Nokia Solutions and Networks T6CB1 SC300 1X Microcell @ 1.9 GHz User Manual 3 of 3
Nokia Solutions and Networks SC300 1X Microcell @ 1.9 GHz Users Manual 3 of 3
Contents
- 1. Users Manual 1 of 3
- 2. Users Manual 2 of 3
- 3. Users Manual 3 of 3
Users Manual 3 of 3
Chapter 7: Optimization and Optional Acceptance Test Procedures (ATP) Table of Contents JAN 2002 ATP Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1 7-1 BTS Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools and Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Remove the Solar Cover . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Power Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Remove Diagnostic Access Cover . . . . . . . . . . . . . . . . . . 7-2 7-2 7-2 7-2 7-2 7-4 Connect LMF to BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LMF to BTS Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Connect LMF to BTS via Serial Port Connection . . . . . . Procedure to Connect LMF to BTS via Ethernet Connection . . . . . . . . 7-6 7-6 7-6 7-6 7-7 Connect Test Equipment to BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Connect Advantest R3465 to BTS . . . . . . . . . . . . . . . . . Procedure to Connect Advantest R3267 to BTS . . . . . . . . . . . . . . . . . . Procedure to Connect the Motorola CyberTest, HP 8935, and HP 8921 to BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Connect the Agilent E4406A/E4432B to BTS . . . . . . . . . 7-10 7-10 7-11 7-13 7-15 7-16 Connect Test Set and Power Meter to LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Connect the Communication Test Set and Power Meter to the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RS232 Cable Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-18 BTS Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Create a Named HyperTerminal Connection for MMI Communication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Establish an MMI Communication Session . . . . . . . . . . . Procedure to Set IP Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Simulate an LMF Session . . . . . . . . . . . . . . . . . . . . . . . . Updating Default Channel Setting to Customer Operating Channel . . . Synchronization Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Verify and Change BTS Synchronization Mode . . . . . . . Procedure to Verify DPLL Tracking (RGPS/HSO) . . . . . . . . . . . . . . . . Procedure to Verify and Modify Default Location Coordinates . . . . . . 7-20 7-20 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-18 7-19 7-20 7-22 7-23 7-24 7-25 7-26 7-27 7-28 7-29 Table of Contents – continued Procedure to Set Frame ID for Multi–Unit Logical BTS Configuration 7-31 BTS Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Install the LMF Program and BTS Binaries . . . . . . . . . . . . . . . . . . . . . Create a Site–Specific BTS Directory . . . . . . . . . . . . . . . . . . . . . . . . . . Start the LMF and Login to the BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . Update BTS Specific CDF File Device Load Version . . . . . . . . . . . . . Download/Enable MAWI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Configuration Data File (CDF) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . System Status LED States . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-32 7-32 7-32 7-32 7-32 7-33 7-34 7-35 7-36 Verify and Set Span Line Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Span Line Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Verify and Set Span Line Settings . . . . . . . . . . . . . . . . . . SPAN_CONFIG Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-37 7-37 7-37 7-37 7-39 GPIB Addresses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verify the Gigatronics 8541C Power Meter GPIB Address . . . . . . . . . Verify and Set Motorola CyberTest GPIB Address . . . . . . . . . . . . . . . . Verify and Set HP8935 Test Set GPIB Address . . . . . . . . . . . . . . . . . . Verify and Set the HP8921A and HP83236A/B GPIB Addresses . . . . Verify and Set Advantest R3465 GPIB Address . . . . . . . . . . . . . . . . . . RS232 GPIB Interface Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verify and Set Advantest R3267 GPIB Address . . . . . . . . . . . . . . . . . Verify and Set Advantest R3562 Signal Generator GPIB Address . . . . Verify and Set Agilent E4406A Transmitter Tester GPIB Address . . . . Verify and Set Agilent E4432B Signal Generator GPIB Address . . . . . 7-40 7-40 7-40 7-41 7-42 7-43 7-44 7-45 7-45 7-47 7-47 7-49 Test Equipment Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Calibrate Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . Calibration Without the LMF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Calibrate R3465 Test Set . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Calibrate R3267 Test Set . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Calibrate Agilent E4406A . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Setup Advantest R3465 Test Equipment . . . . . . . . . . . . . Procedure to Setup Advantest R3267 Test Equipment . . . . . . . . . . . . . 7-51 7-51 7-52 7-52 7-53 7-53 7-54 7-55 7-56 Test Equipment Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Select Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . Selecting Test Equipment Automatically or Manually . . . . . . . . . . . . . Procedure to Manually Select Test Equipment in a Serial Connection Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Automatically Select Test Equipment in a Serial Connection Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-57 7-57 7-57 7-57 7-58 Power Meter Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-60 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-58 7-59 JAN 2002 Table of Contents JAN 2002 – continued Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Calibrate the Power Meter . . . . . . . . . . . . . . . . . . . . . . . . 7-60 7-60 7-60 Test Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Purpose of Cable Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to do an Automated Cable Calibration . . . . . . . . . . . . . . . . . 7-61 7-61 7-61 7-62 Create CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Create a CAL File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-65 7-65 7-65 7-66 Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Test Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TX Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RX Test Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RX Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-67 7-67 7-67 7-67 7-68 7-68 Subscriber Unit (SU) Test and Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Test and Verify SU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Program SU NAM Parameters . . . . . . . . . . . . . . . . . . . . . 7-69 7-69 7-69 7-69 7-71 CDMA Operating Frequency Programming Information – North American Cellular Bands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1900 MHz PCS Channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calculating 1900 MHz Center Frequencies . . . . . . . . . . . . . . . . . . . . . . 800 MHz CDMA Channels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Calculating 800 MHz Center Frequencies . . . . . . . . . . . . . . . . . . . . . . . 7-73 7-73 7-73 7-74 7-76 7-76 TX Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Run TX ATP Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Run TX Tests Using Backup Synchronization (Sites Equipped With GPS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-78 7-78 7-78 7-78 RX Acceptance Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Run RX ATP Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-84 7-84 7-84 7-84 Generate an ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Run ATP Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-88 7-88 7-88 7-88 Copy LMF CAL File to CBSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-89 7-89 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-78 Table of Contents – continued Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Copy CAL Files from LMF to a Diskette . . . . . . . . . . . . Procedure to Copy CAL Files from Diskette to the CBSC . . . . . . . . . . 7-89 7-89 7-90 Prepare to Leave the Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Remove External Test Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reset and Initialize Site Remotely . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bring BTS into Service with the CDMA LMF . . . . . . . . . . . . . . . . . . . Terminate LMF Session/Remove Terminal . . . . . . . . . . . . . . . . . . . . . . Replace Diagnostic Access Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Replace Solar Cover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-91 7-91 7-91 7-91 7-92 7-93 7-93 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 ATP Overview Overview The purpose of this procedure is to outline the optimization and ATP after a BTS installation. Calibration of the BTS is performed in the factory and is not required. The ATP is also performed in the factory and is optional. All the procedures in this chapter are to be performed with the BTS out of service or under LMF control. If necessary, refer to the “Shut Down and Restoring BTS Signaling” procedure in Chapter 7. For a complete listing of the required tools and equipment, refer to the “ATP Tools and Equipment” list in Chapter 1. IMPORTANT You must run the ATP with LMF Software Release 2.15.0.1.10 or higher. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-1 BTS Preparation Overview The purpose of this procedure is to prepare the BTS for the ATP. This procedure consists of: 1. Solar Cover Removal 2. BTS Power Up 3. Diagnostic Access Cover Removal Required Tools and Equipment The following tools and materials are necessary to do this procedure: Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M T20 Torx tamper bit Procedure to Remove the Solar Cover If you did not mount the solar cover during the unit installation, then this procedure is not necessary. Remove the four captive screws (two on each side) that hold the front solar cover. Refer to Figure 7-1. Figure 7-1: Front Solar Cover FRONT COVER CAPTIVE SCREWS CAPTIVE SCREWS BTS Power Up Figure 7-2 shows the location of the AC power breakers inside the optional Primary Surge Suppressor. The AC breakers must be closed before you power up the MicroCell unit. Figure 7-3 shows the location of the AC and DC Power breakers on the unit. Push both the AC and DC breakers in to power up the unit. 7-2 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Preparation – continued Figure 7-2: Location of AC Power Breakers Inside Primary Surge Suppressor AC POWER BREAKER CARRIER 2 AC POWER BREAKER CARRIER 3 AC POWER BREAKER CARRIER 4 AC POWER BREAKER CARRIER 1 MAIN INPUT BREAKER Figure 7-3: Location of AC and DC Power Breakers AC POWER BREAKER DC POWER BREAKER JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-3 BTS Preparation – continued Procedure to Remove Diagnostic Access Cover NOTE The screws are captivated. Do not attempt to remove them from the cover. Table 7-1: Procedure for Removing Diagnostic Access Cover Step Action Using a T20 Torx tamper bit, loosen the two tamper resistant M4 screws holding the cover. See Figure 7-4. Gently tap the cover to loosen if required. Remove the cover and set inside a secure place. NOTE The 19 MHz and 2 SEC connectors should not be terminated with a 50 ohm terminator. Figure 7-4: How To Remove The Diagnostic Access Cover SCREWS IN DIAGNOSTIC ACCESS COVER ARE CAPTIVE 7-4 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Preparation – continued Figure 7-5: Detail Location of the Diagnostic Access Area JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-5 Connect LMF to BTS Overview This procedure gives instructions to connect the LMF to the BTS. LMF to BTS Connection The LMF is connected to the MMI/LMF connector on the diagnostic access area. The LMF serial port, or PCMCIA (Personal Computer Memory Card International Association) Serial Adapter provides the connection between the LMF and the MMI/LMF connector located on the diagnostic access area. There are three different methods to connect the LMF to the BTS: serial port to DB9, Ethernet via Ethernet hub, and Ethernet via crossover connection. Procedure to Connect LMF to BTS via Serial Port Connection Connect the LMF to the BTS. Refer to Figure 7-6, Figure 7-10, and Table 7-2. Figure 7-6: Serial to DB9 BTS to LMF connection LMF CONNECT TO PCMCIA SERIAL I/O OR SERIAL I/O PORT DB9 TO DB9 CABLE CONNECT 15 TO 9–PIN MMI TO SERIAL CONNECTOR TO MMI/ENET SYSTEM PORT DB9 7-6 DB9 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect LMF to BTS – continued Procedure to Connect LMF to BTS via Ethernet Connection You can connect the LMF to the BTS via an Ethernet connection. Depending upon site configuration, you can use an Ethernet connection with or without an Ethernet hub. For example, if your BTS is mounted on a pole and there is no power connection available for the Ethernet hub, then you can connect to the BTS via a RJ45 crossover cable or a MMI to LAN crossover adapter. In either case, you must configure either the RJ45 cable or the adapter to a crossover configuration. Ethernet connection via Ethernet hub To connect the LMF to the BTS via an Ethernet connection using an Ethernet hub, refer to Figure 7-7, Figure 7-10, and Table 7-2. Figure 7-7: Ethernet BTS to LMF Connection Using an Ethernet Hub LMF CONNECT PCMCIA LAN CARD TO ETHERNET HUB RJ45 ETHERNET TO 15–PIN MMI TO LAN ADAPTER 4–PORT 10 BASE T ETHERNET HUB RJ45 ETHERNET CABLE Ethernet connection via crossover cable To connect the LMF to the BTS via an Ethernet connection using a crossover cable or adapter, you must configure the RJ45 cable or the MMI to LAN adapter as a crossover. Refer to Figure 7-8 for information on how to configure the cable or adapter. Refer to Figure 7-9, Figure 7-10, and Table 7-2 to connect the LMF to the BTS. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-7 Connect LMF to BTS – continued Figure 7-8: Ethernet Crossover Cable and Adapter Wiring RJ45 ETHERNET CABLE CROSSOVER CONFIGURATION TX+ BLUE ORANGE 2 TX– RX+ BLACK RX– RED GREEN 15–PIN D–SUB RJ–45 TX+ BLUE 5 TX– YELLOW MMI/LAN ADAPTER CROSSOVER CONFIGURATION 15 12 ORANGE RX+ BLACK RX– YELLOW RED GREEN BROWN 7 GRAY BROWN GRAY Figure 7-9: Ethernet BTS to LMF Connection Using Crossover Cable or Adapter NOTE: YOU MUST CONFIGURE EITHER THE RJ45 CABLE OR THE MMI TO LAN ADAPTER AS A CROSSOVER TO CONNECT THE LMF TO THE BTS IN THIS FASHION. LMF CONNECT PCMCIA LAN CARD TO ETHERNET HUB RJ45 ETHERNET TO 15–PIN MMI TO LAN ADAPTER (SEE NOTE) RJ45 ETHERNET CABLE (SEE NOTE) 7-8 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect LMF to BTS – continued MMI/LMF serial connector information Refer to Figure 7-10 and Table 7-2 for information for the 15–pin MMI/LMF connector. Figure 7-10: 15–Pin MMI/LMF Serial Connector 11 12 13 14 15 10 Table 7-2: 15–Pin MMI/LMF Serial Cable Information JAN 2002 Pin# Abbreviation Description RTS Request to Send TXD Transmit Data RXD Receive Data TX+ Ethernet Transmit + TX– Ethernet Transmit – CTS Clear to Send CTS Clear to Send CTS Clear to Send – Open 10 RI Ring Indicator 11 RI Ring Indicator 12 RX+ Ethernet Receive + 13 CTS Clear to Send 14 GND Ground 15 RX– Ethernet Receive – SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-9 Connect Test Equipment to BTS Overview The following test equipment setup applies to the BTS Acceptance Test Procedure (ATP). The SC300 BTS supports the following test sets for IS95 A/B testing: 1. Advantest R3465 with R3561 Signal Generator. 2. Motorola CyberTest 3. HP 8921A (for 800 MHz testing only) 4. Aglient 8935 Series E6380A (formally HP8935) The 1X SC300 BTS supports the following test sets for CDMA2000 1X testing: 1. Advantest R3267 with R3562 Signal Generator 2. Agilent E4406A with E4432B Signal Generator NOTE If you are not going to perform the ATP, then proceed to the “Creating a Named HyperTerminal Connection for MMI Communication” procedure in this chapter. Equipment warm-up IMPORTANT Warm-up BTS equipment site for a minimum of 60 minutes prior to the BTS ATP. This assures BTS site stability and contributes to test accuracy. (Time spent running initial power–up, hardware/firmware audit, and BTS download counts as warm–up time). IMPORTANT Warm-up test equipment for a minimum of 60 minutes prior to their use in the BTS ATP. This assures maximum equipment measurement accuracy and consistency during testing. All test equipment is controlled by the LMF via a Serial Cable/GPIB bus. The LMF expects each piece of test equipment to have a factory-set GPIB address. If there is a communications problem between the LMF and any piece of test equipment, you should verify that the GPIB addresses have been set correctly. 7-10 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect Test Equipment to BTS – continued NOTE In the following procedure and illustrations, typical DIP switch positions and/or configurations are shown. If required, refer to the test equipment OEM user manuals for additional information. Procedure to Connect Advantest R3465 to BTS Follow the procedure in Table 7-3 to connect the Advantest R3465 to the BTS. Refer to Figure 7-11. Table 7-3: Connecting Advantest R3465 to the BTS Step Action Connect an SMA/BNC coax cable between the following points: – BNC on the Advantest CDMA TIMEBASE IN port. – SMA on the 19 MHz port on the diagnostic access area of the BTS. Connect an SMA/BNC cable between the following points: – BNC to one end of the BNC “T.” – SMA on the 2 Sec port on the diagnostic access area of the BTS. Connect a BNC/BNC cable between the following points: – BNC to one end of the BNC “T.” – BNC to the EXT TRIG port on the rear panel of the Advantest R3465. Connect the BNC “T” to the EVEN SEC/SYNC IN port of the Advantest R356IL. Verify the R3561 and R3465 rear panel connections are in place (These are common connections and should already be installed): – Serial cable between 3465A rear panel SERIAL I/O port and R3561 SERIAL I/O port. – SMA cable between 3465A rear panel 1ST LO OUT port and R3561 LOCAL IN port. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-11 Connect Test Equipment to BTS – continued Figure 7-11: Communications Test Set Timing Signal Detail (Advantest R3465) BTS DIAGNOSTIC ACCESS AREA CONNECTIONS DEPICTED BY HEAVY BOLD LINES ARE STATIONARY AND SHOULD REMAIN INSTALLED DURING TEST EQUIPMENT TRANSPORT FROM SITE TO SITE. 2 SECOND REFERENCE 19.6608 MHZ REFERENCE BNC “T” Advantest R3465 front panel GPIB CONNECTOR Advantest R3465 rear panel FROM EVEN SEC/SYNC IN 7-12 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect Test Equipment to BTS – continued Procedure to Connect Advantest R3267 to BTS Use the procedures in Table 7-4 to connect the Advantest R3267 to the BTS. Refer to Figure 7-12. NOTE The Advantest R3267 test set is used for 1X system testing. Table 7-4: Procedure to Connect Advantest R3267 to the BTS Step Action Connect an SMA/BNC coax cable between the following points: – BNC on the MOD TIMEBASE IN port on the front panel of the Advantest R3562 Test Source. – SMA on the 19 MHz port on the diagnostic access area of the BTS. Connect an SMA/BNC cable between the following points: – SMA on the 2 Sec port on the diagnostic access area of the BTS. – BNC to the EXT TRIG IN port on the front panel of the Advantest R3562 Test Source. Verify the R3267 and R3562 rear panel connections are in place (These are common connections and should already be installed): – Serial cable between R3267 rear panel SERIAL I/O port and R3562 rear panel SERIAL I/O port. – SMA cable between R3267 rear panel 10MHZ REF OUT port and R3562 rear panel SYNTHE REF IN port. – SMA cable between R3267 rear panel EXT TRIG port and R3562 rear panel CLOCK OUT 1 port. – Parallel cable between R3267 rear panel GPIB port and R3562 GPIB port. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-13 Connect Test Equipment to BTS – continued Figure 7-12: R3267 Communications Test Set Timing Signal Detail BTS DIAGNOSTIC ACCESS AREA CONNECTIONS DEPICTED BY HEAVY BOLD LINES ARE STATIONARY AND SHOULD REMAIN INSTALLED DURING TEST EQUIPMENT TRANSPORT FROM SITE TO SITE. 2 SECOND REFERENCE 19.6608 MHZ REFERENCE ADVANTEST R3267 FRONT PANEL ADVANTEST R3267 REAR PANEL ADVANTEST R3267 SPECTRUM ANALYZER 100Hz – 8GHz SERIAL I/O EXT TRIG GPIB 10 MHZ RF OUT ADVANTEST R3562 RECEIVER TEST SOURCE EXT TRIG IN MOD TIME BASE IN SERIAL I/O GPIB SYNTHE REF IN ADVANTEST R3562 TEST SOURCE FRONT PANEL 7-14 CLOCK OUT 1 ADVANTEST R3562 TEST SOURCE REAR PANEL SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect Test Equipment to BTS – continued Procedure to Connect the Motorola CyberTest, HP 8935, and HP 8921 to BTS Figure 7-13: Communications Test Set Timing Signal Detail (CyberTest, HP 8935, and HP 8921) BTS DIAGNOSTIC ACCESS AREA COMMUNICATIONS TEST SET MOTOROLA CYBERTEST SYNC MONITOR EVEN SEC TICK PULSE REFERENCE FROM DIAGNOSTIC ACCESS AREA FREQ MONITOR 19.6608 MHZ CLOCK REFERENCE FROM DIAGNOSTIC ACCESS AREA ÎÎÎ ÎÎÎ ÎÎÎÏ ÁÁ Á ÁÁ Á AGILENT 8935 SERIES E6380A (FORMALLY HP 8935) CONNECTIONS DEPICTED BY DOTTED LINES ARE STATIONARY AND SHOULD REMAIN INSTALLED DURING TEST EQUIPMENT TRANSPORT FROM SITE TO SITE. 2 SECOND REFERENCE 19.6608 MHZ REFERENCE SYNC MONITOR EVEN SEC TICK PULSE REFERENCE FROM DIAGNOSTIC ACCESS AREA HP 8921 FREQ MONITOR 19.6608 MHZ CLOCK REFERENCE FROM DIAGNOSTIC ACCESS AREA FREQ MONITOR 19.6608 MHZ CLOCK REFERENCE FROM DIAGNOSTIC ACCESS AREA SYNC MONITOR EVEN SEC TICK PULSE REFERENCE FROM DIAGNOSTIC ACCESS AREA JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-15 Connect Test Equipment to BTS – continued Procedure to Connect the Agilent E4406A/E4432B to BTS Agilent E4406A/E4432B test equipment interconnection To provide proper operation during testing when both units are required, the 10 MHz reference signal from the E4406A transmitter test set must be provided to the E4432B signal generator. Connect a BNC (M)–BNC (M) cable from the E4406A 10 MHz OUT (SWITCHED) connector to the E4432B 10MHz IN connector as shown in Figure 7-14. Figure 7-14: Agilent 10 MHz Reference Connections E4432B 10 MHz IN TO GPIB BOX E4406A 10 MHz OUT (SWITCHED) 7-16 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect Test Equipment to BTS – continued Figure 7-15: Agilent E4406A/E4432B Communications Test Set Timing Signal Detail BTS DIAGNOSTIC ACCESS AREA CONNECTIONS DEPICTED BY HEAVY BOLD LINES ARE STATIONARY AND SHOULD REMAIN INSTALLED DURING TEST EQUIPMENT TRANSPORT FROM SITE TO SITE. Agilent E4432B (Top) and E4406A (Bottom) 2 SECOND REFERENCE 19.6608 MHZ REFERENCE TO TRIGGER IN ON REAR OF TRANSMITTER TESTER TO PATTERN TRIG IN ON REAR OF SIGNAL GENERATOR BNC “T” TO EXT REF IN ON REAR OF TRANSMITTER TESTER FREQ MONITOR 19.6608 MHZ CLOCK REFERENCE FROM CSM BOARD SYNC MONITOR EVEN SEC TICK PULSE REFERENCE FROM CSM BOARD NOTE: 10 MHZ IN ON REAR OF SIGNAL GENERATOR IS CONNECTED TO 10 MHZ OUT (SWITCHED) ON REAR OF TRANSMITTER TESTER (FIGURE 7-14). JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-17 Connect Test Set and Power Meter to LMF Procedure to Connect the Communication Test Set and Power Meter to the LMF Use the following procedure in Table 7-5 to connect the communication test set to the power meter and to the LMF. Refer to Figure 7-16. Table 7-5: Procedure to Connect the Communication Test Set and Power Meter to the LMF Step Action Connect the RS232–IEEE488 converter serial cable between the COM1 port of the LMF and the RS232 port of the RS232–IEEE488 converter. Connect a GPIB cable between the RS232–IEEE488 converter and the GPIB port on the communication test set. Connect a GPIB cable between the GPIB port on the communication test set and the GPIB port of the power meter. Set the DIP switches on the RS232–IEEE488 converter as shown in Figure 7-16. Power on the communication test set, power meter and RS232–IEEE488 converter. Figure 7-16: LMF to Test Equipment Connection RS–232 CABLE TO COMM1 PORT ON CDMA LMF NOTEBOOK LMF GIGATRONICS POWER METER GPIB CABLE(S) TO GPIB CONNECTOR ON TEST EQUIPMENT SIGNAL GENERATOR (IF EQUIPPED) COMMUNICATION TEST SET RS232–IEEE488 CONVERTER S MODE DATA FORMAT BAUD RATE GPIB ADDRESS G MODE 7-18 OFF ON SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Connect Test Set and Power Meter to LMF – continued RS232 Cable Configuration One National Instruments GPIB–232–CT with Motorola CGDSEDN04X RS232 serial cable or equivalent is used to interface the LMF to the test equipment. A Standard RS–232 cable can be used with the following modifications: Pin 8 (CTS) does not have to be jumpered/shorted to the others as it is a driver output. The DTR is already a driver output signal. The other pins are to receivers. Short pins 7, 1, 4, 6 on each cable end: Figure 7-17 shows the cable configuration for the RS232–IEEE488 converter serial cable. Figure 7-17: RS232–IEEE488 Converter Serial Cable Configuration 9–pin D (female) 9–pin D (female) GND 5 5 GND RX 3 2 TX TX 2 3 RX RTS 7 CTS 8 RSD/DCD 1 7 RTS ON BOTH CONNECTORS SHORT PINS 7 AND 8; SHORT PINS 1, 4 AND 6 8 CTS 1 RSD/DCD DTR 4 4 DTR DSR 6 6 DSR JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-19 BTS Configuration Objective The objective of this procedure is to configure the BTS and establish communication sessions between the LMF and BTS. This procedure consists of: 1. Creating a named hyperterminal connection for MMI communication 2. Establishing an MMI communication session 3. Verify and set IP address 4. Programming customer operating channel 5. Verifying BTS synchronization mode 6. Verifying DPLL tracking 7. Setting frame_id Procedure to Create a Named HyperTerminal Connection for MMI Communication Confirming or changing the configuration data of certain BTS Field Replaceable Units (FRU) requires establishing an MMI communication session between the CDMA LMF computer and the FRU. Using features of the Windows operating system, the connection properties for an MMI session can be saved on the CDMA LMF computer as a named Windows HyperTerminal connection. This eliminates the need for setting up connection parameters each time an MMI session is required to support optimization. Once the named connection is saved, a shortcut for it can be created on the Windows desktop. Double–clicking the shortcut icon will start the connection without the need to negotiate multiple menu levels. Follow the procedures in Table 7-6 to establish a named HyperTerminal connection and create a Windows desktop shortcut for it. Table 7-6: Procedure to Create a Named HyperTerminal Connection for MMI Communication Step Action From the Windows Start menu, select: Programs > Accessories Select Communications, double click the Hyperterminal folder, and then double click on the Hypertrm.exe icon in the window which opens. NOTE If a Location Information Window appears, enter the required information, then click on the Close button. (This is required the first time, even if a modem is not to be used.) If a You need to install a modem..... message appears, click on NO. . . . continued on next page 7-20 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued Table 7-6: Procedure to Create a Named HyperTerminal Connection for MMI Communication Step Action When the Connection Description box opens: – Type a name for the connection being defined (e.g., MMI Session) in the Name: window, – Highlight any icon preferred for the named connection in the Icon: chooser window, and – Click OK. NOTE For CDMA LMF computer configurations where COM1 is used by another interface such as test equipment and a physical port is available for COM2, select COM2 in the following step to prevent conflicts. From the Connect using: pick list in the Connect To box displayed, select Direct to Com 1 or Direct to Com 2 for the RS–232 connection port, and click OK. In the Port Settings tab of the COM# Properties window displayed, configure the RS–232 port settings as follows: Bits per second: 9600 Data bits: 8 Parity: None Stop bits: 1 Flow control: None Click OK. Save the defined connection by selecting: File > Save Close the HyperTerminal window by selecting: File > Exit Click the Yes button to disconnect when prompted. 10 If the Hyperterminal folder window is still open, proceed to step 12. 11 Select Communications and double click the Hyperterminal folder. 12 Highlight the newly–created connection icon by clicking on it. 13 Right click and drag the highlighted connection icon to the Windows desktop and release the right mouse button. 14 From the popup menu which appears, select Create Shortcut(s) Here. 15 If desired, reposition the shortcut icon for the new connection by dragging it to another location on the Windows desktop. 16 Close the Hyperterminal folder window by selecting: File > Close JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-21 BTS Configuration – continued Procedure to Establish an MMI Communication Session For those procedures which require MMI communication between the CDMA LMF and the BTS, follow the procedures in Table 7-7 to initiate the communication session. NOTE If an LMF session is in progress, logout of the LMF prior to establishing an MMI communication session. Refer to steps 1 and 2 of the “Remove LMF” procedure in Table 7-54. Table 7-7: Procedure to Establish an MMI Communication Session Step Action Connect the CDMA LMF computer to the BTS. Refer to the “Connecting the LMF to the BTS” procedure in this chapter. Start the named HyperTerminal connection for MMI sessions by double clicking on its Windows desktop shortcut. NOTE If a Windows desktop shortcut was not created for the MMI connection, access the connection from the Windows Start menu by selecting: Programs > Accessories > Hyperterminal > HyperTerminal >Once the connection window opens, establish MMI communication with the BTS FRU by pressing the CDMA LMF computer Enter key until the prompt identified in the applicable procedure is obtained. Every command is entered at the SC300> prompt unless otherwise specified. 7-22 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued Procedure to Set IP Address You must set an IP address on the unit before you can begin an LMF Ethernet (LAN) session. Follow the instructions in Table 7-8 to set the IP address. Table 7-8: Procedure to Set IP Address Step Action Enter the following command to check the ethernet IP address: sc300>ether getip Observe the following typical response (if the IP address was not set): COMMAND ACCEPTED: ether getip Current IP ADDRESS: 0.0.0.0 Enter the following command to check the ethernet gateway address: sc300>ether getgw Observe the following typical response (if the IP address was not set): COMMAND ACCEPTED: ether getgw GW address: 0.0.0.0 Enter the following command to check the ethernet netmask value: sc300>ether getnm Observe the following typical response (if the IP address was not set): COMMAND ACCEPTED: ether getnm NETMASK: 0.0.0.0 If the IP address is set, then you are finished with this procedure. If you must set the IP address, then proceed with steps 5 through 7. NOTE The default LMF IP address is 128.0.0.2. Enter the following command to set the IP address: sc300>ether setip 128.0.0.2 The system will display the following output: COMMAND ACCEPTED: ether setip 128.0.0.2 THESE ARE THE BYTES READ IN: 128.0.0.2 SETTING IP: 128.0.0.2 Completed flashing of IP address CONFIRM NEW IP: 128.0.0.2 SETTING Ethernet Address: 8:0:80:0:0:2 Completed flashing of Ether address CONFIRM NEW Ethernet Address: 8:0:80:0:0:2 New parameters will take affect after next reset. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-23 BTS Configuration – continued Table 7-8: Procedure to Set IP Address Step Action Enter the following command at the sc300> prompt: sc300>ether setgw 128.0.0.2 The system will display the following output: COMMAND ACCEPTED: ether setgw 128.0.0.2 ”128” ”0” ”0” ”2” THESE ARE THE BYTES READ IN: 128.0.0.2 SETTING GW: 128.0.0.2 Completed flashing of Gateway address CONFIRM NEW GW: 128.0.0.2 New parameters will take affect after next reset. Enter the following command at the sc300> prompt: sc300>ether setnm 255.255.255.255 The system will display the following output: COMMAND ACCEPTED: ether setnm 255.255.255.255 ”255” ”255” ”255” ”255” THESE ARE THE BYTES READ IN: 255.255.255.255 SETTING NETMASK: 255.255.255.255 Completed flashing of SubnetMask address CONFIRM NEW NETMASK: 255.255.255.255 New parameters will take affect after next reset. Repeat steps 1 through 3 to verify your entries. If your entries are correct, then press the red RESET button on the diagnostic access area to reset the unit. Procedure to Simulate an LMF Session You must start a simulated LMF session when you enter MMI commands. Enter the following command at the MMI prompt to simulate an LMF link: sndtype 0xa178 You should enter this command at the beginning of every simulated MMI Communication Session. 7-24 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued Updating Default Channel Setting to Customer Operating Channel A non–volatile database containing the default channel and default power level of the site must be programmed. The default channel is the customer operating channel for this site. The default power level must be set to –50 dBm which will be overwritten by the MM/OMCR when the site comes on–line. It is imperative that the customer frequency be programmed into this database. Failure to do so may result in the RF interference to other RF–emitting devices in the local area whenever the site is powered up. Table 7-9: Procedure to Update Default Channel Setting to Customer Operating Channel Step Action Connect the LMF computer terminal to the MMI/LMF connector. Refer to Figure 7-6. If you have not already done so, logout of the BTS and exit the LMF. Wait 10 seconds before proceeding. Establish an MMI connection session with the BTS. Refer to Table 7-7. Simulate an LMF connection by issuing the sndtype 0xa178 command. Verify that the BTS is in OOS_RAM status by issuing the status command. Enter the op_param –w –50 chan# command. The command parameters are as follows: –w instructs the BTS to write the values into non–volatile memory. –50 defaults the power to –50dBm chan# the customer operating channel (refer to Table 7-43 for 1.9 GHz systems and Table 7-44 for 800 MHz systems). If the command is successful, the following response will display: PASSED: chan# JAN 2002 TRX EEPROM updated for power level = –50 (dBm) and channel = If no additional MMI sessions are required at this time, exit the MMI session and HyperTerminal connection by selecting File>Exit. If you are continuing the MMI session, proceed to Table 7-10. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-25 BTS Configuration – continued Synchronization Background GPS GPS is typically used as the primary timing reference for CDMA BTSs. In applications where RGPS is used, the BTS is said to be synchronous with CDMA system time. The RGPS provides a 1 Pulse Per Second timing reference and Time Of Day information to allow the BTS to synchronize to CDMA system time. HSO A High Stability Oscillator (HSO) within the BTS provides a backup timing reference in the event of a GPS outage. Using only the HSO, the BTS can maintain CDMA system time for up to 24 hours. The BTS can also use the HSO as the primary timing reference (non–synchronous operation). However, synchronization to CDMA system time is not possible. The HSO provides a 1 Pulse Per Second timing reference to allow the BTS to remain synchronized to CDMA system time in the event of a GPS outage (synchronous operation) or to provide a stable frequency reference (non–synchronous operation). NOTE The HSO must be installed with GPS tracking for at least 24 hours before the HSO can provide 24 hours of backup for CDMA system time synchronization. BTS The BTS uses a Digital Phase Locked Loop (DPLL) to track the RGPS and/or HSO and generate a 19.6608 MHz CDMA timing reference. This timing reference, in conjunction with Time Of Day information provided by the RGPS, allows the BTS to synchronize to CDMA system time. A 2 Second reference is also generated by the BTS to allow alignment of Pilot offsets for the BTS and external test equipment. Both the 19.6608 MHz (19 MHz) and 2 Second (2 Sec) references are available via SMA connectors located in the Diagnostic Access Area. In order for the DPLL to begin the RGPS tracking process, the RGPS must be tracking GPS satellites. In order for the DPLL to begin the HSO tracking process, the BTS must be powered up (warmed) for at least 15 minutes. The DPLL status is defined as being in one of five states: Init, Warm, A1, A2 and TK. The Init state is the starting state of the DPLL. The Warm state is the condition during the 15 minute BTS warm up time. The A1 and A2 states are acquisition states when the DPLL is adjusting the 19.6608 MHz frequency based on the available reference 7-26 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued sources (RGPS or HSO). Under normal operating conditions, the acquisition states last about 5 minutes. The TK state is the DPLL tracking state and is entered at the end of the acquisition states. The TK state is required for performing ATP. Procedure to Verify and Change BTS Synchronization Mode The Sync button in the Diagnostic Access Area is used to toggle the RGPS or HSO as the primary timing reference for the BTS. If the External indicator in the Diagnostic Access Area is illuminated, the BTS expects an RGPS to be present for use as the primary timing reference. If the External indicator is not illuminated, the BTS will use the internal HSO as the primary timing reference. Use the procedure in Table 7-10 to verify and, if necessary change the BTS Sync mode. Table 7-10: Procedure to Verify and Change BTS Sync Mode Step Action If an MMI session was established, proceed to step 7. If no MMI session is running, proceed to step 2. Connect the MMI/LMF. Open an MMI Communication session. Simulate an LMF connection by issuing the sndtype 0xa178 command. Verify that the BTS is in OOS_RAM status by issuing the status command. Enter the sndtype 0x4003 command to change the state to OOS_RAM. Observe the condition of the External indicator. No further action is required if the BTS is in the desired Sync mode. Continue with Step 9 if the Sync mode needs to be altered. Push the Sync button to change the BTS Sync mode. 10 Reset the BTS using the Reset button in the Diagnostic Access Area. 11 If no additional MMI sessions are required at this time, exit the MMI session and HyperTerminal connection by selecting File>Exit. If you are continuing the MMI session, proceed to Table 7-11. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-27 BTS Configuration – continued Procedure to Verify DPLL Tracking (RGPS/HSO) The DPLL within the BTS must be tracking either RGPS or HSO in order to perform ATP. Use the procedure in Table 7-11 to verify DPLL tracking. Table 7-11: Procedure to Verify DPLL Tracking Step Action If an MMI session was established, proceed to step 6. If no MMI session is running, proceed to step 2. Connect the MMI/LMF. Open an MMI Communication session. Simulate an LMF connection by issuing the sndtype 0xa178 command. Verify that the BTS is in OOS_RAM status by issuing the status command. If an RGPS is not present, go to Step 9. Enter the gps_status command to display the current state of the RGPS. Observe the following typical response: gps_status GPS Receiver Identification: Current GPS Time :8 03 1999 Current GPS Receiver Status :8 Number of Satellites Currently visible :11 Number of Satellites Currently received :5 Number of Satellites Currently tracked :5 GPS Receiver Type Current GPS Task State :UT :GPS_TRACK 23:01:12 Current Dilution of Precision (HDOP (2D)/antenna ok [0x01]): 0 Chan: 0, SVID: 9, Mode: 8, RSSI: 44, Status: 0xaa Chan: 1, SVID: 4, Mode: 8, RSSI: 46, Status: 0xaa Chan: 2, SVID: 10, Mode: 8, RSSI: 44, Status: 0xaa Chan: 3, SVID: 6, Mode: 8, RSSI: 41, Status: 0xaa Chan: 4, Chan: 5, SVID: 7, SVID: 24, Mode: 8, Mode: 8, RSSI: 43, RSSI: 47, Status: 0xaa Status: 0xaa Chan: 6, SVID: 30, Mode: 8, RSSI: 45, Status: 0xaa Chan: 7, SVID: 5, Mode: 8, RSSI: 48, Status: 0xaa Current Longitude: –350250952 Current Latitude: 118244730 Current Height: 24019 The RGPS must have a Current GPS Task State of GPS_TRACK to proceed. NOTE GPS tracking times vary depending on location and installation. . . . continued on next page 7-28 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued Table 7-11: Procedure to Verify DPLL Tracking Step Action Issue the dpll_status command to display the current state of the DPLL. Observe the following typical response: Current source set to: GPS reference DPLL control task state: DPLL track. DPLL status (not valid if using even sec src): c:0000 off: –8639450,6736579,7204904 TK (Note: This must say TK. A1 and A2 states will have preceded it) Mode cntr: 120 ip: 9, aip1: 9, aip2: 6, tip: 3, integrator: iq: 4 aiq1: 4 aiq2: –2 tiq: –9 4096 10 Verify that the DPLL is “tracking” either the RGPS or HSO. The DPLL must have a Current source set to of GPS reference or HSO reference. The DPLL must also have a DPLL control task state of DPLL track. 11 If no additional MMI sessions are required at this time, exit the MMI session and HyperTerminal connection by selecting File>Exit. If you are continuing the MMI session, proceed to Table 7-12. Procedure to Verify and Modify Default Location Coordinates The BTS supplies the RGPS with default startup coordinates (latitude and longitude) in order to assist the RGPS in tracking satellites. The default startup coordinates can be modified and saved into non–volatile memory to speed the tracking of satellites. Use the procedure in Table 7-12 to verify and, if necessary, modify the default startup coordinates. The procedure in Table 7-12 is only applicable to sites equipped with an RGPS. Table 7-12: Procedure to Verify Default Startup Coordinates Step Action If an MMI session was established, proceed to step 6. If no MMI session is running, proceed to step 2. Connect the LMF/MMI. Open an MMI Communication session. Simulate an LMF connection by issuing the sndtype 0xa178 command. Verify that the BTS is in OOS_RAM status by issuing the status command. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-29 BTS Configuration – continued Table 7-12: Procedure to Verify Default Startup Coordinates Step Action Issue the dpll_status command to display the current state of the DPLL. Verify that the DPLL has a ”Current source set to” of GPS reference and a ”DPLL control task state” of DPLL track. The DPLL must be tracking GPS in order to complete this procedure. * IMPORTANT The values for longitude and latitude in response to the gps_status command are given in units of milli–arcseconds. Be careful to record the values accurately including any leading negative (–) signs. The value of Current Height is given in units of centimeters. Enter the gps_status command. Record the values displayed for Current Longitude, Current Latitude and Current Height. * IMPORTANT The gps_config command displays the default startup coordinates for the BTS. Note that latitude is displayed first, followed by longitude. This is in reverse order compared to the response of the gps_status command. The values for latitude and longitude are given in units of milli–arcseconds. The value of Current Height is given in units of centimeters. Enter the gps_config command to display the default startup coordinates for the BTS. Observe the following typical response: GPS Configuration data: latitude: longitude: height: height_type: cable_delay: accuracy: 151679715 msec –316791269 msec 19740 centi–meters 0 nsec If the default startup coordinates need to be modified, the gps_config command can be issued with additional parameters. Using the Current Longitude, Current Latitude and Current Height values recorded in step 8, issue the following command: gps_config 0 0 0 Be careful to input the latitude and longitude in the proper order along with any leading negative (–) signs. The GPS Height Type Configuration should be set to “0.” 10 Issue the gps_config to verify that the coordinates are set. 11 Reset the BTS to save the new coordinates. 12 Repeat the steps in Table 7-11 to verify the DPLL status prior to performing ATP. 13 If no additional MMI sessions are required at this time, exit the MMI session and HyperTerminal connection by selecting File>Exit. 7-30 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Configuration – continued Procedure to Set Frame ID for Multi–Unit Logical BTS Configuration Do the following procedure in Table 7-13 to setup the hardware for a multi–unit logical BTS configuration. Table 7-13: Procedure to Set Frame ID for Multi–Unit Logical BTS Configuration Step Action Establish an MMI session with the BTS. Refer to Table 7-7. Enter the following command at the SC300> prompt to set the frame ID to “1” on the first frame: frame_id 1 You can also set the frame_id to 1 by pressing the CU–ID button on the diagnostic access area to the “CARRIER #1” state. Enter the following command at the SC300> prompt to set the frame ID to “2” on the second frame: frame_id 2 You can also set the frame_id to 2 by pressing the CU–ID button on the diagnostic access area to the “CARRIER #2” state. If you have three or more units, enter the following command at the SC300> prompt to set the frame ID to “3” on the third frame: frame_id 3 You can also set the frame_id to 3 by pressing the CU–ID button on the diagnostic access area to the “CARRIER #3” state. If you have four units, enter the following command at the SC300> prompt to set the frame ID to “4” on the second frame: frame_id 4 You can also set the frame_id to 4 by pressing the CU–ID button on the diagnostic access area to the “CARRIER #4” state. Press the SYNC button on the diagnostic access area on all of the units to switch them to the “EXTERNAL” mode. If the frame_id of unit #1 is already set to “1” prior to the setup of the BTS, then you do not need to reset it. If the frame_id is not “1,” then you must press the RESET button on the diagnostic access area to reset unit #1. Press the RESET buttons on the diagnostic access areas of units #2, #3 (if equipped), and #4 (if equipped). JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-31 BTS Software Objective This objective of this procedure is to: 1. Install the LMF program. 2. Create a site specific BTS directory. 3. Start the LMF. 4. Login to the BTS 5. Update the BTS–specific CDF file. 6. Download and enable the MAWI Install the LMF Program and BTS Binaries Install the LMF and BTS binaries on the PC to be used if they are not already installed. Refer to the CDMA LMF Operator’s Guide, 68P64114A78 for the installation procedure. Create a Site–Specific BTS Directory Follow the steps in Table 7-14 to create a bts–bts# directory, to which the bts–bts#.cdf, cbsc–1.cdf, and ATP report files will reside. Table 7-14: Procedure to Create Site–Specific BTS Directory Step Action Use MS Windows Explorer to create a bts–# folder under the wlmf\cdma folder (where # is the BTS number). Get the bts–#.cdf file and cbsc–#.cdf file from the CBSC and put a copy of the files in the wlmf\cdma\bts–# folder. Refer to the LMF help screens or the CDMA LMF Operator’s Guide, 68P64114A21 for the copy file procedure. Start the LMF and Login to the BTS Use the following procedure in Table 7-15 to start the LMF and login to the BTS. Prerequisites 1. A bts–# folder with a correct CDF and CBSC file exists. 2. The LMF notebook is correctly set up and connected to the BTS. Refer to Figure 7-6. NOTE The Refresh button can be used to update the Available Base Stations pick list to include any new bts–# folders added/created after the LMF was started. To logout of the BTS, click on Select>Logout. A confirm logout pop–up message will appear. 7-32 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Software – continued Table 7-15: Procedure to Start the LMF and Login to the BTS Step Action Click on the LMF desktop icon. The LMF window should appear. Click on the Login tab if it is not already displayed. Double–click on CDMA in the Available Base Stations pick list if the list of available BTSs is not displayed. Click on the desired BTS. Is all of the information in the Serial Login tab and Equipage Information box list correct? – If YES, go to step 7. – If NO, go to step 6. Click on the Serial Login tab if it is not in the forefront. Select the correct Comm Port (normally COM2) and select the desired Baud Rate (normally 9600 for tests and 38400 for downloads). NOTE This step is not necessary if you are using the Ethernet LAN connection from the LMF to the BTS. Click on the Login button. The system will display a graphic of the SC300 BTS. Update BTS Specific CDF File Device Load Version Follow the steps in Table 7-16 to update the existing BTS specific CDF file NextLoad parameter to reflect the current device load version to be downloaded. The NextLoad version parameter in the CDF file for a BTS can be updated to one of the existing version numbers in the wlmf>cdma>loads folder. When code is downloaded the code file used is determined by the NextLoad parameter in the CDF file. If a version number folder that has the same number as the NextLoad parameter is not found when the download code function is used the LMF will not automatically select the code and data files to be downloaded. NOTE Device load version in the CDF file does not have to match the current version loaded at the OMCR/CBSC. Table 7-16: Procedure to Update BTS–Specific CDF File Device Load Version Step Action Click on the Tools menu item. Select the Update NextLoad item. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-33 BTS Software – continued Table 7-16: Procedure to Update BTS–Specific CDF File Device Load Version Step Action Select CDMA. Select the BTS number from the list of available base stations. Select the radio button next to the desired version number. Click on the Save button. A pop–up message will appear indicating that “This action may take a few seconds.” Click on the OK button. A pop–up message will appear indicating that the NextLoad file has been updated. NOTE At this point, a backup copy of the original CDF is created with a _bak extension, (e.g., bts–812.cdf_bak ). Click on the OK button to dismiss the pop–up message. Download/Enable MAWI The objective of this procedure is to download and enable the BTS. The BTS software platform is based on the Motorola Advanced Wideband Interface (MAWI). The term MAWI is used to refer to the MicroCell from the LMF’s point of view. NOTE The BTS is shipped from the factory with all the software downloaded. Use the load procedure only when new software is loaded. Follow the steps outlined in Table 7-17 to download the code and data to enable the MAWI. Before the download/enable process, use the status function and verify the MAWI responds with status information. Use this information to get the current code loaded in MAWI. Table 7-17: Procedure to Download/Enable MAWI Step Action If the ATP is going to be run, the MAWI has to have the same code load as the LMF CDF or the site specific information cannot be loaded to MAWI (PN offset, etc.) for ATP to complete. If downloading code, insure the LMF is logged into the BTS at 38400 Baud Rate for timely download (20 minutes vs 2+ hours). Click on the MAWI and select Device>Download>Code Manual. A status report is displayed that confirms the change in device status. Click OK to close status window. . . . continued on next page 7-34 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 BTS Software – continued Table 7-17: Procedure to Download/Enable MAWI Step Action Click on the MAWI and select Device>Download>Code Data. A status report is displayed that confirms the change in device status. Click OK to close status window. Click on the MAWI and select Device>Enable to enable the MAWI. The MAWI changes to green (INS–ACT test mode). NOTE The LMF may fail this step. After you enable the MAWI, verify that the LED on the SC300 changes to a solid green, then click on the STOP radio button to halt the ENABLE command. Run the STATUS MAWI command and the display will change to the INS_ACT (green) state. Configuration Data File (CDF) The Configuration Data File (CDF) includes the CDMA channel element allocation plan. This plan indicates how each CDMA carrier is configured, and how the paging, sync, traffic, and access channel elements (and associated gain values) are assigned. The CDF file also contains a table for the Effective Rated Power (ERP) for each transmit antenna. Motorola System Engineering specifies the ERP of a transmit antenna based on site geography, antenna placement, and government regulations. Working from this ERP requirement, the antenna gain, (dependent on the units of measurement specified) and antenna feed line loss can be combined to determine the required power at the BTS TX output. NOTE Refer to the CDMA LMF Operators Guide; 68P64114A78 for additional information on the layout of the LMF directory structure (including cdf file locations and formats). Site equipage verification If you have not already done so, use an editor to view the CDF, and review the site documentation. Verify the site engineering equipage data in the CDF to the actual site hardware. NOTE If the current LMF or BTS binaries need to be installed on the LMF PC, or for more information on viewing CDF files, refer to the CDMA LMF Operators Guide; 68P64114A78. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-35 BTS Software – continued System Status LED States Table 7-18 lists all of the possible system status LED states. Table 7-18: System Status LED States System Status LED Status Indication Steady Green INS_ACT or INS_SBY, no alarms Slow Flashing Red/Green (0.2s Red, 1.4s Green) INS_ACT or INS_SBY w/alarms(s) Fast Flashing Green/Off (0.2s Green, 0.2s Off) OOS_RAM with no alarms Fast Flashing Red/Green (0.2s Red, 0.2s Green) OOS_RAM with alarms(s) Slow Flashing Green/Off (0.2s Green, 1.4s Off) OOS_ROM with no alarms Slow Flashing Green/Red (0.2s Green, 1.4s Red) OOS_ROM with alarm(s) Steady Red Critical hardware failure Fast Flashing Red/Off (0.25s Red/0.25s Off) The MAWI has powered up in boot code because the ROM code is either corrupt or not present. This condition may indicate a MAWI hardware failure. #1: RAM test failure #2: FLASH 1 (512K) manufacture/device ID mismatch #3: FLASH 2 (512K) manufacture/device ID mismatch #4: FLASH 3 (512K) manufacture/device ID mismatch #5: Modem present but untrained #6: Unknown interrupt event #7: Reset by hardware watchdog timeout #8: Reset by software watchdog timeout #9: Reset by double bus fault #10: Reset by loss of clock #11: Reset by RESET instruction #12: Reset by soft reset pin Off No DC Power applied to module NOTE OOS_RAM refers to a MAWI that is loaded but not enabled OOS_ROM refers to a MAWI that is not loaded. INS_ACT refers to a MAWI that is in service and active. INS_SBY refers to a MAWI that is in service but on standby. The number of flashes equals the alarm #, with a three–second pause between flashes. 7-36 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Verify and Set Span Line Settings Objective The following procedure is to verify and configure the BTS Span line interface for T–1 or E–1 configurations. Span Line Settings The following are the span line settings for the BTS span line interface. Span A: Primary span Span B: Downstream span used for daisy–chaining. Procedure to Verify and Set Span Line Settings Use the procedure in Table 7-19 to verify and set (if necessary) the span line settings. IMPORTANT Both spans A and B must be set to either T–1 or E–1. The spans must match the parameters of the CBSC. Table 7-19: Procedure to Verify and Set Span Line Settings Step Action If you have not already done so, connect the LMF computer terminal to the MMI/LMF connector. Refer to Table 7-7. Open an MMI communications session. Refer to Table 7-6. Enter the following command at the SC300> prompt to verify the current span settings: span_config a The system will display the following output: Span A data: Span type: 5 – T1_2 (B8ZS, DS1 AT&T ESF 4 to 1 packing, 64K link) Link Speed: 64K Span EQ: 0 – T1_6 (T1, J1:longhaul, same as choice 10) LAPD slot: 0 Enter the following command at the SC300> prompt to verify the current span settings: span_config b The system will display the following output: Span B data: Span type: 1 – E1_2 (HDB3) Link Speed: 64K Span EQ: 16 – E1 (Long haul: LAPD slot: 1 120 Ohm) . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-37 Verify and Set Span Line Settings – continued Table 7-19: Procedure to Verify and Set Span Line Settings Step Action If the span line settings are not the same for spans A and B, then enter the SPAN_CONFIG command for span A. Refer to the SPAN_CONFIG parameters in Table 7-20. SC300>span_config The SPAN_CONFIG parameters shown below are an example and may not be applicable to your configuration. SC300>span_config a 5 64 0 0 The system will return to the SC300> prompt: Enter the SPAN_CONFIG command for span B. Use the same parameters that you used in step 5. Refer to the SPAN_CONFIG parameters in Table 7-20. SC300>span_config The SPAN_CONFIG parameters shown below are an example and may not be applicable to your configuration. SC300>span_config b 5 64 0 0 The system will return to the SC300> prompt: Enter the following command at the SC300> prompt to verify the changes to the span A settings: SC300>span_config a The system will display the following typical output. Span A data: Span type: 5 – T1_2 (B8ZS, DS1 AT&T ESF 4 to 1 packing, 64K link) Link Speed: 64K Span EQ: 0 – T1_6 (T1, J1:longhaul, same as choice 10) LAPD slot: 0 Enter the following command at the SC300> prompt to verify the changes to the span B settings: SC300>span_config b The system will display the following typical output. Span B data: Span type: 5 – T1_2 (B8ZS, DS1 AT&T ESF 4 to 1 packing, 64K link) Link Speed: 64K Span EQ: 0 – T1_6 (T1, J1:longhaul, same as choice 10) LAPD slot: 0 7-38 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Verify and Set Span Line Settings – continued SPAN_CONFIG Parameters The following parameters in Table 7-20 are for the SPAN_CONFIG command. Table 7-20: SPAN_CONFIG Command Parameters Parameter Values A or B 0 = E1_1 (HDB3, CRC–4) 1 = E1_2 (HDB3) 2 = E1_3 (HDB3, CRC–4, TS16) 3 = E1_4 (HDB3, TS16) 4 = T1_1 (AMI, DS1 AT&T D4, Ext ZCS, 3 to 1 packing, Group 0 unusable) 5 = T1_2 (B8ZS, DS1 AT&T ESF 4 to 1 packing, 64K link) 6 = J1_1 (B8ZS, J1 AT&T ESF, Japan CRC6, 4 to 1 packing) 7 = J1_2 (B8ZS, J1 AT&T ESF, US CRC6, 4 to 1 packing) 8 = T1_3 (AMI, DS1vAT&T D4, Int ZCS, 3 to 1 packing, Group 0 unusable) 56 or 64 0 = T1_6 (T1,J1: long haul, same as choice 10) 1 = T1_4 (T1,J1:393–524 feet) 2 = T1_2 (T1,J1:131–262 feet) 3 = E1_75 (E1:120 Ohm / 75 Ohm coax) 4 = T1_1 (T1,J1:0–131 feet) 5 = T1_5 (T1,J1:524–655 feet) 6 = T1_3 (T1,J1:262–393 feet) 7 = E1_120 (E1:120 Ohm) 8 = T1 (T1,J1: long haul pulse 0 dB, gain 36 dB) 9 = T1 (T1,J1: long haul pulse –7.5 dB, gain 36 dB) 10 = T1 (T1,J1: long haul pulse –15 dB, gain 36 dB) 11 = T1 (T1,J1: long haul pulse –22 dB, gain 36 dB) 12 = T1 (T1,J1: long haul pulse 0 dB, gain 26 dB) 13 = T1 (T1,J1: long haul pulse –7.5 dB, gain 26 dB) 14 = T1 (T1,J1: long haul pulse –15 dB, gain 26 dB) 15 = T1 (T1,J1: long haul pulse –22 dB, gain 26 dB) 16 = E1 (Long haul: 120 Ohm) 17 = E1 (Long haul: 120 Ohm / 75 Ohm coax) JAN 2002 0–31 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-39 GPIB Addresses Introduction Use the following procedures to verify and/or change the GPIB addresses of the applicable test equipment. GPIB addresses can range from 1 through 30. The LMF will accept any address in that range, but the numbers in the GPIB address boxes must match the addresses of the test equipment. Motorola recommends that you use 1 for a CDMA signal generator, 13 for a power meter, and 18 for a CDMA analyzer. NOTE The following procedures assume that the test equipment is set up and ready for testing. Verify the Gigatronics 8541C Power Meter GPIB Address Follow the steps in Table 7-21 to verify and, if necessary, change the Gigatronics 8541C power meter GPIB address. Table 7-21: Verify and/or Change Gigatronics 8541C Power Meter GPIB Address Step Action ! CAUTION Do not connect/disconnect the power meter sensor cable with AC power applied to the meter. Disconnection could result in destruction of the sensing element or miscalibration. Press MENU (refer to Figure 7-18). Use the Use the arrow key to select GPIB and press ENTER. The system displays the current Mode and GPIB Address. If the Mode is not set to 8541C, perform the following to change it: – Use the arrow keys as required to select MODE. – Use the arrow keys as required to set MODE to 8541C. If the GPIB address is not set to 13, perform the following to change it: – Use the arrow key to select ADDRESS. – Use the arrow keys as required to set the GPIB address to 13. Press ENTER to return to normal operation. 7-40 arrow key to select CONFIG MENU and press ENTER. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 GPIB Addresses – continued Figure 7-18: Gigatronics 8541C Power Meter Detail MENU ENTER ARROW KEYS Verify and Set Motorola CyberTest GPIB Address Follow the steps in Table 7-22 to verify and, if necessary, change the GPIB address on the Motorola CyberTest. Changing the GPIB address requires the following items: Motorola CyberTest communications analyzer. Computer running Windows 3.1/Windows 95. Motorola CyberTAME software program “TAME”. Parallel printer port cable (shipped with CyberTest). Table 7-22: Verify and/or Change Motorola CyberTest GPIB Address Step Action On the LMF desktop, locate the CyberTAME icon. Double click on the icon to run the CyberTAME application. In the CyberTAME window taskbar, under Special, select IEEE.488.2. CyberTAME software will query the CyberTest Analyzer for its current GPIB address. It will then open the IEEE 488.2 dialog box. If the current GPIB address is not 18, perform the following steps to change it: – Use the up or down increment arrows, or double–click in the field and type the number. – Click on the OK button. The system will write and save the new address to the CyberTest via the parallel port. NOTE Repeat steps 2 and 3 to verify that the address was set. The new address should now appear in the IEEE 488.2 dialog box Address field. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-41 GPIB Addresses – continued Verify and Set HP8935 Test Set GPIB Address Follow the procedure in Table 7-23 to verify and, if necessary, change the HP8935 GPIB address. Table 7-23: Verify and/or Change HP8935 GPIB Address Step Action * IMPORTANT The HP I/O configuration MUST be set to Talk & Listen, or NO device on the GPIB bus will be accessible (if necessary, consult test equipment OEM documentation for additional information). To verify that the GPIB addresses are set correctly, press Shift and LOCAL on the HP8935 (refer to Figure 7-19). The current HP–IB address will display at the top of the screen. NOTE HP–IB is the same as GPIB. If the current GPIB address is not set to 18, perform the following steps to change it: – Press Shift and Inst Config. – Turn the Cursor Control knob to move the cursor to the HP–IB Adrs field. – Press the Cursor Control knob to select the field. – Turn the Cursor Control knob as required to change the address to 18. – Press the Cursor Control knob to set the address. Press Preset to return to normal operation. Figure 7-19: HP8935 Test Set Preset Local Inst Config Shift Cursor Control FW00885 7-42 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 GPIB Addresses – continued Verify and Set the HP8921A and HP83236A/B GPIB Addresses Follow the procedure in Table 7-24 to verify and, if necessary, change the HP8921A/HP83236A GPIB addresses. Table 7-24: Verify and/or Change HP8921A and HP83236A GPIB Addresses Step Action To verify that the GPIB addresses are set correctly, press Shift and LOCAL on the HP8921A (refer to Figure 7-20). The current HP–IB address is displayed at the top of the screen. NOTE HP–IB is the same as GPIB. If the current HP–IB address is not set to 18, perform the following to change it: – Turn the Cursor Control knob to move the cursor to More and press the knob to select the field. – Turn the Cursor Control knob to move the cursor to I/O Config and press the knob to select the field. – Turn the Cursor Control knob to move the cursor to Adrs and press the knob to select the field. – Turn the Cursor Control knob to change the HP–IB address to 18 and press the knob to set the address. – Press Shift and Preset to return to normal operation. To set the HP83236A (or B) PCS Interface GPIB address=19, set the dip switches as follows: – A1=1, A2=1, A3=0, A4=0, A5=1, HP–IB/Ser = 1 Figure 7-20: HP8921A and HP83236A/B Local Preset Shift JAN 2002 Cursor Control SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-43 GPIB Addresses – continued Verify and Set Advantest R3465 GPIB Address Table 7-25 describes the steps to verify and, if necessary, change the GPIB address for the Advantest R3465. Table 7-25: Verify and/or Change Advantest R3465 GPIB Address Step Action Perform the following procedure to verify that the GPIB address is set correctly: – Press SHIFT then PRESET (see Figure 7-21). – Press LCL. – Press the GPIB and Others CRT menu key to view the current address. If the current GPIB address is not set to 18, perform the following to change it: – Turn the vernier knob as required to select 18. – Press the vernier knob to set the address. To return to normal operation, press Shift and Preset. Figure 7-21: R3465 Communications Test Set GPIB and others REF UNLOCK EVEN SEC/SYNC IN CDMA TIME BASE IN POWER BNC “T” OFF ON Vernier Knob LCL 7-44 Shift Preset REF FW00337 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 GPIB Addresses – continued RS232 GPIB Interface Box Ensure that the RS232 GPIB interface box dip switches are set as shown in Figure 7-22. Figure 7-22: RS232 GPIB Interface Box DIP SWITCH SETTINGS S MODE DATA FORMAT BAUD RATE ON GPIB ADRS G MODE RS232–GPIB INTERFACE BOX Verify and Set Advantest R3267 GPIB Address Perform the procedure in Table 7-26 and refer to Figure 7-23 to verify and, if necessary, change the Advantest R3267 spectrum analyzer GPIB address. Table 7-26: Verify and Change Advantest R3267 GPIB Address Step Action If the REMOTE LED is lighted, press the LCL key. – The LED extinguishes. Press the CONFIG key. – The CONFIG softkey labels will appear in the softkey label display area of the instrument display. – The current GPIB address will be displayed below the GPIB Address softkey label. If the current GPIP address is not set to 18, perform the following to change it: 3a Press the GPIB Address softkey. – A GPIB Address entry window will open in the instrument display showing the current GPIB address. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-45 GPIB Addresses – continued Table 7-26: Verify and Change Advantest R3267 GPIB Address Step 3b Action Enter 18 on the keypad in the ENTRY section of the instrument front panel. – Characters typed on the keypad will replace the address displayed in the GPIB Address entry window. NOTE To correct an entry, press the BS (backspace) key at the lower right of the keypad to delete one character at a time. 3c Press the ENTR key to the lower right of the keypad to enter the address. – The GPIB Address entry window closes. – The new address is displayed in the bottom portion of the GPIB Address softkey label. Figure 7-23: Setting Advantest R3267 GPIB Address Softkey Label Display Area Softkey Buttons on REMOTE LED LCL Key CONFIG Key Keypad 7-46 BS Key ENTR Key SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 GPIB Addresses – continued Verify and Set Advantest R3562 Signal Generator GPIB Address Set the GP–IP ADDRESS switch on the rear of the Advantest R3562 signal generator to address 1 as shown in Figure 7-24. Figure 7-24: Advantest R3562 GPIB Address Switch Setting GPIB Address set to “1” GP–IP ADDRESS 5 4 3 2 1 Verify and Set Agilent E4406A Transmitter Tester GPIB Address Follow the procedure in Table 7-27 and refer to Figure 7-25 to verify and, if necessary, change the Agilent E4406A GPIB address. Table 7-27: Verify and Change Agilent E4406A GPIB Address Step Action In the SYSTEM section of the instrument front panel, press the System key. The softkey labels displayed on the right side of the instrument screen will change. Press the Config I/O softkey button to the right of the instrument screen. – The softkey labels will change. – The current instrument GPIB address will display below the GPIB Address softkey label. If the current GPIB address is not set to 18, perform the following to change it: 3a Press the GPIB Address softkey button. In the on–screen Active Function Area, GPIB Address will be displayed followed by the current GPIB address. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-47 GPIB Addresses – continued Table 7-27: Verify and Change Agilent E4406A GPIB Address Step Action 3b On the front panel Data Entry keypad, enter the communications system analyzer GPIB address of 18. – The GPIB Address label will change to Enter. – Digits entered with the keypad will replace the current GPIB address in the display. NOTE To correct an entry, press the Bk Sp key at the upper right of the keypad to delete one character at a time. 3c Press the Enter softkey button or the keypad Enter key to set the new GPIB address. – The Config I/O softkey labels will re–appear. – The new GPIB address will display under the GPIB Address softkey label. Figure 7-25: Setting Agilent E4406A GPIB Address Active Function Area Softkey Label Display Area System Key Bk Sp Key Softkey Buttons 7-48 Data Entry Keypad SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT Enter Key JAN 2002 GPIB Addresses – continued Verify and Set Agilent E4432B Signal Generator GPIB Address Refer to Figure 7-26 and follow the procedure in Table 7-28 to verify and, if necessary, change the Agilent E4432B GPIB address. Table 7-28: Verify and Change Agilent E4432B GPIB Address Step Action In the MENUS section of the instrument front panel, press the Utility key. – The softkey labels displayed on the right side of the instrument screen will change. Press the GPIB/RS232 softkey button to the right of the instrument screen. – The softkey labels will change. – The current instrument GPIB address will be display below the GPIB Address softkey label. If the current GPIB address is not set to 1, perform the following to change it: 3a Press the GPIB Address softkey button. – The GPIB Address label and current GPIB address will change to boldface. – In the on–screen Active Entry Area, Address: and the current GPIB address will display. 3b On the front panel Numeric keypad, enter the signal generator GPIB address of 1. – The GPIB Address label will change to Enter. – Digits entered with the keypad will replace the current GPIB address in the Active Entry display. NOTE To correct an entry, press the backspace key at the lower right of the keypad to delete one character at a time. 3c Press the Enter softkey button to set the new GPIB address. – The new GPIB address will be display under the GPIB Address softkey label. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-49 GPIB Addresses – continued Figure 7-26: Setting Agilent E4432B GPIB Address Active Entry Area Softkey Label Display Area Utility Key Softkey Buttons Numeric Keypad Backspace Key 7-50 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Equipment Calibration Background CAUTION To prevent damage to the test equipment, all Microcell transmit (TX) tests must be made using the 30 dB attenuator. Proper test equipment calibration ensures that the test equipment and associated test cables do not introduce measurement errors, and that measurements are correct. NOTE If the test set being used to interface with the BTS has been calibrated and maintained as a set, this procedure does not need to be performed. (Test Set includes LMF terminal, communications test set, additional test equipment, associated test cables, and adapters.) This procedure must be performed prior to beginning the optimization. Verify all test equipment (including all associated test cables and adapters actually used to interface all test equipment and the BTS) has been calibrated and maintained as a set. CAUTION If any piece of test equipment, test cable, or RF adapter, that makes up the calibrated test equipment set, has been replaced, re-calibration must be performed. Failure to do so can introduce measurement errors, resulting in incorrect measurements and degradation to system performance. IMPORTANT Calibration of the communications test set (or equivalent test equipment) must be performed at the site before calibrating the overall test set. Calibrate the test equipment after it has been allowed to warm–up and stabilize for a minimum of 60 minutes. These procedures access the LMF automated calibration routine used to determine the path losses of the supported communications analyzer, power meter, associated test cables, and (if used) antenna switch that make up the overall calibrated test set. After calibration, the gain/loss offset values are stored in a test measurement offset file on the LMF. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-51 Test Equipment Calibration – continued Procedure to Calibrate Test Equipment The calibrate test equipment function zeros the power measurement level of the test equipment item that is to be used for TX calibration and audit. If both a power meter and an analyzer are connected, only the power meter is zeroed. Use the Calibrate Test Equipment menu item from the Util menu to calibrate test equipment. The test equipment must be selected before calibration can begin. Follow the procedure in Table 7-29 to calibrate the test equipment. Prerequisites Ensure the following prerequisites have been met before proceeding: Test equipment to be calibrated has been connected correctly for tests that are to be run. Test equipment has been selected. Table 7-29: Procedure to Calibrate Test Equipment Step Action From the Util menu, select Calibrate Test Equipment. A Directions window is displayed. Follow the directions provided. Click on Continue to close the Directions window. A status report window is displayed. Click on OK to close the status report window. Calibration Without the LMF Several test equipment items used in the optimization process require pre–calibration actions or calibration verification which are not supported by the LMF. Procedures to perform these activities for the applicable test equipment items are covered in this section. 7-52 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Equipment Calibration – continued Procedure to Calibrate R3465 Test Set Follow the steps inTable 7-30 to configure and calibrate the R3465 communication test set. Table 7-30: Procedure to Calibrate R3465 Step Action * IMPORTANT – Perform this calibration only after the analyzer has warmed–up and stabilized for a minimum of 60 minutes. Test equipment warm–up may vary depending on operating environment or initial temperature of unit upon turn–on. Consult test equipment OEM documentation for additional information as required. Connect the male BNC to male N cable between the CAL OUT connector and the INPUT 50 W connector. Select CW. Push the SHIFT and CAL pushbuttons. Select Cal All in CRT menu. Internal calibration should complete in about 6 minutes. Procedure to Calibrate R3267 Test Set Follow the steps in Table 7-31 to configure and calibrate the R3267 communication test set. Table 7-31: Procedure to Calibrate R3267 Step Action * IMPORTANT – Perform this calibration only after the analyzer has warmed–up and stabilized for a minimum of 60 minutes. Test equipment warm–up may vary depending on operating environment or initial temperature of unit upon turn–on. Consult test equipment OEM documentation for additional information as required. Connect the male BNC to male N cable between the CAL OUT connector and the INPUT 50 W connector. Select CW. Push the SHIFT and CAL pushbuttons. Select Cal All in CRT menu. Internal calibration should complete in about 6 minutes. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-53 Test Equipment Calibration – continued Procedure to Calibrate Agilent E4406A Refer to Figure 7-27 and follow the procedure in Table 7-32 to perform the Agilent E4406A self–alignment (calibration). Table 7-32: Perform Agilent E4406A Self–alignment (Calibration) Step Action In the SYSTEM section of the instrument front panel, press the System key. – The softkey labels displayed on the right side of the instrument screen will change. Press the Alignments softkey button to the right of the instrument screen. – The softkey labels will change. Press the Align All Now softkey button. – All other instrument functions will be suspended during the alignment. – The display will change to show progress and results of the alignments performed. – The alignment will take less than one minute. Figure 7-27: Performing Agilent E4406A Self–alignment (Calibration) Softkey Label Display Area System Key Softkey Buttons 7-54 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Equipment Calibration – continued Procedure to Setup Advantest R3465 Test Equipment Follow the steps outlined in Table 7-33 (for Advantest R3465) or Table 7-34 (for Advantest R3267) to set up test equipment prior to performing ATP tests. IMPORTANT LMF based measurements factor in cable and attenuator loss between the BTS and test equipment. No additional attenuation can be inserted as the additional losses would not be factored in. IMPORTANT If you are logged in to the BTS, you must log out prior to loading the special JCDMA software on a PCMCIA RAM card and inserting it in the Advantest R3465 PCMCIA slot. This must be done before using the Advantest R3465 test set for JCDMA tests. Table 7-33: Procedure to Setup Advantest R3465 Test Equipment Step Action If you have not already done so, interface the CDMA LMF computer to the BTS and login to the BTS. Perform the following steps for the manual test procedure for Automated TX verification. Set up the communication test set by inserting the Automatic TX test PCMCIA card into the Advantest PCMCIA card reader slot A. (software version=97.10.07 rev 0001 or later). Perform the following steps to access and use the Advantest Automatic TX test screen: Press the Remote LCL button (located below the CRT). Press the Loader ON button (located below the CRT). Press the LOAD CRT menu button. Use the DISPLAY CONTROL knob to select CDMA_BSR.BAS and then press the knob. Press the RUN CRT menu button after the LOAD pop–up disappears. Wait for *Idle Free space to appear at the bottom of the CRT. Refer to Figure 7-34 to set up test equipment. Verify that the coaxial cable from the appropriate TX connector on the BTS is connected to the test equipment RF input port via the in line 30 dB high power attenuator for MicroCell BTSs. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-55 Test Equipment Calibration – continued Procedure to Setup Advantest R3267 Test Equipment Table 7-34: Procedure to Setup Advantest R3267 Test Equipment Step Action If you have not already done so, interface the CDMA LMF computer to the BTS and login to the BTS. Perform the following steps for the manual test procedure for Automated TX verification. Set up the communication test set by inserting the Automatic TX test PCMCIA card into the Advantest PCMCIA card reader slot A. (software revision 0.0.0.4 or later). Perform the following steps to access and use the Advantest Automatic TX test screen: Press the Remote LCL button (located below the CRT). Press the Loader ON button (located below the CRT). Select LOAD on the CRT screen (button #6). Use the DISPLAY CONTROL knob to select the REMOTE.BAS file, then press the knob. Select RUN on the CRT screen (button #1). Wait for *Idle Free space to appear at the bottom of the CRT. Refer to Figure 7-34 to set up test equipment. Verify that the coaxial cable from the appropriate TX connector on the BTS is connected to the test equipment RF input port via the in line 30 dB high power attenuator for MicroCell BTSs. 7-56 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Equipment Selection Objective The objective of this procedure is to select the test equipment used for BTS testing. The LMF must select the test equipment before it is used for BTS testing. Prerequisites The following are prerequisites for test equipment selection: 1. Test equipment to be used has been connected as shown in Figure 7-16. 2. Power for the test equipment and GPIB box has been turned on. 3. LMF has been started (do not have to be logged in to the BTS). Procedure to Select Test Equipment Follow the steps in Table 7-35 for test equipment selection NOTE The test equipment can also be selected via a manual or automatic connection. Refer to the CDMA LMF Operator’s Guide, 68P64114A78 for the procedures. Table 7-35: Procedure to Select Test Equipment Step Action Select Tools>Options from the menu. A LMF Options window appears. Select the correct COM port from the Comm Port pick list (normally COM1). Click on the Auto–Detection button if it is not enabled. If the GPIB addresses are not displayed, enter the GPIB addresses in the box labeled GPIB addresses to search. NOTE When both a power meter and a communication test set are selected, the first item listed in the GPIB addresses to search box will be used for RF power measurements, e.g., TX calibration and audit. The address for a power meter is 13 and the address for a communications test set is 18. The numbers 13 and 18 must be included in the GPIB address to search box so the power meter (13) will be used for TX calibration and audit. Click on the Apply button. The button will darken until the selection has been committed. A check mark will appear in the Manual Configuration section for detected test equipment items. Click on the Dismiss button to close the LMF Options window. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-57 Test Equipment Selection – continued Selecting Test Equipment Automatically or Manually Use LMF Options from the Tools>Options menu list to select test equipment automatically (using the autodetect feature) or manually. A Serial Connection and a Network Connection tab are provided for test equipment selection. The Serial Connection tab is used when the test equipment items are connected directly to the LMF computer via a GPIB box (normal setup). The Network Connection tab is used when the test equipment is to be connected remotely via a network connection. Procedure to Manually Select Test Equipment in a Serial Connection Tab Test equipment can be manually specified before, or after, the test equipment is connected. The LMF does not check to see if the test equipment is actually detected for manual specification. Follow the procedure in Table 7-36 to select test equipment manually. Table 7-36: Procedure to Manually Select Test Equipment in a Serial Connection Tab Step Action Select Tools>Options. The LMF Options window appears. Click on the Serial Connection tab (if not in the forefront). Select the correct serial port in the COMM Port pick list (normally COM1). Click on the Manual Specification button (if not enabled). Click on the check box corresponding to the test item(s) to be used. Type the GPIB address in the corresponding GPIB address box (the default address is “1”). Recommended Addresses 1 = R3562 Test Source 13 = Power Meter 18 = CDMA Analyzer Click on Apply (the button darkens until the selection has been committed). NOTE With manual selection, the LMF does not detect the test equipment to see if it is connected and communicating with the LMF. 7-58 Click on Dismiss to close the test equipment window. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Equipment Selection – continued Procedure to Automatically Select Test Equipment in a Serial Connection Tab When using the auto-detection feature to select test equipment, the LMF examines which test equipment items are actually communicating with the LMF. Follow the procedure in Table 7-37 to use the auto-detect feature. Table 7-37: Procedure to Select Test Equipment Using Auto-Detect Step Action Select Tools>Options. The LMF Options window appears. Click on the Serial Connection tab (if not in the forefront). Select the correct serial port in the COMM Port pick list (normally COM1). Click on Auto–Detection (if not enabled). Type in the GPIB addresses in the box labeled GPIB addresses to search (the default address is “1”). NOTE When both a power meter and analyzer are selected, the first item listed in the GPIB addresses to search box is used for RF power measurements (i.e., TX calibration). The address for a the test source is 1; the address for the power meter is normally 13; and the address for a CDMA analyzer is normally 18. If 1, 13,18 are included in the GPIB addresses to search box, the power meter (13) is used for RF power measurements. If the test equipment items are manually selected, the CDMA analyzer is used only if a power meter is not selected. Click on Apply. NOTE The button darkens until the selection has been committed. A check mark appears in the Manual Configuration section for detected test equipment items. JAN 2002 Click Dismiss to close the LMF Options window. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-59 Power Meter Calibration Objective This procedure calibrates the power meter that will be used for cable calibration and BTS testing. Prerequisites The following are prerequisites for power meter calibration: 1. The power meter is connected. Refer to Figure 7-16 in the “Test Equipment Selection” procedure. 2. Test equipment has been selected. Procedure to Calibrate the Power Meter Follow the steps in Table 7-38 to calibrate the power meter. Table 7-38: Procedure to Calibrate the Power Meter Step Action Click on Util>Calibrate Test Equipment. A cable connection direction pop–up is displayed. Follow the directions provided. Click on the OK button to close the status results window. 7-60 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Cable Calibration Background Proper test equipment setup ensures that all measurements are correct, and that test equipment and associated test cables do not introduce measurement errors. Motorola recommends repeating cable calibration prior to testing at each BTS site. If not already done so, this procedure needs to be performed prior to beginning the ATP. Verify that all test equipment (including all associated test cables and adapters actually used to interface all test equipment and the BTS together) has been calibrated. CAUTION In the event that any piece of test equipment, test cable, or RF adaptor is replaced that makes up the calibrated test equipment set, re–calibration should be performed. Failure to do so can introduce measurement errors, resulting in incorrect measurements or degradation to system performance. IMPORTANT Calibration of the communications test set (or equivalent test equipment) must be performed at the site before calibrating the overall test set after it has been allowed to warm–up and stabilize for a minimum of 60 minutes. Purpose of Cable Calibration This procedure accesses the LMF automated calibration routine used to determine the path losses of the supported communications analyzer, power meter, associated test cables, and (if used) RF Network making up the overall calibrated test set. After calibration, the gain/loss offset values are stored in a test measurement offset file on the LMF. If you have obtained the test cable insertion loss values previously, you can manually enter them using the Util>Edit>CableLoss>TX or RX menu. Do not use the manual method if you plan to run/have already run the cable calibration procedure. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-61 Test Cable Calibration – continued Procedure to do an Automated Cable Calibration This procedure calibrates the cables that will be used for BTS testing. Follow the steps in Table 7-39 to calibrate the test cables. Refer to Figure 7-28. Prerequisites 1. Test equipment has been connected as shown in Figure 7-16. 2. Power for the test equipment and GPIB box has been turned on. 3. LMF has been started and BTS has been logged into. 4. Inspect and verify the TX and RX antenna cabling for your BTS. Refer to the applicable “Antenna Cabling” procedure in chapter 6. Table 7-39: Automated Cable Calibration Step Action Click on the Util>Cable Calibration menu item. Select one of the following options in the Cable Calibration menu: TX and RX CABLE CAL, TX CABLE CAL, or RX CABLE CAL. NOTE Normally, the option TX and RX CABLE CAL is used so both the TX and RX cable configurations are calibrated. Use the TX CABLE CAL and RX CABLE CAL options only if one of the cable configurations needs to be calibrated. 7-62 Enter a channel value into the Channel box. The channel value is the channel that the BTS is being calibrated on, e.g., 170. Click the OK button. A Directions pop–up is displayed for each step of the cable calibration. Follow the directions displayed for each step. A status report window is displayed with the results of the cable calibration. Click on OK to close the status report window. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Test Cable Calibration – continued Figure 7-28: Cable Calibration Test Setup (Motorola CyberTest, HP 8935, HP 8921, and Advantest R3465) SUPPORTED TEST SETS CALIBRATION SET UP Motorola CyberTest A. SHORT CABLE CAL ÎÎÎÎ ÎÎÎÎÏ ANT IN SHORT CABLE TEST SET RF GEN OUT Note: The Directional Coupler is not used with the Cybertest Test Set. The TX cable is connected directly to the Cybertest Test Set. B. RX TEST SETUP A 10dB attenuator must be used with the short test cable for cable calibration with the CyberTest Test Set. The 10dB attenuator is used only for the cable calibration procedure, not with the test cables for TX calibration and ATP tests. N–N FEMALE ADAPTER RX CABLE Hewlett–Packard Model HP 8935 ÁÁ Á ÁÁ Á ANT IN SHORT CABLE TEST SET DUPLEX OUT Advantest Model R3465 RF OUT 50–OHM C. TX TEST SETUP 30 DB 10W RF ATTENUATOR N–N FEMALE ADAPTER INPUT 50–OHM TX CABLE Hewlett–Packard Model HP 8921A SHORT CABLE TEST SET Note: For 800 MHZ only. The HP8921A cannot be used to calibrate cables for PCS frequencies. FW00089 JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-63 Test Cable Calibration – continued Figure 7-29: Cable Calibration Test Setup (Advantest R3267 and Agilent E4406A) CALIBRATION SET UP SUPPORTED TEST SETS A. SHORT CABLE CAL Agilent E4406A with E4432B Signal Generator SHORT CABLE TEST SET B. RX TEST SETUP N–N FEMALE ADAPTER RX CABLE SHORT CABLE TEST SET Advantest Model R3267 with R3562 Signal Generator ADVANTEST R3267 SPECTRUM ANALYZER 100Hz – 8GHz C. TX TEST SETUP 30 DB 10W RF ATTENUATOR N–N FEMALE ADAPTER TX CABLE SHORT CABLE ADVANTEST R3562 RECEIVER TEST SOURCE TEST SET 7-64 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Create CAL File Objective Use this procedure to create a CAL file for the Calibration audit. You must do this procedure before the RF path audit. Background The Create CAL File function gets the BLO data from the MAWI and creates/updates the CAL file for the BTS. If a CAL file does not exist, a new one is created. If a CAL file already exists, it is updated. The BTS is calibrated at the factory and normally does not require calibration after installation, so you must use the Create CAL File function to create a CAL file since TX calibration is not performed. NOTE The Create CAL File function only applies to selected (highlighted) MAWIs. NOTE The CBSC does not require a calibration file for operation of an SC300 BTS. NOTE The user is not encouraged to edit the CAL file as this action can cause interface problems between the BTS and the LMF. To manually edit the CAL file, you must first logout of the BTS. If you manually edit the CAL file and then use the Create CAL File function, the edited information is lost. Prerequisites The following must be done before you run this test: The MAWI has the correct code load and data load. The MAWI is INS. The LMF is logged on to the BTS. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-65 Create CAL File – continued Procedure to Create a CAL File Use the following procedure in Table 7-40 to create a CAL file. Table 7-40: Procedure to Create a CAL File Step Action Log on to the BTS if you have not already done so. Select the MAWI. Click on the Device menu. Click on the Create Cal File menu item. The status report window displays the results of the action. Click OK. NOTE The bts–#.cal is located in the wlmf\cdma\bts–# folder (where # is the number of the BTS). 7-66 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Acceptance Tests Overview This chapter describes the various TX and RX acceptance tests. TX Test Objective The following tests will verify the TX antenna path. Output power control will also be verified. All tests will be performed using the power meter and communication test set. Measurements will be via the Antenna B connectors. NOTE You must remove the antenna cables before you perform the ATP. The BTS is keyed up to generate a CDMA carrier at 31 dBm. TX Tests The following TX tests will be performed to verify the CDMA Forward Link. Near band & in band spurious emissions and occupied bandwidth You will verify that the transmitted CDMA carrier waveform generated meets the Spurious Emissions specification (transmit spectral mask and Occupied Bandwidth as defined in IS95A/B) with respect to either a pre–determined test pattern or test pattern generated by using assigned cdf file values. – +/– 750 kHz from center frequency to +/– 1980 kHz from center frequency – at least –45 dBc – +/– 1980 kHz from center frequency and out – at least –60 dBc – all near band and out of band spurious emissions are verified to be less than or equal to –60 dBc relative to reference power (measured previously as total power). Waveform quality (Rho) and pilot time tolerance (offset) You will verify that the transmitted Pilot channel waveform quality (rho) exceeds the minimum specified value in ARIB STD T53. Rho represents the correlation between actual and perfect CDMA modulation spectrum. 1.0000 represents 100% (or perfect correlation). – Waveform quality (Rho) should be > 0.912 (–0.4 dB). The Pilot Time Tolerance (Offset) is the difference between the CDMA analyzer measurement interval (based on the BTS system time reference) and the incoming block of transmitted data from the BTS (Pilot only, Walsh code 0). – Pilot Time Tolerance (Offset) should be < 10 uS. (< 3 uS typical). JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-67 Acceptance Tests – continued CDMA carrier frequency verification You will verify the frequency of the transmitted CDMA carrier signal to be within 0.05 ppm. Code domain power noise, pilot power, and total power You will verify that the code domain noise floor of all unused Walsh codes within the CDMA spectrum measures < –27 dB (with respect to total power). Pilot power will be verified to measure –7.04 dB +/–0.5 dB (with respect to standard test patterns). Total power will be verified to measure +2/–4 dB (with respect to CDF specific file parameters). BTS frequency accuracy BTS frequency accuracy can be verified manually during normal operation by monitoring the 19.6608 MHz reference (19 MHz) from the Diagnostic Access Area. A frequency counter with an accuracy of +/– 0.005 ppm can be used to check the BTS frequency accuracy. RX Test Objective The following test will verify the RX antenna path(s). All tests will be performed using the communication test set. Measurements will be via the Antenna A and Antenna B connectors. RX Tests The following RX test will be performed to verify the CDMA Reverse Link. BTS RX sensitivity/frame erasure rate The default test verifies the BTS sensitivity on all Traffic Channel elements (fullrate at 1% FER) at an RF input level of –117 dBm on the RX antenna path. NOTE There are no pass/fail criteria associated with FER readings taken at level below –117 dBm; other than to verify that the FER measurement reflects changes in RX input signal level. 7-68 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Subscriber Unit (SU) Test and Setup Objective The following procedure is to test and verify the operation of the Subscriber Unit (SU). This procedure also contains instructions to program the NAM parameters into the SU prior to operation. Background The integral Subscriber Unit (SU) provides a controlled method of terminating calls within the local BTS for diagnostic purposes. The SU’s RF is connected to the forward port of the antenna directional couplers via distribution components to provide a hard–wired path. The SU performs a system–level test call with audio loopback functionality. Control of the SU is only available remotely via the dial up modem (or locally via the MMI). The OMCR–based SALT script is not supported. The Subscriber Unit Distribution (SUD) is the board that provides RF splitting and attenuation for the subscriber unit RF signal. The SUD is an internal module. Procedure to Test and Verify SU Follow the instructions in Table 7-41 to test and verify the operation of the SU. Table 7-41: Procedure to Test and Verify the Subscriber Unit Step Action Connect the LMF computer to the MMI/LMF connector. Refer to Figure 7-6. If you have not already done so, logout of the BTS and exit the LMF. Wait 10 seconds before proceeding. Establish an MMI communications session with the BTS. Refer to NO TAG. Enter the sndtype 0xa178 command to simulate an LMF session. Make sure the unit has booted into the OOS_RAM state. Enter the following command at the sc300’x–1> prompt to enable SU response printing in the MMI session: printf on . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-69 Subscriber Unit (SU) Test and Setup – continued Table 7-41: Procedure to Test and Verify the Subscriber Unit Step Action Enter the following command at the sc300’x–1> prompt to view the ESN number of the SU and the CAMPS version: su version The system will display the following output. Note that the ESN numbers will be different, but everything else will remain as shown below. sc300’x–1> su version COMMAND ACCEPTED: su version ***************su version*************** Model :+GMM: C401M GMIinfo :+GMI: SANYO Electric Co., Ltd. GMRinfo :+GMR: 1.310 GOI_id :+GOI: GSN_id :+GSN: 1869FE88 GCAP_format :+GCAP: +CIS707, +MS, +ES, +FCLASS ESN: 0x1869FE88 Press ENTER once to return to the sc300’x–1> prompt. Proceed to the “Subscriber Unit Programming” procedure in Table 7-42. 7-70 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Subscriber Unit (SU) Test and Setup – continued Procedure to Program SU NAM Parameters Follow the instructions in Table 7-42 to program the SU NAM parameters. Table 7-42: Procedure to Program the SU NAM Parameters Step Action Enter the following command at the sc300’x–1> prompt to turn the power to the SU on: su power on Enter the following command at the sc300’x–1> prompt to view the NAM parameters stored in the SU: su nam show The system will display the following typical output: sc300’x–1> su nam show COMMAND ACCEPTED: su nam show SU NAM CONFIG ––––––––––––––––––––––– Phone Number Station Class Mark Access Overload Code Security Code Lock Code Slot Cycle Index System Id Network Id IMSI 11 & 12 IMSI MCC CDMA Pri Channel A CDMA Pri Channel B CDMA Sec Channel A CDMA Sec Channel B 8476324677 34 48 123 65535 11 111 76 76 872 872 NOTE The NAM values shown above are for example only. You must enter site–specific NAM parameter values into the following commands. Enter the following command at the sc300’x–1> prompt to program the Mobile Phone Number: su nam min Enter the following command at the sc300’x–1> prompt to program the Access Overload Code: su nam aoc Enter the following command at the sc300’x–1> prompt to program the Slot Cycle Index: su nam si . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-71 Subscriber Unit (SU) Test and Setup – continued Table 7-42: Procedure to Program the SU NAM Parameters Step Action Enter the following command at the sc300’x–1> prompt to program the System ID: su nam sid Enter the following command at the sc300’x–1> prompt to program the Mobile Country Code (MCC) and IMSI 11&12 (MNC) code: su nam imsi For example, if the MCC code is “11” and the MNC code is “23,” you would enter: su nam imsi 1123 Enter the following command at the sc300’x–1> prompt to view the changes to the NAM table: su nam show Enter the following command at the sc300’x–1> prompt to download the NAM information into the mobile: su nam update Downloading the NAM parameters into the Mobile may take a few minutes. 7-72 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 CDMA Operating Frequency Programming Information – North American Cellular Bands Objective The following tables show each of the valid operating channels for North American PCS Bands and their corresponding transmit and receive frequencies. 1900 MHz PCS Channels Figure 7-30 shows the valid channels for the North American PCS 1900 MHz frequency spectrum. Figure 7-30: North America PCS Frequency Spectrum (CDMA Allocation) FREQ (MHz) RX TX 1851.25 1931.25 CHANNEL 25 275 ÉÉÉ ÉÉÉ ÉÉÉ ÉÉÉ 1863.75 1943.75 1871.25 1951.25 1883.75 1963.75 1896.25 1976.25 1908.75 1988.75 425 675 ÉÉÉ ÉÉÉ ÉÉÉ 925 1175 JAN 2002 FW00463 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-73 CDMA Operating Frequency Programming Information – North American Cellular Bands – continued Calculating 1900 MHz Center Frequencies Table 7-43 shows selected 1900 MHz CDMA candidate operating channels, listed in both decimal and hexadecimal, and the corresponding transmit, and receive frequencies. Center frequencies (in MHz) for channels not shown in the table may be calculated as follows: TX = 1930 + 0.05 * Channel# Example: Channel 262 TX = 1930 + 0.05*262 = 1943.10 MHz RX = TX – 80 Example: Channel 262 RX = 1943.10 – 80 = 1863.10 MHz Actual frequencies used depend on customer CDMA system frequency plan. Each CDMA channel requires a 1.77 MHz frequency segment. The actual CDMA carrier is 1.23 MHz wide, with a 0.27 MHz guard band on both sides of the carrier. Minimum frequency separation required between any CDMA carrier and the nearest NAMPS/AMPS carrier is 900 kHz (center-to-center). Table 7-43: 1900 MHz TX and RX Frequency vs. Channel Channel Number Decimal Hex 25 0019 50 0032 75 004B 100 0064 125 007D 150 0096 175 00AF 200 00C8 225 00E1 250 00FA 275 0113 300 012C 325 0145 350 015E 375 0177 400 0190 425 01A9 450 01C2 475 01DB 500 01F4 525 020D 550 0226 575 023F Transmit Frequency (MHz) Center Frequency 1931.25 1932.50 1933.75 1935.00 1936.25 1937.50 1938.75 1940.00 1941.25 1942.50 1943.75 1945.00 1946.25 1947.50 1948.75 1950.00 1951.25 1952.50 1953.75 1955.00 1956.25 1957.50 1958.75 Receive Frequency (MHz) Center Frequency 1851.25 1852.50 1853.75 1855.00 1856.25 1857.50 1858.75 1860.00 1861.25 1862.50 1863.75 1865.00 1866.25 1867.50 1868.75 1870.00 1871.25 1872.50 1873.75 1875.00 1876.25 1877.50 1878.75 . . . continued on next page 7-74 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 CDMA Operating Frequency Programming Information – North American Cellular Bands – continued Table 7-43: 1900 MHz TX and RX Frequency vs. Channel Channel Number Decimal Hex 600 0258 625 0271 650 028A 675 02A3 700 02BC 725 02D5 750 02EE 775 0307 800 0320 825 0339 850 0352 875 036B 900 0384 925 039D 950 03B6 975 03CF 1000 03E8 1025 0401 1050 041A 1075 0433 1100 044C 1125 0465 1150 047E 1175 0497 Transmit Frequency (MHz) Center Frequency 1960.00 1961.25 1962.50 1963.75 1965.00 1966.25 1967.50 1968.75 1970.00 1971.25 1972.50 1973.75 1975.00 1976.25 1977.50 1978.75 1980.00 1981.25 1982.50 1983.75 1985.00 1986.25 1987.50 1988.75 Receive Frequency (MHz) Center Frequency 1880.00 1881.25 1882.50 1883.75 1885.00 1886.25 1887.50 1888.75 1890.00 1891.25 1892.50 1893.75 1895.00 1896.25 1897.50 1898.75 1900.00 1901.25 1902.50 1903.75 1905.00 1906.25 1807.50 1908.75 JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-75 CDMA Operating Frequency Programming Information – North American Cellular Bands – continued 800 MHz CDMA Channels Figure 7-31 shows the valid channels for the North American cellular telephone frequency spectrum. OVERALL WIRELINE (B) BANDS ÉÉ ÉÉ ËË ËË 848.970 893.970 777 739 ËËË ËËË ËËË ËËË 799 891.480 891.510 846.480 846.510 716 717 694 ÉÉ ÉÉ ÉÉ ÉÉ 689 844.980 845.010 889.980 890.010 OVERALL NON–WIRELINE (A) BANDS 644 356 ËËË ËËË ËËË ËËË ËËË ËËË ËËË ËËË 666 667 879.990 880.020 834.990 835.020 333 334 311 825.000 825.030 1023 824.040 CHANNEL ÉÉ ÉÉÉÉ ÉÉÉÉ ÉÉ ÉÉÉÉ ÉÉÉÉ ÉÉ ÉÉÉÉ ÉÉÉÉ ÉÉ ÉÉÉÉ ÉÉÉÉ 1013 RX FREQ (MHz) 991 TX FREQ (MHz) 870.000 870.030 869.040 Figure 7-31: North American Cellular Telephone System Frequency Spectrum (CDMA Allocation). CDMA NON–WIRELINE (A) BAND CDMA WIRELINE (B) BAND FW00402 Calculating 800 MHz Center Frequencies Table 7-44 shows selected 800 MHz CDMA candidate operating channels, listed in both decimal and hexadecimal, and the corresponding transmit, and receive frequencies. Center frequencies (in MHz) for channels not shown in the table may be calculated as follows: Channels 1–777 TX = 870 + 0.03 * Channel# Example: Channel 262 TX = 870 + 0.03*262 = 877.86 MHz Channels 1013–1023 TX = 870 + 0.03 * (Channel# – 1023) Example: Channel 1015 TX = 870 +0.03 *(1015 – 1023) = 869.76 MHz RX = TX – 45 MHz Example: Channel 262 RX = 877.86 –45 = 832.86 MHz Table 7-44: 800 MHz TX and RX Frequency vs. Channel Channel Number Decimal Hex Transmit Frequency (MHz) Center Frequency Receive Frequency (MHz) Center Frequency 0001 870.0300 825.0300 25 0019 870.7500 825.7500 50 0032 871.5000 7-76 826.5000 . . . continued on next page SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 CDMA Operating Frequency Programming Information – North American Cellular Bands – continued Table 7-44: 800 MHz TX and RX Frequency vs. Channel Channel Number Decimal Hex Transmit Frequency (MHz) Center Frequency Receive Frequency (MHz) Center Frequency 75 004B 872.2500 827.2500 100 0064 873.0000 828.0000 125 007D 873.7500 828.7500 150 0096 874.5000 829.5000 175 00AF 875.2500 830.2500 200 00C8 876.0000 831.0000 225 00E1 876.7500 831.7500 250 00FA 877.5000 832.5000 275 0113 878.2500 833.2500 300 012C 879.0000 834.0000 325 0145 879.7500 834.7500 350 015E 880.5000 835.5000 375 0177 881.2500 836.2500 400 0190 882.0000 837.0000 425 01A9 882.7500 837.7500 450 01C2 883.5000 838.5000 475 01DB 884.2500 839.2500 500 01F4 885.0000 840.0000 525 020D 885.7500 840.7500 550 0226 886.5000 841.5000 575 023F 887.2500 842.2500 600 0258 888.0000 843.0000 625 0271 888.7500 843.7500 650 028A 889.5000 844.5000 675 02A3 890.2500 845.2500 700 02BC 891.0000 846.0000 725 02D5 891.7500 846.7500 750 02EE 892.5000 847.5000 775 0307 893.2500 848.2500 Channel numbers 778 through 1012 are not used. 1013 03F5 869.7000 824.7000 NOTE 1023 JAN 2002 03FF 870.0000 825.0000 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-77 TX Acceptance Tests Objective Refer to Table 7-45 to perform a TX ATP test. This procedure assumes that the site specific CDF file is in the wlmf\cdma\bts–# folder. The ALL TX list performs the following ATP tests: 1. TX Mask 2. Rho 3. Pilot Time Offset 4. Code Domain Power Prerequisites You must successfully complete all the procedures outlined in previous chapters before you attempt to run an ATP. Procedure to Run TX ATP Test Table 7-45: Procedure to Run TX ATP Test Step Action Set up test equipment for TX tests per Figure 7-32 or Figure 7-33. Perform the following to run TX Acceptance Tests: – Select the MAWI. – Click on the Tests menu – Select ALL TX. * IMPORTANT The DPLL must be tracking either GPS or HSO. Procedure to Run TX Tests Using Backup Synchronization (Sites Equipped With GPS) Follow the steps in Table 7-46 to perform the TX test using backup synchronization. Table 7-46: Procedure to Run TX Test Using Backup Synchronization Step Action If logged into the BTS with the LMF, disable the MAWI and logout. Enter the sndtype 0x4003 command to change the state to OOS_RAM. Open an MMI Communication session. Enter the status command to verify that the BTS is in OOS_RAM status. Enter the sndtype 0xa178 command to simulate an LMF connection. . . . continued on next page 7-78 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 TX Acceptance Tests – continued Table 7-46: Procedure to Run TX Test Using Backup Synchronization Step Action At the MMI prompt, enter dpll_info and verify that GPS and HSO are good reference sources. Observe the following typical response. current dpll task state info: dpll task state: DPLL_LOCKED global cdma time: enabled local cdma time: disabled Reference Ref_Status Ref_select Even_select(DPLL’s Ref source) GPS TRUE TRUE TRUE HSO TRUE FALSE FALSE FREERUN FALSE FALSE FALSE 2SEC FALSE FALSE FALSE The Ref_Status for the GPS and HSO must be TRUE. The Ref_select must be TRUE and FALSE for the GPS and HSO, respectively. Verify that the HSO takes over for the GPS by simulating a failure of the GPS through software. Enter the gps_rx_debug nosats on command at the MMI prompt to simulate the GPS losing all tracked satellites. Observe the following typical response. FM: #2716 Ticks=00140aab pc=08137df4 nid=30003004 org=6 info=09e200270000 file=gps_misc.c line=3904 send gps no sats SET –seeing no tracked sats. Enter dpll_info at the MMI prompt to verify that the BTS is now using the HSO as the primary reference source. The Ref_select must be FALSE and TRUE for the GPS and HSO, respectively. Enter the dpll_status command to display the current state of the DPLL. Observe the following typical response. Current source set to: HSO reference DPLL control task state: DPLL track DPLL status (not valid if using even sec src): c:6CD6 off: –9697314,25154,8669797 TK Mode cntr: 60 ip: 3, iq: –9 aip1: 9, aiq1: 4 aip2: 6, aiq2: –2 tip: 3, tiq: –9 integrator: –2511864 Verify that the DPLL is “tracking” the HSO. The Current source set to field should read HSO reference. The DPLL control task state field should read DPLL track. 10 Exit the MMI communication session and login to the BTS with the LMF. 11 Select Tests>TX>Pilot Time Offset to verify that the BTS passes using the HSO as the backup synchronization source. 12 Logout of the BTS. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-79 TX Acceptance Tests – continued Table 7-46: Procedure to Run TX Test Using Backup Synchronization Step Action 13 If logged into the BTS with the LMF, then logout. 14 Open an MMI Communication session. 15 Enter the status command to verify that the BTS is in OOS_RAM status. 16 Enter the sndtype 0xa178 command to simulate an LMF connection. 17 Enter the gps_rx_debug nosats off command at the MMI prompt to disable the simulation of the GPS losing tracked satellites. NOTE The gps_rx_debug command simulates the “No Satellites Tracked” condition. In reality, the receiver is tracking satellites. However, the software is masking that information. Be sure to turn off the “No Satellites” condition after completing this test. 18 Follow the procedure in Table 7-11 (Synchronization Verification) to make sure the BTS is tracking the RGPS. 7-80 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 TX Acceptance Tests – continued Figure 7-32: TX ATP Setup (CyberTest, HP 8935 and Advantest R3465) MICROCELL UNIT NOTE: THE DOTTED LINES REPRESENT THAT EITHER TX RF TEST CABLE CONNECTS TO BOTH COMMUNICATIONS TEST SET AND POWER METER ANTENNA B COMMUNICATIONS TEST SET MOTOROLA CYBERTEST ÎÎÎ ÎÎÎÏ 30DB IN-LINE ATTENUATOR RF IN/OUT AGILENT 8935 SERIES E6380A (FORMERLY HP 8935) ÁÁ Á ÁÁ Á RF IN/OUT ADVANTEST MODEL R3465 POWER METER: GIGATRONICS 8541C OR HP 437B INPUT 50–OHM TRANSMIT RF TEST CABLE POWER SENSOR JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-81 TX Acceptance Tests – continued Figure 7-33: TX ATP Setup (HP 8921A) MICROCELL UNIT NOTE: THE DOTTED LINES REPRESENT THAT EITHER TX RF TEST CABLE CONNECTS TO BOTH COMMUNICATIONS TEST SET AND POWER METER ANTENNA B COMMUNICATIONS TEST SET HEWLETT–PACKARD MODEL HP 8921A W/PCS INTERFACE (FOR 1700 AND 1900 MHz) 30DB IN-LINE ATTENUATOR RF IN/OUT HEWLETT–PACKARD MODEL HP 8921A (FOR 800 MHz) RF IN/OUT POWER METER: GIGATRONICS 8541C OR HP 437B TRANSMIT RF TEST CABLE POWER SENSOR 7-82 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 TX Acceptance Tests – continued Figure 7-34: TX ATP Setup (Advantest R3267 and Agilent E4406A) NOTE: THE DOTTED LINES REPRESENT THAT EITHER TX RF TEST CABLE CONNECTS TO BOTH COMMUNICATIONS TEST SET AND POWER METER AGILENT E4432B (TOP) AND E4406A (BOTTOM) ANTENNA B ADVANTEST R3267 (TOP) AND R3562 (BOTTOM) ADVANTEST R3267 SPECTRUM ANALYZER 100Hz – 8GHz 30DB IN-LINE ATTENUATOR INPUT 50 OHM RF INPUT POWER METER ADVANTEST R3562 RECEIVER TEST SOURCE TRANSMIT RF TEST CABLE POWER SENSOR JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-83 RX Acceptance Tests Objective This procedure assumes that the site specific CDF file is in the wlmf\cdma\bts–# folder. Prerequisites You must successfully complete all the procedures outlined in previous chapters before you attempt to run an ATP. Procedure to Run RX ATP Test Refer to Table 7-47 to perform an RX ATP test. This procedure assumes that the site specific CDF file is in the wlmf\cdma\bts–# folder. Table 7-47: Procedure to Run RX ATP Test Step Action Set up test equipment per Figure 7-35, Figure 7-36, or Figure 7-37. Terminate diversity RX antenna inputs on the unit. Enter the following commands to run the RX Acceptance Tests. – Select the MAWI. – Select Tests>ALL RX. NOTE The LMF refers to the antennas as Main and Diversity. The Main is Antenna B and the Diversity is Antenna A. NOTE Select Both in the RX Branch pick list if a diversity antenna is used. 7-84 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 RX Acceptance Tests – continued Figure 7-35: RX ATP Setup (CyberTest, HP 8935, and Advantest R3465) MICROCELL UNIT ANTENNA B (MAIN) ANTENNA A (DIVERSITY) COMMUNICATIONS TEST SET MOTOROLA CYBERTEST ÎÎÎÎ ÏÏ ÎÎÎÎ AGILENT 8935 SERIES E6380A (FORMERLY HP 8935) RF GEN OUT ÁÁ ÁÁ ADVANTEST MODEL R3465 RECEIVE RF TEST CABLE RF IN/OUT RF OUT JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-85 RX Acceptance Tests – continued Figure 7-36: RX ATP Setup (HP 8921A) MICROCELL UNIT ANTENNA B (MAIN) COMMUNICATIONS TEST SET HEWLETT–PACKARD MODEL HP 8921A W/PCS INTERFACE (FOR 1700 AND 1900 MHz) ANTENNA A (DIVERSITY) RF OUT ONLY HEWLETT–PACKARD MODEL HP 8921A (FOR 800 MHz) RECEIVE RF TEST CABLE RF IN/OUT 7-86 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 RX Acceptance Tests – continued Figure 7-37: RX ATP Setup (Advantest R3267 and Agilent E4406A) ANTENNA A (DIVERSITY) ANTENNA B (MAIN) ADVANTEST R3267 (TOP) AND R3562 (BOTTOM) ADVANTEST R3267 SPECTRUM ANALYZER 100Hz – 8GHz AGILENT E4432B (TOP) AND E4406A (BOTTOM) RF OUTPUT RECEIVE RF TEST CABLE ADVANTEST R3562 RECEIVER TEST SOURCE RF OUT JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-87 Generate an ATP Report Background Each time an ATP test is run, an ATP report is updated to include the results of the most recent ATP tests if the Save Results button is used to close the status report window. The ATP report will not be updated if the status reports window is closed with use of the Dismiss button. ATP Report A separate report is created for each BTS and includes the following for each test: Test name PASS or FAIL Description information (if applicable) MAWI number Channel number Carrier number Sector number Upper test limit Lower test limit Test result Time stamp Details/Warning information (if applicable) Procedure to Run ATP Report Follow the procedures in Table 7-48 to view and create a printable file for the ATP report of a BTS. Table 7-48: Procedure to Generate an ATP Report Step Action Click on the Login tab if it is not in the forefront. Select the desired BTS from the Available Base Stations pick list. Click on the Report button. Start the report if desired by clicking on a column heading. Click on the Dismiss button if you do not want to create a printable file copy. To create a printable file, select the desired file type in the picklist and then click on the Save button. NOTE Refer to the LMF help screens, or the CDMA LMF Operator’s Guide, 68P64114A21, for information on how to print an ATP report. 7-88 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Copy LMF CAL File to CBSC Objective The following procedure is to copy the LMF CAL file to the CBSC after performing an ATP. Background After you perform the ATP you must move a copy of the CAL file for the BTS from the LMF to the CBSC. This is normally done by putting a copy of the CAL file on a floppy disk and then using the floppy disk to move the CAL file to the CBSC. Prerequisites A DOS formatted 1.44 MB 3 1/2–in. floppy disk is necessary to do this procedure. The ATP and Audit procedures have successfully been performed. The Create CAL File procedure was performed. You logged out of the BTS. Procedure to Copy CAL Files from LMF to a Diskette Follow the procedure in Table 7-49 to copy CAL files from an LMF computer to a 3.5 diskette. Table 7-49: Procedure to Copy CAL Files from LMF to a Diskette Step Action Insert a diskette into your Windows A: drive. NOTE If your diskette has not been formatted, format it using Windows. The diskette must be DOS formatted before copying any files. Consult your Windows/DOS documentation or online help on how to format diskettes. Click on the bold Start button to launch the Windows Explorer program from your Programs menu list. Click on your C: drive Double click on the wlmf folder. Double–click on the CDMA folder Double click on the bts–# folder for the file you want to copy. Drag the file (for example, BTS–#.cal, BTS–#.txt, BTS–#.htm, BTS–#.xls) to the 3–1/2–in. floppy (A:) icon on the top left of the screen and release the mouse button. Repeat step 6 and 7 until you have copied each file desired and close the Windows Explorer program by selecting Close from the File menu option. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-89 Copy LMF CAL File to CBSC – continued Procedure to Copy CAL Files from Diskette to the CBSC Follow the procedures in Table 7-50 to copy CAL file from a diskette to the CBSC. Table 7-50: Procedure to Copy CAL Files from Diskette to the CBSC Step Action Log in to the CBSC on the OMC–R Unix workstation using your account name and password. Place your diskette containing calibration file(s) in the workstation diskette drive. Type in eject –q and press the Enter key. Type in mount and press the Enter key. NOTE Check to see that the message floppy/no_name is displayed on the last line. If the eject command was previously entered, floppy/no_name will be appended with a number. Use the explicit floppy/no_name reference displayed. Type in cd /floppy/no_name and press the Enter key. Type in ls –lia and press the Enter key. Verify that the bts–#.cal file is on the diskette. Type in cd and press the Enter key. Type in pwd and press the Enter key. Verify you are in your home directory (/home/ ). With Solaris versions of Unix, create a Unix–formatted version of the bts–#.cal file in your home directory by entering the following command: dos2unix /floppy/no_name/bts–#.cal bts–#.cal and press the Enter key (where # is BTS number). NOTE Other versions of Unix do not support the dos2unix command. In these cases, use the Unix cp (copy) command. The copied files will contain DOS line feed characters which must be edited out with a Unix text editor. 10 Type in ls –l *.cal and press the Enter key. Verify the cal files have been copied. 11 Type in eject and press the Enter key. 12 Remove the diskette from the workstation. 7-90 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Prepare to Leave the Site Remove External Test Equipment Perform the procedure in Table 7-51 to disconnect the test equipment and prepare the BTS for active service. Table 7-51: Remove External Test Equipment Step Action Disconnect all test equipment from the antenna connectors on the BTS. Reconnect and visually inspect all antenna feed lines on the BTS. Disconnect all test equipment from the diagnostic access area. Reset and Initialize Site Remotely The BTS should not be left with data and code loaded from the CDMA LMF. The configuration data and code loads used for normal operation could be different from those stored in the CDMA LMF files. By resetting the BTS, the required data and code can be loaded from the CBSC when spans are again active. To reset the BTS and have the OMCR/CBSC bring up the site remotely, perform the procedure in Table 7-52. Table 7-52: Reset BTS and Remote Site Initialization Step Action Terminate the CDMA LMF session by following the procedures in Table 7-54. Use the AC and DC power breakers to cycle BTS power off and on. Notify the OMCR/CBSC to take control of the site and download code and data to the BTS. Verify the CBSC can communicate with the MAWI. Bring BTS into Service with the CDMA LMF IMPORTANT Whenever possible, have the OMCR/CBSC enable the BTS. If code and/or data could not be loaded remotely from the OMCR/CBSC, follow the steps outlined in Table 7-53 as required to bring the BTS from the OOS to INS mode. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-91 Prepare to Leave the Site – continued Table 7-53: Procedure to Bring BTS into Service Step Action On the CDMA LMF, select the MAWI. Click on Device from the menu bar. Click on Enable from the Device menu. A status report window is displayed. Click Cancel to close the transceiver parameters window, if applicable. Click OK to close the status report window. The selected devices that successfully change to INS change color to green. Terminate LMF Session/Remove Terminal Perform the procedure in Table 7-54 to terminate the LMF session and remove the CDMA LMF computer. Table 7-54: Procedure to Remove LMF Step Action ! CAUTION Do not power down the CDMA LMF terminal without performing the procedure below. Corrupted/lost data files may result. 7-92 Log out of all BTS sessions and exit CDMA LMF by clicking on the File selection in the menu bar and selecting Exit from the File menu list. Click Yes in the Confirm Logout pop–up message which appears. In the Windows Task Bar, click Start and select Shutdown. Click Yes when the Shut Down Windows message appears. Wait for the system to shut down and the screen to go blank. Disconnect the CDMA LMF terminal serial cable from the BTS. Disconnect the CDMA LMF terminal serial port, the RS–232–IEEE488 converter and the GPIB cables as required for equipment transport. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Prepare to Leave the Site – continued Replace Diagnostic Access Cover Use a T20 Torx tamper bit to tighten the two tamper–resistant M4 screws holding the cover. Torque to 10 in–lb. Refer to Figure 7-38. Figure 7-38: How To Replace The Diagnostic Access Cover SCREWS IN DIAGNOSTIC ACCESS COVER ARE CAPTIVE Replace Solar Cover Replace the solar cover. Refer to the “Powering on Unit and Mounting the Solar Cover” procedure in Chapter 5. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 7-93 Prepare to Leave the Site – continued Notes 7-94 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Chapter 8: Field Replaceable Unit (FRU) Procedures Table of Contents JAN 2002 Field Replaceable Unit (FRU) Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . List of FRUs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1 8-1 8-1 Shut Down & Restoring BTS Signaling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Accessing the OMCR CLI window . . . . . . . . . . . . . . . . . . . . . . . . . . . . Shut Down Signaling Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Restore Signaling Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8-3 8-3 8-3 8-10 Site I/O Junction Box Replacement Procedure . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . System Impact/Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Replace Site I/O Junction Box . . . . . . . . . . . . . . . . . . . . . Site I/O Junction Box Location Diagram . . . . . . . . . . . . . . . . . . . . . . . 8-14 8-14 8-14 8-14 8-14 8-16 Short Duration Battery Replacement Procedures . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Replace Short Duration Battery . . . . . . . . . . . . . . . . . . . . 8-17 8-17 8-17 8-17 Remote GPS Replacement Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Replace Remote GPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-19 8-19 8-19 8-19 Full Unit Replacement Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . System Impact/Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Procedure to Replace Failed Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-21 8-21 8-21 8-21 8-21 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT Table of Contents – continued Notes SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Field Replaceable Unit (FRU) Overview Overview The purpose of this chapter is to provide the Field Replaceable Unit (FRU) replacement procedures for the unit. Figure 8-1, Figure 8-2 and Figure 8-3 show the FRUs associated with the unit. List of FRUs The following is a list of FRUs for the unit: 1. Site I/O Junction Box with Primary Surge Suppressor – Kit T450AE 2. Site I/O Junction Box without Primary Surge Suppressor – Kit T450AA 3. RGPS Head – Kit T472AP 4. Short Duration Battery – Kit T348AE 5. Primary Surge Suppressor – Kit T449AA 6. AC Installation Box – Kit T449AB MicroCell units 1. A Band BTS with HSO – Kit SG1478AA 2. A Band BTS without HSO – Kit SG1479AA 3. B Band BTS with HSO – Kit SG1486AA 4. B Band BTS without HSO – Kit SG1487AA 5. Solar Cover – Kit T451AA 6. Fin Cover – Kit T389AB Figure 8-1: FRU Items RGPS HEAD UNIT SUBSCRIBER UNIT SITE I/O JUNCTION BOX SITE I/O INTERFACE SHORT DURATION BATTERY JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-1 Field Replaceable Unit (FRU) Overview – continued Figure 8-2: Front and Back Solar Covers for MicroCell FRONT COVER BACK COVER Figure 8-3: Front and Back Fin Covers BACK COVER FRONT COVER 8-2 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restoring BTS Signaling Objective The FRU procedures require the shut down of BTS signalling functions. Accessing the OMCR CLI window The commands to manipulate the BTS in the following replacement procedure must be entered via UNO or OMCR (Operations and Maintenance Center – Radio). IMPORTANT Should there be any issues which affect CLI operations or the UNO/OMCR, this replacement procedure cannot be performed. Accessing the OMCR CLI window The commands used in the following replacement procedure in Table 8-1 are entered at the OMCR. Table 8-1: Procedure to Login and Access Alarm Window Step Action Login by entering the user name. Enter the password at the system prompt. Open an Alarm Manager window and an OMCR CLI window from the pull down menu using the mouse button. Verify that the filter display is set to ALL. This is so that any alarms which may be encountered while installing the hardware can be observed and rectified. Shut Down Signaling Functions Table 8-2 contains steps for shutting down the signaling functions for the sector/site. NOTE The BTS acts like a single sector and all sector commands operate on the BTS carrier. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-3 Shut Down & Restore BTS Signaling – continued IMPORTANT The EDIT SECTOR REDIRECT or REDIRECT2 command does NOT affect calls in progress and will NOT move these calls to another sector/carrier. The command only prevents future calls from being originated on the targeted sector/carrier. If active call processing is still taking place in the target sector/carrier, it is advisable to wait for any active calls to terminate prior to disabling the sector. Table 8-2: Procedure to Shut Down Signaling Functions Step Action Open a CLI window. Refer to Table 8-1. * IMPORTANT Record the values shown in the following system display response. These values will be used to answer the prompts for the EDIT SECTOR REDIRECT command when restoring signaling operations at the end of the replacement procedure. View the status of the sector signaling redirect parameters for all carriers equipped for the sector by entering the following command at the prompt: omc–000000>display 000000 sector– – bt # t # redirect Observe the following typical system display response (this example shows initial standard values): CARRIER ID (bts–sector–carrier) –––––––––––––––––––– CARRIER–1–1–1 RETURN IF FAIL ––––––– Access 0 0 0 1 – – N N Overload Class Redirect 0 0 0 0 0 0 0 0 1 1 1 1 2 3 4 5 6 7 8 9 0 1 2 3 – – – – – – – – – – – – N N N N N N N N N N N N Flags 1 1 4 5 – – N N ROTATE TIMER (SEC) ––––– RECORD TYPE –––– EXP SID ––– IGNORE CDMA –––– SYS ORDERING ––––––– CUSTOM . . . continued on next page 8-4 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restore BTS Signaling – continued Table 8-2: Procedure to Shut Down Signaling Functions Step Action NOTE This step edits the redirect parameters so that the Global Service Redirect Message broadcast on the paging channel redirects all subscribers away from the sector with the failed equipment and onto a different system. Enter the following command at the prompt: omc–000000>edit sector– – redirect ! The system will prompt you to enter each command parameter value one at a time. Answer the prompts in the following order: enter Y, enter Y, ... enter Y All Access Overload Classes must be set to Y (yes) to ensure that all subscribers are redirected. , enter N Must be set to no to ensure that subscribers do not return if redirect is unsuccessful. , enter 1 or 2 A value of 2 will invoke REDIRECT2 which is used to redirect subscribers to a CDMA channel at a neighbor site. A value of 1 redirects subscribers to an 800 MHz analog site. This example uses 2. , enter 13 Use the Area ID the subscriber units should expect to find on the system they are being redirected to. This example uses 13. , enter Y , enter custom The system acquisition ordering value tells the mobiles the order to use when attempting to obtain service on the different analog systems. The valid values are: custom – use custom system selection (default selection); aonly – try the A system only; bonly – use the B system only; afirst – try the A system first. If unsuccessful, enter bfirst to try the B system first. If unsuccessful, enter aorb to try the A or B. If unsuccessful, enter custom to try the alternative system. , enter 4 Call processing continuously rotates, circular right–shifts, the Y/N values of Access Overload Class Redirect Flags 0 to 9. Values are shifted one flag at the end of the timer period; then timer re–starts. Valid values are 0–255; 4 is default. The system will display the command that will be sent. Verify the command syntax. omc–000000>Accept [yes/no]? Enter Y to accept the command. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-5 Shut Down & Restore BTS Signaling – continued Table 8-2: Procedure to Shut Down Signaling Functions Step Action View the status of the sector signaling redirect parameters to verify that the sector is ready for maintenance. omc–000000>display sector– – redirect Ensure that the values in the system display response match the values input in step 3 (see example below). CARRIER ID (bts–sector–carrier) –––––––––––––––––––– CARRIER–1–1–1 RETURN IF FAIL ––––––– Access 0 0 0 1 – – Y Y Overload Class Redirect 0 0 0 0 0 0 0 0 1 1 1 1 2 3 4 5 6 7 8 9 0 1 2 3 – – – – – – – – – – – – Y Y Y Y Y Y Y Y Y Y Y Y Flags 1 1 4 5 – – Y Y ROTATE TIMER (SEC) ––––– If you entered 2 for in step 3, go to step 6. If you entered 1 for in step 3, go to step 9. * IMPORTANT RECORD TYPE –––– EXP SID –––– 13 IGNORE CDMA ––– SYS ORDERING –––––––– CUSTOM Record the values shown in the following system display response. These values will be used to answer the prompts for the EDIT SECTOR REDIRECT2 command when restoring signaling operations at the end of the replacement procedure. View the status of the BTS signaling redirect parameters for all carriers equipped for the BTS. Enter the following command at the prompt: omc–000000>display omc 000000>display sector– sector– – redirect2 Ensure that the values in the system display response match the values input in step 3. Observe the following typical system output: Access Overload Class Redirect Flags CARRIER ID EXP BAND 1 7 8 10 11 12 13 14 15 (bts–sector–carrier) NID CLASS –––––––––––––––––––– –––– ––––– ––––––––––––––––––––––––––––––––––––––––––––––––––––––– CARRIER–1–1–1 65535 AMPS – – – – – – – – – – – – – – – . . . continued on next page 8-6 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restore BTS Signaling – continued Table 8-2: Procedure to Shut Down Signaling Functions Step Action NOTE This step edits the REDIRECT2 parameters so that the Global Service Redirect Message broadcast on the paging channel redirects all subscribers away from the BTS with the failed equipment and onto a CDMA channel at a neighbor site. Enter the following command at the prompt: omc–000000> edit sector– redirect2! The system prompts you to enter each command parameter value one at a time. Answer the prompts in the following order: expecting an integer number (from 0 to 65535) Use the Network ID the subscriber units should expect to find on the system they are being redirected to. This example uses 555. expecting an integer number (from 0 to 2047) , ... A list of CDMA channels for neighbor sites that the subscriber units can use for redirection. This example uses 200, 350, 400, 725, 75, 175, 100, 575, and 950. expecting an enumerated value: CDMA1900 CDMA800 CDMA900 JAPANCDMA Use CDMA1900 for 1.9 GHz systems and CDMA800 for 800 MHz systems. This example uses CDMA1900. The system displays the command to be sent. Verify the command syntax. omc–000000>Accept [yes/no]? Enter Y to accept the command or N to go back and enter the correct value(s). View the status of the BTS signalling REDIRECT2 parameters to verify that the BTS is ready for maintenance. omc–000000> display sector– redirect2 Make sure that the values in the system display response match the values input in step 7 (see example below): CARRIER ID (bts–sector–carrier) –––––––––––––––––––– CARRIER–1–1–1 RETURN IF FAIL ––––––– Access 0 0 0 1 – – Y Y Overload Class Redirect 0 0 0 0 0 0 0 0 1 1 1 1 2 3 4 5 6 7 8 9 0 1 2 3 – – – – – – – – – – – – Y Y Y Y Y Y Y Y Y Y Y Y Flags 1 1 4 5 – – Y Y ROTATE TIMER (SEC) ––––– RECORD TYPE –––– EXP SID –––– 13 IGNORE CDMA ––– SYS ORDERING –––––––– CUSTOM . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-7 Shut Down & Restore BTS Signaling – continued Table 8-2: Procedure to Shut Down Signaling Functions Step Action View the existing congestion control parameters for all carriers equipped for the sector by entering the following command at the prompt: omc–000000>display sector– – congestconf Observe the following typical system display response: CARRIER (bts#–sector#–carrier#) ––––––––––––––––––––––– 300–1–4 10 SET ––– NEWCALL ALARMFLAG ––––––––– ENABLE REG ALARMFLAG –––––––––– ENABLE AGG ALARMFLAG –––––––––– ENABLE ANALOGREDIRECT –––––––––––––– DISABLE GLOBALREDIRECT –––––––––––––– DISABLE NOTE In this step, you will change the value of the Global Service Redirection Flag (GLOBALREDIRECT) in the congestion control parameters so that the Global Service Redirect Message is broadcast on the sector paging channel. Enter the following command at the prompt: omc–000000>edit sector– – congestconf ! The system will prompt you to enter each control parameter value one at a time. Skip through the prompts until you get to the following: , enter enable (This will force the Global Service Redirect Message to be broadcast on the sector paging channel.) The system will display the values of the control parameters. Verify that only the globalredirect value changed. omc–000000>Accept [yes/no]? Enter Y to accept the change. Now the Global Service Redirection Message is sent over the sector paging channels. All subscribers are redirected away from the sector and onto a different system. This effectively shuts down the sector. 11 Display the status of the MAWI at the BTS by entering the following command at the prompt: omc–000000>display bts– status Observe the following typical system response for the entry of: DISPLAY BTS – 300 STATUS DEVICE –––––––––––––––––– BTS–300 BTSSPAN–300–1 BTSLINK–300–1 LPA–300–1 MDM–300–1 MAWI–300–1 CBSC –––– STATUS –––––– INS INS INS OOS_PARENT PRECUT INS Config Data –––– n/a n/a n/a n/a n/a GOOD DEVSYNC Calibration Data –––– n/a n/a n/a n/a n/a GOOD Calibration Sync ––––––– UNLOCKED n/a n/a n/a n/a GOOD ISO RELATED STATE –––––––––––– UNLOCKED n/a n/a n/a n/a KEYED . . . continued on next page 8-8 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restore BTS Signaling – continued Table 8-2: Procedure to Shut Down Signaling Functions Step 12 Action Display the status of the MAWI at the BTS to verify the status of the MAWI (which CEs are INS_IDLE or INS_BUSY) by entering the following command at the prompt: omc–000000>status mawi– – add Observe the following typical system response: MAWI–300–1 00–05–24 15:10:31 omcr5 MM–5 M000109.00046 045519/479457 INFO:42 ”Mawi Status Response” TELSTATE=INS_ACTIVE PROCEDURE=NONE PHYSTATE=INS_ACTIVE HDWR_TYPE=MAWI DEVICE_ASSUMED=NONE CLOCK_SRC=REMOTE_GPS LATITUDE=”+032:50:41.502” LONGITUDE=”–097:17:38.645” ALTITUDE=”+0019865” NUM_SATELLITES=”8” CF MMCONF MMSTATE MMSECTOR PHYCONF PHYSTATE PHYREASON –– –––––– –––––––– –––––––– ––––––– –––––––– ––––––––– PCH_ACH INS_BUSY PCH_ACH INS_BUSY NONE SCH INS_BUSY SCH INS_BUSY NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE 10 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 11 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 12 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 13 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 14 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 15 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 13 PHYSECTOR ––––––––– FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT Disable the MAWI in the INS–IDLE or the INS–BUSY state (predetermine number of active calls remaining to be terminated prematurely) by entering the following command at the prompt: omc–000000>disable mawi– – unc 14 Disable the BTS where the replacement procedure will be performed by entering the following command at the prompt: omc–000000>disable bts– unc JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-9 Shut Down & Restore BTS Signaling – continued Restore Signaling Operations Follow the steps in Table 8-3 to restore signaling operations to the site. Table 8-3: Procedure to Restore Signaling Operations Step Action Open a CLI window. Refer to Table 8-1. Enable the BTS by entering the following command at the prompt: omc–000000>enable bts– unc Enable the MAWI by entering the following command at the prompt: omc–000000>enable mawi– unc View the status of the sector signaling redirect parameters for all carriers equipped for the sector by entering the following command at the prompt: omc–000000>display sector– – redirect Observe that the values in the system display response should match the values input in step 3 of the shut down signaling functions table. CARRIER ID (bts–sector–carrier) –––––––––––––––––––– CARRIER–1–1–1 RETURN IF FAIL ––––––– Access 0 0 0 1 – – Y Y Overload Class Redirect 0 0 0 0 0 0 0 0 1 1 1 1 2 3 4 5 6 7 8 9 0 1 2 3 – – – – – – – – – – – – Y Y Y Y Y Y Y Y Y Y Y Y Flags 1 1 4 5 – – Y Y ROTATE TIMER (SEC) ––––– RECORD TYPE –––– EXP SID ––– 13 IGNORE CDMA –––– SYS ORDERING –––––––– CUSTOM . . . continued on next page 8-10 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restore BTS Signaling – continued Table 8-3: Procedure to Restore Signaling Operations Step Action * IMPORTANT In this step, use the values recorded in step 2 of the shut down signaling functions table to answer the prompts for the EDIT SECTOR REDIRECT command; except for record type enter 2. NOTE This step shows the entry of initial standard values which is consistent with the original example; except record type must be 2. Your entries may be different. Restore the values of all redirect parameters by entering the following command at the prompt: omc–000000>edit sector– – redirect ! The system will prompt you to enter each command parameter one at a time. Answer the prompts in the following order (Note that the following specified values are consistent with the original example. Yours may be different): Enter N, Enter N, ... enter N , enter N , enter 2 , enter 0 , enter N , enter custom , enter 4 The system will display the command that will be sent. Verify the command syntax. omc–000000>Accept [yes/no]? Enter Y to accept the command. View the status of the sector signaling redirect parameters to verify that the sector is ready for maintenance. omc–000000>display sector– – redirect Ensure that the values in the system display response match the values input by the operator in step 5 (see example below). CARRIER ID (bts–sector–carrier) –––––––––––––––––––– CARRIER–1–1–1 RETURN IF FAIL ––––––– Access 0 0 0 1 – – N N Overload Class Redirect 0 0 0 0 0 0 0 0 1 1 1 1 2 3 4 5 6 7 8 9 0 1 2 3 – – – – – – – – – – – – N N N N N N N N N N N N Flags 1 1 4 5 – – N N ROTATE TIMER (SEC) ––––– RECORD TYPE –––– EXP SID ––– IGNORE CDMA –––– SYS ORDERING –––––––– CUSTOM . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-11 Shut Down & Restore BTS Signaling – continued Table 8-3: Procedure to Restore Signaling Operations Step Action View the congestion control parameters for all carriers equipped for the sector by entering the following command at the prompt: omc–000000>display sector– – congestconf Observe the following typical system display response: CARRIER (bts#–sector#–carrier#) ––––––––––––––––––––––– 300–1–4 SET ––– NEWCALL ALARMFLAG ––––––––– ENABLE REG ALARMFLAG ––––––––– ENABLE AGG ALARMFLAG ––––––––– ENABLE ANALOGREDIRECT –––––––––––––– DISABLE GLOBALREDIRECT –––––––––––––– ENABLE NOTE In this step, you will change the value of the Global Service Redirection Flag (GLOBALREDIRECT) in the congestion control parameters so that the Global Service Redirect Message is only broadcast on the sector paging channel when there is traffic congestion in the sector. Enter the following command at the prompt: omc–000000>edit sector– – congestconf ! The system will prompt you to enter each control parameter value one at a time. Skip through the prompts until you get to the following: , enter disable (This will revert the Global Service Redirect Message to congestion control.) The system will display the values of the control parameters. Verify that only the GLOBALREDIRECT value changed. omc–000000>Accept [yes/no]? Enter Y to accept the change. Now the Global Service Redirection Message will only be sent over the sector paging channels when there is traffic congestion in the sector. Display the status of the MAWI at the BTS by entering the following command at the prompt: omc–000000>display bts– status Observe the following typical system response: DEVICE –––––––––––––––––– BTS–300 BTSSPAN–300–1 BTSLINK–300–1 LPA–300–1 MDM–300–1 MAWI–300–1 CBSC –––– STATUS –––––– INS INS INS OOS_PARENT PRECUT INS Config Data –––– n/a n/a n/a n/a n/a GOOD DEVSYNC Calibration Data –––– n/a n/a n/a n/a n/a GOOD Calibration Sync ––––––– UNLOCKED n/a n/a n/a n/a GOOD ISO RELATED STATE –––––––––––– UNLOCKED n/a n/a n/a n/a KEYED . . . continued on next page 8-12 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Shut Down & Restore BTS Signaling – continued Table 8-3: Procedure to Restore Signaling Operations Step 10 Action Display the status of the MAWI in the BTS by entering the following command at the prompt: omc–000000>status mawi– – add Observe the following typical system response for entry of: STATUS MAWI – 300 –1 ADD MAWI–300–1 00–05–24 15:10:31 omcr5 MM–5 M000109.00046 045519/479457 INFO:42 ”Mawi Status Response” TELSTATE=INS_ACTIVE PROCEDURE=NONE PHYSTATE=INS_ACTIVE HDWR_TYPE=MAWI DEVICE_ASSUMED=NONE CLOCK_SRC=REMOTE_GPS LATITUDE=”+032:50:41.502” LONGITUDE=”–097:17:38.645” ALTITUDE=”+0019865” NUM_SATELLITES=”8” CF MMCONF MMSTATE MMSECTOR PHYCONF PHYSTATE PHYREASON –– –––––– –––––––– –––––––– ––––––– –––––––– ––––––––– PCH_ACH INS_BUSY PCH_ACH INS_BUSY NONE SCH INS_BUSY SCH INS_BUSY NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE TCH INS_IDLE FLOAT TCH INS_IDLE NONE 10 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 11 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 12 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 13 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 14 TCH INS_IDLE FLOAT TCH INS_IDLE NONE 15 TCH INS_IDLE FLOAT TCH INS_IDLE NONE PHYSECTOR ––––––––– FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT FLOAT JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-13 Site I/O Junction Box Replacement Procedure Objective The objective of this procedure is to replace the Site I/O junction box. System Impact/Considerations The removal of the failed Site I/O junction box will require system downtime. The BTS cannot report alarms without the Site I/O junction box. The other system level alarms are too numerous and outside the scope of this document. Required Tools and Materials The following tools are required to remove the solar cover and install the new Site I/O junction box. Tools Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M T20 Torx tamper bit T30 Torx tamper bit Replacement units One Site I/O junction box is required – Kit T396AA Procedure to Replace Site I/O Junction Box Before you begin Before you begin, enter the following information into the following replacement list table. Table 8-4: Item Number Replacement List Item Number BTS number Failed Site I/O Junction Box number 8-14 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Site I/O Junction Box Replacement Procedure – continued Remove the failed site I/O junction box Follow the steps in Table 8-5 to remove the failed Site I/O junction box. Table 8-5: Remove the Failed Site I/O Junction Box Step Action Place the BTS out of service using the “Shut Down Signaling Functions” procedure shown in Table 8-2. Using a T20 Torx tamper bit, remove the Solar Cover if one is present and locate the failed Site I/O junction box. If DC power is being supplied to the unit or if the battery backup is present, open (pull) the DC power breaker. The white collar on the breaker is visible when the breaker is opened. If AC power is being supplied to the unit, open (pull) the AC power breaker. The white collar on the breaker is visible when the breaker is open. Disconnect the unit ground cable from the Site I/O junction box. Using a T30 Torx tamper bit, remove the two tamper resistant captive screws to disconnect the Site I/O junction box from the unit. See Figure 8-4. If your BTS is equipped with the customer–supplied Site I/O interface, then proceed to step 8. If your BTS is equipped with the optional Primary Surge Suppressor, then proceed to step 9. Disconnect the Site I/O cable from the Deutsche connector on the Site I/O cable. Location of Site I/O interface is site– dependent. Disconnect the Site I/O cable from the Primary Surge Suppressor. Install the replacement Site I/O junction box Follow the steps in Table 8-6 to install the replacement Site I/O junction box. Table 8-6: Install the Replacement Site I/O Junction Box Step Action Reconnect the Site I/O cable according to the “Site I/O, Span Line, RGPS and Modem Cabling” procedure in Chapter 4. Install the replacement Site I/O junction box according to the “Mounting the Site I/O Junction Box to the Unit” procedure in Chapter 5. Attach the ground cable from the mounting bracket to the Site I/O junction box. If AC power is being supplied to the unit, close (push) the AC power breaker. The white collar on the breaker is not visible when the breaker is closed. If DC power is being supplied to the unit or if battery backup is present, close (push) the DC power breaker. The white collar on the breaker is not visible when the breaker is closed. Install the Solar Cover if one is present according to the “Mounting Solar Cover and Powering on Unit” procedure in Chapter 5. Place the BTS back in service using the “Restore Signaling Operations” procedure in Table 8-3. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-15 Site I/O Junction Box Replacement Procedure – continued Site I/O Junction Box Location Diagram Figure 8-4: Site I/O Junction Box Replacement NOTE: SU REMOVED FOR CLARITY DISCONNECT GROUND REMOVE TWO M6 CAPTIVE SCREWS SITE I/O JUNCTION BOX DISCONNECT SITE I/O CABLE FROM SITE I/O INTERFACE 8-16 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Short Duration Battery Replacement Procedures Objective The objective of this procedure is to replace the short duration battery. Required Tools and Materials The following tools are required to remove the solar cover and install the new battery. Tools Attaching the battery to the unit requires: T20 Torx tamper bit, 1/4–in. hex T30 Torx tamper bit, 1/4–in. hex Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M Two (2) Screws M6x19 (Motorola Part Number 0387541C03) Replacement units One Battery – Kit T392AA is necessary for this procedure. Procedure to Replace Short Duration Battery Before you begin Before you begin, enter the following information into the following replacement list table. Table 8-7: Item Number Replacement List Item Number BTS number Failed Battery number Remove the failed battery Follow the steps in Table 8-8 to remove the failed battery. Refer to NO TAG. NOTE The short duration battery is designed to be replaced with the DC breaker closed (pushed). If the DC breaker is opened (pulled) during this procedure, the BTS must be taken off–line and restarted to ensure proper battery fault management. Table 8-8: Procedure to Remove the Failed Short Duration Battery Step Action Turn the DC Power Breaker off. Use a T20 Torx tamper bit to remove the Solar Cover (if one is present) and locate the battery. . . . continued on next page JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-17 Short Duration Battery Replacement Procedure – continued Table 8-8: Procedure to Remove the Failed Short Duration Battery Step Action Turn the connector on the short duration battery cable counterclockwise to disconnect the cable from the unit. See NO TAG. An alarm will be generated. Using a T30 Torx tamper bit remove the two screws that are holding the battery to the unit. See NO TAG. Install the replacement battery Follow the steps in Table 8-8 to install the replacement short duration battery. Refer to NO TAG. Table 8-9: Procedure to Install the Replacement Short Duration Battery Step Action Install the replacement battery according to the “Attaching the Battery to the Unit” installation procedure in Chapter 5. Re–connect the short–duration battery cable to DC input connector. See Figure 8-5. The alarm will clear. Re–install the Solar Cover if one is present. 8-18 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Short Duration Battery Replacement Procedure – continued Figure 8-5: Short Duration Battery Replacement AC POWER BREAKER DC POWER BREAKER TURN COUNTERCLOCKWISE TO REMOVE CABLE REMOVE TWO SCREWS HOLDING BATTERY TO THE UNIT CABLE IS PART OF THE BATTERY ASSEMBLY JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-19 Remote GPS Replacement Procedure Objective The objective of this procedure is to replace the RGPS head. Required Tools and Materials Replacement units One RGPS head with cable attached (Motorola Kit T472AP) is required to do this procedure. Procedure to Replace Remote GPS Before you begin Before you begin, enter the following information into the following replacement list table. Table 8-10: Item Number Replacement List Item Number BTS number Failed RGPS head number Remove the failed RGPS head Follow the steps in Table 8-11 to remove the failed RGPS head. Refer to Figure 8-6. Table 8-11: Procedure to Remove the Failed RGPS Head Step Action NOTE To prevent twisting of cables, do not unscrew or screw the RGPS head while holding the pipe/conduit. Loosen the pipe/conduit mounting hardware until the pipe/conduit is free to be unscrewed from the RGPS head. 8-20 Grasp the RGPS head with one hand and the pipe/conduit with the other hand. Unscrew the pipe/conduit from the head and separate the head from the pipe/conduit. Grasp the cable just below the head and pull about 16 inches of cable out of the pipe/conduit until the mating cable connectors are exposed. Separate the mating cable connectors to disconnect the RGPS head from the RGPS cable. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Remote GPS Replacement Procedures – continued Install the replacement RGPS head Follow the steps in Table 8-12 to install the replacement RGPS head. Refer to Figure 8-6. Table 8-12: Procedure to Install the Replacement RGPS Head Step Action Connect the cable connector of the replacement RGPS head to the RGPS cable connector. Secure the connection by tightening the spinning connector flange. Feed the cable slack into the RGPS head end of the mounting pipe/conduit. Grasp the RGPS head with one hand and the pipe/conduit with the other hand. Be careful not to cross–thread the fitting on the RGPS head, screw the pipe/conduit into the head. Hand tighten only! Tighten the pipe/conduit mounting hardware until the pipe/conduit is securely mounted. Figure 8-6: RGPS Head Replacement UNSCREW PIPE, PULL CABLE THROUGH AND DISCONNECT CABLE CONNECTOR CABLE CONNECTOR LOCATED INSIDE PIPE SITE I/O INTERFACE JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-21 Full Unit Replacement Procedures Objective The objective of this procedure is to replace a Microcell unit. See NO TAG. System Impact/Considerations The removal of the failed unit will require system downtime. Required Tools and Materials The following tools and materials are required to do this procedure: Tools The following tools are required to do this procedure: Torque driver wrench, 1/4–in. hex female drive, 0–10 N–M T20 TORX Tamper Bit, 1/4–in. hex T30 TORX Tamper Bit, 1/4–in. hex 13 mm torque wrench set to 5.0 N–M 5/16 breakaway torque wrench 9–in. lb. 13/16 breakaway torque wrench 38–in. lb Key for lock (optional) Handles for unit (optional) Replacement units One Microcell unit is required to do this procedure. Procedure to Replace Failed Unit Before you begin Before you begin, enter the following information into the following replacement list table. Table 8-13: Item Number Replacement List Item Description BTS Number Failed Unit Number Remove the failed unit Follow the steps in Table 8-14 to remove the failed unit. Table 8-14: Procedure to Remove the Failed Unit Step Action Place the BTS out of service. Refer to the “Shut Down Signaling Functions” procedure in Table 8-2. If necessary, use a T20 TORX Tamper bit to remove the Solar Cover. . . . continued on next page 8-22 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Full Unit Replacement Procedures – continued Table 8-14: Procedure to Remove the Failed Unit Step Action If DC power is being supplied to the unit or if battery backup is present, open (pull) the DC power breaker. The white collar on the breaker is visible when the breaker is opened. If AC power is being supplied to the unit, open (pull) the AC power breaker. The white collar on the breaker is visible when the breaker is opened. Turn the power off at the main power source (AC and/or DC). Use a T30 TORX tamper bit to remove the two tamper–resistant screws that hold the site I/O junction box (or site I/O cap) to the BTS. Refer to Figure 8-4 in the “Site I/O Junction Box Replacement” procedure. Disconnect the AC input cable from the unit. Refer to NO TAG. Disconnect the DC input cable from the unit. Refer to NO TAG. Disconnect the antenna cable(s) from the unit. Refer to NO TAG. 10 Disconnect the MIB cables from the unit (if equipped). Refer to NO TAG. 11 Disconnect the SU cables from the unit (if equipped). Refer to NO TAG. 12 Remove the two mounting screws that hold the short duration battery (if present) to the unit. Refer to Table 8-8 in the “Short Duration Battery Replacement Procedures” procedure and NO TAG. 13 Attach the installation handles to the unit. Refer to the “Attaching Installation Handles to the Unit” procedure in Chapter 6. 14 Use a T30 Tamper bit to remove the two screws that hold the unit to the mounting bracket. 15 Remove the pin or lock (if equipped) from the unit. 16 Remove the unit from the mounting bracket. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-23 Full Unit Replacement Procedures – continued Install the replacement unit Follow the steps in Table 8-15 to install the replacement unit. Table 8-15: Procedure to Install the New Unit Step Action Attach the installation handles to the replacement unit. Refer to the “Attaching Installation Handles to Unit” procedure in Chapter 6. Mount the replacement unit to the bracket. Refer to the “Attaching Unit to the Mounting Bracket” procedure in Chapter 6. Once the replacement unit has been secured to the mounting bracket, remove the installation handles (reverse the installation order of the “Attaching Installation Handles to the Unit” procedure in Chapter 6). Attach the site I/O junction box or site I/O cap to the unit. Refer to the “Attaching the Site I/O Junction Box to the Unit” procedure in Chapter 6 and Figure 8-4. Attach the short duration battery (if present) to the unit. Refer to Table 8-9 in the “Short Duration Battery Replacement Procedure” and NO TAG. Connect the AC input cable. Refer to the “AC Power Cabling” procedure in Chapter 6. Connect the DC input cable. Refer to the “DC Power Cabling” procedure in Chapter 6. Connect the antenna cable(s). Refer to the “Antenna Cabling” procedure in Chapter 6. Connect the MIB cables (if equipped). Refer to the “MIB Cabling” procedure in Chapter 6. 10 Connect the SU cables (if equipped). Refer to the “SU Cabling” procedure in Chapter 6. 11 Turn power on at the main power source (AC and/or DC). 12 If AC power is being supplied to the unit, close (push) the AC power breaker. The white collar on the breaker is not visible when the breaker is closed. 13 If DC power is being supplied to the unit or if battery backup is present, close (push) the DC power breaker. The white collar is not visible when the breaker is closed. 14 Perform the ATP, if necessary. Refer to the ATP procedures in Chapter 7. 15 Install the Solar Covers (if necessary). 16 Place the BTS back in service using the “Restore Signaling Operations” procedure in Table 8-3. 8-24 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Full Unit Replacement Procedures – continued Figure 8-7: Unit Replacement REMOVE SCREWS USED TO HOLD UNIT ON BRACKET REMOVE SU CABLE (IF EQUIPPED) REMOVE SCREWS TO REMOVE SUBSCRIBER UNIT (IF EQUIPPED) REMOVE SCREWS TO REMOVE SITE I/O JUNCTION BOX OR SITE I/O CAP (IF EQUIPPED) REMOVE AC INPUT POWER CABLE REMOVE DC INPUT CABLE REMOVE MIB CABLES (OPTIONAL) REMOVE ANTENNA A CABLE REMOVE LOCK REMOVE ANTENNA B REMOVE SCREWS TO REMOVE SHORT DURATION BATTERY NOTE: REMOVE THE SITE I/O JUNCTION BOX (OR SITE I/O CAP), SUBSCRIBER UNIT, AND BATTERY FROM THE FAILED UNIT AND RE–MOUNT THEM ON THE REPLACEMENT UNIT JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT 8-25 Full Unit Replacement Procedures – continued Notes 8-26 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 A Appendix A: Outdoor Grounding Guidelines Overview Appendix Content Outdoor Grounding Guidelines Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chassis Isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Master Ground Plate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Main AC Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Antenna . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chassis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T1 Span Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Modem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Customer I/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT A-1 A-1 A-1 A-1 A-1 A-1 A-2 A-2 A-2 A-2 A Table of Contents – continued Notes SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Outdoor Grounding Guidelines Summary Background This is a summary of the outdoor grounding guidelines. Outdoor installations should be based on this summary and site specific documentation. Motorola publication 68P81150E62 should also be followed to ground an antenna tower. This guideline assumes that auxiliary equipment is co–located at the installation site. All of the equipment referenced may not be present at every site. Because outdoor MicroCell installations will involve a variety of methods, this information is not meant to represent actual physical layout. It is meant to act as an aid to understanding an effective ground system. Chassis Isolation Regardless of the type of installation (wall, frame, pole), the grounding plan must have a single point ground to prevent surge/transient currents from passing through the BTS and auxiliary equipment. The BTS includes insulation hardware to insure that the chassis will be grounded by the intended ground path and not through the mounting structure (frame, pole, or wall). Master Ground Plate The Master Ground Plate (MGP) is the key to the outdoor grounding scheme. The MGP is the single grounding point for all BTS input and output and provides a uniform ground potential through out the site. Although the MGP may be implemented differently at each installation, it must be a plate that is big enough to attach to all the lightning arrestors and have a ground stud. The MGP ground stud is the only connection to earth ground for the BTS hardware. Main AC Power The AC power input is single–phase and connects to the BTS by a three conductor cable. The cable is insulated and connects to the BTS on one end and the AC source on the other end. The AC power source should be ground referenced to the MGP at a point closest to the access point. The line and neutral conductors must be protected by lightning arrestors. The lightning arrestors connect to the MGP at the same point as the AC ground reference. If an external circuit breaker or an uninterruptible power supply are used, install them between the AC power lightning arrestor and the BTS. Antenna Coaxial cables are used to connect to the antenna(s). The ground conductor (shield) of the coaxial cable must be ground referenced to the JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT A-1 A Outdoor Grounding Guidelines Summary – continued MGP at the antenna access point. The signal (center) conductor must be protected by a lightning arrestor. The lightning arrestor connects to the MGP at the same point as the ground conductor (shield) of the antenna cable. Chassis The ground stud of the BTS chassis connects to the MGP. T1 Span Lines The BTS can connect to two T1 span lines. For many applications the T1 cable is derived from an optical fiber interconnect. For cases where the optical interconnect is non–metallic, no special grounding is needed. If the optical fiber is encased in a metallic sheath, the sheath must be grounded to the MGP. If the span lines are metallic, the conductors must be protected by lightning arrestors which connect to the MGP at a point closest to the demarcation point. Modem A single tip and ring pair is used for a dial–up modem connection. The tip and ring pair must be protected by a lightning arrestor which connects to the MGP at a point closest to the demarcation point. Customer I/O The BTS provides eight customer defined inputs. These connections are internal to the cell site and do not require special grounding unless they originate from an area not protected by the MGP. Example: Signal light in tower configuration A-2 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Appendix B: Alarm List Appendix Content Release 15 Alarm List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Objective . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . List of Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-1 B-1 B-1 Table of Contents – continued Notes SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List Objective Table B-1 lists all the alarms which can be generated by an SC300 BTS. Additional Data field values are not shown. The list of alarms is based on R15 SC300 functionality. List of Alarms Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 400 Traffic Channel Element Failure This trouble notification indicates the availability of a single channel element or a set of channel elements. It is generated whenever the BTS detects an alarm condition on a DSP, its internal path connection, or its associated span. It is never displayed or latched in the MM and it is only used to update the MM’s call processing resource list. This trouble notification contains the address of the channel card along with the list of affected channel elements. 1200 BTS LAN Connection Error This alarm causes the MM to take the BTS out of service. The MM converts the alarm ID from 1200 to 12–60 (MAWI out of service). Call Overload Alarms 1950 BTS Overload: New Calls Threshold 1 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1951 BTS Overload: New Calls Threshold 2 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1952 BTS Overload: New Calls Threshold 3 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-1 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 1953 BTS Overload: Registration Threshold 1 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1954 BTS Overload: Registration Threshold 2 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1955 BTS Overload: Registration Threshold 3 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1956 BTS Overload: Aggregate Access Threshold 1 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1957 BTS Overload: Aggregate Access Threshold 2 Reached A capacity overload alarm indicates that the new calls capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the call setups. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. B-2 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 1958 BTS Overload: Aggregate Access Threshold 3 Reached A capacity overload alarm indicates that the aggregate of both call setups and registration capacity ceiling was reached and mobile restrictions associated with the alarm will be in effect for the mobile originations and registrations. This alarm is cleared when the overload condition is no longer in effect. The reporting mechanism is disabled by default for all overload alarms in this category and can be changed via Recent Change command EDIT CARRIER/SECTOR/BTS CONGESTCONF at OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1959 Global Service Redirection Threshold Reached: New Calls This alarm indicates that all mobiles in the affected access class will be redirected to an overlaid analog system or to another CDMA system until the rate drops below the threshold level for new calls. This alarm is cleared when the overload condition is no longer in effect. The default is set to DISABLED for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/ BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1960 Global Service Redirection Threshold Reached: Registrations This alarm indicates that all mobiles in the affected access class will be redirected to an overlaid analog system or to another CDMA system until the rate drops below the threshold level for new calls. This alarm is cleared when the overload condition is no longer in effect. The default is set to DISABLED for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/ BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. 1961 Global Service Redirection Threshold Reached: Aggregate This alarm indicates that all mobiles in the affected access class will be redirected to an overlaid analog system or to another CDMA system until the rate drops below the threshold level for new calls. This alarm is cleared when the overload condition is no longer in effect. The default is set to DISABLED for all overload alarms in this category and can be changed via the Recent Change command EDIT CARRIER/SECTOR/ BTS CONGESTCONF at the OMCR. Supplemental data represents the state of the system after the alarm actions have taken place. LPAC Alarms 3901 JAN 2002 LPAC: High Power Over Limit Alarm – Unit A The output detector on the unit monitors the output power. An alarm generates when the output power surpasses a preset threshold. At this point, the PA is outputting more power than it can sustain, and damage will result if the PA continues to operate. A typical scenario that would cause a high power over limit alarm would be when power into the PA is more than it can safely sustain. This would cause an input overload, which is detected by the output detector, and the BTS would automatically reduce its output power. The BTS will remain in service after this alarm. Some calls may be dropped. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-3 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 3921 LPAC: Very High Temperature Alarm – Unit A This alarm is generated when the temperature on the PA unit exceeds the threshold value for very high temperatures. This is either an equipment alarm suggesting a hardware failure, or an alarm indicating environmental extremes. To avoid equipment damage, the PA will automatically shut down. This will also cause the BTS to reboot. 3931 LPAC: High Temperature Alarm – Unit A This alarm is generated when the temperature on the PA unit exceeds the threshold value for very high temperature. This is either an equipment alarm suggesting a hardware failure, or an alarm indicating environmental extremes. The BTS will reboot automatically to avoid equipment damage. 3941 LPAC: VSWR Alarm – Unit A This alarm indicates a VSWR alarm was detected on the PA unit. This is an equipment alarm, suggesting a hardware failure of the antenna system, which is external to the PA. This alarm is considered capacity–limiting because the BTS will reboot automatically. 3961 LPAC: IM Loop Not Converged Alarm – Unit A This alarm is generated when the convergence loop on the PA unit is unable to cancel the distortion components created by the PA such that the PA meets proper specifications. This alarm is detected by monitoring and measuring IM products. An alarm will generate if the readings fall below a preset threshold. The BTS will reboot automatically. 3980 LPAC Combination Alarm, Complete Sector Failure This alarm is generated when the LPAC reports at least one of the following alarms: Very High Temperature Alarm, IM Loop Not Converged Alarm, VSWR Alarm A combination alarm indicates a complete BTS reboot. Therefore, the sector has lost power and is no longer transmitting. Calls will neither originate to the failed sector, nor will existing calls hand off. RF Related Alarms 9141 B-4 Forward Power Very High Alarm: Sector 1 This alarm is generated whenever the P out of N forward gain samples (where N and P may be configured) exceed a configurable forward gain threshold. Two alarm levels can be specified: a very high (first level) and a high (second level). The order of alarming by increasing severity is normal condition, then high (second level), followed by very high (first level). A forward power very high alarm clear is generated whenever P out of N forward gain samples fall below the forward threshold minus a forward gain Delta. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 9151 Reverse Noise Rise Very High Alarm: Sector 1 This alarm is generated whenever a reverse noise rise measurement (rolling average over a configurable number of samples) exceeds a reverse noise rise threshold. Two alarm levels can be specified: a very high (first level) and a high (second level). The order of alarming by increasing severity is normal condition, then high (second level), followed by very high (first level). A Reverse Noise Rise Very High Alarm clear is generated whenever the reverse noise rise measurement recedes below the reverse noise rise threshold minus a Delta. 9161 Forward Power High Alarm: Sector 1 This alarm is generated whenever the P out of N forward gain samples (where N and P may be configured) exceed a configurable forward gain threshold. Two alarm levels can be specified: a very high (first level) and a high (second level). The order of alarms listed by increasing severity is: normal condition, high (second level), and very high (first level). A Forward Power High Alarm Clear is generated whenever P out of N forward gain samples fall below the forward threshold minus a forward gain Delta. 9171 Reverse Noise Rise High Alarm: Sector 1 This alarm is generated whenever a reverse noise rise measurement (rolling average over a configurable number of samples) exceeds a reverse noise rise threshold. Two alarm levels can be specified: a very high (first level) and a high (second level). The order of alarms listed by increasing severity are: normal condition, high (second level), and very high (first level). A Reverse Noise Rise High Alarm Clear is generated whenever the reverse noise rise measurement recedes below the reverse noise rise threshold minus a delta. 9210 Forward Power Limiting Alarm When the Forward Power Limiting alarm is activated, the BTS controller will instruct the CDMA transceiver to limit the forward power at or below the current peak power level (or at a fixed power level) or to reduce the forward gain by a fixed amount. A Forward Power Limiting Alarm is generated whenever the forward power exceeds the user definable fixed power threshold (fixed limit mode), or the forward gain measurement exceeds the forward gain limiting threshold (self–calibrating limit mode). A Forward Power Limiting Alarm Clear is generated whenever the forward power falls below the power limit threshold minus a clear event delta (fixed limit mode) or the forward gain measurement falls below the forward gain limiting threshold minus a forward gain limiting delta (self–calibrating limit mode). 9211 Forward Power Limiting Alarm – Recovery Attempts Exceeded This alarm is generated when the system has tried to recover the LPA over–driven condition for the user–configurable maximum number of times and the over–driven condition still exist. This alarm is only applicable for the self–calibrating limit mode. Synchronization Alarms 10030 JAN 2002 Lost Phase Lock This alarm is generated when the active BTS DPLL loses phase lock and re–enters acquisition mode. If the BTS does not regain phase lock, or repeatedly gains and loses phase lock, the problem is most likely a hardware problem in the unit. SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-5 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 10040 GPS Reference Source Failure This alarm is generated when the BTS detects a failure (missing clock pulses or associated device not ready) of its GPS reference source. The additional alarm data will include information about the reference source priority. The reference source priority is the priority of the GPS reference source in relation to the other available reference sources. This alarm will report when local conditions prevent proper GPS reception or when the GPS system is taken down for configuration. If the GPS reference source does not recover or repeatedly fails, a problem may exist in the GPS receiver hardware. This alarm is only reported after the GPS is lost for more than 30 seconds. The loss of GPS for shorter periods of time is not considered unusual, especially if the antenna placement is less than optimum. Short losses of GPS will have no impact on the performance of the BTS. 10060 GPS Message Failure This alarm is generated when the BTS receives a message from the GPS receiver that cannot be processed. The additional info will indicate if the message problem was due to an unknown type, checksum failure, format failure, incomplete message (timeout during message reception) or remote GPS cable delay compensation failure. This alarm is provided to allow additional status to be tracked. 10091 HSO Reference Source Failure This alarm is generated when the BTS detects a failure (missing clock pulses) of its High Stability Oscillator (HSO) reference source. The additional alarm data will include information about the reference source priority. The reference source priority is the priority of the Rubidium reference source in relation to the other available reference sources. If the Rubidium reference source does not recover or repeatedly fails, a problem may exist in the Rubidium Reference Source hardware. 10100 No Reference Source Available This alarm is generated when the BTS detects a failure of all of its available reference sources. 10110 Reference Source Switch This alarm is generated when the BTS switches to an alternate reference source. The additional alarm data will identify the alternate reference source type (GPS, HSO, HSO2 – if sync daisy chain is used or freerun). A reference source switch occurs when a reference source fails and an alternate reference source is available. The reference source switch is seamless and does not cause degradation in system performance 10111 Reference Source Unreliable This alarm is generated when the reporting device expires a given time period during which its reference source is known to provide a reliable clock for the maintenance of CDMA system time. Once the alarm is generated, it is possible that the reporting device is running with a clock that has drifted from CDMA system time. If so, the reporting device will continue to support call originations and maintenance, but cannot guarantee hand–off capability. The additional data will identify the reference source the device is currently using as a timing reference. B-6 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description HW Specific Alarms 1701– 1708 BTS Relay #n – Contact Alarm This alarm is active when a BTS input relay has opened or closed. The relay number “n” will be 1–8. This is an equipment alarm and suggests a possible hardware failure or operator–defined condition. 1800 BTS Controller Disabled Device This alarm is active when the BTS Controller has detected a faulty device and is requesting that the device be disabled. The device is not responding to an update or has been implicated by a series of alarms. 12040 TRX Failure This alarm is generated when a BTS detects a failure in its TRX. The additional data specifies the TRX failure. If the BTS is not a master device, the BTS will de–key its TRX and Ram Boot itself. If the BTS is a master device and it is in service, the master BTS shall de–key its troubled TRX and stay in service. Since there is a one–to–one relation between a BTS and its TRX, this will result in the sector going out of service. 12050 TRX Warning This alarm is generated when a BTS detects a high temperature in its TRX. The additional data indicates the specific problem. The BTS will not de–key the TRX as a result of this alarm. 12060 Cabinet Temperature This alarm is generated when a BTS detects a temperature threshold violation or a problem with the temperature sensing mechanism. The reason code indicates the exact error. 12071 – 12072 RXDC Failure Unit A/B This alarm is generated when a BTS detects a failure in a particular RXDC unit. This is reported thru the RX and indicates a diversity problem within the site. CE Alarms 12100 – 12131 Channel Element Failure #n This alarm is generated when a BTS detects an unrecoverable error for a particular channel element (CE). The additional data indicates the specific error. The CE will be disabled automatically. NOTE SC340 device has 16 channel elements, thus it does not detect and generate alarms 12116–12131. 12200 – 12231 Channel Element Recovered #n This alarm is generated when a BTS detects a recoverable error for a particular Channel Element (CE). The additional data indicates the specific error. The CE has been recovered automatically. While in recovery mode, all active calls at the CE could be lost. NOTE SC340 device has 16 channel elements, thus it does not detect and generate alarms 12216–12231. JAN 2002 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-7 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm 12300 – 12331 Alarm Name Channel Element TSI Mapping Failure #n Alarm Description This alarm is generated when a BTS detects a problem internally allocating a SRCHAN to a particular channel element (CE). The additional data indicates the specific error. The CE is unusable for call processing. NOTE The SC340 device has 16 channel elements, thus it does not detect and generate alarms 12316–12331. Span Alarms 18001/ 18002 SPAN Degraded – Remote Fault Daily Threshold Exceeded (source)/(sink) This alarm indicates that the count of remote faults exceeded the alarm threshold (default threshold = 16) within a 24–hour period. This alarm is caused by the transmit span line path fading in and out. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18004/ 18005 SPAN Degraded – Remote Fault Hourly Threshold Exceeded (source)/(sink) This alarm indicates that the count of remote alarms exceeded the alarm threshold (default threshold = 20) within a 1–hour period. This alarm is caused by the transmit span line path fading in and out. This alarm condition may have a minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18007/ 18008 SPAN Degraded – Remote Fault Critical Threshold Exceeded (source)/(sink) This alarm indicates that the count of remote faults exceeded the alarm threshold (default threshold = 511) within a 24–hour period. This alarm is caused by the transmit span line path fading in and out. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. B-8 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name 18010/ 18011 SPAN Out–of–Service – Continuous Remote Faults (source)/(sink) This alarm indicates that the span is out–of–service due to continuous remote faults being received for more than 0.5 seconds. This alarm indicates that the transmit span line signal was lost at the remote end, or the transmit framing words were corrupted at the remote end. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18013/ 18014 SPAN Degraded – Frame Slip Daily Threshold Exceeded (source)/(sink) This alarm indicates that the number of frame slips exceeded the alarm threshold (default threshold = 4) within a 24–hour period. This alarm is caused by the master unit in the BTS not being synchronized with the inbound span line. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18016/ 18017 SPAN Degraded – Frame Slip Hourly Threshold Exceeded (source)/(sink) This alarm indicates that the number of frame slips exceeded the alarm threshold (default threshold = 10) within a 1–hour period. This alarm is caused by the BTS unit not being synchronized with the inbound span line. This alarm condition may have a minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18019/ 18020 SPAN Degraded – Frame Slip Critical Threshold Exceeded (source)/(sink) This alarm indicates that the number of frame slips exceeded the alarm threshold (default threshold = 255) within a 24–hour period. This alarm is caused by the BTS unit not being synchronized with the inbound span line. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. JAN 2002 Alarm Description SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-9 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 18031/ 18032 SPAN Out–of–Service – Continuous Framed AIS Faults (source)/(sink) This alarm indicates that the span is out–of–service due to continuous Framed Alarm Indication Signal (AIS) faults being received for more than 2.5 seconds. This alarm indicates that the receive span signal was lost, the receive framing words were corrupted, or an incompatible remote span interface was detected by the network. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18034/ 18035 SPAN Degraded – Unframed AIS Daily Threshold Exceeded (source)/(sink) This alarm indicates that the number of Unframed Alarm Indication Signal (AIS) alarms exceeded the alarm threshold (default threshold = 16) within a 24–hour period. This alarm is caused by the receive span fading in and out. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18037/ 18038 SPAN Degraded – Unframed AIS Hourly Threshold Exceeded (source)/(sink) This alarm indicates that the number of Unframed Alarm Indication Signal (AIS) alarms exceeded the alarm threshold (default threshold = 20) within a 1–hour period. This alarm is caused by the receive span fading in and out. This alarm condition may have a minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18040/ 18041 SPAN Degraded – Unframed AIS Critical Threshold Exceeded (source)/(sink) This alarm indicates that the number of Unframed Alarm Indication Signal (AIS) alarms exceeded the alarm threshold (default threshold = 511) within a 24–hour period. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. B-10 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name 18043/ 18044 SPAN Out–of–Service – Continuous Unframed AIS Faults (source)/(sink) This alarm indicates that the span is out–of–service due to continuous Unframed Alarm Indication Signal (AIS) faults being received for more than 2.5 seconds. This alarm indicates that the receive span signal was lost, the receive framing words were corrupted, or an incompatible remote span interface was detected by the network. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18046/ 18047 SPAN Degraded – REC Fault Daily Threshold Exceeded (source)/(sink) This alarm indicates that the number of Receive Error Condition (REC) alarms exceeded the alarm threshold (default threshold = 16) within a 24–hour period. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18049/ 18050 SPAN Degraded – REC Fault Hourly Threshold Exceeded (source)/(sink) This alarm indicates that the number of Receive Error Condition (REC) alarms exceeded the alarm threshold (default threshold = 20) within a 1–hour period. This alarm condition may have a minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18052/ 18053 SPAN Degraded – REC Fault Critical Threshold Exceeded (source)/(sink) This alarm indicates that the number of Receive Error Condition (REC) alarms exceeded the alarm threshold (default threshold = 511) within a 24–hour period. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. JAN 2002 Alarm Description SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-11 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name 18055/ 18056 SPAN Out–of–Service – Continuous REC Faults (source)/(sink) This alarm indicates that the span is out–of–service due to continuous Receive Error Condition (REC) faults being received for more than 2.5 seconds. This alarm indicates that the receive span signal was lost, the receive framing words were corrupted, or an incompatible remote span interface was detected by the network. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18058/ 18059 SPAN Degraded – RED Fault Daily Threshold Exceeded (source)/(sink) This alarm indicates that the number of RED faults exceeded the alarm threshold (default threshold = 16) within a 24–hour period. A RED Alarm Event is generated when there is a Loss of Signal, Loss of Frame Alignment or the Bit Error Rate <= 10E–3. This alarm is caused by the receive span fading in and out. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18061/ 18062 SPAN Degraded – RED Fault Hourly Threshold Exceeded (source)/(sink) This alarm indicates that the number of RED alarms exceeded the alarm threshold (default threshold = 20) within a 1–hour period. A RED Alarm Event is generated when there is a Loss of Signal, Loss of Frame Alignment or the Bit Error Rate <= 10E–3. This alarm condition may have an minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18064/ 18065 SPAN Degraded – RED Fault Critical Threshold Exceeded (source)/(sink) This alarm indicates that the number of RED alarms exceeded the alarm threshold (default threshold = 511) within a 24–hour period. A RED Alarm Event is generated when there is a Loss of Signal, Loss of Frame Alignment or the Bit Error Rate <= 10E–3. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. B-12 Alarm Description SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name 18067/ 18068 SPAN Out–of–Service – Continuous RED Faults (source)/(sink) This alarm indicates that the span is out–of–service due to continuous RED faults being received for more than 2.5 seconds. A RED Alarm Event is generated when there is a Loss of Signal, Loss of Frame Alignment or the Bit Error Rate >= 10E–3. This alarm indicates that the receive span signal was lost, the receive framing words were corrupted, or an incompatible remote span interface was detected by the network. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18070/ 18071 SPAN Degraded – Sync Loss Daily Threshold Exceeded (source)/(sink) The alarm indicates that the count of synch loss alarms has exceeded the alarm threshold (default threshold = 16) within a 24 hour period. This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18073/ 18074 SPAN Degraded – Sync Loss Hourly Threshold Exceeded (source)/(sink) The alarm indicates that the count of synch loss alarms has exceeded the alarm threshold (default threshold = 20) within a 1 hour period. This alarm condition may have an minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18076/ 18077 SPAN Degraded – Sync Loss Critical Threshold Exceeded (source)/(sink) The alarm indicates that the count of synch loss alarms has exceeded the alarm threshold (default threshold = 511) within a 24 hour period. This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. JAN 2002 Alarm Description SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT B-13 Release 15 Alarm List – continued Table B-1: List of Alarms (Software Release 15) Alarm Alarm Name Alarm Description 18079/ 18080 SPAN Degraded – BER Daily Threshold Exceeded (source)/(sink) This error indicates that the Bit Error Rate (BER) has risen above the alarm threshold (default threshold = 10E–6). This alarm condition will have an insignificant impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18082/ 18083 SPAN Degraded – BER Hourly Threshold Exceeded (source)/(sink) This error indicates that the Bit Error Rate (BER) has risen above the alarm threshold (default threshold = 10E–4). This alarm condition may have an minor impact on system performance and call quality. This alarm may provide an early warning of a more serious condition. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18085/ 18086 SPAN Degraded – BER Critical Threshold Exceeded (source)/(sink) This error indicates that the Bit Error Rate (BER) has risen above the alarm threshold (default threshold = 10E–3). This alarm indicates that system performance and call quality is seriously degraded. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. 18090 Span Type Mismatch This error indicates that the span type configuration downloaded from the OMC–R is not the same as the type programmed into the BTSs in the modem cage where the span terminates. The span is operational while the alarm is present but may prevent a span from returning to service if a BTS fails or goes out of service for any reason. 18091/ 18092 SPAN Out–of–Service – Continuous Sync Loss (source)/(sink) This alarm indicates that the span is out–of–service due to continuous sync loss faults being detected. This alarm indicates that the receive span signal was lost, the receive framing words were corrupted, or an in–compatible remote span interface was detected by the network. This alarm will be sent by one of the two devices at the end of the span. In some cases, a second alarm will be sent by the device at the other end of the span. One alarm will have “(source)” to indicate that it came from the source end point, and the other will have “(sink)” to indicate that it came from the sink end point. B-14 SC300 1X BTS Hardware Installation, ATP, and FRU Procedures DRAFT JAN 2002
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No Modify Date : 2002:01:10 18:50:38-06:00 Create Date : 2002:01:10 18:50:18-06:00 Title : SC300 1X BTS Hardware Installation, ATP, and FRU Procedures Subject : Software Release 2.16.x.x (1.9 GHz) Author : Tom Lunde Producer : Acrobat Distiller 4.05 for Windows Page Count : 146EXIF Metadata provided by EXIF.tools