Nokia Solutions and Networks T5GX1 UBS CDMA XMI Transceiver at 800 MHz User Manual Exhibit 123c

Nokia Solutions and Networks UBS CDMA XMI Transceiver at 800 MHz Exhibit 123c

Exhibit 123c

Download: Nokia Solutions and Networks T5GX1 UBS CDMA XMI Transceiver at 800 MHz User Manual Exhibit 123c
Mirror Download [FCC.gov]Nokia Solutions and Networks T5GX1 UBS CDMA XMI Transceiver at 800 MHz User Manual Exhibit 123c
Document ID854644
Application IDeMUbY9ea3DZH+SCD4aP11w==
Document DescriptionExhibit 123c
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize193.23kB (2415341 bits)
Date Submitted2007-10-15 00:00:00
Date Available2007-10-15 00:00:00
Creation Date2007-10-11 09:53:36
Producing SoftwareAdobe Acrobat 8.1
Document Lastmod2007-10-11 10:03:18
Document TitleExhibit 123c
Document CreatorAdobe Acrobat 8.1 Combine Files
Document Author: Motorola Gold Disk User

1X UBS Macro BTS Optimization/ATP
Test Equipment Set Up
Figure 3-26 TX Calibration Test Setup – Anritsu MT8212B
TEST SETS
TRANSMIT (TX) SET UP
ANRITSU MT8212B
RF OUT
50 Ω
COMMUNICATIONS
SYSTEM ANALYZER
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
SERIAL
INTERFACE
CONNECTOR
RF IN
50 Ω
RF IN
50 Ω
SERIAL
INTERFACE
TX AND
RX TEST
CABLE
30 DB
DIRECTIONAL
COUPLER
50 Ω
TERM.
1O DB MINIMUM
IN-LINE ATTENUATOR
TX AND
RX TEST
CABLE
RX DIV
TX/RX M
(DUPLEXED TX
AND RX)
RS232 SERIAL
INTERFACE CABLE
IDRF
UBS
FREF
CRMS/LMT OUT
CUSTOMER
TREF
ENET
OUT
SSI
CDMA
LMF
UNSHIELDED TWISTED PAIR (UTP)
CABLE (RJ45 CONNECTORS)
INTERNAL OR PCMCIA ETHERNET
NETWORK INTERFACE CARD (NIC)
tti-cdma-06206.eps
68P09283A63-5
3-39
FOA
AUG 2007
Test Equipment Set Up
Chapter 3: LMF Operation
Setup for ATP
Figure 3-27, Figure 3-28, Figure 3-29, and Figure 3-30 show test set connections for ATP tests.
3-40
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Set Up
Figure 3-27 ATP Test Setup – Agilent E4432B/8935 and Agilent E4432B/E4406A
TEST SETS
OPTIMIZATION/ATP SET UP
AGILENT E4432B (TOP) AND 8935 SERIES E6380A
(BOTTOM)
RF OUTPUT 50 Ω
TX/RX TEST
CABLE
RF
OUTPUT
50 Ω
SIGNAL
GENERATOR
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
RF IN/OUT
OR
RF INPUT
50 Ω
DIRECTIONAL
COUPLER
(30 DB)
RF
IN/OUT
GPIB
COMMUNICATIONS
SYSTEM ANALYZER
EXT
REF
IN
50 Ω
TERM.
10 MHZ
IN
PATTERN
TRIG IN
TRIGGER IN
OR
EVEN SEC
SYNCH IN
10 MHZ
REF OUT
OR
10 MHZ
OUT
HP-IB
OR
GPIB
TX/RX
TEST
CABLE
TX TEST: 1O DB MINIMUM
IN-LINE ATTENUATOR
BNC
“T”
SYNC MONITOR
EVEN SEC TICK
PULSE REFERENCE
FROM SSI TREF OU
FREQ MONITOR
19.6608 MHZ CLOCK
REFERENCE FROM
SSI FREF OUT
BNC
“T”
NOTES:
OR
10 MHZ IN ON REAR OF SIGNAL GENERATOR IS CONNECTED TO
10 MHZ REF OUT ON SIDE OF CDMA BASE STATION TEST SET
PATTERN TRIG IN ON REAR OF SIGNAL GENERATOR IS
CONNECTED TO EVEN SECOND SYNC IN ON SIDE OF CDMA
BASE STATION TEST SET.
RX DIV
AGILENT E4432B (TOP) AND E4406A
(BOTTOM)
TX/RX M
(DUPLEXED TX
AND RX)
GPIB
CABLE
IDRF
RF
OUTPUT
50 Ω
* BLACK RECTANGLES
REPRESENT THE
RAISED PART OF
SWITCHES
UBS
DIP SWITCH SETTINGS *
S MODE
DATA FORMAT
BAUD RATE
RF INPUT
50 Ω
TO TRIGGER IN
ON REAR OF
TRANSMITTER
TESTER
TO EXT REF IN
ON REAR OF
TRANSMITTER
TESTER
FREF
CRMS/LMT OUT
CUSTOMER
TREF
ENET
OUT
SSI
ON
GPIB ADRS
TO PATTERN TRIG
IN ON REAR OF
SIGNAL
GENERATOR
RS232 NULL
MODEM
CABLE
BNC
“T”
NOTE:
G MODE
RS232-GPIB
INTERFACE BOX
CDMA
LMF
SYNC MONITOR EVEN
SEC TICK PULSE
REFERENCE FROM
SSI TREF OUT
FREQ MONITOR
19.6608 MHZ CLOCK
REFERENCE FROM
SSI FREF OUT
10 MHZ IN ON REAR OF SIGNAL GENERATOR IS CONNECTED TO
10 MHZ OUT (SWITCHED) ON REAR OF TRANSMITTER TESTER
UNSHIELDED TWISTED PAIR
(UTP) CABLE
(RJ45 CONNECTORS)
INTERNAL PCMCIA ETHERNET
NETWORK INTERFACE CARD (NIC)
ti-cdma-06174.eps
68P09283A63-5
3-41
FOA
AUG 2007
Test Equipment Set Up
Figure 3-28
Chapter 3: LMF Operation
ATP Test Setup – Advantest R3267/3562
TEST SETS
OPTIMIZATION/ATP SET UP
RF OUT
50 Ω
TX/RX TEST
CABLE
Advantest R3267 (Top) and R3562 (Bottom)
SIGNAL GENERATOR
MOD TIME
BASE IN
TO EXT TRIG
ON REAR OF
SPECTRUM
ANALYZER
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
SYNTHE
REF
IN
EXT
TRIG IN
GPIB
SPECTRUM
ANALYZER
INPUT
50 Ω
INPUT 50 Ω
10 MHZ
OUT
EXT TRIG
BNC
“T”
DIRECTIONAL
COUPLER
(30 DB)
50 Ω
TERM.
RF OUT
50 Ω
GPIB
TX/RX
TEST
CABLE
TX TEST: 1O DB MINIMUM
IN-LINE ATTENUATOR
BNC
“T”
FREQ MONITOR
19.6608 MHZ CLOCK
REFERENCE FROM
SSI FREF OUT
OR
SYNC MONITOR
EVEN SEC TICK
PULSE REFERENCE
FROM SSI TREF OUT
NOTE:
SYNTHE REF IN ON REAR OF SIGNAL GENERATOR IS
CONNECTED TO 10 MHZ REF OUT ON REAR OF
SPECTRUM ANALYZER
RX DIV
TX/RX M
(DUPLEXED TX
AND RX)
GPIB
CABLE
IDRF
* BLACK RECTANGLES
REPRESENT THE RAISED
PART OF SWITCHES
UBS
DIP SWITCH SETTINGS
S MODE
DATA FORMAT
BAUD RATE
ON
FREF
CRMS/LMT OUT
CUSTOMER
TREF
ENET
OUT
SSI
GPIB ADRS
G MODE
RS232-GPIB
INTERFACE BOX
RS232 NULL
MODEM
CABLE
CDMA
LMF
UNSHIELDED TWISTED
PAIR (UTP) CABLE
(RJ45 CONNECTORS)
INTERNAL PCMCIA ETHERNET
NETWORK INTERFACE CARD (NIC)
ti-cdma-06173.eps
3-42
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Set Up
Figure 3-29 ATP Test Setup – Agilent E7495A or E7495B
ATP TEST SET UP
TEST SET
POWER METER
AGILENT E7495A or E7495B
(SEE NOTE FOR RX TEST
ATTENUATION SELECTION)
RX TEST
PORT 1
RF OUT
COMMUNICATIONS
SYSTEM ANALYZER
RF INPUT 50 Ω
OR INPUT 50 Ω
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
PORT 2
RF IN
TX TEST
30 DB
DIRECTIONAL
COUPLER
50 Ω
TERM.
EVEN SECOND
SYNC IN
INTERNAL
ETHERNET
CARD
NOTE: USE THE SAME
CABLE SET FOR TX AND RX
ATP. SWITCH THE CABLES
DURING ALL ATP TESTS AS
SHOWN.
TX TEST: 1O DB MINIMUM
IN-LINE ATTENUATOR
GPIO
Port 2
RF In
Ext Ref
In
Power REF
50 MHz
Even Second
Sync In
Serial 1
Sensor
Serial 2
TEST
CABLES
Use only
Agilent supplied
power adapter
TX/RX
TEST
Port 1
RF Out / SWR
GPS
Antenna
RX DIV
PORT 2
RF IN
SYNC MONITOR
EVEN SEC TICK
PULSE REFERENCE
FROM SSI TREF OUT
TX/RX M
(DUPLEXED TX
AND RX)
PORT 1
RF OUT
NOTE: FOR RX TESTING, TOTAL RF PATH
ATTENUATION (CABLES+COUPLERS+ATTENUATORS)
MUST BE WITHIN THE FOLLOWING VALUES
SPECIFIED FOR EACH TYPE OF TEST SET:
ETHERNET HUB
IDRF
UBS
E7495A: 25 TO 32 dB
E7495B: 10 TO 100 dB
FREF
CRMS/LMT OUT
CUSTOMER
TREF
ENET
OUT
2. WHEN USING THE E7495A, TX TESTS REQUIRE A
MINIMUM OF 30 DB ATTENUATION PLUS THE CABLE
LOSSES.
SSI
CDMA
LMF
3. USE THE SAME CABLE SET FOR TX AND RX ATP.
SWITCH THE CABLES DURING ALL ATP TESTS AS
SHOWN.
4. IF BTS IS EQUIPPED WITH DUPLEXED RX/TX
SIGNALS, CONNECT THE TX TEST CABLE TO THE
DUPLEXED ANTENNA CONNECTOR.
UNSHIELDED TWISTED PAIR (UTP)
CABLE (RJ45 CONNECTORS)
68P09283A63-5
INTERNAL PCMCIA ETHERNET
NETWORK INTERFACE CARD (NIC)
ti-cdma-06175.eps
3-43
FOA
AUG 2007
Test Equipment Set Up
Chapter 3: LMF Operation
Figure 3-30 ATP Test Setup – Anritsu MT8212B
TEST SET
OPTIMIZATION/ATP SET UP
ANRITSU MT8212B
FREQ MONITOR
19.6608 MHZ CLOCK
REFERENCE FROM
SSI FREF OUT
SYNC MONITOR
EVEN SEC TICK
PULSE REFERENCE
FROM SSI TREF OUT
RX TEST
RF OUT
50 Ω
COMMUNICATIONS
SYSTEM ANALYZER
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
RF IN
50 Ω
SERIAL
INTERFACE
TX TEST
SERIAL
INTERFACE
CONNECTOR
RF IN
50 Ω
RF OUT
50 Ω
RX DIV
TX/RX M
(DUPLEXED TX
AND RX)
RS232 SERIAL
INTERFACE CABLE
IDRF
UBS
NOTES:
1. USE THE SAME CABLE SET FOR TX
AND RX ATP. SWITCH THE CABLES
DURING ATP TESTS AS SHOWN.
2. FOR RX TESTING (RSSI), TOTAL RF
PATH ATTENUATION
(CABLES+COUPLERS+ATTENUATORS)
MUST BE 65 dB OR GREATER.
FREF
CRMS/LMT OUT
CUSTOMER
TREF
ENET
OUT
SSI
CDMA
LMF
UNSHIELDED TWISTED PAIR (UTP)
CABLE (RJ45 CONNECTORS)
INTERNAL OR PCMCIA ETHERNET
NETWORK INTERFACE CARD (NIC)
ti-cdma-06207.eps
3-44
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Connection to the LMF
Test Equipment Connection to the LMF
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Test Equipment Connection
The LMF computer platform provides two types of hardware interfaces which support three
different test equipment communication methods.
•
The COM hardware interface (RS-232) supports connection with both of the following
communication methods:
General Purpose Interface Bus (GPIB)
Direct serial connection
•
The Ethernet interface supports the network test equipment communication method.
Additional information on each interface type is provided in the following subsections.
COM Port Interface
The LMF computer RS-232 serial bus interfaces are designated as COM connections or ports in
software. These interfaces support communication with test equipment connected to the LMF
computer either directly with a serial cable or through a GPIB interface device (GPIB box). The
LMF normally uses COM1 for the interface. COM2 is not used unless the LMF computer has
two RS-232 connectors. The COM port selected in the LMF can not be used for any other
purpose when the LMF is using it.
Selecting the COM port - Perform the following to select a COM port for use with test
equipment needing either a GPIB or a direct serial connection:
Procedure 3-6
Selecting a COM Port for GPIB or Serial Test Equipment Connection
From the LMF window menu bar select Tools > Options.
Result: The LMF Options window opens.
If the Test Equipment tab is not in the forefront, click the tab to bring it forward.
Click in the COM radio button in the GPIB/COM settings area.
Result: A black dot appears in the circle.
Select the COM port to use (normally COM1) from the dropdown in the Port: box of
the GPIB/COM settings area.
Click the Save button to save the selection configuration for future LMF sessions.
Click the Close button to close the LMF Options window.
68P09283A63-5
3-45
FOA
AUG 2007
Test Equipment Connection to the LMF
Chapter 3: LMF Operation
Disconnecting and Reconnecting the LMF and the COM port - The LMF can be
disconnected from the active COM port by using the Disconnect Port button in the GPIB/COM
settings area of the Test Equipment tab. Disconnecting the LMF may be needed, for example,
to use a HyperTerminal connection for a hardware Man Machine Interface (MMI) communication
session. Perform the following to disconnect or reconnect the LMF and the selected COM port.
Procedure 3-7 Disconnect and Reconnect the LMF and the Active COM Port
From the LMF window menu bar select Tools > Options.
Result: The LMF Options window opens.
If the Test Equipment tab is not in the forefront, click the tab to bring it forward.
Disconnect the LMF from the active COM port: click the Disconnect Port button in
the GPIB/COM settings area.
Reconnect the LMF to the active COM port: click the Detect button in the GPIB Test
equipment or Serial Test Equipment area.
If no other operations are required in the LMF Options window click Close to close
the window.
Ethernet Interface
The LMF computer Ethernet interface supports communication with test equipment which
uses the network connection method. This interface uses Internet Protocol (IP) addressing to
differentiate each node on the network. Motorola recommends that the Ethernet connection be
done through an Ethernet hub. The hub connects to the LMF computer, the test equipment, and
the base station Local Area Network (LAN). Connection details are as follows:
Test equipment to hub – This is an Unshielded Twisted Pair (UTP) Ethernet cable with two
10/100Base–TX 8-contact modular connectors.
LMF to hub – Use one of the following cable types to connect the LMF to the Hub:
•
Ethernet cable. Be sure the computer Network Interface Card (NIC) is set for either AUTO
or to use the 8–contact modular connector only.
•
Coaxial cable between NIC and Hub. For a computer NIC equipped with a 10Base–2 (BNC)
connector, use a BNC tee connector on the hub. If the hub does not have BNC connectors,
use a BNC–to–UTP adapter with the tee connector. Connect a coaxial cable between the
NIC and one end of the BNC tee crossbar.
Hub to base station– Use one of the following, depending on the type of base station to be
calibrated or tested:
•
For UBS with 10/100Base–T LAN: Connect an Ethernet cable between the hub and the SSI
CRMS/LMT CUSTOMER ENET connector.
3-46
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Connection to the LMF
Addressing Methods
Different addressing methods are used for test equipment depending on the type of interface
connection it has. The different addressing methods are described in the following subsections.
GPIB Addresses
GPIB addresses can range from 1 through 30. The LMF will accept any address in that
range, but the numbers entered in the LMF Options window GPIB address box must match
the addresses set in the test equipment. Motorola recommends using 1 for a CDMA signal
generator, 13 for a power meter, and 18 for a communications system analyzer. To verify
and, if necessary, change the GPIB addresses of the test equipment, refer to the Setting GPIB
Addresses sections of Appendix D Test Equipment Preparation.
Serial Connection
This connection type uses a direct serial connection between the test equipment and the
LMF computer platform. The Anritsu MT8212B communications test set is an example of
test equipment using this type of connection. There are no specific addressing requirements
for this type of interface.
IP Addresses
Test equipment using the Network connection type use IP addresses to identify them on the
Ethernet LAN. The E7495A and E7495B communications test sets are examples of Network
connection test equipment. Setting the IP address in the test equipment is covered in the
specific test equipment (for example, Agilent E7495) set-up section of Appendix D Test
Equipment Preparation.
68P09283A63-5
3-47
FOA
AUG 2007
Test Equipment Selection
Chapter 3: LMF Operation
Test Equipment Selection
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Test Equipment Selection
Test equipment selection is performed in the LMF Options window, accessed through Tools
> Options in the LMF window menu bar. The window has four tabs covering different
categories of options. Test equipment operations, including selection, are performed on the
Test Equipment tab. For software release 2.20.0.x (R20), the test equipment list displayed on
this tab is context sensitive based on the Connection type selected.
•
When GPIB is selected, only test equipment with a GPIB interface is displayed.
•
When Serial is selected, only test equipment needing a direct serial connection is
displayed.
•
When Network is selected, only test equipment needing an Ethernet connection is
displayed.
Manual and Autodetect Selection
Test equipment can be manually specified before or after the test equipment is connected. The
LMF does not try to determine if the test equipment is actually connected for manual selection.
The LMF can be commanded to automatically detect test equipment connected to it. This
autodetection feature is operated by a Detect button located in the test equipment list area for
each connection type (GPIB, Serial, or Network).
Selecting Test Equipment
There is a different set of test equipment selection procedures for each test equipment
connection type. These are:
•
GPIB connection
•
Serial connection
•
Network (Ethernet) connection
Selection Procedures
Test equipment selection procedures are contained in the following subsections. Each
subsection is for a different connection type. Each subsection includes a procedure for manually
specifying test equipment items and a procedure to have the LMF automatically detect the
connected test equipment.
3-48
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Selection
GPIB Interface Test Equipment Manual Selection and Autodetection
Prerequisites - The following must be done before performing these procedures:
•
LMF computer and test equipment are both correctly connected to the GPIB box
•
Test equipment is turned on
•
GPIB addresses set in the test equipment have been verified as correct using the applicable
procedures in Appendix D Test Equipment Preparation.
Manual selection – Test equipment may be selected manually even if it is not connected to
the LMF.
Procedure 3-8
Manually Selecting Test Equipment - GPIB Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the GPIB radio button in the Connection Type area.
Result: A black dot appears in the circle.
Click the COM radio button in the GPIB/COM settings area.
Result: A black dot appears in the circle.
Select the correct LMF computer serial port from the Port: pick list (normally COM1)
(Refer to the Test Equipment Connection to the LMF on page 3-45 section of this chapter).
In the GPIB Test equipment area click the checkbox(es) of the test equipment being
used.
Result: Checkmarks appear in the boxes clicked on.
If one is not already displayed, type the GPIB address for each checked
piece of test equipment in the corresponding box labeled GPIB.
Recommended Addresses
1 = CDMA Signal generator
13 = Power Meter
18 = CDMA Analyzer
When the test equipment items are manually selected, the CDMA analyzer is
used only if a power meter is not selected.
Continued
68P09283A63-5
3-49
FOA
AUG 2007
Test Equipment Selection
Chapter 3: LMF Operation
Procedure 3-8 Manually Selecting Test Equipment - GPIB Interface (Continued)
Click the Apply button. The button will darken until the selection is committed.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.A checkmark
appears in the box.
10
Click the Save button to save the selection configuration for future LMF sessions.
11
Click the Close button to close the LMF Options window.
When two devices of the same type have been selected, a window will appear
warning that more than one signal generator/power meter/ analyzer has been
chosen. Click the Continue button to close this window. The checkbox can be
clicked to prevent the window from being displayed again, if desired.
Automatically Selecting Test Equipment (Autodetection) – When using the
autodetection feature to select test equipment, the LMF determines which test equipment items
are actually communicating with the LMF.
Procedure 3-9 Autodetecting Test Equipment - GPIB Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the GPIB radio button in the Connection Type area.
Result: A black dot appears in the circle.
Click the COM radio button in the GPIB/COM settings area.
Result: A black dot appears in the circle.
Select the correct LMF computer serial port from the Port: pick list (normally COM1)
(Refer to the Test Equipment Connection to the LMF on page 3-45 section of this chapter).
Continued
3-50
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Procedure 3-9
Test Equipment Selection
Autodetecting Test Equipment - GPIB Interface (Continued)
If they are not already displayed, enter the GPIB address for each
piece of required test equipment, separated by commas, in the
GPIB Addresses: box in the GPIB Test equipment area.
Recommended Addresses
1 = CDMA Signal generator
13 = Power Meter
18 = CDMA Analyzer
In autodetection when both a power meter and a CDMA analyzer are
selected, the LMF uses the first item that is capable of performing RF power
measurement listed in the GPIB Addresses: box. The address for a CDMA
signal generator is normally 1, the address for a power meter is normally 13,
and the address for a CDMA analyzer is normally 18. If 1,13,18 is listed
in the GPIB Addresses: box, the power meter (13) is used for RF power
measurements. When the test equipment items are manually selected, the
CDMA analyzer is used only if a power meter is not selected.
Click the Detect button. The button will darken until the selection is committed.
Result: For each detected equipment item, a check will appear in its checkbox and its
GPIB address will appear in its GPIB box.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.
Result: A checkmark appears in the box.
Click the Save button to save the selection configuration for future LMF sessions.
10
Click the Close button to close the LMF Options window.
When two devices of the same type have been selected, a window will appear
warning that more than one signal generator/power meter/ analyzer has been
chosen. Click the Continue button to close this window. The checkbox can be
clicked to prevent the window from being displayed again, if desired.
Serial Interface Test Equipment Manual Selection and Autodetection
Prerequisites – The following must be done before performing these procedures:
•
Test equipment is correctly connected to the LMF computer RS-232 connector with
a serial cable
•
Test equipment is turned on
68P09283A63-5
3-51
FOA
AUG 2007
Test Equipment Selection
Chapter 3: LMF Operation
Manual selection – Test equipment may be selected manually even if it is not connected to
the LMF.
Procedure 3-10 Manually Selecting Test Equipment - Serial Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the Serial radio button in the Connection Type area.
Result: A black dot appears in the circle.
Click the COM radio button in the GPIB/COM settings area.
Result: A black dot appears in the circle.
Select the correct LMF computer serial port from the Port: pick list (normally COM1)
(Refer to the Test Equipment Connection to the LMF on page 3-45 section of this chapter).
In the Serial Test equipment, area click the checkbox(es) of the test equipment being
used.
Result: Checkmarks appear in the box(es) clicked on.
Click the Apply button. The button will darken until the selection is committed.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.
Result: A checkmark appears in the box.
Click the Save button to save the selection configuration for future LMF sessions.
10
Click the Close button to close the LMF Options window.
Automatically Selecting Test Equipment (Autodetection) – When using the
autodetection feature to select test equipment, the LMF determines which test equipment items
are actually communicating with the LMF.
Procedure 3-11 Autodetecting Test Equipment - Serial Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the Serial radio button in the Connection Type area.
Result: A black dot appears in the circle.
Continued
3-52
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Equipment Selection
Procedure 3-11 Autodetecting Test Equipment - Serial Interface (Continued)
Click the COM radio button in the GPIB/COM settings area.
Result: A black dot appears in the circle.
Select the correct LMF computer serial port from the Port: pick list (normally COM1)
(Refer to the Test Equipment Connection to the LMF on page 3-45 section of this chapter).
Choose the test equipment on the Serial Test Equipment list by clicking the
corresponding checkbox.
Result: A checkmark appears in the box.
Click the Detect button. The button will darken until the selection is committed.
Result: For each detected equipment item, a check will appear in its checkbox.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.
Result: A checkmark appears in the box.
Click the Save button to save the selection configuration for future LMF sessions.
10
Click the Close button to close the LMF Options window.
Network Interface Test Equipment Manual Selection and Autodetection
Prerequisites– The following must be done before performing these procedures:
•
Be sure that no other equipment is connected to the LMF.
•
Test equipment is correctly connected to the LMF computer through the Ethernet LAN
•
The IP address is set in the test equipment as specified in the test equipment model (for
example, Agilent E7495) set-up section of Appendix D Test Equipment Preparation.
•
Test equipment is turned on
Manual selection – Test equipment may be selected manually even if it is not connected to
the LMF.
Procedure 3-12 Manually Selecting Test Equipment - Network Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the Network radio button in the Connection Type area.
Result: A black dot appears in the circle.
Continued
68P09283A63-5
3-53
FOA
AUG 2007
Test Equipment Selection
Chapter 3: LMF Operation
Procedure 3-12 Manually Selecting Test Equipment - Network Interface (Continued)
In the Ethernet Test equipment area click the checkbox(es) of the test equipment
being used.
Result: Checkmarks appear in the box(es) clicked on.
If it is not already displayed, enter the IP address for the required piece test equipment in
the IP box in the Ethernet Test equipment area.
Click the Apply button. The button will darken until the selection is committed.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.
Result: A checkmark appears in the box.
Click the Save button to save the selection configuration for future LMF sessions.
Click the Close button to close the LMF Options window.
Automatically Selecting Test Equipment (Autodetection) – When using the
autodetection feature to select test equipment, the LMF determines which test equipment items
are actually communicating with the LMF.
Procedure 3-13 Autodetecting Test Equipment - Network Interface
In the LMF menu bar, select Tools > Options.
Result: The LMF Options window appears.
Click on the Test Equipment tab (if not in the forefront).
Click the Network radio button in the Connection Type area.
Result: A black dot appears in the circle.
If it is not already displayed, enter the IP address for the required piece test equipment in
the IP box in the Ethernet Test equipment area.
Click the Detect button. The button will darken until the selection is committed.
Result: For each detected equipment item, a check will appear in its checkbox.
Click the Detect on startup checkbox in the Autodetection settings area to allow the
LMF to detect the test equipment automatically on application startup.
Result: A checkmark appears in the box.
Click the Save button to save the selection configuration for future LMF sessions.
Click the Close button to close the LMF Options window.
3-54
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Set Calibration
Test Set Calibration
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Test Set Calibration Background
Proper test equipment calibration ensures that the test equipment and associated test cables do
not introduce measurement errors, and that measurements are correct.
If the test equipment set being used to interface with the base station has been
calibrated and maintained as a set, this procedure does not need to be performed.
(Test equipment set includes LMF computer, communications test set, additional test
equipment, associated test cables, and adapters.)
This procedure must be performed before beginning the optimization. Verify all test equipment
(including all associated test cables and adapters actually used to interface all test equipment
and the base station) has been calibrated and maintained as a set.
If any piece of test equipment, test cable, or RF adapter, that makes up the calibrated
test equipment set, has been replaced, re-calibration must be performed. Failure to
do so can introduce measurement errors, resulting in incorrect measurements and
degradation to system performance.
Calibration of the communications test set (or equivalent test equipment) must
be performed at the site before calibrating the overall test set. Calibrate the test
equipment after it has been allowed to warm-up and stabilize for a minimum of 60
minutes.
68P09283A63-5
3-55
FOA
AUG 2007
Test Set Calibration
Chapter 3: LMF Operation
Calibration Procedures Included
Automatic
Procedures included in this section use the LMF automated calibration routines to determine
path losses of the supported communications analyzer, power meter, associated test cables,
adapters, and (if used) antenna switch that make up the overall calibrated test equipment set.
After calibration, the gain/loss offset values are stored in a test measurement offset file on
the LMF computer.
Manual
Agilent E4406A Transmitter Tester - The E4406A does not support the power level
zeroing calibration performed by the LMF. If this instrument is to be used for Bay Level Offset
calibration and calibration is attempted with the LMF Calibrate Test Equipment function, the
LMF will return a status window failure message stating that zeroing power is not supported
by the E4406A. Refer to Appendix D Test Equipment Preparation for instructions on using
the instrument’s self-alignment (calibration) function prior to performing Bay Level Offset
calibration.
Power Meters - Manual power meter calibration procedures to be performed prior to
automated calibration are included in Appendix D Test Equipment Preparation.
Cable Calibration - Manual cable calibration procedures using the Advantest R3465
communications system analyzer are provided in Appendix D Test Equipment Preparation,
if needed.
Prerequisites
Ensure the following prerequisites have been met before proceeding:
•
Test equipment is correctly connected and turned on.
•
Test equipment addressing is set as required for the connection type being used (GPIB,
Serial, Network)
Calibrate Test Equipment Function (Except Agilent E4406A and
Anritsu MT8212B)
The Calibrate Test Equipment function zeros the power measurement level of the test
equipment item to be used for TX calibration and audit. If both a power meter and an analyzer
are connected, only the power meter is zeroed.
3-56
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Set Calibration
1.
The Agilent E4406A transmitter tester does not support power measurement
level zeroing. Refer to the Test Equipment Calibration section of Appendix F
for E4406A calibration.
2.
Power measurement zeroing and other required calibration procedures for the
Anritsu MT8212B are included in the Calibrating the Anritsu MT8212B on page
3-57 subsection below.
Prerequisites
•
Test equipment to be zeroed has been connected correctly for tests to be run.
•
Test equipment has been selected in the LMF (Test Equipment Selection on page 3-48)
and detected.
Procedure
Perform the following to calibrate the test equipment.
Procedure 3-14 Calibrate Test Equipment - Power Measurement Zeroing
From the Util menu, select Calibrate Test Equipment from the pull-down menu. A
Directions window is displayed.
Follow the directions provided.
Click on Continue to close the Directions window and start the calibration process. A
status report window is displayed.
Click on OK to close the status report window.
Calibrating the Anritsu MT8212B
Three types of calibration are required for the MT812B. These are:
•
Zero out power meter
•
Calibrate TX Analyzer
•
Calibrate CW Generator
Procedures for each type of calibration is covered in the following subsections.
68P09283A63-5
3-57
FOA
AUG 2007
Test Set Calibration
Chapter 3: LMF Operation
Zero Out Power Meter
Before using the MT8212B test set to perform RF power measurement, the test set internal
power meter function must be zeroed.
Prerequisites – The following must be done before the zeroing out the power meter:
•
The test set is connected to the LMF computer serial port with the Anritsu 800-441 RS-232
serial interface cable
•
Test equipment is turned on and has warmed up for at least 60 minutes.
•
Test equipment has been selected/detected in the LMF (Test Equipment Selection on
page 3-48)
Zero out power meter – Perform the following to zero out the power meter function before
performing RF power measurements.
Procedure 3-15 Anritsu MT8212B Multi-function Test Set Zero Out Power Meter
In the LMF menu bar select Util > Calibrate Test Equipment.
Result: ACalibrate Anritsu MT8212B window appears.
Click in the Option for zero out power meter on Anritsu MT8212B radio button in
the Zero Out Power Meter area.
Result: A black dot appears in the circle.
Click on OK.
Result: A Directions window is displayed.
Follow the directions provided.
Result: A status report window will open.
Click on OK to close the status report window.
Calibrate TX Analyzer
TX Analyzer calibration should be accomplished before performing any ATP operations with
the MT8212B.
Prerequisites – The following must be done before the CW generator calibration:
•
The test set is connected to the LMF computer serial port with the Anritsu 800-441 RS-232
serial interface cable
•
Test equipment has been selected/detected in the LMF (Test Equipment Selection on
page 3-48)
•
Additional items must be available for the TX Analyzer calibration method chosen as
indicated in the following:
3-58
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
•
Test Set Calibration
Standard Open-Short-Load Components calibration:
Anritsu 22N50 Open/Short, DC to 18 GHz, N(m) connector, 50 ohm
Anritsu SM/PL precision load, DC-to-4 GHz, 42 dB, N(m) connector, 50 ohm
•
Standard InstaCal™ calibration:
Anritsu ICN50 InstaCal calibration module, 2 MHz to 4 GHz, N(m) connector, 50 ohm
TX analyzer calibration – Perform the following to calibrate the MT8212B TX analyzer
function..
Procedure 3-16 Anritsu MT8212B Multi-function Test Set TX Analyzer Calibration
In the LMF menu bar select Util > Calibrate Test Equipment.Calibrate Anritsu
MT8212B window appears
Click in the radio button in the Calibrate TX Analyzer area.
Result: A black dot appears in the circle.
Select the required frequency band from the dropdown list in the Frequency Band: box.
The dropdown list in the Frequency Band: box is automatically populated
with selections for the base station the LMF is logged into.
Enter the channel number to be calibrated in the Channel box.
Select the desired calibration method from the dropdown list in the Calibration Method
box.
Click OK.
Result: A Directions window is displayed.
Follow the directions provided.
When actions required by directions have been completed, click on Continue to close the
Directions window and start the generator calibration process.
Result: A status report window is displayed.
Click on OK to close the status report window.
Calibrate CW Generator
Before using the MT8212B test set to perform base station RSSI testing, the test set internal
Continuous Wave (CW) generator must be calibrated.
68P09283A63-5
3-59
FOA
AUG 2007
Test Set Calibration
Chapter 3: LMF Operation
Prerequisites - The following must be done before the CW generator calibration:
•
The test set is connected to the LMF computer serial port with the Anritsu 800-441 RS-232
serial interface cable
•
Test equipment is turned on and has warmed up for at least 60 minutes.
•
Test equipment has been selected/detected in the LMF (Test Equipment Selection on
page 3-48)
•
RX cable(s) used in the calibration process must be calibrated for the channel for which the
CW generator is to be calibrated (refer to Figure 3-34 and Calibrating cables on page 3-65)
CW generator calibration - Perform the following to calibrate the MT8212B internal CW
generator before performing RSSI testing with this test set.
Procedure 3-17 Anritsu MT8212B Multi-function Test Set CW Generator Calibration
In the LMF menu bar select Util > Calibrate Test Equipment.
Result: Calibrate Anritsu MT8212B window appears
Click in the radio button in the Calibrate CW Generator area.
Result: A black dot appears in the circle.
Select the required frequency band from the dropdown list in the Frequency Band: box.
The dropdown list in the Frequency Band: box is automatically populated
with selections for the base station the LMF is logged into.
Enter the channel or channels to be calibrated in the Channel(s) box (separate multiple
channels with a comma and no space).
When two or more channels numbers are entered, the generator will be
calibrated for each channel. Interpolation will be accomplished for other
channels as required for TX calibration. Channels must be within the range of
the selected frequency band.
Click OK.
Result: A Directions window is displayed.
Follow the directions provided.
When actions required by directions have been completed, click on Continue to close the
Directions window and start the generator calibration process.
Result: A status report window is displayed.
3-60
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Test Set Calibration
Procedure 3-17 Anritsu MT8212B Multi-function Test Set CW Generator Calibration
(Continued)
Click on OK to close the status report window.
68P09283A63-5
3-61
FOA
AUG 2007
Setting and Editing Generator Calibration Data
Chapter 3: LMF Operation
Setting and Editing Generator Calibration Data
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Generator Calibration Data
Generator calibration data is automatically stored in a generator calibration data file by the
LMF when the generator function of a test equipment item is calibrated using the LMF Util >
Calibrate Test Equipment functions. Stored data values can be edited with this procedure,
or new data can be entered manually for a test equipment item generator function which was
calibrated without using the LMF.
This procedure MUST be used to enter calibration data values for any MT8212B which
was calibrated without using the LMF. Failure to do this will generate incorrect results
for any RSSI testing performed.
Prerequisites
The LMF is logged into a BTS.
Set or Edit Generator Calibration Data
Perform the following to enter new calibration data or edit existing data.
Procedure 3-18
Set or Edit Generator Calibration Data
In the LMF menu bar select Util > Edit > Generator Calibration Data.
Result: Generator Calibration Data window appears with tabs for each type of
generator test equipment calibrated using the LMF (for example, the Anritsu MT8212B).
Click on the tab for the generator with data to be edited or entered.
Result: The tab moves to the forefront.
To edit existing values, click in the data field to be edited and make required changes.
To add a new channel and its data:
1.
Click the Add Row button.
2.
Click in the field where data is to be entered; for example, Frequency Band,
Channel #, or Power (dB).
3.
Enter the desired value.
Continued
3-62
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Setting and Editing Generator Calibration Data
Procedure 3-18 Set or Edit Generator Calibration Data (Continued)
For Frequency Band fields, select the required frequency band from the
dropdown provided. Selections are made available for the BTS which the LMF
is logged into.
To delete a row, click in the row, and then click the Delete Row button.
For each tab with changes, click the Save button to save the displayed values.
•
Values entered after the Save button was used will not be saved.
•
If generator calibration values exist for two different channels assigned to
one frequency band, the LMF will interpolate for all other channels on
this frequency band.
•
Entered values will be used by the LMF as soon as they are saved. It is not
necessary to log out and log back into the LMF for changes to take effect.
68P09283A63-5
3-63
FOA
AUG 2007
Cable Calibration
Chapter 3: LMF Operation
Cable Calibration
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Calibrating Cables Overview
The cable calibration function measures the loss (in dB) for the TX and RX cables that are to be
used for testing. A CDMA analyzer is used to measure the loss of each cable configuration (TX
cable configuration and RX cable configuration). The cable calibration consists of the following:
•
Measuring the loss of a short cable – This is required to compensate for any
measurement error of the analyzer. The short cable (used only for the calibration process)
is used in series with both the TX and RX cable configuration when measuring. The
measured loss of the short cable is deducted from the measured loss of the TX and RX
cable configuration to determine the actual loss of the TX and RX cable configurations.
The result is then adjusted out of both the TX and RX measurements to compensate for
the measured loss.
•
Measuring the short cable plus the RX cable configuration loss – The RX cable
configuration normally consists only of a coax cable with type-N connectors that is long
enough to reach from the BTS RX port of the test equipment. Refer to Figure 3-31,
Figure 3-32, Figure 3-33, or Figure 3-34 for specific cable and connection requirements for
each type of communications system analyzer.
•
Measuring the short cable plus the TX cable configuration loss – The TX cable
configuration normally consists of two coax cables with type N connectors and a directional
coupler, a load, and an additional attenuator (if required by the specified BTS). The total
loss of the path loss of the TX cable configuration must be as required for the BTS (normally
30 or 50 dB). Refer to Figure 3-31, Figure 3-32, Figure 3-33, or Figure 3-34 for specific
cable and connection requirements for each type of communications system analyzer.
Cable Calibration Set–up Diagrams
Figure 3-31 and Figure 3-32 show the cable calibration set–up for various supported test sets.
The left side of the diagram depicts the location of the input and output connectors of each test
equipment item, and the right side details the set up for each test.
Calibrate Test Cabling using Communications System Analyzer
Cable Calibration is used to calibrate both TX and RX test cables.
3-64
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Cable Calibration
Prerequisites
Ensure the following prerequisites have been met before proceeding:
•
One of the following:
LMF computer serial port and test equipment are connected to the GPIB box
For MT8212B, the test equipment is connected to the LMF computer serial port
For E7495A/B, the LMF computer NIC and the E7495 are connected to the Ethernet
hub (Test Equipment Connection section)
•
Test equipment is turned on and has warmed up for at least 60 minutes.
•
Test equipment has been selected/detected in the LMF (Refer to the Selection Procedures
subsection of the Test Equipment Selection section)
Calibrating cables
Refer to Figure 3-31, Figure 3-32, Figure 3-33, or Figure 3-34 and perform the following to
calibrate the test cable configurations.
Procedure 3-19 Automatic Cable Calibration
From the Util menu, select Cable Calibration.
Result: A Cable Calibration window is displayed.
Enter the channel number(s) in the Channels box.
Multiple channel numbers must be separated with a comma and no space (for
example; 200,800). When two or more channel numbers are entered, the cables
are calibrated for each channel. Interpolation is accomplished for other channels
as required for TX calibration.
In the Cable Calibration pick list select one of the following:
•
TX and RX Cable Cal
•
TX Cable Cal
•
RX Cable Cal
Click OK and follow the direction displayed for each step. A status report window displays
the results of the cable calibration.
68P09283A63-5
3-65
FOA
AUG 2007
Cable Calibration
Chapter 3: LMF Operation
Figure 3-31 Cable Calibration Test Setup – Agilent 8935
CALIBRATION SET UP
SUPPORTED TEST SETS
A. SHORT CABLE CAL
HEWLETT-P ACKARD MODEL HP 8935
SHORT
CABLE
ANT
IN
DUPLEX
OUT
TEST
SET
B. RX TEST SETUP
N-N FEMALE
ADAPTER
RX
CABLE
SHORT
CABLE
TEST
SET
C. TX TEST SETUP
50 Ω TERM.
100-W ATT (MIN)
NON-RADIA TING
RF LOAD
DIRECTIONAL COUPLER
(30 DB)
10 DB MINIMUM
IN-LINE ATTENUATOR
SHORT
CABLE
TX
CABLE
N-N FEMALE
ADAPTER
RX
CABLE
TX CABLE FOR
DRDC TX TEST
CABLE CALIBRATION
TEST
SET
ti-cdma-06176.eps
3-66
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Cable Calibration
Figure 3-32 Cable Calibration Test Setup – Advantest R3267/R3562,E4406A/E4432B,
and Agilent E4432/8935 Series E6380A
SUPPORTED TEST SETS
CALIBRATION SET UP
ADVANTEST R3267 (TOP) AND R3562 (BOTTOM)
A. SHORT CABLE CAL
SHORT
CABLE
TEST
SET
RF IN
B. RX TEST SETUP
EXT TRIG IN
MOD TIME BASE IN
(EXT REF IN)
RF OUT
N-N FEMALE
ADAPTER
NOTE:
SYNTHE REF IN on rear signal generator is
connected to 10 MHZ OUT on rear of spectrum
analyzer
RX
CABLE
AGILENT E4432B (TOP) AND E4406A (BOTTOM)
SHORT
CABLE
TEST
SET
RF
OUTPUT
50 OHM
RF
INPUT 50
OHM
C. TX TEST SETUP
50 Ω TERM.
AGILENT E4432B (TOP) AND 8935 SERIES
E6380A (BOTTOM)
RF
OUTPUT
50 Ω
100-W ATT (MIN)
NON-RADIA TING
RF LOAD
DIRECTIONAL COUPLER
(30 DB)
10 DB MINIMUM
IN-LINE ATTENUATOR
SHORT
CABLE
TX
CABLE
N-N FEMALE
ADAPTER
RX
CABLE
ANT
IN
NOTE:
10 MHZ IN on rear of signal generator is connected to
10 MHZ REF OUT on side of CDMA Base Station Test Set
TX CABLE FOR
DUPLEXED TX/RX
TEST CABLE
CALIBRATION
TEST
SET
ti-cdma-06177.eps
68P09283A63-5
3-67
FOA
AUG 2007
Cable Calibration
Chapter 3: LMF Operation
Figure 3-33 Cable Calibration Test Setup – Agilent E7495A and E7495B
CALIBRATION SET UP
SUPPORTED TEST SETS
A. SHORT CABLE CAL
AGILENT E7495A OR E7495B
10 DB PAD
SHORT
CABLE
TEST
SET
10 DB PAD
B. RX and TX TEST SETUP
50 Ω
TERM.
10 DB MIMIMUM
IN-LINE ATTENUATOR
100-W ATT (MIN)
NON-RADIA TING
RF LOAD
GPIO
Power REF
50 MHz
Ext Ref
In
DIRECTIONAL
COUPLER
(30 DB)
TX
CABLE
Use only
Agilent supplied
power adapter
10 DB PAD
Even Second
Sync In
Serial 1
Port 2
RF In
Sensor
Serial 2
Port 1
RF Out / SWR
GPS
Antenna
PORT 2
RF IN
SHORT
CABLE
RX
CABLE
PORT 1
RF OUT
N-N FEMALE
ADAPTER
10 DB PAD
TEST
SET
TX CABLE FOR
DUPLEXED TX/RX
TEST CABLE
CALIBRATION
NOTES:
1. FOR RX TESTING, TOTAL RF PATH
ATTENUATION
(CABLES+COUPLERS+ATTENUATORS)
MUST BE WITHIN THE VALUES
SPECIFIED BELOW FOR EACH TYPE
OF TEST SET:
E7495A: 25 TO 32 dB
E7495B: 10 TO 100 dB
2. WHEN USING THE E7495A, TX
TESTS REQUIRE A MINIMUM OF 30 DB
ATTENUATION PLUS THE CABLE
LOSSES.
ti-cdma-06178.eps
3-68
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Cable Calibration
Figure 3-34 Cable Calibration Test Setup – Anritsu MT8212B
SUPPORTED TEST SETS
CALIBRATION SET UP
A. SHORT CABLE CAL
ANRITSU MT8212B
SHORT
CABLE
RF IN
50 Ω
TEST
SET
RF OUT
50 Ω
C. RX and TX TEST SETUP
50 Ω TERM.
100-W ATT (MIN.)
NON-RADIA TING
RF LOAD
DIRECTIONAL COUPLER
(30 DB)
TX TESTS: 10 DB MINIMUM
IN-LINE ATTENUATOR
RX TEST: 35 DB MINIMUM
IN-LINE ATTENUATOR
TX AND RX
CABLE
SHORT
CABLE
NOTE: FOR RX TESTING (RSSI), TOTAL
RF PATH ATTENUATION
(CABLES+COUPLERS+ATTENUATORS)
MUST BE 65 dB OR GREATER.
TX AND RX
CABLE
N-N FEMALE
ADAPTER
TEST
SET
ti-cdma-06208.eps
Calibrate Test Cabling Using Signal Generator & Spectrum
Analyzer
Manual cable calibration can be performed by following Procedure 3-20 to calibrate the
TX/duplexed RX cables using a signal generator and spectrum analyzer. Refer to Figure 3-35,
if required. Follow Procedure 3-21 to calibrate the non–duplexed RX cables using the signal
generator and spectrum analyzer. Refer to Figure 3-36, if required.
68P09283A63-5
3-69
FOA
AUG 2007
Cable Calibration
Chapter 3: LMF Operation
TX and Duplexed RX Cable Calibration
Procedure 3-20 Calibrating TX and Duplexed RX Cables Using Signal Generator and Spectrum
Analyzer
Connect a short test cable between the spectrum analyzer and the signal generator.
Set signal generator to 0 dBm at the customer frequency.
Use a spectrum analyzer to measure signal generator output (see Figure 3-35 A) and record
the value.
Connect the spectrum analyzer’s short cable to Figure 3-35 point B, (as shown in the lower
right portion of the diagram) to measure cable output at customer frequency. Record the
value at point B,
Calibration factor = A - B. Example: Cal = -1 dBm - (-53.5 dBm) = 52.5 dB
The short cable is used for calibration only. It is part of the final test setup. After
calibration is completed, rearrange any cables. Use the equipment setup, as is, to
ensure test procedures use the correct calibration factor.
Figure 3-35 TX and Duplexed RX Cable Calibration
SIGNAL
GENERATOR
SPECTRUM
ANALYZER
SHORT
TEST
CABLE
40W NON-RADIATING
RF LOAD
50 OHM
TERMINATION
SPECTRUM
ANALYZER
10DB MINIMUM, 20 W
IN-LINE ATTENUATOR
SHORT TEST CABLE
THIS WILL BE THE TX TEST CABLE CONNECTION TO THE
POWER SENSOR OR COMMUNICATIONS TEST SET INPUT
IPORT DURING TX CALIBRATION AND ATP TESTS.
SIGNAL
GENERATOR
30 DB
DIRECTIONAL
COUPLER
CABLE FROM 10 DB MINIMUM @ 20W ATTENUATOR
TO THE POWER SENSOR OR COMMUNICATION
TEST SET.
ti-cdma-00145.eps
3-70
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Cable Calibration
Non–duplexed RX Cable Calibration
Procedure 3-21 Calibrating RX Cables Using a Signal Generator and Spectrum
Analyzer
Connect a short test cable to the spectrum analyzer and connect the other end to the Signal
Generator.
Set signal generator to -10 dBm at the customer’s RX frequency.
Use spectrum analyzer to measure signal generator output (see Figure 3-36, A) and record
the value for A.
Connect the test setup, as shown in the lower portion of the diagram to measure the output at
the customer’s RX frequency. Record the value atFigure 3-36, point B.
Calibration factor = A - B. Example: Cal = -12 dBm - (-14 dBm) = 2 dBm
The short cable is used for calibration only. It is not part of the final test setup.
After calibration is completed, do not rearrange any cables. Use the equipment
setup as is to ensure test procedures use the correct calibration factor.
68P09283A63-5
3-71
FOA
AUG 2007
Cable Calibration
Chapter 3: LMF Operation
Figure 3-36 Non-Duplex RX Cable Calibration
SIGNAL
GENERATOR
SIGNAL
GENERATOR
SPECTRUM
ANALYZER
SHORT
TEST
CABLE
CONNECTION TO THE COMMUNICATION
TEST SET OUTPUT PORT
DURING RX MEASUREMENTS.
SPECTRUM
ANALYZER
SHORT TEST
CABLE
BULLET
CONNECTOR
LONG
CABLE 2
CONNECTION TO THE RX PORTS
DURING RX MEASUREMENTS.
ti-cdma-06209.eps
Setting Cable Loss Values
Cable loss values for the TX and RX test cable configurations are normally set by accomplishing
cable calibration using the applicable test equipment. The resulting values are stored in the
cable loss files. The cable loss values can also be set/changed manually.
If cable calibration was performed without using the LMF, cable loss values must be
manually entered in the LMF database. Failure to do this will result in inaccurate UBS
calibration and reduced site performance.
Prerequisites
LMF is logged into the UBS
3-72
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Cable Calibration
Procedure
Perform the following to set cable loss values.
Procedure 3-22 Setting Cable Loss Values
In the LMF menu bar, click on Util > Edit > Cable Loss
In the data entry pop–up window, select one of the following:
•
TX Cable Loss
•
RX Cable Loss
To add a new channel number, click on Add Row, and click in Channel# and Loss (dBm)
columns and enter the desired values.
To edit existing values, click in the data box to be changed and change the value.
To delete a row, click on the row and then click on the Delete Row button.
To save displayed values, click on the Save button.
To exit the window, click on the Dismiss button.
Values entered/changed after the Save button was used are not saved.
•
If cable loss values exist for two different channels, the LMF will interpolate
for all other channels.
•
Entered values are used by the LMF as soon as they are saved. Logging out
and logging in again is not necessary.
68P09283A63-5
AUG 2007
3-73
FOA
Cable Calibration
Chapter 3: LMF Operation
3-74
68P09283A63-5
FOA
AUG 2007
Chapter
Acceptance Test Procedures
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
68P09283A63-5
AUG 2007
4-1
FOA
Introduction to ATP
Chapter 4: Acceptance Test Procedures
Introduction to ATP
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Introduction
General
The Acceptance Test Procedures (ATP) allow Cellular Field Engineers (CFEs) to run automated
acceptance tests on all UBS subsystem devices equipped in the NEC using the LMF and the
test equipment it supports.
LMF User Interface
This chapter provides procedures for performing acceptance testing from the LMF Graphical
User Interface (GUI) environment, the recommended method. The GUI provides the advantages
of simplifying the LMF user interface, reducing the potential for mis-keying commands and
associated parameters, and speeding up the execution of complex operations involving multiple
command strings. If it is believed the LMF command line interface (CLI) will provide additional
insight into ATP operation or unexpected test results, refer to LMF CLI Reference.
Test Reports
The CFE can choose to save the results of ATP tests to a report file from which ATP reports are
generated for later printing. See the Generating an ATP Report section in this chapter.
Test Equipment Selection
Because test equipment functions during acceptance testing are controlled by the LMF directly,
only the test equipment models supported by the LMF can be used.
1.
Before using the LMF, read the Developer Release Notes for WinLMF section in
the LMF Help function on-line documentation for any applicable information. Pay
particular attention to the Caveats/Known Issues part of this appendix.
2.
The ATP test is to be performed on out-of-service sectors only.
3.
DO NOT substitute test equipment with other models not supported by the LMF.
4-2
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Introduction to ATP
Test Equipment Set Calibration
Refer to Test Set Calibration on page 3-55,Cable Calibration on page 3-64, and Appendix D
Test Equipment Preparation for detailed interconnection information needed for calibrating
equipment, cables, and other test equipment set components.
Equipment has been factory-tested for FCC compliance. If license-governing bodies
require documentation supporting UBS site compliance with regulations, a full ATP
may be necessary. Perform the Reduced ATP only if reports for the specific UBS
site are NOT required.
After verifying that the proper operational software was code synced to the UBS, the CFE must
perform these procedures (minimal recommendation):
1.
Verify the TX/RX paths by performing TX Audit and Receive Signal Strength Indicator
(RSSI) tests.
2.
Be sure calibration data for all equipped sector-carriers is obtained and loaded on the
OMC-R for normal site operation.
Should failures occur while performing the specified tests, refer to the Basic Troubleshooting
section of this manual for help in determining the failure point. Once the point of failure has
been identified and corrected, refer to the FRU Optimization and ATP Test Matrix in Appendix B
FRU Optimization/ATP Matrix to determine the applicable test that must be performed.
In the unlikely event that the UBS passes these tests but has a forward link problem during
normal operation, the CFE should then perform the additional TX tests for troubleshooting: TX
spectral mask, TX rho, and TX code domain.
1x EV-DO ATP
Should the UBS Macro be equipped with EV-DO cards/modules, refer to 1x EV-DO System
ATP — 68P09283A59 for testing procedures.
68P09283A63-5
4-3
FOA
AUG 2007
Acceptance Test Procedures - TX & RX
Chapter 4: Acceptance Test Procedures
Acceptance Test Procedures - TX & RX
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Reduced and Full ATP
The full ATP (all the ATP tests) is optional. It is recommended that the reduced ATP be used.
The reduced ATP consists of TX Audit and Receive Signal Strength Indicator (RSSI).
TX Audit and RSSI Tests
TX Audit The Audit is a power out test that will pass within +/-2 dB of the expected power.
The standard pattern per S-C is 43dBm and the Audit test will pass if the output power is
within the limits listed above.
TX Audit Test Procedure Perform the procedure in Procedure 4-1 for TX Audit.
Procedure 4-1 Procedure for TX Audit
Set up test equipment for TX acceptance tests per Figure 3-23 through
Figure 3-26
If it has not already been done, configure the test equipment for TX path
audit as in Figure 3-23
Click on the devices to be tested.
Click Tests > TX > TX Audit
Select the appropriate carrier in the Channels/Carrier pick list.
Enter the channel number in the Carrier # Channels box.
To select multiple items, hold down the Shift or CTRL key while
making the selections.
Click OK. The status report window is displayed and then a Directions
pop-up is displayed.
Follow the cable connection directions as they are displayed. Test results are
displayed in the status report window.
Continued
4-4
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Acceptance Test Procedures - TX & RX
Procedure 4-1 Procedure for TX Audit (Continued)
Click Save Results or Dismiss button.
If Dismiss is selected, the test results will not be saved.
Figure 4-1 TX Audit Signal
ti-cdma-TX_Audit.eps
68P09283A63-5
4-5
FOA
AUG 2007
Acceptance Test Procedures - TX & RX
Chapter 4: Acceptance Test Procedures
Receive Signal Strength Indication Acceptance Test
Overview This test verifies Receive Signal Strength Indication (RSSI) for the selected sectors
to ensure integrity of the reverse (RX) path, that path losses are within tolerances required for
correct receiver operation, and correct installation of the RX path. Testing is performed using
the calibrated external test equipment as the signal source. The test equipment is controlled by
the LMF during the test. The receive signal generated by the test equipment is injected into the
sector RX path to be tested at the applicable UBS main and / or diversity receive ports.
Equipment Operation During Testing The LMF sets the pilot channel power level of the
sector for the selected sector to +XX dBm (measured at the TX port of the frame) and enables
the sector-carrier on pilot channel only to enable the RX circuitry. The LMF then commands the
test equipment to generate the receive signal on the selected carrier at -80 dBm as measured
at the UBS RX port
Test Measurements The power level of the received signal is measured by the RFX. The
LMF corrects the measured power of the signal using the RX BLO and determines if the
corrected signal gain is equal to or greater than the following specified criteria for the band in
which the UBS operates:
•
1900 MHz: –80 dBm (-86 dBm or greater)
•
800 MHz: –80 dBm (-86 dBm or greater)
The LMF provides -80 dBm signal (default) input to the UBS. The RSSI must be
+/-6 dB.
Receive Signal Strength Indicator ATP
Perform the following procedure for RSSI acceptance testing.
Procedure 4-2
Procedure for RSSI Acceptance Testing
Set up the test equipment for RX acceptance tests. Reference Figure 3-23
through Figure 3-26.
Select the carrier to be tested.
In the LMF window menu bar, click on Tests > RX > RSSI
Select the carrier to be tested in the Channels/Carriers pick list which is
displayed.
Continued
4-6
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Acceptance Test Procedures - TX & RX
Procedure 4-2 Procedure for RSSI Acceptance Testing (Continued)
Select the RX Branch to be tested from the choices in the drop down list
provided (Both, Main, Diversity)
Enter the appropriate power level into the Generator amplitude box (default:
-80 dBm)
Click OK. A status bar will be displayed followed by a Directions pop up
window.
Follow cable connection directions as they are displayed, and click the
Continue button to begin testing. Progress will be indicated in the status bar.
When the test is completed, click Save Results or Dismiss button, as
required, in the Status Report window.
If Dismiss is selected, then the test results will not be saved.
Automated ATP
This section covers the general requirements and procedures for conducting both automated
ATP testing and performing individual ATP tests.
Automated ATP Test Options
Acceptance tests can be run individually or as one of the following automated groups:
•
All TX: TX tests verify the performance of the UBS transmit line up.
•
All RX: RX tests verify the performance of the UBS receiver line up.
•
All TX/RX: Executes all the TX and RX tests.
•
Full Optimization: Executes the TX calibration, downloads the BLO, and executes the TX
audit before running all of the TX and RX tests.
The Full Optimization test can be run if TX path calibration is needed before the TX
and RX acceptance tests are run.
The STOP button can be used to stop the testing process.
The LMF is optimized to perform the tests as quickly as possible when selecting the
“perform all" menu options. It is recommended that the user select this option on a
per sector/carrier option where possible to save time.
68P09283A63-5
4-7
FOA
AUG 2007
Acceptance Test Procedures - TX & RX
Chapter 4: Acceptance Test Procedures
Required Test Equipment
The following test equipment is required:
•
LMF
•
Power Meter
•
Communications System Analyzer
•
Before connecting any test equipment directly to any UBS TX OUT connector,
verify that there are no CDMA channels keyed.
•
At active sites, have the OMC-R operator place the carrier assigned to the UBS
under test OOS. Failure to do so can result in serious personal injury and/or
equipment damage.
Test equipment must be calibrated and the cables re-calibrated before using them to
perform acceptance tests.
ATP Test Prerequisites
Before attempting to run any ATP tests, ensure the following have been completed:
•
LMF is logged into the UBS.
•
All FRUs on the LMF screen are INS (Green)
•
Test cables are calibrated
•
Test equipment is connected for ATP tests (refer to ATP Test Setup illustrations in the Test
Equipment Set Up section of Appendix E Optimization and Calibration Procedures)
•
Test equipment has been selected in the LMF, warmed up 60 minutes and calibrated
•
All required Ethernet test equipment connections are made
•
UBS transmit connectors are terminated with either non-radiating loads or connected to
the test equipment as specified in Figure 3-27 through Figure 3-30.
4-8
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Acceptance Test Procedures - TX & RX
Before a FER test is run, be sure that the following is done:
All transmitter connectors are properly terminated. Terminations should be 50-Ohms,
200 W. Failure to observe these warnings may result in bodily injury or equipment
damage.
Procedure 4-3 Setup Test Equipment — TX Output Verify/Control Tests
If it has not already been done, interface the LMF computer to the UBS.
If it has not already been done, refer to Procedure 3-3 to start a GUI LMF
session and log into the UBS.
If it has not already been done, refer to Figure 3-23, Figure 3-24, Figure 3-25,
or Figure 3-26 as applicable, for the test equipment and antennas being used,
to connect test equipment for acceptance testing.
LMF-based measurements factor in TX cable loss between the UBS
and the test equipment.
Antenna Connectors
All acceptance testing requires test equipment connections to the UBS antenna TX or RX
connectors. Refer to the ATP Test Setup illustrations in the Test Equipment Set Up section of
Appendix E Optimization and Calibration Procedures for specific connection requirements
Recommended Tests
The recommended tests are TX Audit and Receive Signal Strength Indicator (RSSI) to confirm
the physical assembly of the frame and that all the cables TX, RX, Digital etc are correctly
connected. The rest of the tests are supported, optional, or for troubleshooting purposes.
TX/RX ATP Test Procedure
Follow the procedure in Procedure 4-4 to perform the All TX/RX ATP test.
Procedure 4-4 All TX/RX ATP Test Procedure
Continued
68P09283A63-5
4-9
FOA
AUG 2007
Acceptance Test Procedures - TX & RX
Chapter 4: Acceptance Test Procedures
Set up the test equipment for abbreviated tests per Procedure 4-3
Select the device(s) to be tested.
To select multiple items, hold down the Shift or Ctrl key while
making the selections.
For all TX tests except Code domain, a SectorCarrier must be
selected. For code domain select the modem and carrier. For RX
test — FER select the modem and SectorCarrier. For RX test —
RSSI select SectorCarrier only.
Click on Tests in the UBS Menu bar, and select All TX/RX ATP... from
pull-down menu.
Select the appropriate SectorCarrier (carrier-bts#-sector#-carrier#)
displayed in the Channels/Carrier pick list.
Since the UBS supports OMNI configurations only, sector# will
always be 1.
Verify that the correct channel number for the selected
SectorCarrier is shown in the Carrier # Channels box.
If not obtain the latest bts-#.necf files.
If necessary, the correct number may be manually entered into
the Carrier # Channels box.
Select the appropriate RX Branch (Both,
Main, or Diversity) from the drop-down menu.
In the Rate Set box, select the appropriate data rate (1=9600, 2= 14400, 3 =
9600 1X) from the drop-down list.
In the Test Pattern box, select the Standard test pattern from the drop
down list in the Bay Level Offset Calibration section.
Click on the OK button.
The status report window and a Directions pop-up are displayed.
Follow the cable connection directions as they are displayed.
The test results are displayed in the status report window.
Continued
4-10
68P09283A63-5
FOA
AUG 2007
1X UBS Macro BTS Optimization/ATP
Acceptance Test Procedures - TX & RX
Procedure 4-4 All TX/RX ATP Test Procedure (Continued)
10
Click on Save Results or Dismiss.
If Dismiss is used, the test results will not be saved in the test
report file.
Figure 4-2 TX Test Options Screen
en ter_filena me_her e_and_mo ve_per_st ep_8
Perform the procedure in Procedure 4-5 for all-inclusive transmit test.
Procedure 4-5
All TX ATP Test
Set up the test equipment for TX acceptance tests per Procedure 4-3
Continued
68P09283A63-5
4-11
FOA
AUG 2007
Acceptance Test Procedures - TX & RX
Procedure 4-5
Chapter 4: Acceptance Test Procedures
All TX ATP Test (Continued)
On LMF, select devices to be tested.
To select multiple items, hold down the Shift or Ctrl key while
making the selections.
Click on Tests in the BTS Menu bar, and select All TX ATP... from pull-down
menu.
Select the appropriate carrier (HDModem) from those displayed in the
Channels/Carrier pick list.
Verify that the correct channel number for the selected
carrier is shown in the Carrier # Channels box.
If not obtain the latest bts-#.necf files.
If necessary, the correct number may be manually entered into
the Carrier # Channels box.
In the Test Pattern box, select the Standard test pattern from the drop
down list in the Bay Level Offset Calibration section. Other selections are
available for TX Mask only.
Click OK to display a status bar followed by a Directions pop-up window.
Follow the cable connection directions as they are
displayed, and click the Continue button to begin testing.
As the ATP process is completed, results will be displayed in a status report
window.
Click the Save Results or Dismiss button.
If Dismiss is used, the test results will not be saved in the test
report file.
4-12
68P09283A63-5
FOA
AUG 2007

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Encryption                      : Standard V2.3 (128-bit)
User Access                     : Print, Print high-res
XMP Toolkit                     : Adobe XMP Core 4.0-c316 44.253921, Sun Oct 01 2006 17:14:39
Modify Date                     : 2007:10:11 10:03:18-06:00
Create Date                     : 2007:10:11 09:53:36-06:00
Metadata Date                   : 2007:10:11 10:03:18-06:00
Creator Tool                    : Adobe Acrobat 8.1 Combine Files
Format                          : application/pdf
Title                           : 
Creator                         : Motorola Gold Disk User
Document ID                     : uuid:aa64e73a-e039-4126-9fbb-c4aa42d0a28e
Instance ID                     : uuid:1beb47df-75f3-4e6e-9e9f-8ff46d6bbfcd
Producer                        : Adobe Acrobat 8.1
Page Count                      : 48
Author                          : Motorola Gold Disk User
EXIF Metadata provided by EXIF.tools
FCC ID Filing: IHET5GX1

Navigation menu