procedure in Table B-7 to verify and, if necessary, change the Agilent 8935 GPIB address. Figure B-7: Agilent 8935 Test Set Preset Local Inst Config Shift NOTE MAY 2004 Cursor Control FW00885 This procedure assumes that the test equipment is set up and ready for testing. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-9 Verifying and Setting GPIB Addresses – continued Table B-7: Verify and/or Change Agilent 8935 (formerly HP 8935) GPIB Address Step Action NOTE The HP I/O configuration MUST be set to Talk & Listen, or no device on the GPIB will be accessible. (Consult test equipment OEM documentation for additional information as required.) To verify that the GPIB addresses are set correctly, press Shift and LOCAL on the Agilent 8935. – The current HP–IB address is displayed at the top of the screen. NOTE HP–IB is the same as GPIB. If the current GPIB address is not set to 18, perform the following to change it: 2a – Press Shift and Inst Config. 2b – Turn the Cursor Control knob to move the cursor to the HP–IB Adrs field. 2c – Press the Cursor Control knob to select the field. 2d – Turn the Cursor Control knob as required to change the address to 18. 2e – Press the Cursor Control knob to set the address. B-10 Press Preset to return to normal operation. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verifying and Setting GPIB Addresses – continued Hewlett Packard HP8921A and HP83236A/B GPIB Address Refer to Figure B-8 and follow the procedure in Table B-8 to verify and, if necessary, change the HP 8921A HP 83236A GPIB addresses. Figure B-8: HP 8921A and HP 83236A/B Local Preset Cursor Control Shift NOTE This procedure assumes that the test equipment is set up and ready for testing. Table B-8: Verify and/or Change HP 8921A and HP 83236A GPIB Addresses Step Action To verify that the GPIB addresses are set correctly, press Shift and LOCAL on the HP 8921A. – The current HP–IB address is displayed at the top of the screen. NOTE HP–IB is the same as GPIB. If the current HP–IB address is not set to 18, perform the following to change it: 2a – Turn the Cursor Control knob to move the cursor to More and press the knob to select the field. 2b – Turn the Cursor Control knob to move the cursor to I/O Config and press the knob to select the field. 2c – Turn the Cursor Control knob to move the cursor to Adrs and press the knob to select the field. 2d – Turn the Cursor Control knob to change the HP–IB address to 18 and press the knob to set the address. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-11 Verifying and Setting GPIB Addresses – continued Table B-8: Verify and/or Change HP 8921A and HP 83236A GPIB Addresses Step 2e Action – Press Shift and Preset to return to normal operation. To set the HP 83236A (or B) PCS Interface GPIB address=19, set the DIP switches as follows: – A1=1, A2=1, A3=0, A4=0, A5=1, HP–IB/Ser = 1 Advantest R3465 Communications Test Set GPIB Address Refer to Figure B-9 and follow the procedure in Table B-9 to verify and, if necessary, change the GPIB address for the Advantest R3465. Figure B-9: R3465 Communications Test Set GPIB and others REF UNLOCK EVEN SEC/SYNC IN CDMA TIME BASE IN POWER BNC “T” OFF ON Vernier Knob LCL Shift NOTE Preset REF FW00337 This procedure assumes that the test equipment is set up and ready for testing. Table B-9: Verify and/or Change Advantest R3465 GPIB Address Step Action To verify that the GPIB address is set correctly, perform the following: 1a – Press SHIFT then PRESET. 1b – Press LCL. 1c – Press the GPIB and Others CRT menu key to view the current address. If the current GPIB address is not set to 18, perform the following to change it: 2a B-12 – Turn the vernier knob as required to select 18. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verifying and Setting GPIB Addresses – continued Table B-9: Verify and/or Change Advantest R3465 GPIB Address Step 2b Action – Press the vernier knob to set the address. To return to normal operation, press Shift and Preset. Motorola CyberTest GPIB Address Follow the steps in Table B-10 to verify and, if necessary, change the GPIB address on the Motorola CyberTest. Changing the GPIB address requires the following items: NOTE Motorola CyberTest communications analyzer. Computer running Windows 3.1/Windows 95. Motorola CyberTAME software program “TAME”. Parallel printer port cable (shipped with CyberTest). This procedure assumes that the test equipment is set up and ready for testing. Table B-10: Verify and/or Change Motorola CyberTest GPIB Address Step Action On the LMF desktop, locate the CyberTAME icon. Double click on the icon to run the CyberTAME application. In the CyberTAME window taskbar, under Special, select IEEE.488.2. CyberTAME software will query the CyberTest Analyzer for its current GPIB address. It then will open the IEEE 488.2 dialog box. If the current GPIB address is not 18, perform the following procedure to change it: 3a Use the up or down increment arrows or double–click in the field and type the number to set the address to 18. 3b Click on the OK button. The new address will be written to the CyberTest through the parallel port and saved. Verify that the address has been set by repeating steps 2 and 3. The new address should now appear in the IEEE 488.2 dialog box Address field. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-13 Verifying and Setting GPIB Addresses – continued HP 437 Power Meter GPIB Address Refer to Figure B-10 and follow the steps in Table B-11 to verify and, if necessary, change the HP 437 GPIB address. Figure B-10: HP 437 Power Meter PRESET SHIFT (BLUE) PUSHBUTTON – ACCESSES FUNCTION AND DATA ENTRY KEYS IDENTIFIED WITH LIGHT BLUE TEXT ON THE FRONT PANEL ABOVE THE BUTTONS REF FW00308 ENTER NOTE This procedure assumes that the test equipment is set up and ready for testing. Table B-11: Verify and/or Change HP 437 Power Meter GPIB Address Step Action Press Shift and PRESET. Use the y arrow key to navigate to HP–IB ADRS and press ENTER. The HP–IB address is displayed. NOTE HP–IB is the same as GPIB. If the current GPIB address is not set to 13, perform the following to change it: – Use the y b arrow keys to change the HP–IB ADRS to 13. – Press ENTER to set the address. Press Shift and ENTER to return to a standard configuration. B-14 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verifying and Setting GPIB Addresses – continued Gigatronics 8541C Power Meter GPIB Address Refer to Figure B-11 and follow the steps in Table B-12 to verify and, if necessary, change the Gigatronics 8541C power meter GPIB address. Figure B-11: Gigatronics 8541C Power Meter Detail NOTE This procedure assumes that the test equipment is set up and ready for testing. Table B-12: Verify and/or Change Gigatronics 8541C Power Meter GPIB Address Step Action ! CAUTION Do not connect/disconnect the power meter sensor cable with AC power applied to the meter. Disconnection could result in destruction of the sensing element or miscalibration. Press MENU. Use the b arrow key to select CONFIG MENU and press ENTER. Use the b arrow key to select GPIB and press ENTER. The current Mode and GPIB Address are displayed. If the Mode is not set to 8541C, perform the following to change it: Use the a ’ arrow keys as required to select MODE. Use the by arrow keys as required to set MODE to 8541C. If the GPIB address is not set to 13, perform the following to change it: Use the ’ arrow key to select ADDRESS. Use the by arrow keys as required to set the GPIB address to 13. Press ENTER to return to normal operation. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-15 Verifying and Setting GPIB Addresses – continued RS232 GPIB Interface Adapter Be sure that the RS–232 GPIB interface adapter DIP switches are set as shown in Figure B-12. Figure B-12: RS232 GPIB Interface Adapter DIP SWITCH SETTINGS S MODE DATA FORMAT BAUD RATE ON GPIB ADRS G MODE RS232–GPIB INTERFACE BOX B-16 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control Inter–unit Connection, Testing, and Control Settings The following illustrations, tables, and procedures provide the information necessary to prepare various items of CDMA test equipment supported by the WinLMF for BTS calibration and/or acceptance testing. HP 8921A with PCS Interface Test Equipment Connections The following diagram depicts the rear panels of the HP 8921A test equipment as configured to perform automatic tests. All test equipment is controlled by the WinLMF via an IEEE–488/GPIB bus. The WinLMF expects each piece of test equipment to have a factory-set GPIB address (refer to Table B-8 and Figure B-8). If there is a communications problem between the WinLMF and any piece of test equipment, verify that the GPIB addresses have been set correctly and that the GPIB cables are firmly connected to the test equipment. Table B-13 shows the connections when not using an external 10 MHz Rubidium reference. Table B-13: HP 8921A/600 Communications Test Set Rear Panel Connections Without Rubidium Reference From Test Set: To Interface: 8921A 83203B CDMA CW RF OUT 114.3 MHZ IF OUT IQ RF IN DET OUT CONTROL I/O 10 MHZ OUT HPIB INTERFACE CW RF IN 114.3 MHZ IF IN IQ RF OUT AUX DSP IN CONTROL I/O SYNTH REF IN 10 MHZ OUT MAY 2004 83236A PCS HPIB INTERFACE REF IN Connector Type SMC–female – SMC–female SMC–female – SMC–female SMC–female – SMC–female SMC–female – SMC–female 45–pin custom BUS BNC–male – BNC–male HPIB cable BNC–male – BNC–male 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-17 Test Equipment Connection, Testing, and Control – continued Figure B-13: HP 8921A/600 Cable Connections for 10 MHz Signal and GPIB without Rubidium Reference HP 83203B CDMA CELLULAR ADAPTER TO POWER METER GPIB CONNECTOR ÎÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎÎ TO GPIB INTERFACE BOX HP 8921A CELL SITE TEST SET HP 83236A PCS INTERFACE REF IN HP–IB FW00368 REAR PANEL COMMUNICATIONS TEST SET B-18 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control – continued Figure B-14 shows the connections when using an external 10 MHz Rubidium reference. Table B-14: HP 8921A/600 Communications Test Set Rear Panel Connections With Rubidium Reference From Test Set: To Interface: 8921A 83203B CDMA CW RF OUT 114.3 MHZ IF OUT IQ RF IN DET OUT CONTROL I/O 10 MHZ OUT HPIB INTERFACE 10 MHZ INPUT MAY 2004 83236A PCS CW RF IN 114.3 MHZ IF IN IQ RF OUT AUX DSP IN CONTROL I/O REF IN HPIB INTERFACE 10 MHZ OUT Connector Type SMC–female – SMC–female SMC–female – SMC–female SMC–female – SMC–female SMC–female – SMC–female 45–pin custom BUS BNC–male – BNC–male HPIB cable BNC–male – BNC–male 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-19 Test Equipment Connection, Testing, and Control – continued Figure B-14: HP 8921A Cable Connections for 10 MHz Signal and GPIB with Rubidium Reference 10 MHZ WITH RUBIDIUM STANDARD HP 83203B CDMA CELLULAR ADAPTER TO POWER METER GPIB CONNECTOR ÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎ TO GPIB INTERFACE BOX HP 8921A CELL SITE TEST SET HP 83236A PCS INTERFACE REF IN HP–IB FW00369 REAR PANEL COMMUNICATIONS TEST SET B-20 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control – continued HP 8921A with PCS Interface System Connectivity Test Follow the steps outlined in Table B-15 to verify that the connections between the PCS Interface and the HP 8921A are correct and cables are intact. The software also performs basic functionality checks of each instrument. NOTE Disconnect other GPIB devices, especially system controllers, from the system before running the connectivity software. Table B-15: System Connectivity Step Action NOTE – Perform this procedure after test equipment has been allowed to warm–up and stabilize for a minimum of 60 minutes. Insert HP 83236A Manual Control/System card into memory card slot. Press the [PRESET] pushbutton. Press the Screen Control [TESTS] pushbutton to display the “Tests” Main Menu screen. Position the cursor at Select Procedure Location and select it by pressing the cursor control knob. In the Choices selection box, select Card. Position the cursor at Select Procedure Filename and select it by pressing the cursor control knob. In the Choices selection box, select SYS_CONN. Position the cursor at RUN TEST and select it. The software will provide operator prompts through completion of the connectivity setup. Do the following when the test is complete, S position cursor on STOP TEST and select it S OR press the [K5] pushbutton. To return to the main menu, press the [K5] pushbutton. Press the [PRESET] pushbutton. Pretest Setup for HP 8921A Before the HP 8921A CDMA analyzer is used for WinLMF–controlled testing it must be set up correctly for automatic testing. Perform the procedure in Table B-16. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-21 Test Equipment Connection, Testing, and Control – continued Table B-16: Pretest Setup for HP 8921A Step Action Unplug the memory card if it is plugged in. Press the CURSOR CONTROL knob. Position the cursor at IO CONFIG (under To Screen and More) and select it. Select Mode and set for Talk&Lstn. Pretest Setup for Agilent 8935 Before the Agilent 8935 analyzer is used for WinLMF controlled testing it must be set up correctly for automatic testing. Perform the procedure in Table B-17. Table B-17: Pretest Setup for Agilent 8935 Step Action Unplug the memory card if it is plugged in. Press the Shift button and then press the I/O Config button. Press the Push to Select knob. Position the cursor at IO CONFIG and select it. Select Mode and set for Talk&Lstn. Advantest R3465 Connection The following diagram depicts the rear panels of the Advantest R3465 test equipment as configured to perform automatic tests. All test equipment is controlled by the WinLMF via an IEEE–488/GPIB bus. The WinLMF expects each piece of test equipment to have a factory-set GPIB address (refer to Table B-9 and Figure B-9). If there is a communications problem between the WinLMF and any piece of test equipment, verify that the GPIB addresses have been set correctly and that the GPIB cables are firmly connected to the test equipment. Figure B-15 shows the connections when not using an external 10 MHz Rubidium reference. B-22 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control – continued Figure B-15: Cable Connections for Test Set without 10 MHz Rubidium Reference SERIAL I/O CDMA CLOCK OUT R3561L REAR PANEL SYN REF IN LOCAL IN TO POWER METER GPIB CONNECTOR PARALLEL 10 MHZ OUT AC POWER SERIAL I/O R3465 REAR PANEL GATE IN EXT TRIGGER AC POWER GPIB TO GPIB INTERFACE BOX 10 MHZ REF IF OUT 421 MHZ FW00370 GPIB CONNECTOR MAY 2004 ADVANTEST R3465 REAR PANEL TO T–CONNECTOR ON FRONT PANEL (EVEN/SEC/SYNC IN) 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-23 Test Equipment Connection, Testing, and Control – continued Figure B-16 shows the connections when using an external 10 MHz Rubidium reference. Figure B-16: Cable Connections for Test Set with 10 MHz Rubidium Reference FROM 10 MHZ RUBIDIUM REFERENCE SERIAL I/O CDMA CLOCK OUT R3561L REAR PANEL SYN REF IN LOCAL IN TO POWER METER GPIB CONNECTOR PARALLEL AC POWER 10 MHZ OUT SERIAL I/O R3465/3463 REAR PANEL GATE IN EXT TRIGGER AC POWER GPIB TO GPIB INTERFACE BOX 10 MHZ REF IF OUT 421 MHZ FW00371 GPIB CONNECTOR ADVANTEST R3465 REAR PANEL TO T–CONNECTOR ON FRONT PANEL (EVEN SEC/SYNC IN) R3465 GPIB Clock Set–up Table B-18 describes the steps to set the clock for the Advantest R3465 equipment. Table B-18: Advantest R3465 Clock Setup Step Action Observe the current date and time displayed in upper right of the CRT display. If the date and time are incorrect, perform the following to change them: 2a – Push the Date/Time CRT menu key. 2b – Rotate the vernier knob to select and set. 2c – Push the vernier knob to enter. 2d – Push the SHIFT then PRESET pushbutton (just below the CRT display). B-24 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control – continued Pretest Setup for Advantest R3465 Before the Advantest R3465 analyzer is used for WinLMF–controlled testing it must be set up correctly for automatic testing. Perform the procedure in Table B-19. Table B-19: Pretest Setup for Advantest R3465 Step Action Press the SHIFT button so the LED next to it is illuminated. Press the RESET button. Agilent 8932/E4432B Test Equipment Interconnection To perform FER testing on a 1X BTS with the Agilent 8935, a 1X–capable signal generator, such as the Agilent E4432B, must be used in conjunction with the CDMA base station test set. For proper operation, the test equipment items must be interconnected as follows: 10 MHz reference signal – Connect a BNC (M)–BNC (M) cable from the 8935 10 MHz REF OUT connector to the E4432B 10MHz IN connector as shown in Figure B-17 Even second pulse reference – Refer to Figure B-17, and connect a BNC “T” connector to the 8935 EVEN SEC SYNC IN connector. Connect a BNC (M)–BNC (M) cable from one side of the BNC “T” to the E4432B PATTERN TRIG IN connector. Connect the other side of the BNC “T” to the CSA Card SYNC MONITOR connector using a BNC (M)–BNC (M) cable. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-25 Test Equipment Connection, Testing, and Control – continued Figure B-17: Agilent 8935/E4432B 10MHz Reference and Even Second Tick Connections E4432B PATTERN TRIG IN E4432B 10 MHz IN TO GPIB ÁÁ Á Á ÁÁ ÁÁÁ 8935 EVEN SECOND SYNC IN WITH BNC “T” 8935 10 MHz REF OUT TO CSA CARD SYNC MONITOR (EVEN SEC TICK) TDME0011–1 Agilent E4406A/E4432B Test Equipment Interconnection To provide proper operation during testing when both units are required, the 10 MHz reference signal from the E4406A transmitter test set must be provided to the E4432B signal generator. Connect a BNC (M)–BNC (M) cable from the E4406A 10 MHz OUT (SWITCHED) connector to the E4432B 10MHz IN connector as shown in Figure B-18. Figure B-18: Agilent 10 MHz Reference Connections E4432B 10 MHz IN TO GPIB BOX E4406A 10 MHz OUT (SWITCHED) TDME0009–1 B-26 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Test Equipment Connection, Testing, and Control – continued Advantest R3267/R3562 Test Equipment Interconnection To provide proper operation during testing when both units are required, the R3257 spectrum analyzer must be interconnected with the R3562 signal generator as follows: 10 MHz reference signal – Connect a BNC (M)–BNC (M) cable between the R3562 SYNTHE REF IN connector and the R3267 10 MHz OUT connector as shown in Figure B-19. Serial I/O – Using the Advantest cable provided, connect the R3267 SERIAL I/O connector to the R3562 SERIAL I/O connector as shown in Figure B-19. Figure B-19: Advantest 10 MHz Reference and Serial I/O Connections R3267 10 MHZ OUT R3267 SERIAL I/O TO GPIB BOX R3562 SYNTHE REF IN TO GPIB BOX R3562 SERIAL I/O TDME0010–1 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-27 Equipment Calibration Calibration Without the LMF Several test equipment items used in the optimization process require pre–calibration actions or calibration verification which are not supported by the LMF. Procedures to perform these activities for the applicable test equipment items are covered in this section. Agilent E4406A Transmitter Tester Self–alignment (Calibration) Figure B-20: Performing Agilent E4406A Self–alignment (Calibration) Softkey Label Display Area System Key Softkey Buttons Refer to Figure B-20 and follow the procedure in Table B-20 to perform the Agilent E4406A self–alignment (calibration). Table B-20: Perform Agilent E4406A Self–alignment (Calibration) Step Action In the SYSTEM section of the instrument front panel, press the System key. – The softkey labels displayed on the right side of the instrument screen will change. Press the Alignments softkey button to the right of the instrument screen. – The softkey labels will change. Press the Align All Now softkey button. – All other instrument functions will be suspended during the alignment. – The display will change to show progress and results of the alignments performed. – The alignment will take less than one minute. B-28 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Equipment Calibration – continued Calibrating HP 437 Power Meter Precise transmit output power calibration measurements are made using a bolometer–type broadband power meter with a sensitive power sensor. Follow the steps outlined in Table B-21 to enter information unique to the power sensor before calibrating the test setup. Refer to Figure B-21 as required. NOTE This procedure must be done before the automated calibration to enter power sensor specific calibration values. Figure B-21: Power Meter Detail CONNECT POWER SENSOR TO POWER REFERENCE WHEN CALIBRATING UNIT. POWER REFERENCE IS ENABLED USING THE SHIFT ’ KEYS SHIFT (BLUE) PUSHBUTTON – ACCESSES FUNCTION AND DATA ENTRY KEYS IDENTIFIED WITH LIGHT BLUE TEXT ON THE FRONT PANEL ABOVE THE BUTTONS CONNECT POWER SENSOR WITH POWER METER TURNED OFF FW00308 Table B-21: HP 437 Power Meter Calibration Procedure Step Action ! CAUTION Do not connect/disconnect the power meter sensor cable with AC power applied to the meter. Disconnection could result in destruction of the sensing element or mis–calibration. Make sure the power meter AC LINE pushbutton is OFF. Connect the power sensor cable to the SENSOR input. Set the AC LINE pushbutton to ON. NOTE The calibration should be performed only after the power meter and sensor have been allowed to warm–up and stabilize for a minimum of 60 minutes. Perform the following to set or verify the correct power sensor model: 4a – Press [SHIFT] then [a] to select SENSOR. 4b – Identify the power sensor model number from the sensor label. 4c – Use the [y] or [b] button to select the appropriate model; then press [ENTER]. Refer to the illustration for step 8, and perform the following to ensure the power reference output is OFF: . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-29 Equipment Calibration – continued Table B-21: HP 437 Power Meter Calibration Procedure Step Action 5a – Observe the instrument display and determine if the triangular indicator over PWR REF is displayed. 5b – If the triangular indicator is displayed, press [SHIFT] then [’] to turn it off. Press [ZERO]. – Display will show “Zeroing ******.” – Wait for process to complete. Connect the power sensor to the POWER REF output. Turn on the PWR REF by performing the following: 8a – Press [SHIFT] then [’]. 8b – Verify that the triangular indicator (below) appears in the display above PWR REF. Perform the following to set the REF CF%: 9a – Press ([SHIFT] then [ZERO]) for CAL. 9b – Enter the sensor’s REF CF% from the sensor’s decal using the arrow keys and press [ENTER]. (The power meter will display ”CAL *****” for a few seconds.) NOTE If the REF CAL FACTOR (REF CF) is not shown on the power sensor, assume it to be 100%. 10 Perform the following to set the CAL FAC %: 10a – Press [SHIFT] then [FREQ] for CAL FAC. 10b – On the sensor’s decal, locate an approximate calibration percentage factor (CF%) at 2 GHz. 10c – Enter the sensor’s calibration % (CF%) using the arrow keys and press [ENTER]. –– When complete, the power meter will typically display 0.05 dBm. (Any reading between 0.00 and 0.10 is normal.) 11 To turn off the PWR REF, perform the following: 11a – Press [SHIFT] then [’]. 11b – Disconnect the power sensor from the POWER REF output. B-30 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Equipment Calibration – continued Calibrating Gigatronics 8541C Power Meter Precise transmit output power calibration measurements are made using a bolometer–type broadband power meter with a sensitive power sensor. Follow the steps in Table B-22 to enter information unique to the power sensor. Table B-22: Calibrate Gigatronics 8541C Power Meter Step Action ! CAUTION Do not connect/disconnect the power meter sensor cable with AC power applied to the meter. Disconnection could result in destruction of the sensing element or miscalibration. Make sure the power meter POWER pushbutton is OFF. Connect the power sensor cable to the SENSOR input. Set the POWER pushbutton to ON. NOTE Allow the power meter and sensor to warm up and stabilize for a minimum of 60 minutes before performing the calibration procedure. Connect the power sensor to the CALIBRATOR output connector. Press ZERO. – Wait for the process to complete. Sensor factory calibration data is read to power meter during this process. When the zeroing process is complete, disconnect the power sensor from the CALIBRATOR output. Figure B-22: Gigatronics 8541C Power Meter Detail CONNECT POWER SENSOR TO CALIBRATOR POWER REFERENCE WHEN CALIBRATING/ZEROING UNIT CONNECT POWER SENSOR WITH POWER METER TURNED OFF FRONT View AC POWER GPIB CONNECTION REAR View FW00564 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-31 Manual Cable Calibration Calibrating Test Cable Setup Using HP PCS Interface (HP83236) Table B-23 covers the procedure to calibrate the test equipment using the HP8921 Cellular Communications Analyzer equipped with the HP83236 PCS Interface. NOTE This calibration method must be executed with great care. Some losses are measured close to the minimum limit of the power meter sensor (–30 dBm). Prerequisites Ensure the following prerequisites have been met before proceeding: S Test equipment to be calibrated has been connected correctly for cable calibration. S Test equipment has been selected and calibrated. Table B-23: Calibrating Test Cable Setup (using the HP PCS Interface) Step Action NOTE Verify that GPIB controller is turned off. Insert HP83236 Manual Control System card into memory card slot. Press the Preset pushbutton. Under Screen Controls, press the TESTS pushbutton to display the TESTS (Main Menu) screen. Position the cursor at Select Procedure Location and select it. In the Choices selection box, select CARD. Position the cursor at Select Procedure Filename and select it. In the Choices selection box, select MANUAL. Position the cursor at RUN TEST and select it. HP must be in Control Mode Select YES. If using HP83236A: Set channel number= : – Position cursor at Channel Number and select it. – Enter the chan# using the numeric keypad; press [Enter] and the screen will go blank. – When the screen reappears, the chan# will be displayed on the channel number line. Set RF Generator level: – Position the cursor at RF Generator Level and select it. – Enter –10 using the numeric keypad; press [Enter] and the screen will go blank. – When the screen reappears, the value –10 dBm will be displayed on the RF Generator Level line. . . . continued on next page B-32 If using HP83236B: Set channel frequency: – Position cursor at Frequency Band and press Enter. – Select User Defined Frequency. – Go Back to Previous Menu. – Position the cursor to 83236 generator frequency and enter actual RX frequency. – Position the cursor to 83236 analyzer frequency and enter actual TX frequency. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Manual Cable Calibration – continued Table B-23: Calibrating Test Cable Setup (using the HP PCS Interface) Step Action Set the user fixed Attenuation Setting to 0 dBm: – Position cursor at Analyzer Attenuation and select it – Position cursor at User Fixed Atten Settings and select it. – Enter 0 (zero) using the numeric keypad and press [Enter]. 10 Select Back to Previous Menu. 11 Record the HP83236 Generator Frequency Level: Record the HP83236B Generator Frequency Level: – Position cursor at Show Frequency and Level Details and select it. – Under HP83236 Frequencies and Levels, record the Generator Level. – Under HP83236B Frequencies and Levels, record the Generator Frequency Level (1850 – 1910 MHz). – Position cursor at Prev Menu and select it. 12 Click on Pause for Manual Measurement. 13 Connect the power sensor directly to the RF OUT ONLY port of the PCS Interface. 14 On the HP8921A, under To Screen, select CDMA GEN. 15 Move the cursor to the Amplitude field and click on the Amplitude value. 16 Increase the Amplitude value until the power meter reads 0 dBm ±0.2 dB. NOTE The Amplitude value can be increased coarsely until 0 dBM is reached; then fine tune the amplitude by adjusting the Increment Set to 0.1 dBm and targeting in on 0 dBm. 17 Disconnect the power sensor from the RF OUT ONLY port of the PCS Interface. NOTE The Power Meter sensor’s lower limit is –30 dBm. Thus, only components having losses ≤30 dB should be measured using this method. For further accuracy, always re-zero the power meter before connecting the power sensor to the component being calibrated. After connecting the power sensor to the component, record the calibrated loss immediately. 18 Disconnect all components in the test setup and calibrate each one separately by connecting each component, one-at-a-time, between the RF OUT ONLY PORT and the power sensor. Record the calibrated loss value displayed on the power meter. S Example: (A) Test Cable(s) (B) 20 dB Attenuator = (B) Directional Coupler = –1.4 dB –20.1 dB –29.8 dB 19 After all components are calibrated, reassemble all components together and calculate the total test setup loss by adding up all the individual losses: S Example: Total test setup loss = –1.4 –29.8 –20.1 = –51.3 dB. This calculated value will be used in the next series of tests. 20 Under Screen Controls press the TESTS button to display the TESTS (Main Menu) screen. . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-33 Manual Cable Calibration – continued Table B-23: Calibrating Test Cable Setup (using the HP PCS Interface) Step Action 21 Select Continue (K2). 22 Select RF Generator Level and set to –119 dBm. 23 Click on Pause for Manual Measurement. 24 Verify the HP8921A Communication Analyzer/83203A CDMA interface setup is as follows (fields not indicated remain at default): S Verify the GPIB (HP–IB) address: – – – – under To Screen, select More select IO CONFIG Set HP–IB Adrs to 18 set Mode to Talk&Lstn S Verify the HP8921A is displaying frequency (instead of RF channel) – Press the blue [SHIFT] button, then press the Screen Control [DUPLEX] button; this switches to the CONFIG (CONFIGURE) screen. – Use the cursor control to set RF Display to Freq 25 B-34 Refer toChapter 3 for assistance in setting the cable loss values into the LMF. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Manual Cable Calibration – continued Figure B-23: Cable Calibration Using HP8921 with PCS Interface MEMORY CARD SLOT POWER SENSOR (A) (A) POWER SENSOR (B) (B) 20 dB / 20 WATT ATTENUATOR POWER SENSOR (C) POWER SENSOR (C) 50 Ω TERMINATION 150 W NON–RADIATING RF LOAD MAY 2004 30 dB DIRECTIONAL COUPLER FW00292 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-35 Manual Cable Calibration – continued Calibrating Test Cable Setup Using Advantest R3465 NOTE Be sure the GPIB Interface is OFF for this procedure. Advantest R3465 Manual Test setup and calibration must be performed at both the TX and RX frequencies. Table B-24: Procedure for Calibrating Test Cable Setup Using Advantest R3465 Step Action * IMPORTANT – This procedure can only be performed after test equipment has been allowed to warm–up and stabilize for a minimum of 60 minutes. Press the SHIFT and the PRESET keys located below the display Press the ADVANCE key in the MEASUREMENT area of the control panel. Select the CDMA Sig CRT menu key Select the Setup CRT menu key Using the vernier knob and the cursor keys set the following parameters NOTE Fields not listed remain at default Generator Mode: SIGNAL Link: FORWARD Level Unit: dBm CalCorrection: ON Level Offset: OFF Select the return CRT menu key Press FREQ key in the ENTRY area Set the frequency to the desired value using the keypad entry keys Verify that the Mod CRT menu key is highlighting OFF; if not, press the Mod key to toggle it OFF. 10 Verify that the Output CRT menu key is highlighting OFF; if not, press the Output key to toggle it OFF. 11 Press the LEVEL key in the ENTRY area. 12 Set the LEVEL to 0 dBm using the key pad entry keys. 13 Zero power meter. Next connect the power sensor directly to the “RF OUT” port on the R3561L CDMA Test Source Unit. 14 Press the Output CRT menu key to toggle Output to ON. 15 Record the power meter reading ________________________ . . . continued on next page B-36 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Manual Cable Calibration – continued Table B-24: Procedure for Calibrating Test Cable Setup Using Advantest R3465 Step 16 Action Disconnect the power meter sensor from the R3561L RF OUT jack. * IMPORTANT The Power Meter sensor’s lower limit is –30 dBm. Thus, only components having losses < 30 dB should be measured using this method. For best accuracy, always re–zero the power meter before connecting the power sensor to the component being calibrated. Then, after connecting the power sensor to the component, record the calibrated loss immediately. 17 Disconnect all components in the the test setup and calibrate each one separately. Connect each component one–at–a–time between the “RF OUT” port and the power sensor (see Figure B-24, “Setups A, B, and C”). Record the calibrated loss value displayed on the power meter for each connection. Example: (A) 1st Test Cable = –0.5 dB (B) 2nd Test Cable = –1.4 dB (C) 20 dB Attenuator = –20.1 dB (D) 30 dB Directional Coupler = –29.8 dB 18 Press the Output CRT menu key to toggle Output OFF. 19 Calculate the total test setup loss by adding up all the individual losses: Example: Total test setup loss = 0.5 + 1.4 + 20.1 + 29.8 = 51.8 dB This calculated value will be used in the next series of tests. 20 Press the FREQ key in the ENTRY area 21 Using the keypad entry keys, set the test frequency to the RX frequency 22 Repeat steps 9 through 19 for the RX frequency. 23 Refer to Chapter 3 for assistance in setting the cable loss values into the LMF. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY B-37 Manual Cable Calibration – continued Figure B-24: Cable Calibration Using Advantest R3465 RF OUT POWER SENSOR (A) & (B) (C) POWER SENSOR 20 DB / 2 WATT ATTENUATOR POWER SENSOR (C) POWER SENSOR (D) FW00320 50 Ω TERMINATION 100 W NON–RADIATING RF LOAD B-38 30 DB DIRECTIONAL COUPLER 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix C: Download ROM Code Appendix Content Downloading ROM Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Exception Procedure – Downloading ROM Code . . . . . . . . . . . . . . . . . MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY C-1 C-1 Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Downloading ROM Code Exception Procedure – Downloading ROM Code This procedure is not part of a normal optimization. Perform this procedure only on an exception basis when no alternative exists to load a BTS device with the correct version of ROM code. NOTE One GLI must be INS_ACT (bright green) before ROM code can be downloaded to non–GLI devices. CAUTION The correct ROM and RAM codes for the software release used on the BSS must be loaded into BTS devices. To identify the correct device ROM and RAM code loads for the software release being used on the BSS, refer to the Version Matrix section of the SCt CDMA Release Notes (supplied on the tapes or CD–ROMs containing the BSS software). All devices in a BTS must be loaded with the ROM and RAM code specified for the software release used on the BSS before any optimization or ATP procedures can be performed. If a replacement device is loaded with ROM code which is not compatible with the BSS software release being used, the device ROM code can be changed using the LMF before performing the BTS optimization and ATPs. A device loaded with later release ROM code can not be converted back to a previous release ROM code in the field without Motorola assistance If it is necessary to download ROM code to a device from the LMF, the procedure in Table C-1 includes steps for both ROM and RAM code download using the LMF. Prerequisites Prior to performing this procedure, ensure the correct ROM and RAM code files exist in the LMF computer’s applicable :\ \cdma\loads\ \code folder for each of the devices to be loaded. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY C-1 Downloading ROM Code – continued CAUTION The Release level of the ROM code to be downloaded must be the one specified for the software release installed in the BSS. The release level of the ROM code resident in the other devices in the BTS must also be correct for the BSS software release being used. ROM code must not be downloaded to a frame loaded with code for a BSS software release with which it is not compatible. This procedure should only be used to upgrade replacement devices for a BTS. It should NOT be used to upgrade all devices in a BTS. If a BTS is to be upgraded from R15.x to R16.0, the upgrade should be done by the OMC–R using the DownLoad Manager. Table C-1: Download ROM and RAM Code to Devices Step Action Click on the device to be loaded. NOTE More than one device of the same type can be selected for download by either clicking on each one to be downloaded or from the BTS menu bar Select pull–down menu, select the device item that applies. Where: device = the type of device to be loaded (BBX, CSA, GLI, MCC) From the BTS menu bar Device pull–down menu, select Status. – A status report window will appear. Make a note of the number in the HW Bin Type column. NOTE “HW Bin Type” is the Hardware Binary Type for the device. This code is used as the last four digits in the filename of a device’s binary ROM code file. Using this part of the filename, the ROM code file can be matched to the device in which it is to be loaded. Click OK to close the status window. Click on the device to be loaded. NOTE ROM code is automatically selected for download from the :\ \version folder>\ specified by the NextLoad property in the bts–#.cdf file. To check the value of the NextLoad property, click on Util > Examine > Display Nextload. A pop–up message will show the value of the NextLoad. From the BTS menu bar Device pull–down menus, select Download > ROM. – If the file matching the Hardware Binary Type of the device is found in the code folder, a status report shows the result of the download. Proceed to Step 11. – If a file selection window appears, select the ROM code file manually. Double–click on the version folder with the desired version number for the ROM code file (for example 2.16.0.x). . . . continued on next page C-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Downloading ROM Code – continued Table C-1: Download ROM and RAM Code to Devices Step Action Double–click the Code folder. – A list of ROM and RAM code files will be displayed. ! CAUTION A ROM code file with the correct HW Bin Type must be chosen. Using a file with the wrong HW Bin Type can result in unpredictable operation and damage to the device. Click on the ROM code file with the filename which matches the device type and HW Bin Type number noted in step 3 (for example, file bbx_rom.bin.0604 is the ROM code file for a BBX with a HW Bin Type of 0604). – The file should be highlighted. 10 Click on the Load button. – A status report window is displayed showing the result of the download. NOTE If the ROM load failed for some devices, load them individually by clicking on one device, perform steps 6 through 10 for it, and repeat the process for each remaining device. 11 Click OK to close the status window. 12 From the LMF window menu bar Tools pull–down menus, select Update NextLoad > CDMA. 13 14 In the left–hand pane of the window which opens, click on the BTS number for the frame being loaded (for example, BTS–14). On the list of versions displayed in the right–hand pane, click the button next to the version number of the folder that was used for the ROM code download (for example, 2.16.0.x) and click Save. – A pop–up message will appear showing the CDF has been updated. 15 Click on the OK button to dismiss the pop–up message. 16 Click on the device that was loaded with ROM code. 17 NOTE RAM code is automatically selected for download. From the BTS menu bar Device pull–down menus, select Download > Code/Data to download RAM code and dds file data. – A status report is displayed showing the result of the download. 18 Click OK to close the status window. 19 Observe the downloaded non–GLI device to ensure it is OOS_RAM (yellow). 20 Click on the device which was loaded with code. 21 From the BTS menu bar Device pull–down menu, select Status. Verify that the correct ROM and RAM version numbers are displayed in the status report window. Click OK to close the status window. 22 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY C-3 Downloading ROM Code – continued Notes C-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix D: MMI Cable Fabrication Appendix Content MMI Cable Fabrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cable Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Wire Run List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY D-1 D-1 D-1 D-1 D-2 Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 MMI Cable Fabrication Purpose When the Motorola SLN2006A MMI Interface Kit is not available, a cable can be fabricated by the user to interface a nine–pin serial connector on an LMF computer platform with an MMI connector on GLI cards and other Motorola BTS assemblies. This section provides information necessary for fabricating this cable. Required Parts Table D-1: Parts Required to Fabricate MMI Cable Item Part Number Qty Description Motorola 3009786R01 Ribbon cable assembly, 1.524 M, one 8–contact MMI connector, one 10–contact connector AMP 749814–1, Belkin A4B202BGC, or equivalent Receptacle kit, unassembled, 9–position, socket contacts, unshielded, metal or plastic shell, solder or crimp–type contacts Cable Details Figure D-1 illustrates the details of the fabricated MMI cable. Figure D-1: Fabricated MMI Cable Details 8–Contact MMI Plug Socket Numbering (Mating Side) Item B DB–9 Plug Socket Numbering (Mating Side) 1 3 5 7 4 3 2 1 2 4 6 8 8 7 6 Item A: Cable assembly 3009786R01 (with 10–contact plug removed) FABRICATION NOTES: 1. Remove 10–contact connector from ribbon cable of cable assembly 3009786R01 2. Separate wires at unterminated end of ribbon cable as required to connect to DB–9 connector contacts 3. Dark wire on ribbon cable of cable assembly 3009786R01 connects to pin 1 of the 8–contact plug 4. Strip three ribbon cable wires with connections specified in Table D-2 and connect to DB–9 plug contacts as specified in Table D-2 5. Shorten un–connected ribbon cable wires enough to prevent contacting DB–9 contacts, leaving enough wire to egage any strain relief in the DB–9 connector shell MAY 2004 MMIFAB001–0 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY D-1 MMI Cable Fabrication – continued Wire Run List Table D-2 provides the wire run/pin–out information for the fabricated MMI cable. Table D-2: Fabricated MMI Cable Wire Run List 8–CONTACT MMI PLUG CONTACT D-2 DB–9 PLUG CONTACT ––––––––––––––––– ––––––––––––––––– ––––––––––––––––– No Connection (NC) NC NC NC NC 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix E: Multiple BTS Configurations Appendix Content Compact BTS Expansion Configuration (Indoor) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . External Combiner and Directional Coupler . . . . . . . . . . . . . . . . . . . . . Frame ID Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Procedure for Expansion Compact BTS with Dual cCLPAs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Three Expansion BTSes Interconnect Cabling for Dual cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Two Expansion BTSes Interconnect Cabling for Dual cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and One Expansion BTSes Interconnect Cabling for Dual cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Procedure for Expansion Compact BTS with Single cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Three Expansion BTSes Interconnect Cabling for Single cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Two Expansion BTSes Interconnect Cabling for Single cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and One Expansion BTSes Interconnect Cabling for Single cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Procedure for Expansion Compact BTS without cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Expansion BTSes Interconnect Cabling without cCLPA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Starter and Two Expansion BTSes to cCLPA Cabling . . . . . . . . . . . . . Starter and One Expansion BTS to cCLPA Cabling . . . . . . . . . . . . . . . Multiple Compact BTS Configuration (Outdoor) . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . External Combiner and Directional Coupler . . . . . . . . . . . . . . . . . . . . . ExpansionCompact BTS Installation Procedure . . . . . . . . . . . . . . . . . . Frame ID Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-1 E-1 E-1 E-1 E-2 E-2 E-3 E-5 E-7 E-9 E-10 E-12 E-14 E-16 E-16 E-20 E-21 E-22 E-22 E-22 E-22 E-23 E-23 E-26 Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) Introduction This appendix covers the indoor and outdoor version of the Compact BTS Expansion configuration. This configuration is set up for only using other Compact BTSes. Power and ground cabling is not shown. Figure E-1 through Figure E-3 show expansion BTSes using two cCLPAs. Figure E-4 through Figure E-6 show expansion BTSes using one cCLPA. Materials Needed The following materials are required to configure expansion BTSes. Interconnect cabling of varying lengths Various sized conduit (if used) Data cable for cCLPA (if used) Customer I/O cabling External Combiner and Directional Coupler A combiner and directional coupler are required for some of the configurations. The following are the recommended specifications for the combiner and directional coupler. Table E-1: Combiner and Directional Coupler Specifications Item Specifications Combiner Connector: N–Type Frequency Range: Up to 2 GHz Insertion Loss: 3.5 dB maximum Return Loss: 16 dB minimum Average Input Power: 60 Watts minimum Directional Coupler MAY 2004 Connector: N–Type Frequency Range: 810 to 950 MHz Coupling: 30 +/–1 dB Directivity: 28 dB minimum Return Loss: 18 dB minimum Average Input Power: 10 Watts minimum 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-1 Compact BTS Expansion Configuration (Indoor) – continued S Motorola recommended directional coupler is P/N 809643T03 S Recommended cable with combiner is Andrew LDF4–50 or equivalent Frame ID Switch Settings Refer to Chapter 5, Figure 5-1 or Figure 5-2 or Table 5-1 through Table 5-4 for the Frame DIP Switch settings. Installation Procedure for Expansion Compact BTS with Dual cCLPAs Follow the procedure in Table E-2 for installation of expansion Compact BTS with Dual cCLPAs. Table E-2: Procedure for Installing Expansion Compact BTS with Dual cCLPA Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure E-1. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure E-2. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure E-3. Proceed to step 3. If not using conduit, dress cables as necessary. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. E-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Starter and Three Expansion BTSes Interconnect Cabling for Dual cCLPA Table E-3 shows in tabular format the interconnect cabling of Figure E-1. Table E-3: Starter and Three Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Dual cCLPA BTS Expansion 1 Expansion 2 Expansion 3 cCLPA Starter TX–1 – – – cCLPA–1 (TX IN) Starter TX–2 – – – cCLPA–2 (TX IN) Starter EXP–TX 2 EXP TX–2 – – *cCLPA–2 Starter EXP–TX 3 – EXP TX–2 – *cCLPA–1 Starter EXP–TX 4 – – EXP TX–2 *cCLPA–2 Starter RX MAIN – – – cCLPA–1 (RX OUT) Starter EXP–RX MAIN 2 – EXP – RX MAIN 2 – *cCLPA–1 Starter EXP–RX MAIN 3 EXP – RX MAIN 2 – – *cCLPA–2 Starter EXP–RX MAIN 4 – – EXP – RX MAIN 2 *cCLPA–2 Starter RX DIV – – – cCLPA–2 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV – – *cCLPA–2 Starter EXP–RX DIV 3 – EXP – RX DIV – *cCLPA–1 Starter EXP–RX DIV 4 – – EXP – RX DIV *cCLPA–2 Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – SDC INPUT EXPANSION – – Starter SDCX 4 – – SDC INPUT EXPANSION – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-3 Compact BTS Expansion Configuration (Indoor) – continued Figure E-1: Three Expansion BTSes Cabling Diagram with Two cCLPAs EXPANSION 3 LOCAL GPS LA cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LA cCLPA 2 Power and Ground not shown Ensure that the expansion BTSes have an Expansion cMPC card installed. E-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Starter and Two Expansion BTSes Interconnect Cabling for Dual cCLPA Table E-4 shows in tabular format the interconnect cabling of Figure E-2. Table E-4: Starter and Two Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Dual cCLPA BTS Expansion 1 Expansion 2 Expansion 3 cCLPA Starter TX–1 – – – cCLPA–1 (TX IN) Starter TX–2 – – – cCLPA–2 (TX IN) Starter EXP–TX 2 EXP TX–2 – – *cCLPA–2 Starter EXP–TX 3 – EXP TX–2 – *cCLPA–1 Starter EXP–TX 4 – – – – Starter RX MAIN – – – cCLPA–1 (RX OUT) EXP – RX MAIN 2 – *cCLPA–1 – *cCLPA–2 Starter EXP–RX MAIN 2 Starter EXP–RX MAIN 3 EXP – RX MAIN 2 Starter EXP–RX MAIN 4 – – – – Starter RX DIV – – – cCLPA–2 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV 2 – – *cCLPA–2 Starter EXP–RX DIV 3 – EXP – RX DIV 2 – *cCLPA–1 Starter EXP–RX DIV 4 – – – – Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – SDC INPUT EXPANSION – – Starter SDCX 4 – – – – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-5 Compact BTS Expansion Configuration (Indoor) – continued Figure E-2: Two Expansion BTSes Cabling Diagram with Two cCLPAs Power and Ground not shown Ensure that the expansion BTSes have an Expansion cMPC card installed. LOCAL GPS LA cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LA cCLPA 2 E-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Starter and One Expansion BTSes Interconnect Cabling for Dual cCLPA Table E-5 shows in tabular format the interconnect cabling of Figure E-3. Table E-5: Starter and One Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Dual cCLPA BTS Expansion 1 Expansion 2 Expansion 3 cCLPA Starter TX–1 – – – cCLPA–1 (TX IN) Starter TX–2 – – – cCLPA–2 (TX IN) Starter EXP–TX 2 EXP TX–2 – – – Starter EXP–TX 3 – – – – Starter EXP–TX 4 – – – – Starter RX MAIN – – – cCLPA–1 (RX OUT) Starter EXP–RX MAIN 2 – – – – Starter EXP–RX MAIN 3 EXP – RX MAIN 2 – – *cCLPA–2 Starter EXP–RX MAIN 4 – – – – Starter RX DIV – – – cCLPA–2 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV 2 – – *cCLPA–2 Starter EXP–RX DIV 3 – – – – Starter EXP–RX DIV 4 – – – – Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – – – – Starter SDCX 4 – – – – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-7 Compact BTS Expansion Configuration (Indoor) – continued Figure E-3: One Expansion BTS Cabling Diagram with Two cCLPAs Power and Ground not shown LOCAL GPS Ensure that the expansion BTS has an Expansion cMPC card installed. LA cCLPA 1 STARTER EXPANSION 1 LA cCLPA 2 E-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Installation Procedure for Expansion Compact BTS with Single cCLPA Follow the procedure in Table E-2 for installation of expansion Compact BTS with Dual cCLPAs. Table E-6: Procedure for Installing Expansion Compact BTS with Single cCLPA Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure E-4. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure E-5. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure E-6. Proceed to step 3. If not using conduit, dress cables as necessary. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-9 Compact BTS Expansion Configuration (Indoor) – continued Starter and Three Expansion BTSes Interconnect Cabling for Single cCLPA Table E-7 shows in tabular format the interconnect cabling of Figure E-4. Table E-7: Starter and Three Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Single cCLPA BTS Expansion 1 Starter TX–1 Expansion 3 Signals are sent thruogh an external combiner and directional coupler Starter TX–2 Expansion 2 cCLPA cCLPA–1 (TX IN) Starter EXP–TX 2 EXP TX–2 – – *cCLPA–1 Starter EXP–TX 3 – EXP TX–2 – *cCLPA–1 Starter EXP–TX 4 – – EXP TX–2 *cCLPA–1 Starter RX MAIN – – – Antenna Starter EXP–RX MAIN 2 EXP – RX MAIN 2 – – *cCLPA–1 Starter EXP–RX MAIN 3 – EXP – RX MAIN 2 – *cCLPA–1 Starter EXP–RX MAIN 4 – – EXP – RX MAIN 2 *cCLPA–1 Starter RX DIV – – – cCLPA–1 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV – – *cCLPA–1 Starter EXP–RX DIV 3 – EXP – RX DIV – *cCLPA–1 Starter EXP–RX DIV 4 – – EXP – RX DIV *cCLPA–1 Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – SDC INPUT EXPANSION – – Starter SDCX 4 – – SDC INPUT EXPANSION – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. E-10 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-4: Three Expansion BTSes Cabling Diagram with One cCLPA EXPANSION 2 EXPANSION 3 LOCAL GPS LA cCLPA 1 STARTER DC EXPANSION 1 COMBINER TX 1 LA TX 2 RX DIV RX MAIN Power and Ground not shown MAY 2004 Ensure that the expansion BTSes have an Expansion cMPC card installed. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-11 Compact BTS Expansion Configuration (Indoor) – continued Starter and Two Expansion BTSes Interconnect Cabling for Single cCLPA Table E-8 shows in tabular format the interconnect cabling of Figure E-5. Table E-8: Starter and Two Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Single cCLPA BTS Expansion 1 Starter TX–1 Expansion 3 Signals are sent thruogh an external combiner and directional coupler Starter TX–2 Expansion 2 cCLPA cCLPA–1 (TX IN) Starter EXP–TX 2 EXP TX–2 – – *cCLPA–1 Starter EXP–TX 3 – EXP TX–2 – *cCLPA–1 Starter EXP–TX 4 – – – – Starter RX MAIN – – – Antenna Starter EXP–RX MAIN 2 EXP – RX MAIN 2 – – *cCLPA–1 Starter EXP–RX MAIN 3 – EXP – RX MAIN 2 – *cCLPA–1 Starter EXP–RX MAIN 4 – – – – Starter RX DIV – – – cCLPA–1 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV 2 – – *cCLPA–1 Starter EXP–RX DIV 3 – EXP – RX DIV 2 – *cCLPA–1 Starter EXP–RX DIV 4 – – – – Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – SDC INPUT EXPANSION – – Starter SDCX 4 – – – – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. E-12 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-5: Two Expansion BTSes Cabling Diagram with One cCLPA Power and Ground not shown Ensure that the expansion BTSes have an Expansion cMPC cards installed. LOCAL GPS LA cCLPA 1 EXPANSION 2 STARTER DC EXPANSION 1 COMBINER TX 1 TX 2 LA RX DIV RX MAIN MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-13 Compact BTS Expansion Configuration (Indoor) – continued Starter and One Expansion BTSes Interconnect Cabling for Single cCLPA Table E-9 shows in tabular format the interconnect cabling of Figure E-6. Table E-9: Starter and One Expansion BTS Interconnect Cabling for Circuit or Packet Configuration with Single cCLPA BTS Expansion 1 Expansion 2 Expansion 3 cCLPA Starter TX–1 – – – cCLPA–1 (TX IN) Starter TX–2 – – – – Starter EXP–TX 2 EXP TX–2 – – – Starter EXP–TX 3 – – – – Starter EXP–TX 4 – – – – Starter RX MAIN – – – Antenna Starter EXP–RX MAIN 2 – – – – Starter EXP–RX MAIN 3 EXP – RX MAIN 2 – – *cCLPA–1 Starter EXP–RX MAIN 4 – – – – Starter RX DIV – – – cCLPA–1 (RX OUT) Starter EXP–RX DIV 2 EXP – RX DIV 2 – – *cCLPA–1 Starter EXP–RX DIV 3 – – – – Starter EXP–RX DIV 4 – – – – Starter SDCX 2 SDC INPUT EXPANSION – – – Starter SDCX 3 – – – – Starter SDCX 4 – – – – * Not actual physical connections to cCLPA, but software connections through the Starter BTS. E-14 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-6: One Expansion BTS Cabling Diagram with One cCLPA Power and Ground not shown LOCAL GPS Ensure that the expansion BTS has an Expansion cMPC card installed. LA cCLPA 1 STARTER EXPANSION 1 TX 1 RX DIV LA RX MAIN MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-15 Compact BTS Expansion Configuration (Indoor) – continued Installation Procedure for Expansion Compact BTS without cCLPA Follow the procedure in Table E-2 for installation of expansion Compact BTS without cCLPAs. Table E-7 through Table E-9 (less the cCLPA) are virtually the same and are can be used for the diagrams without cCLPA, and so separate tables will not be included here. Table E-10: Procedure for Installing Expansion Compact BTS without cCLPA Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure E-7. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure E-8. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure E-9. Proceed to step 3. If not using conduit, dress cables as necessary. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. Starter and Expansion BTSes Interconnect Cabling without cCLPA Table E-7 through Table E-9 are virtually the same and are can be used for the diagrams without cCLPA. Separate tables will not be included here. E-16 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-7: Three Expansion BTSes Cabling Diagram EXPANSION 2 EXPANSION 3 LOCAL GPS STARTER LA LA EXPANSION 1 DC LA TX 2 COMBINER TX 1 RX MAIN RX DIV Power and Ground not shown MAY 2004 Ensure that the expansion BTSes have the expansion cMPC cards installed. 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-17 Compact BTS Expansion Configuration (Indoor) – continued Figure E-8: Two Expansion BTSes Cabling Diagram Power and Ground not shown Ensure that the expansion BTSes have the expansion cMPC cards installed. LOCAL GPS LA EXPANSION 2 STARTER LA LA EXPANSION 1 DC TX 2 COMBINER TX 1 RX MAIN RX DIV E-18 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-9: One Expansion BTS Cabling Diagram Power and Ground not shown LOCAL GPS Ensure that the expansion BTS has an expansion cMPC card installed. LA STARTER LA EXPANSION 1 LA TX 1 RX MAIN RX DIV MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-19 Compact BTS Expansion Configuration (Indoor) – continued Table E-11: BBX (Carrier) to cCLPA Via RS485 BTS cCLPA Starter – BBX1 cCLPA–1 Starter – BBX4 cCLPA–1 Expansion 1 – BBX1 cCLPA–2 Expansion 1 – BBX4 cCLPA–2 Expansion 2 – BBX1 cCLPA–1 Expansion 2 – BBX4 cCLPA–1 Expansion 3 – BBX1 cCLPA–2 Expansion 3 – BBX4 cCLPA–2 Table E-12 shows in tabular format the BTS–to–cCLPA cabling of Figure E-1. Table E-12: Starter and Three Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) Expansion 2 – BBX1 CPA–A (CPA–1) Expansion 2 – BBX4 CPA–A (CPA–1) Expansion 3 – BBX1 CPA–B (CPA–2) Expansion 3 – BBX4 CPA–B (CPA–2) Starter and Two Expansion BTSes to cCLPA Cabling Table E-13 shows in tabular format the BTS–to–cCLPA cabling of Figure E-2. E-20 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Compact BTS Expansion Configuration (Indoor) – continued Table E-13: Starter and Two Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) Expansion 2 – BBX1 CPA–A (CPA–1) Expansion 2 – BBX4 CPA–A (CPA–1) Starter and One Expansion BTS to cCLPA Cabling Table E-14 shows in tabular format the BTS–to–cCLPA cabling of Figure E-3. Table E-14: Starter and One Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS MAY 2004 cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-21 Multiple Compact BTS Configuration (Outdoor) Introduction This section covers only the outdoor version of the multiple Compact BTS configuration. Materials Needed The following materials are required to configure expansion BTSes. Varied length cables with RJ45 connectors Varied length cables with RF connectors Conduit (customer supplied) DC Power source (custoemr supplied) Battery Backup (customer supplied) External Combiner and Directional Coupler A combiner and directional coupler are required for some of the configurations. The following are the recommended specifications for the combiner and directional coupler. Table E-15: Combiner and Directional Coupler Specifications Item Specifications Combiner Connector: N–Type Frequency Range: Up to 2 GHz Insertion Loss: 3.5 dB maximum Return Loss: 16 dB minimum Average Input Power: 60 Watts minimum Directional Coupler Connector: N–Type Frequency Range: 810 to 950 MHz Coupling: 30 +/–1 dB Directivity: 28 dB minimum Return Loss: 18 dB minimum Average Input Power: 10 Watts minimum S Motorola recommended directional coupler is P/N 809643T03 S Recommended cable with combiner is Andrew LDF4–50 or equivalent E-22 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Multiple Compact BTS Configuration (Outdoor) – continued S Directional coupler and combiner are not environmentally protected , and so must be placed within the TME. ExpansionCompact BTS Installation Procedure Follow the procedure in Table E-16for installation of multiple Compact BTSes. Table E-16: Procedure for Installing Expansion Compact BTSes Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure E-1. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure E-2. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure E-3. Proceed to step 3. If conduit is not used, dress cables as necessary. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. Frame ID Switch Settings Refer to Chapter 5, Figure 5-1 or Figure 5-2 or Table 5-1 through Table 5-4 for the Frame DIP Switch settings. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-23 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-10: Three Expansion BTSes Cabling Diagram Power and Ground not shown EXPANSION 3 LOCAL GPS TME RF–GPS CONNECTOR LIGHTNING ARRESTOR cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS E-24 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-11: Outdoor Two Expansion BTSes Cabling Diagram Power and Ground not shown LOCAL GPS TME RF–GPS CONNECTOR LIGHTNING ARRESTOR cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY E-25 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-12: Outdoor One Expansion BTS Cabling Diagram Power and Ground not shown LOCAL GPS LIGHTNING ARRESTOR TME RF–GPS CONNECTOR cCLPA 1 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS Other Diagrams For single cCLPA and no cCLPA, refer to the diagrams for indoor and allow for the TME connectors as shown in the diagrams presented in this appendix. E-26 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix F: Logical BTS Configuration Appendix Content Logical BTS LAN Configuration for Compact BTS (Indoor) . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Frame ID Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logical BTS LAN Cabling Installation Procedure . . . . . . . . . . . . . . . . F-1 F-1 F-1 F-1 F-3 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Logical BTS LAN Configuration for Compact BTS (Indoor) Introduction This appendix covers only the Logical BTS configuration for cicruit Compact BTS. The diagrams cover only the LAN connections. This configuration is set up to be used only with other Compact BTSes. Power and ground cabling are not shown. The LAN operates at 10Mbps which is an ethernet standard. It provides an interface for each GLI in the confiiguration. Refer to Figure 6-1 for location of the LAN connectors. In circuit mode, the LAN connections are used by the LMF to download data, and for use in calibration, acceptance testing, and optimization. Use these diagrams in conjunction with the diagrams for expansion BTSes in Appendix E. Materials Needed The following materials are required to configure LAN connections BTSes. S 7 – RG–58 U cables (Length depends on spacing) S 14 – BNC, Terminaton Resistor Plugs (IEC 169–8 spec) S 2 – BNC, 50 Ohm terminations BTS ID Switch Settings Refer to Chapter 5, Figure 5-1 or Figure 5-2 or Table 5-1 through Table 5-4 for the BTS DIP Switch settings. Figure F-1: Three Expansion BTSes LAN Cabling Diagram 50–ohm Load 50–ohm Load Ain Bin Aout Bout STARTER MAY 2004 Ain Bin Aout Bout Ain Bin Aout Bout EXPANSION 1 EXPANSION 2 Ain Bin Aout Bout EXPANSION 3 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY F-1 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Figure F-2: Two Expansion BTSes LAN Cabling Diagram 50–ohm Load Ain Bin Aout Bout STARTER Ain Bin Aout Bout Ain Bin Aout Bout EXPANSION 1 EXPANSION 2 50–ohm Load Figure F-3: One Expansion BTSes LAN Cabling Diagram 50–ohm Load Ain Bin Aout Bout Ain Bin Aout Bout STARTER F-2 50–ohm Load EXPANSION 1 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Logical BTS LAN Cabling Installation Procedure Follow the procedure in Table F-1 for installation of LAN cables for Logical BTS. Table F-1: Procedure for Installing LAN Cabling for Logical BTS Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure F-1. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure F-2. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure F-3. Proceed to step 3. Route LAN cables through conduit from Starter to Expansion BTS 1. Route LAN cables through conduit from Starter to Expansion BTS 2 or 3 (depending on configuration). If in use, route LAN cables from Expansion BTS 1 to Expansion BTS 2. If in use, route LAN cables from Expansion BTS 2 to Expansion BTS 3. Ensure that unused LAN connections are terminated in 50 ohms. If not already performed, proceed to Appendix E for expansion cabling diagrams. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY F-3 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Notes F-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix G: Integrated BTS Router Preliminary Operations Appendix Content Integrated BTS Router Preliminary Operations – Introduction . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preliminary Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . When to Perform the Verifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-1 G-1 G-1 G-1 Verify GLI3 Software Version and Span Parameter Settings . . . . . . . . . . . . . . . Verify GLI3 Software Version and Span Parameter Settings . . . . . . . . Required Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verifying GLI3 Software Version and Span Parameter Settings . . . . . . G-2 G-2 G-2 G-2 Change GLI3 Span Parameter Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Change GLI3 Span Parameter Configuration . . . . . . . . . . . . . . . . . . . . G-6 G-6 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Integrated BTS Router Preliminary Operations – Introduction Introduction The information and procedures provided are performed in cases where the GLI3 load and span parameters need to be verified. Preliminary Operations Implementing the Integrated BTS Router (IBR) function requires some preliminary checks of the GLI3 cards which will be used. This appendix provides the procedures to accomplish these checks. The checks are: S Verification that IBR–capable software is installed on GLI3 cards which will be used for IBR S Verification that span parameter settings on GLI3 cards match the requirement for the spans at the BTS where the cards will be installed. When to Perform the Verifications All preliminary verifications provided in this chapter can be performed at either the BTS site or in a central facility equipped to power–up the GLI3 cards. Depending on the circumstances of the cards’ use, however, it may be advantageous in reducing the on–site upgrade time and logistics to perform some of the verifications prior to installation at the BTS site. Table G-1 lists card conditions of use and the corresponding suggested verification locations for the software version and span parameter settings. Table G-1: Suggested Preliminary Verification Locations GLI3 Card Condition Installed and operating (circuit or packet) MAY 2004 Installation Location Software Version Verification Location Span Parameter Settings Verification Location Site where installed At site Not required unless span type will change Different operating site from where currently installed At site where currently installed Before or after installation at different site 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-1 Verify GLI3 Software Version and Span Parameter Settings Verify GLI3 Software Version and Span Parameter Settings Software Version Verification – Before upgrading a BTS to packet backhaul with an IBR, the software version installed in the GLI3 card or cards must be verified. If the installed software version does not support IBR functionality, it must be upgraded to a version which does. For BTS sites which are already in operation, the upgrade can be done through a network download to the GLI3 once it is installed. For cards to be installed in new BTS sites not previously in operation, the upgrade requires special procedures, and must be done with Motorola Field Operations or Account Team assistance. Span Parameter Settings – Prior to initializing a GLI3 card for the first time in a live circuit BTS or IBR packet BTS site, the span parameter settings in the card must be verified as matching those provisioned in the OMC–R database. If the settings are not correct, the card will be unable to communicate with the RAN network elements and the site will not go into service. Procedures are included in this section to change the GLI3 card span parameter settings if this is necessary to match those required for the BTS. Required Items The following items are required to perform the verification: S Local Maintenance Facility (LMF) computer with the LMF application program version installed which is compatible with the software release installed on the BSS refer to Chapter 6 Optimization/ATP in this manual. S One of the following – Motorola cable part number CGDSMMICABLE219112 – Fabricated DB–9 receptacle–to–8–contact MMI connector cable (see the MMI Cable Fabrication Section of Appendix D for fabrication instructions and Figure 6-9 for connection) – SLN2006A MMI Interface Kit (this kit is no longer available to order), consisting of the following: –– Motorola Model TRN9666A null modem board –– Motorola 3009786R01 MMI cable or equivalent S (For use with SLN2006A only) Straight–through RS–232 cable, DB–9 to DB–9, and DB–9 to DB–25 connector adapter (see Figure D-1) Verifying GLI3 Software Version and Span Parameter Settings Follow the procedure in Table G-2 to verify GLI3 card software version and span parameter settings. G-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step Action If it has not been done, start a GLI3 MMI communication session on the LMF computer as described in Table 6-11. Verify the installed software version by entering the following at the GLI3 prompt: display version 3a Response to the command will depend on the operating mode of the card. Responses similar to the following will be displayed for: – Cards in circuit mode: GLI3> display version 01.09.1980 20:01:59 MGLI–002–2 OOS–SBY BTS–CDMA 16.41.200.14 RAM version: 16.41.200.14 ROM version: 16.41.200.14 Built: Tue Oct 21 09:52:28 2003 il27–2112 Bootrom version: 16.41.200.12 Bootrom Built: Thu Oct 2 03:11:34 2003 IL27–0775 Bootblock version: 16.1.59.00 Bootblock Built: Wed Apr 10 07:08:06 2002 RIPCORD004 This GLI board is in RAM Booted from /nvram00/loads/gli3_ckt_rom_upgrade.elf Next boot from /nvram00/loads/gli3_ckt_rom_upgrade.elf GLI3> . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-3 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step 3b Action – For cards in packet mode: GLI3> display version 03.23.2004 18:16:07 MGLI–250–1 CC PRESENT BTS–CDMA 16.41.00.11 INTERNAL RAM VERSION: 16.41.0.11 RAM Built: Tue Mar 2 04:59:33 2004 il27–2112 BOOTROM VERSION: 16.41.00.08 BOOTROM Built: Tue Feb 17 10:52:27 2004 il27–0507 BOOTBLOCK VERSION: 16.1.59.00 BOOTBLOCK Built: Wed Apr 10 07:08:06 2002 RIPCORD004 SYSTEM VERSION: 2.16.4.50.15 COMMITTED VERSION: 2.16.4.50.15 NEXT VERSION: 2.16.4.50.15 BACK UP VERSION 2.16.4.50.10 CURRENT RELEASE PATH: /nvram00/screl/2.16.4.50.15/ CURRENT LIF: /nvram00/screl/2.16.4.50.15/NE_LIF.xml CURRENT IMAGE: /nvram00/screl/2.16.4.50.15/gli_ram.bin.0108 CODE SERVER: 128.0.0.1 GLI3> Note the bootROM or System version numbers displayed and determine if the GLI3 is loaded with IBR–capable code as follows: S If the booROM version number is 2.16.41.00.08 or later, the GLI3 is IBR–capable S If the System version number is 2.16.4.50.7 or later (for example, 2.16.4.50.25), the GLI3 is IBR–capable NOTE If the card is to be installed in a new BTS site which has not previously been in operation, contact the local Motorola Account Team for assistance in upgrading the card with IBR–capable software version. . . . continued on next page G-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step Action Verify the span parameter settings for frame format, equalization, and linkspeed by entering the following at the GLI3> prompt: config ni current The system will respond with a display similar to the following: The frame format in flash Equalization: Span A – Default (0–131 Span B – Default (0–131 Span C – Default (0–131 Span D – Default (0–131 Span E – Default (0–131 Span F – Default (0–131 is set to use T1_2. feet feet feet feet feet feet for for for for for for T1/J1, T1/J1, T1/J1, T1/J1, T1/J1, T1/J1, 120 120 120 120 120 120 Ohm Ohm Ohm Ohm Ohm Ohm for for for for for for E1) E1) E1) E1) E1) E1) Linkspeed: Default (56K for T1 D4 AMI, 64K otherwise) Currently, the link is running at the default rate The actual rate is 0 NOTE S Defaults for span equalization are 0–131 feet for T1/J1 spans and 120 Ohm for E1. S Default linkspeed is 56K for T1 D4 AMI spans and 64K for all other types. S There is no need to change from defaults unless the provisioned span configuration requires it. The span parameter settings in the GLI must match those provisioned in the OMC–R database for the BTS. If they do not, proceed to Table G-3 in the Change GLI3 Span Parameter Settings section. If no other MMI actions are required for the card, terminate the MMI communication session and disconnect the LMF computer from the card. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-5 Change GLI3 Span Parameter Settings Change GLI3 Span Parameter Configuration If span parameter settings in the GLI3 card do not match the OMC–R database span parameters for the BTS where they are to be installed, follow the procedure in Table G-3 to change them. Table G-3: Set GLI3 Span Parameter Configuration Step Action If it has not been done, start a GLI3 MMI communication session on the LMF computer as described in Table 6-11. At the GLI3> prompt, enter the following: config ni format The terminal will display a response similar to the following: COMMAND SYNTAX: config ni format option Next available options: LIST – option : Span Option E1_1 : E1_1 – E1 HDB3 CRC4 no TS16 E1_2 : E1_2 – E1 HDB3 no CRC4 no TS16 E1_3 : E1_3 – E1 HDB3 CRC4 TS16 E1_4 : E1_4 – E1 HDB3 no CRC4 TS16 T1_1 : T1_1 – D4, AMI, No ZCS T1_2 : T1_2 – ESF, B8ZS J1_1 : J1_1 – ESF, B8ZS (Japan) – Default J1_2 : J1_2 – ESF, B8ZS T1_3 : T1_3 – D4, AMI, ZCS NOTE With this command, all active (in–use) spans will be set to the same format. To set or change the span type, enter the correct option from the list at the entry prompt (>), as shown in the following example: > T1_2 NOTE The entry is case–sensitive and must be typed exactly as it appears in the list. If the entry is typed incorrectly, a response similar to the following will be displayed: CP: Invalid command 01.061980 00:11’59 MGLI–000–2 INS–ACT BTS–CDMA 16.1.68.00 GLI3> . . . continued on next page G-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action An acknowledgement similar to the following will be displayed: The value has been programmed. It will take effect after the next reset. GLI3> If the current GLI span rate must be changed, enter the following MMI command: config ni linkspeed A response similar to the following will be displayed : Next available options: LIST – linkspeed : Span Linkspeed 56K : 56K (default for T1_1 and T1_3 systems) 64K : 64K (default for all other span configurations) NOTE With this command, all active (in–use) spans will be set to the same linkspeed. To set or change the span linkspeed, enter the required option from the list at the entry prompt (>), as shown in the following example: > 64K NOTE The entry is case–sensitive and must be typed exactly as it appears in the list. If the entry is typed incorrectly, a response similar to the following will be displayed: CP: Invalid command 01.061980 00:12’04 MGLI–000–2 INS–ACT BTS–CDMA 16.1.68.00 GLI3> An acknowledgement similar to the following will be displayed: The value has been programmed. GLI3> It will take effect after the next reset. . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-7 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action If the span equalization must be changed, enter the following MMI command: config ni equal A response similar to the following will be displayed: COMMAND SYNTAX: config ni equal Next available options: LIST – span : Span a : Span b : Span c : Span d : Span e : Span f : Span span equal . . . continued on next page G-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action At the entry prompt (>), enter the designator from the list for the span to be changed as shown in the following example: > a A response similar to the following will be displayed : COMMAND SYNTAX: config ni equal a equal Next available options: LIST – equal : Span Equalization 0 : 0–131 feet (default for T1/J1) 1 : 132–262 feet 2 : 263–393 feet 3 : 394–524 feet 4 : 525–655 feet 5 : LONG HAUL 6 : 75 OHM 7 : 120 OHM (default for E1) 8 : T1 Long Haul mode. No Attenuation 9 : T1 Long Haul mode. 7.5 dB Attenuation 10 : T1 Long Haul mode. 15.0 dB Attenuation 11 : T1 Long Haul mode. 22.5 dB Attenuation 12 : E1 Long Haul mode. ! CAUTION When selecting span equalization settings, comply with the following or the BTS may operate erratically or unpredictably: S For ALL BTS types, do not select any of the following settings if they are displayed: – – – – 5 LONG HAUL 6 75 OHM 11 T1 Long Haul mode. 22.5 dB Attenuation 12 E1 Long Haul mode S For four–digit BTSs supported with Channel Service Units (CSU), do not select any of the following additional settings: – 8 T1 Long Haul mode. No Attenuation – 9 T1 Long Haul mode. 7.5 dB Attenuation – 10 T1 Long Haul mode. 15.0 dB Attenuation . . . continued on next page MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-9 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step 10 Action At the entry prompt (>), enter the code for the required equalization from the list as shown in the following example: > 0 A response similar to the following will be displayed : > 0 The value has been programmed. It will take effect after the next reset. GLI2> 11 Repeat steps 8 through 10 for each in–use span. 12 NOTE This step must be performed for GLI3 cards operating on a packet image to ensure the span parameter changes will replace the previous settings. For a GLI3 card in packet mode, enter the following: rmfile /nvram00/config/hlp_param.txt A response similar to the following will be displayed : GLI3> rmfile /nvram00/config/hlp_param.txt 11.24.2003 23:14:57 MGLI–004–1 CC PRESENT BTS–CDMA 16.40.00.09 Removing file: /nvram00/config/hlp_param.txt Successfully removed file: /nvram00/config/hlp_param.txt GLI3> 13 * IMPORTANT S After executing the config ni format, config ni linkspeed, and/or config ni equal commands, the affected MGLI/GLI board MUST be reset and reloaded for changes to take effect. S Although defaults are shown in the software, always consult site–specific documentation for span type, equalization, and linkspeed used at the site where the cards are to be installed. Reset the card using the MMI reset command. . . . continued on next page G-10 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step 14 Action Once the card has completed resetting, execute the following command to verify span settings are as required: config ni current A response similar to the following will be displayed : The frame format in flash Equalization: Span A – 0–131 feet Span B – 0–131 feet Span C – Default (0–131 Span D – Default (0–131 Span E – Default (0–131 Span F – Default (0–131 is set to use T1_2. feet feet feet feet for for for for T1/J1, T1/J1, T1/J1, T1/J1, 120 120 120 120 Ohm Ohm Ohm Ohm for for for for E1) E1) E1) E1) Linkspeed: 64K Currently, the link is running at 64K The actual rate is 0 15 If the span configuration is not correct, perform the applicable step from this table to change it and repeat steps 12, 13, and 14 to verify required changes have been programmed. 16 If no other MMI actions are required for the card, terminate the MMI communication session and disconnect the LMF computer from the card. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY G-11 Change GLI3 Span Parameter Settings – continued Notes G-12 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix H: Integrated BTS Router Installation Appendix Content Integrated BTS Router Installation – Introduction . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1 H-1 New Packet BTS Installation with IBR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . New Packet BTS Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Implementing IBR Functionality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-2 H-2 H-2 H-2 BTS Span Connections for IBR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Span Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Span Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-4 H-4 H-4 BTS Span Connections for IBR – One Span . . . . . . . . . . . . . . . . . . . . . . . . . . . One Span Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-5 H-5 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Integrated BTS Router Installation – Introduction Background The IBR capability was developed to provide a low–cost solution for providing CDMA packet backhaul benefits at cell sites with lower traffic volumes. The IBR function is implemented by using the GLI3 card Concentration Highway Interface (CHI) bus 2 processor to perform the router function. This is accomplished through changes in the GLI3 card software. A card with the IBR–capable software can perform as a circuit GLI3 card, as a GLI3 with IBR, and as a GLI3 used with external BTS router groups. The card has the capability to recognize the environment in which it is installed and autoselect the appropriate operating mode (circuit, IBR packet, external BTS router packet). Span line channel capability for an IBR–equipped SC480 BTS is limited to those available on a single T1 or E1 span. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY H-1 New Packet BTS Installation with IBR New Packet BTS Installation This section covers the actions necessary for implementing IBR packet capability in the installation of a new BTS. Procedures unique to this implementation are contained in this section. When procedures required in this implementation are contained in other parts of this publication or in other publications, the user will be specifically directed to them at the appropriate places in this section. Prerequisites The following must be accomplished prior to traveling to the BTS site for IBR implementation: S The BTS has been installed as described in Chapter 4 of this manual. S One of the following: – GLI3 card(s) for the site have been verified as having IBR–capable software image installed – Motorola Field Operations or Account Team member is identified to travel to the BTS site to perform GLI3 IBR–capable software installation, if required S GLI3 card(s) for the BTS are on hand for transport to the BTS site or are verified to be at the BTS site S Required publications to support IBR implementation activities are on hand for transportation to the BTS site Implementing IBR Functionality Follow the procedure in Table H-1 to implement IBR functionality for the BTS. Table H-1: Implement IBR Functionality in New BTS Step Action Upon arrival at the site, contact the OMC–R and notify the operator that site operations are starting. If the BTS has not been initially powered up, apply power to the BTS in accordance with the Power Pre–Power–up Tests and Initial Power–up Tests and Procedures described in Chapter 5 of this manual. Once the BTS is fully powered up with these procedures, the GLI3 card should have been seated in the correct slot. If it is not, seat the card at this time and allow each to complete its initialization. If it was not previously done, follow the procedure in Table G-2 to: S Verify the software version in the GLI3 card(s) S Verify the span parameter settings in each GLI3 card match those established for the site in the OMC–R database If the GLI3software requires upgrading for IBR capability, request Motorola Field Operations or Account Team assistance in upgrading the software. If GLI3 card span parameter settings do not match those required, change them as necessary by following the procedure in Table G-3. . . . continued on next page H-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 New Packet BTS Installation with IBR – continued Table H-1: Implement IBR Functionality in New BTS Step Action Refer to the site documentation for IBR spans and inspect the BTS span cabling connections to be sure they match Figure H-1. Correct any cabling discrepancies between the BTS span cabling and site documentation, referring to Figure H-1 and the Install Span and Alarm Cables and Span Line Cable Pin Numbering Chapter 4 of this manual as required. If the BTS requires optimization and/or ATP, perform them at this time by following the applicable procedures in Chapter 6 of this manual. 10 When all preparations for BTS operation are completed, contact the OMC–R and notify the operator that the BTS is ready for operation and request notification when the operator no longer requires support on–site. 11 When advised that there is no further requirement for on–site support of BTS and IBR initialization, proceed to Chapter 8 and follow the procedures to prepare to leave the site. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY H-3 BTS Span Connections for IBR BTS Span Connections The illustration in this section provides the detail of span connection for a non–redundant BTS to support IBR packet operation. The required configuration for IBR in redundant BTS is a single span. BTS Span Cable All connections in the BTS span connection diagram for IBR are based on the use of the following Motorola–standard BTS span cable: Table H-2: BTS Span Cables Item BTS span cable Part Number CGDS1583461 or CGDS1583462 Qty Description Cable, 50–wire, shielded twisted 25 pair, 100 ohm, 24–AWG, 7.6 m (25 ft – CGDS1583461) or 15.2 m (50 ft – CGDS1583462), one male 50–contact TELCO connector attached. One end of cable is un–terminated to allow connection to site termination equipment. H-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 BTS Span Connections for IBR – One Span One Span Frame Figure H-1 illustrates the connection details for one span to support packet operation with IBR for non–redundant BTS. Figure H-1: Cabling Compact BTS Packet Operation Integrated BTS Router Spans – One Span Termination Equipment BTS ALL CROSS–CONNECTS ARE DONE WITHIN TERMINATION EQUIPMENT SPAN I/O A BLU–WHT RX TIP PIN 2 RX TIP A WHT–BLU RX RING ORG–WHT TX TIP PIN 1 RX RING A PIN 5 TX TIP A PIN 4 TX RING A BTS SPAN CABLE WHT–ORG TX RING SC4812TL0201 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY H-5 BTS Span Connections for IBR – One Span – continued Notes H-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Appendix I: Packet Backhaul Configuration Appendix Content Packet Backhaul BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Packet Backhaul BTS Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-1 I-1 I-1 MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Packet Backhaul BTS Introduction For Packet Backhaul, the LMF Help should be accessed for the appropriate procedures. Packet Backhaul BTS Procedures Optimization Procedures S Click on LMF Help S Select Optimization/ATP Process S Select Optimization procedure for SC48X – – – – – – – Important CDF Parameters CSA Optimization of SC48X High Power Configuration Optimization of SC48X Low Power Configuration Optimization of SC48X High Power in Logical Configuration Optimization of SC48X Low Power in Logical Configuration Calibrating Procedures for SC48X Expansion Frame Configurations Follow the appropriate procedure identified in the LMF Help. MAY 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY I-1 Packet Backhaul BTS – continued Notes I-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY MAY 2004 Index Numbers code domain power acceptance test procedure, 7-19 10BaseT/10Base2 converter, LMF to BTS failure report generation, 7-23 FER test, frame error rate testing, 7-21 pilot time offset, 7-16 prerequisites, 7-2 spectral purity TX mask, 7-11 test set–up, 6-61 Advantest R3267/R3562, DRDCs, 6-64 Advantest R3465, 6-61 Agilent 8935, DRDCs, 6-61 Agilent 8935/E4432B, DRDCs, 6-63 Agilent E4406A/E4432B, DRDCs, 6-63 CyberTest, 6-61 HP 8921A, 1.9 GHz, 6-62 HP 8921A, 800 MHz, 6-59 , 6-62 waveform quality (Rho), 7-14 waveform quality (RHO) acceptance test procedure, 7-14 connection, 6-17 Abbreviated RX acceptance test, all–inclusive, 7-5 TX acceptance test, all–inclusive, 7-5 Acceptance Test Procedure. See ATP Accessing OMCR CLI Window, 10-2 Advantest R3267 Spectrum Analyzer GPIB Address, B-7 Advantest R3465 Communications Test Set GPIB Address, B-12 Advantest R3562 Signal Generator GPIB Address, B-9 Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address, B-9 Agilent E4406A, calibration, B-28 Agilent E4406A Transmitter Tester GPIB Address, B-5 Agilent E4432B Signal Generator GPIB Address, B-6 ATP – Reduced, 7-1 Attenuator, required test equipment, 1-18 Basic Troubleshooting Overview, 11-1 Bay Level Offset calibration description, 6-76 purpose, 6-76 when to calibrate, 6-76 All TX ATP Test Procedure, 7-7 BBX carrier spectral purity, 7-11 primary and redundant, TX tests to be performed, 7-9 All TX/RX ATP Test Procedure, 7-6 BLO. See Bay Level Offset calibration ATP all inclusive TX acceptance test outline, 7-5 automated introduction, 7-1 code domain noise floor acceptance test procedure, 7-19 Broad Band Receiver. See BBX All Cal/Audit procedure, 6-82 All RX ATP Test Procedure, 7-8 MAY 2004 BTS download, 6-36 Ethernet LAN interconnect diagram, 6-33 LMF connection, 6-16 , 6-17 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Index-1 Index – continued RX sensitivity/frame error rate, 7-10 system software download, 6-6 BTS Frame Erasure Rate. See FER BTS Log In Procedure, GUI, 6-25 BTS login CLI environment, 6-27 General, 6-25 GUI environment, 6-25 BTS Logout CLI environment, 6-29 GUI environment, 6-28 Create CAL File, 6-88 Cell Site equipage verification, 6-2 types configuration, 6-5 Cell Site Data File. See CDF CLI, 6-24 Clock Sync Module. See CSM Code domain power/noise floor acceptance test, 7-18 analyzer display, 7-20 Command Line Interface, 6-24 Communication test set, rear panel, B-18 , B-20 communications test set, TX acceptance tests, 7-4 Connect BTS E1/T1 spans, 8-4 cable calibration, automatic, test set–up, 6-56 Advantest R3267/R3562, 6-57 Advantest R3465, 6-56 Agilent 8935, 6-56 Agilent E4406A/E4432B, 6-57 CyberTest, 6-56 HP 8921A, 6-56 Connect BTS T1/E1 spans, 8-4 Connecting test equipment to the BTS, 6-51 Control, TX output verification, 7-4 Copy and Load Cal File to to CBSC, 8-1 Copy BTS CDF (or NECF) and CBSC CDF Files to the LMF, 6-12 CAL file. See calibration data file Copying CAL files from CDMA LMF to the CBSC, 8-1 Calibrate Test Cabling Using Signal Generator & Spectrum Analyzer, 6-71 Copying CAL files to the CBSC, 8-2 Calibrating, Test Equipment, 6-68 Calibrating Cables, Overview, 6-69 Calibrating Test Cable Setup, PCS Interface HP83236B, B-32 Calibrating Test Cabling using Communications System Analyzer, 6-70 Calibration, required test equipment, 1-14 calibration calibration data file, 6-77 Gigatronics 8542B, B-31 calibration data file, description of, 6-77 Cannot communicate to Power Meter, 11-5 CCP shelf illustration, left side, 1-24 CDF, 6-5 site equipage verification, 6-6 site type and equipage data information, 6-1 CDMA, subscriber mobile radiotelephone, optional test equipment, 1-19 Index-2 CSM clock source, select, 6-40 enable, 6-41 LEDs, 6-43 system description, 6-43 CSM clock source, select, 6-40 CSM frequency verification, 6-45 Devices, download. See Download Digital multimeter, required test equipment, 1-19 Download See also Devices BTS, 6-36 BTS system software, 6-6 Download BLO Procedure, 6-84 download ROM and RAM code. See ROM code Download/Enable MCCs, 6-42 Download/Enable MGLIs, 6-39 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY Index – continued Motorola CyberTest, B-13 E1, isolate BTS from the E1 spans, 6-16 GPIB Interface Box, RS232, B-16 E4406A, calibration, B-28 Enable CSMs. See CSM GPS Initialization/Verification estimated position accuracy, 6-46 surveyed position accuracy, 6-46 Equipment, warm–up, required test equipment, 1-14 GPS satellite system, 6-41 Equipment warm-up, 6-55 GUI, 6-19 establish MMI communication, 6-30 Ethernet LAN, interconnect diagram, 6-33 Ethernet LAN termination, 6-3 Hardware Requirements, 1-15 External Test Equipment Removal, 8-3 Hewlett Packard, 10833A or equivalent, required test equipment, 1-17 Hewlett Packard HP8921A and HP83236A/B GPIB Address, B-11 Failure report generation, 7-23 FER, acceptance test, 7-21 Files, intermediate file, 7-23 files, calibration data, 6-77 Fluke, model 8062A with Y8134 test lead kit, test equipment, 1-19 High–impedance conductive wrist strap, required test equipment, 1-18 HP 437 Pre–calibration, B-29 setting GPIB address, B-14 HP 83236A, B-21 Folder Structure Overview, 6-9 HP 8921A PCS interface, Cables Connection for 10 MHz Signal and GPIB , B-18 , B-20 Frame, equipage preliminary operations, 6-1 HP 8921A/600 test set, 1-16 Frequency counter, optional test equipment, 1-19 HP8921A, B-21 Test equipment connections , B-17 HyperTerminal, Creating named HyperTerminal connection, 6-14 General Purpose Interface Bus, IEEE–488 protocol interface bus. See GPIB Generating an ATP Report, 7-23 Gigatronics 8541C Power Meter GPIB Address, B-15 Gigatronics 8542 power meter, calibration, B-31 GPIB, B-17 , B-21 , B-22 cables required test equipment, 1-17 set address, HP 437B, B-14 GPIB Address Advantest R3267, B-7 Advantest R3465, B-12 Advantest R3562, B-9 Agilent (formerly HP) 8935, B-9 Agilent E4406A, B-5 Agilent E4432B, B-6 Gigatronics 8541C Power Meter, B-15 Hewlett Packard HP8921a & HP83236A/B, B-11 MAY 2004 HyperTerminal , create named connection, 6-14 IEEE–488 protocol interface bus. See GPIB Initial HP8921A setup, B-32 Initial Installation of Boards/Modules, preliminary operations, 6-2 Intermediate file, generate ATP file using, 7-23 LAN, tester optional test equipment, 1-19 LAN termination, 6-3 LED, CSM, 6-43 LIF, Load Information File, 6-10 LMF, B-17 , B-22 1X FER acceptance test, 7-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Index-3 Index – continued 1X upgrade preparation, home directory, 6-9 BTS connection, 6-17 to BTS connection, 6-16 TX acceptance tests, 7-4 view CDF information, 6-6 LMF BTS displays, 6-19 LMF Removal, 8-4 Load Information File, 6-10 Power meter required test equipment, 1-17 , 1-18 TX acceptance tests, 7-4 Pre–calibration, HP 437, B-29 Preliminary operations, cell Site types, 6-1 Prepare to leave site connect BTS E1/T1 spans, 8-4 connect BTS T1/E1 spans, 8-4 Prepare to Leave the Site External Test Equipment Removal, 8-3 Final Checks before leaving site, 8-5 LMF Removal, 8-4 Re–connect BTS T1 spans, 8-4 Motorola CyberTest GPIB Address, B-13 Prerequisites, automated acceptance tests, 7-2 Multi Channel Card. See MCC Procedures to Copy CAL Files From Diskette to the CBSC, 8-2 Procedures to Copy Files to a Diskette, 8-1 National Instruments, GPIB–232–CT or equivalent, required test equipment, 1-16 NECF, 6-5 RAM code, described, 6-36 Logging Into a BTS, 6-25 Logging Out, 6-28 Re–connect BTS T1 Spans, 8-4 OMCR CLI access procedure, 10-2 Reduced ATP, 7-1 Online Help, 6-32 Optional, test equipment list, 1-19 Optional test equipment CDMA subscriber mobile or portable radiotelephone, 1-19 frequency counter, 1-19 LAN tester, 1-19 oscilloscope, 1-19 RF test cable, 1-19 spectrum analyzer, 1-19 Oscilloscope, optional test equipment, 1-19 PCMCIA, Ethernet adapter, LMF to BTS connection, 6-17 Pilot time offset, acceptance test, 7-16 Report generation, ATP report, 7-23 Required test equipment calibration, 1-14 communications system analyzer, 1-16 digital multimeter, 1-19 equipment warm–up, 1-14 GPIB cables, 1-17 high–impedance conductive wrist strap, 1-18 list, 1-15 optional equipment, 1-19 policy, 1-14 power meter, 1-17 , 1-18 RF adaptors, 1-18 RF attenuator, 1-18 RF load, 1-18 RS232 to GPIB interface, 1-16 test cable calibration, 1-14 Restore Carrier Signaling Operations for a Circuit BTS, 10-29 Ping, 6-33 Policy, required test equipment, 1-14 Power Meter, setting GPIB address, HP437B, B-14 Index-4 receive path, calibration, 6-76 component verification, 6-76 Restore Carrier Signaling Operations for a Packet BTS, 10-59 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY Index – continued Restore Carrier Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-29 Setting Cable Loss Values, 6-73 Restore Carrier Signaling Operations Procedure For a Packet BTS, Starting Up, 10-59 Shut Down Carrier Signaling Functions for a Circuit BTS, 10-16 Restore Sector Signaling Operations for a Circuit BTS, 10-26 Shut Down Carrier Signaling Functions for a Packet BTS, 10-46 Restore Sector Signaling Operations for a Packet BTS, 10-56 Shut Down Carrier Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-16 Restore Sector Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-26 Shut Down Carrier Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-47 Restore Sector Signaling Operations Procedure For a Packet BTS, Starting Up, 10-56 Shut Down Sector Signaling Functions for a Packet BTS, 10-39 Restore Site Signaling Operations for a Circuit BTS, 10-23 Shut Down Sector Signaling Functions for a Circuit BTS, 10-9 Restore Site Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-23 Shut Down Sector Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-9 Restore Site Signaling Operations for a Packet BTS, 10-53 Shut Down Sector Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-40 Restore Site Signaling Operations Procedure For a Packet BTS, Starting Up, 10-53 RF attenuator, 1-18 load for required test equipment, 1-18 required test equipment load, 1-18 test cable, 1-18 RF path calibration. See Bay Level Offset calibration Rho TX waveform quality acceptance test, 7-14 waveform quality requirements, 7-14 Setting TX Coupler Loss Value, 6-74 Shut Down Site Signaling Functions for a Circuit BTS, 10-3 Shut Down Site Signaling Functions for a Packet BTS, 10-32 Shut Down Site Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-3 Shut Down Site Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-33 signal generator, 1X FER acceptance test, 7-4 Site, equipage verification, 6-6 Site equipage, CDF/NECF, 6-5 Software Release caveats, 8-1 ROM code described, 6-36 downloading, C-1 procedure, C-2 Span line, J1 verification equipment, optional test equipment, 1-19 RS232 GPIB Interface Box, B-16 Spectral purity, TX mask – primary and redundant BBX, 7-9 RS232 to GPIB interface, required test equipment, 1-16 Spectral purity transmit mask, acceptance test, 7-11 RX acceptance tests, FER, 7-21 sensitivity/frame error rate, 7-10 Supported Test Sets, 6-51 System Connectivity Test, B-21 T1, isolate BTS from the T1 spans, 6-16 Selecting Test Equipment, 6-66 Set–up for TX Calibration, 6-81 MAY 2004 Spectrum analyzer, optional test equipment, 1-19 Tektronics, model 2445 or equivalent, optional test equipment, 1-19 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU PRELIMINARY Index-5 Index – continued Test cable calibration, required test equipment, 1-14 TX Audit Test, 6-85 Test Equipment, Calibrating, 6-68 Tx BLO Nominal Offset, Setup for TX Cal, 6-82 Test equipment set up, TX output verification/control, 7-4 system analyzer, 1-16 TX acceptance tests, 7-4 TX calibration, 6-82 All Cal/Audit, 6-82 set–up, 6-58 Advantest R3267, 6-60 Agilent 8935, 6-58 Agilent E4406A, 6-60 CyberTest, 6-58 Test equipment connections , preliminary Agilent E4406A/E4432B set–up, B-26 Test Equipment Setup Calibration for TX Bay Level Offset, B-36 TX path calibration, 6-82 Test Equipment Setup Chart, 6-53 Test equipment setup RF path calibration, 6-78 Updating Calibration Data Files Copy and Load Cal File to to CBSC, 8-1 Software Release caveats, 8-1 transmit path, calibration, 6-76 component verification, 6-76 Transmit TX path audit, 6-85 UTP, LMF to BTS connection, 6-17 Transmit TX path calibration, 6-79 TX acceptance tests code domain power/noise floor, 7-18 equipment setup, 7-4 pilot time offset, 7-16 spectral purity mask, 7-11 spectrum analyzer display, 7-13 waveform quality (rho), 7-14 all inclusive TX ATP test, 7-5 output acceptance tests code domain power noise, 7-9 pilot time offset, 7-9 waveform quality, 7-9 verification during calibration, 6-76 Index-6 Verify, TX output, 7-4 Verify GLI ROM code load, 6-38 Waveform quality (Rho), acceptance test procedure, 7-14 Xircom Model PE3–10B2, LMF to BTS connection, 6-17 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU MAY 2004 PRELIMINARY *68P09260A11−7* 68P09260A11–7 Technical Information 1X SC480 BTS HARDWARE INSTALLATION, OPTIMIZATION/ATP, AND FRU SOFTWARE RELEASE 2.16.4.X 800 MHZ CDMA2000 1X PRELIMINARY ENGLISH MAY 2004 68P09260A11–7 1X SC480 BTS HARDWARE INSTALLATION, OPTIMIZATION/ATP, AND FRU SOFTWARE RELEASE 2.16.4.X 800 MHZ CDMA2000 1X PRELIMINARY MAY 2004 ENGLISH 68P09260A11–7 Technical Information Products and Services STANDARD MANUAL PRINTING INSTRUCTIONS Filename: Part Number: 68P09260A11–7 260A11–7 APC: 379 Title: 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Volume 1 of 1 Print Vendor: eDOC Date MAY 2004 ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ STANDARD SPECIFICATIONS – FOR REFERENCE–DO NOT MODIFY ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ PAPER: 1st. LEVEL TABS: 2nd. LEVEL TABS: Body: 70 lb. Inside Cover: 65 lb. Cougar Tabs: 110 lb. Index Binder Cover: Standard TED cover – 10 pt. Carolina Single Sided 5 Cuts Clear Mylar Pantone 2706–C Black Ink Single Sided 7 Cuts Clear Mylar White Black Ink FINISHING: 3–Ring Binder Slant–D 3–Hole Punched (5/16–in. dia.) Shrink Wrap Body Black ink for body, inside cover, and binder cover. TAB and SHEET SIZE/QUANTITY 7X9 8.5x11 648 1st Level Tabs 11x17 Sheets = (Total Pages) / 2 2nd Level Tabs NON–STANDARD SPECIFICATIONS Tape Bound Corner Stitch Other: Meet with manager to determine the deliverable. SPECIAL INSTRUCTIONS
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Modify Date : 2004:06:11 14:21:48-07:00 Create Date : 2004:06:11 14:21:07-07:00 Title : print_instructions Author : Win32 user Producer : Acrobat Distiller 6.0 (Windows) Page Count : 147 Mod Date : 2004:06:11 14:21:48-07:00 Creation Date : 2004:06:11 14:21:07-07:00 Metadata Date : 2004:06:11 14:21:48-07:00 Has XFA : NoEXIF Metadata provided by EXIF.tools