Initial Power Up
Introduction
The following information is used to check for any electrical short
circuits and to verify the operation and tolerances of the cellsite and BTS
power supply units before applying power for the first time. It contains
instructional information on the initial proper power up procedures for
the SC 4812ET power cabinet and RF cabinet. Also presented are tests
to be preformed on the power cabinet. Please pay attention to all
cautions and warning statements in order to prevent accidental injury to
personnel.
Required Tools
The following tools are used in the procedures.
DC current clamp (600 Amp capability with jaw size to accommodate
2/0 cable).
Hot Air Gun – (optional for part of the Alarm Verification)
Digital Multimeter (DMM)
Cabling Inspection
Using the site-specific documentation generated by Motorola Systems
Engineering, verify that the following cable systems are properly
connected:
Receive RF cabling – up to 12 RX cables
Transmit RF cabling – up to six TX cables
IMPORTANT
For positive power applications (+27 V):
The positive power cable is red.
The negative power cable is black. (The black power
cable is at ground potential.)
Initial Inspection and Setup
CAUTION
Ensure all battery breakers for unused battery positions are
open (pulled out) during any part of the power up process,
and remain in the off position when leaving the site.
Table 2-2: Initial Inspection and Setup
Step
Action
Verify that ALL AC and DC breakers are turned OFF in both the Power and RF cabinets. Verify that
the DC power cables between the Power and RF cabinets are connected with the correct polarity
The RED cables connect to the uppermost three (3) terminals (marked +) in both cabinets. Confirm
that the split phase 240/120 AC supply is correctly connected to the AC load center input.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-3
Initial Power Up – continued
CAUTION
Failure to connect the proper AC feed will damage the
surge protection module inside the AC load center.
Power Up Sequence
The first task in the power up sequence is to apply AC power to the
Power cabinet. Once power is applied a series of AC Voltage
measurements is required.
Table 2-3: AC Voltage Measurements
Step
Action
Measure the AC voltages connected to the AC load center (access the terminals from the rear of the
cabinet after removing the AC load center rear panel). See Figure 2-2.
Measure the AC voltage from terminal L1 to neutral. This voltage should be in the range of nominally
115 to 120 V AC.
Measure the AC voltage from terminal L1 to ground. This voltage should be in the range of nominally
115 to 120 V AC.
Measure the AC voltage from terminal L2 to neutral. This voltage should be in the range of nominally
115 to 120 V AC.
Measure the AC voltage from terminal L2 to ground. This voltage should be in the range of nominally
115 to 120 V AC.
Measure L1 – L2 – should be from 208 to 240 V AC.
CAUTION
If the AC voltages are in excess of 120 V (or exceed
200 V) when measuring between terminals L1 or L2 to
neutral or ground, STOP and Do Not proceed until the
cause of the higher voltages are determined. The power
cabinet WILL be damaged if the Main breaker is turned
on with excessive voltage on the inputs.
2-4
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
Figure 2-2: AC Load Center Wiring
L1
L2
= Ground
= Neutral
= Line 1
= Line 2
L1
L2
AC to Pilot Beacon
FW00305
Applying AC Power
Once AC Voltage Measurements are complete, apply AC power to the
Power Cabinet. Table 2-4 provides the procedure for applying AC
power.
Table 2-4: Applying AC Power
Step
Action
When the input voltages are verified as correct, turn the Main AC breaker (located on the front of the
AC Load Center) ON. Observe that all eight (8) green LEDs on the front of the AC Load Center are
illuminated (see Figure 2-7).
Turn Rectifier 1 and Rectifier 2 AC branch breakers (on the AC Load Center) ON. All the installed
rectifier modules (see Figure 2-7) will start up and should each have two green LEDs (DC and Power)
illuminated.
Turn the Meter Alarm Panel module, ON (see Figure 2-3), while observing the K2 contact in the
PDA assembly (see Figure 2-9). The contact should close. The Meter Alarm Panel voltage meter
should read approximately 27.4 + 0.2 Vdc.
Turn the Temperature Compensation Panel (TCP) ON, (see Figure 2-4). Verify that the Meter Alarm
Control Panel does not have any alarm LEDs illuminated.
Check the rectifier current bargraph displays (green LED display on the rectifier module). None
should be illuminated at this point.
NOTE
If batteries are fitted, turn on the two battery heater AC
breakers on the AC Load Center.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-5
Initial Power Up – continued
Figure 2-3: Meter Alarm Panel
VOLT
AMP
AMPS
VOLT
–
PWR
–
TEST POINTS
TEST POINTS
OFF ON
FW00245
FRONT VIEW
Figure 2-4: Temperature Compensation Panel
TEMPERATURE COMPENSATION PANEL
1/2 A 250V
ON
OFF ON
SENSOR
COM 1 2
SENSE
25 c
V ADJ
–
FW00246
FRONT VIEW
Power Cabinet Power Up
Tests
Table 2-5 lists the step–by–step instructions for Power Up Tests.
Table 2-5: Power Cabinet Power Up Tests
Step
Action
Probe the output voltage test point on the Meter Alarm Panel while pressing the 25° C set button on
the TCP (see Figure 2-4). The voltage should read 27.4 + 0.2 Vdc. Adjust Master Voltage on Meter
Alarm Panel if necessary. Release the TCP 25° C set button.
Depending on the ambient temperature, the voltage reading may now change by up to + 1.5 V
compared to the reading just measured. If it is cooler than 25C, the voltage will be higher, and if it is
warmer than 25C, the voltage will be lower.
Ensure the RF cabinet 400 Amp main DC breaker is OFF.
Close the three (3) Main DC breakers on the Power Cabinet ONLY. Close by holding in the reset
button on the front of the PDA, and engaging one breaker at a time.
Measure the voltage between the + and – terminals at the rear of the Power Cabinet and the RF
Cabinet, observing that the polarity is correct. The voltage should be the same as the measurement in
step 2.
Place the probes across the black and red battery buss bars in each battery compartment. Place the
probe at the bottom of the buss bars where the cables are connected. The DC voltage should measure
the same as the previous step.
2-6
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
DC Power Pre-test (BTS Frame)
Before applying any power to the BTS cabinet, verify there are no shorts
in the RF or power DC distribution system (see Figure 2-5).
Table 2-6: DC Power Pre–test (BTS Frame)
Step
Action
Physically verify that all AC rectifiers supplying power to the RF cabinets are OFF or disabled (see
Figure 2-5). There should be no 27 Vdc on DC feed terminals.
On each RF cabinet:
Unseat all circuit boards/ modules in the distribution shelf, transceiver shelf, and Single Carrier
Linear Power Amplifier (SCLPA) shelves, but leave them in their associated slots.
Unseat all circuit boards (except CCD and CIO cards) in the C–CCP shelf and LPA shelves, but
leave them in their associated slots.
Set C–CCP shelf breakers to the OFF position by pulling out power distribution breakers (labeled
C–CCP 1, 2, 3 – located on the power distribution panel).
Set LPA breakers to the OFF position by pulling out power distribution breakers (8 breakers,
labeled 1A–1B through 4C–4D – located on the power distribution panel).
Verify that the resistance from the power (+) feed terminals with respect to the ground terminal on the
cabinet measures > 500 Ω (see Figure 2-5).
If reading is < 500 Ω, a short may exist somewhere in the DC distribution path supplied by the
breaker. Isolate the problem before proceeding. A reading > 3 MΩ could indicate an open (or
missing) bleeder resistor (installed across the filter capacitors behind the breaker panel).
Set the 400 Amp Main Breaker and the C–CCP breakers (C–CCP 1, 2, 3) to the ON position by
pushing them IN one at a time. Repeat step 3 after turning on each breaker.
* IMPORTANT
If, after inserting any board/module, the ohmmeter stays at 0 Ω, a short probably exists in that
board/module. Replace the suspect board/module and repeat the test. If test still fails, isolate the
problem before proceeding.
Insert and lock the DC/DC converter modules into their associated slots one at a time. Repeat step3
after inserting each module.
A typical response is that the ohmmeter will steadily climb in resistance as capacitors charge, finally
indicating approximately 500 Ω.
! CAUTION
Verify the correct power/converter modules by observing the locking/retracting tabs appear as follows:
–
(in +27 volt systems)
Insert and lock all remaining circuit boards and modules into their associated slots in the C–CCP shelf.
Repeat step 3 after inserting and locking each board or module.
A typical response is that the ohmmeter will steadily climb in resistance as capacitors charge,
stopping at approximately 500 Ω..
. . . continued on next page
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-7
Initial Power Up – continued
Table 2-6: DC Power Pre–test (BTS Frame)
Step
Action
Set the 8 LPA breakers ON by pushing them IN one at a time. Repeat step 3 after turning on each
breaker.
A typical response is that the ohmmeter will steadily climb in resistance as capacitors charge,
stopping at approximately 500 Ω..
Seat all LPA and associated LPA fan modules into their associated slots in the shelves one at a time.
Repeat step 3 after seating each LPA and associated LPA fan module.
A typical response is that the ohmmeter will steadily climb in resistance as capacitors charge,
stopping at approximately 500 Ω..
Seat the Heat Exchanger, ETIB, and Options breakers one at a time. Repeat step 3.
RF Cabinet Power Up
Table 2-7 covers the procedures for properly powering up the RF
Cabinet.
Table 2-7: RF Cabinet Power Up
Step
Action
Ensure the 400 Amp Main DC breaker and all other breakers in the RF Cabinet are OFF.
Proceed to the DC Power Pre–test (BTS Frame) sequence (see Table 2-6) (for initial power–up as
required).
Ensure the power cabinet is turned on (see Table 2-5). Verify that 27 volts is applied to the terminals
on the back of the RF cabinet.
Engage the main DC circuit breaker on the RF cabinet (see Figure 2-5).
On each RF cabinet:
Set C–CCP shelf breakers to the ON position by pushing them in one at a time (labeled
C–CCP 1, 2, 3 – located on the power distribution panel).
Set LPA breakers to the ON position by pushing them in one at a time (8 breakers, labeled 1A–1B
through 4C–4D – located on the power distribution panel).
Set the two heat exchanger breakers to the ON position by pushing them in one at a time.
Set the ETIB breaker to the ON position by pushing it in.
Set the OPTION breaker to the ON position by pushing it in.
. . . continued on next page
2-8
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
Table 2-7: RF Cabinet Power Up
Step
Action
Measure the voltage drop between the Power Cabinet meter test point and the 27 V buss bar inside the
RF Cabinet PDA while the RF Cabinet is transmitting.
NOTE
For a three (3) sector carrier system, the voltage drop should be less than 0.2 V.
For a twelve (12) sector carrier system, the voltage drop should be less than 0.3 V.
Using a DC current probe, measure the current in each of the six (6) DC cables that are connected
between the RF and Power Cabinet. The DC current measured should be approximately the same. If
there is a wide variation between one cable and the others (>20 A), check the tightness of the
connections (torque settings) at each end of the cable.
Figure 2-5: RF Cabinet Circuit Breaker Panel and 27V DC Terminal Locations
400
5 RU RACK
SPACE
MAIN BREAKER
1A
30
1B
1C
30
1D
2A
30
2B
2C
30
2D
3A
30
3B
3C
30
3D
4A
30
4B
4C
30
4D
PS1
50
PS2
50
PS3
50
LPA
BLOWERS
25
SC 4812ET BTS RF Cabinet
(Front View)
RF CABINET
(Rear View)
HEAT EXCHANGER
CAUTION
SHUT OFF BOTH BREAKERS
25 ONLY DURING HEAT EXCHANGER
MAINTENANCE OR REPAIR
PUSH BUTTON
TO RESET
LPA BLOWERS
ETIB
10
OPTION
15
27V Ret
FW00307
Apr 2001
27V
I/O Plate + and – DC Feed
Terminals (Back Panel of RF
Cabinet)
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-9
Initial Power Up – continued
Battery Charge Test
(Connected Batteries)
Table 2-8 lists the step–by–step instructions for testing the batteries.
Table 2-8: Battery Charge Test (Connected Batteries)
Step
Action
Close the battery compartment breakers for connected batteries ONLY. This process should be
completed quickly to avoid individual battery strings with excess charge current
NOTE
If the batteries are sufficiently discharged, the battery circuit breakers may not engage individually
due to the surge current. If this condition is observed, turn off the Meter Alarm Panel power switch,
and then engage all the connected battery circuit breakers, the Meter Alarm Panel power switch
should then be turned ON.
Using the DC current probe, measure the current in each of the battery string connections to the buss
bars in each battery cabinet. The charge current may initially be high but should quickly reduce in a
few minutes if the batteries have a typical new battery charge level.
The current in each string should be approximately equal (+ 5 A).
The bargraph meters on the rectifier modules can be used as a rough estimate of the total battery
charge current. Each rectifier module has eight (8) LEDs to represent the output current. Each
illuminated LED indicates that approximately 12.5% (1/8 or 8.75 A) of the rectifiers maximum (70 A)
current is flowing.
EXAMPLE:
Question: A system fitted with three (3) rectifier modules each have three bargraph LEDs
illuminated. What is the total output current into the batteries?
Answer: Each bargraph is approximately indicating 12.5% of 70 A, therefore, 3 X 8.75 equals
26.25 A. As there are three rectifiers, the total charge current is equal to (3 X 26.25 A) 78.75 A.
This charge current calculation only applies at this part of the start up procedure, when the RF Cabinet
is not powered on, and the power cabinet heat exchanger is turned off.
Allow a few minutes to ensure that the battery charge current stabilizes before taking any further
action. Recheck the battery current in each string. If the batteries had a reasonable charge, the current
in each string should reduce to less than 5 A.
Recheck the DC output voltage. It should remain the same as measured in step 4 of the Power Up
Test.
NOTE
If discharged batteries are installed, all bargraphs may be illuminated on the rectifiers during the
charge test. This indicates that the rectifiers are at full capacity and are rapidly charging the batteries.
It is recommended in this case that the batteries are allowed to charge and stabilize as in the above
step before commissioning the site. This could take several hours.
Battery Discharge Test
Perform the test procedure in Table 2-9 only when the battery current is
less than 5 A per string. Refer to Table 2-8 on the procedures for
checking current levels.
2-10
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
Table 2-9: Battery Discharge Test
Step
Action
Turn the battery test switch on the Meter Alarm Panel, ON (see Figure 2-3). The rectifier output
voltage and current should decrease by approximately 10% as the batteries assume the load. Alarms
for the Meter Alarm Panel may occur.
Measure the individual battery string current using the DC current probe. The battery discharge
current in each string should be approximately the same (within + 5 A).
Turn Battery Test Switch OFF.
CAUTION
Failure to turn OFF the Battery Test Switch before leaving
the site, will result in low battery capacity and reduce
battery life.
Heat Exchanger Power Up
Table 2-10: Heat Exchanger Power Up
Step
Action
Turn the Power Cabinet Heat Exchanger breakers ON (seeFigure 2-6 for breaker location).
The Heat Exchanger will now go into a 5 minute test sequence. Ensure that the internal and external
fans are operating. Place a hand on the internal and external Heat Exchanger grills to feel for air draft.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-11
Initial Power Up – continued
Figure 2-6: Heat Exchanger Blower Assembly
Heat Exchanger
Assembly
Bottom (Ambient) Blower
Mounting
Bracket
Fan Module
Top (Internal) Blower
Blower
Power
Cord
Core
Mounting
Bracket
Fan Module
T–30 Screw
Blower
Power
Cord
T–30 Screw
POWER CABINET
Front View
OUT=OFF
IN=ON
Blower Assembly
Circuit Breaker
Side View
2-12
FW00181
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
Figure 2-7: Power Cabinet Circuit Breaker Assemblies
DC Circuit
Breaker
25
160
160
160
25
ON
OFF
BREAKER SYSTEM BREAKER
SHOULD BE RESET
IF ILLUMINATED OR
AFTER RESET OF
BREAKER SYSTEM
3 MAIN BREAKERS
BREAKER
SYSTEM RESET
BUTTON
TO RESET MAIN BREAKERS, PRESS
AND HOLD IN GREEN BUTTON WHILE
PRESSING 160 AMP BREAKER BUTTON
UNTIL LATCHED RELEASE GREEN BUTTON
AFTER ALL 3 BREAKERS HAVE BEEN RESET
POWER CABINET
Front View
ATTENTION
RECTIFIER
SHELF #1
Circuit Breaker Legend:
1.
2.
3.
4.
5.
6.
7.
Main . . . . . . . . . . . . . . .
Rectifier Shelf #1 . . . .
Rectifier Shelf #2 . . . .
Battery Heater #1 . . . .
Battery Heater #2 . . . .
GFCI . . . . . . . . . . . . . . .
Spare . . . . . . . . . . . . . .
RECTIFIER
SHELF #2
150 Amp
70 Amp
70 Amp
15 Amp
15 Amp
15 Amp
15 Amp
BATTERY
HEATER #1
BATTERY
HEATER #2
MAIN
CAUTION
LIVE TERMINALS
GFCI
SPARE
LED Status
AC Circuit
Breaker
FW00144
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
2-13
Initial Power Up – continued
Figure 2-8: Power Cabinet AC Circuit Breakers
7/16 NUT
AC Circuit Breaker
150 Amp Breaker
POWER CABINET
Front View
5/16 NUT
SCREW
WIRE
LEFT TAB
15 Amp Breaker
RIGHT TAB
SCREW
5/16 NUT
WIRE
WIRE
LEFT TABS
30 Thru 140 Amp Breaker
RIGHT
TABS
FW00145
2-14
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Initial Power Up – continued
Figure 2-9: Power Cabinet DC Circuit Breakers
DC Circuit Breaker
9/32 Nut
15 AMP
POWER CABINET
Front View
3x150 AMP
DC Power
Panel Door
Locks
Flat Washer
Lock Washer
FW00146
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
17 mm Nut
2-15
Initial Power Up – continued
Notes
2-16
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Optimization/Calibration – Introduction
Introduction
This chapter provides procedures for downloading system operating
software, set up of the supported test equipment, CSM reference
verification/optimization, and transmit/receive path verification.
IMPORTANT
Before using the LMF, use an editor to view the
”CAVEATS” section in the ”readme.txt” file in the c:\wlmf
folder for any applicable information.
Optimization Process
After a BTS is physically installed and the preliminary operations
(power up) have been completed, the CDMA LMF is used to calibrate
and optimize the BTS. The basic optimization process can be
accomplished as follows:
Download MGLI2–1 with code and data and then enable MGLI2–1.
Use the status function and verify that all of the installed devices of
the following types respond with status information: CSM2, BBX2,
GLI2, and MCC (and TSU if RFDS is installed). If a device is
installed and powered up but is not responding and is colored gray in
the BTS display, the device is not listed in the CDF file. The CDF file
will have to be corrected before the device can be accessed by CDMA
LMF.
Download code and data to all devices of the following types:
– CSM2
– BBX
– GLI2 (other than MGLI2–1)
– MCC
Download the RFDS TSIC (if installed).
Verify the operation of the GPS and HSO signals.
Enable the following devices (in the order listed):
– Secondary CSM (slot 2)
– Primary CSM (slot 1)
– All MCCs
Connect the required test equipment for a full optimization.
Select the test equipment.
Calibrate the TX and RX test cables if they have not previously been
calibrated using the CDMA LMF that is going to be used for the
optimization/calibration. The cable calibration values can also be
entered manually.
. . . continued on next page
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-1
Optimization/Calibration – Introduction – continued
Select all of the BBXs and all of the MCCs and use the full
optimization function. The full optimization function performs TX
calibration, BLO download, TX audit, all TX tests, and all RX tests
for all selected devices.
If the TX calibration fails, repeat the full optimization for any failed
paths.
If the TX calibration fails again, correct the problem that caused the
failure and repeat the full optimization for the failed path.
If the TX calibration and audit portion of the full optimization passes
for a path but some of the TX or RX tests fail, correct the problem that
caused the failure and run the individual tests as required until all TX
and RX tests have passed for all paths.
Cell–site Types
Sites are configured as Omni/Omni or Sector/Sector (TX/RX). Each type
has unique characteristics and must be optimized accordingly.
Cell–site Data File
The CDF includes the following information:
Download instructions and protocol
Site specific equipage information
C–CCP shelf allocation plan
– BBX2 equipage (based on cell–site type) including redundancy
– CSM equipage including redundancy
– MCC (MCC24E, MCC8E or MCC–1X) channel element allocation
plan. This plan indicates how the C–CCP shelf is configured, and
how the paging, synchronization, traffic, and access channel
elements (and associated gain values) are assigned among the (up to
12) MCCs in the shelf.
CSM equipage including redundancy
Effective Rated Power (ERP) table for all TX channels to antennas
respectively. Motorola System Engineering specifies the ERP of a
transmit antenna based on site geography, antenna placement, and
government regulations. Working from this ERP requirement, the
antenna gain, (dependent on the units of measurement specified) and
antenna feed line loss can be combined to determine the required
power at the top of the BTS frame. The corresponding BBX2 output
level required to achieve that power level on any channel/sector can
also be determined.
NOTE
Refer to the CDMA LMF Operator’s Guide, 68P64114A78,
for additional information on the layout of the LMF
directory structure (including CDF file locations and
formats).
3-2
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Optimization/Calibration – Introduction – continued
BTS System Software
Download
BTS system software must be successfully downloaded to the BTS
processor boards before optimization can be performed. BTS operating
code is loaded from the LMF computer terminal.
IMPORTANT
Before using the LMF for optimization/ATP, the correct
bts–#.cdf and cbsc–#.cdf files for the BTS must be
obtained from the CBSC and put in a bts–# folder in the
LMF. Failure to use the correct CDF files can cause wrong
results. Failure to use the correct CDF files to log into a
live (traffic carrying) site can shut down the site.
The CDF is normally obtained from the CBSC on a DOS formatted
diskette, or through a file transfer protocol (ftp) if the LMF computer has
ftp capability. Refer to the CDMA LMF Operator’s Guide,
68P64114A78, or the LMF Help screen, for more information.
Site Equipage Verification
If you have not already done so, use an editor to view the CDF, and
review the site documentation. Verify the site engineering equipage data
in the CDF to the actual site hardware.
CAUTION
Always wear a conductive, high impedance wrist strap
while handling any circuit card/module to prevent damage
by ESD. Extreme care should be taken during the removal
and installation of any card/module. After removal, the
card/module should be placed on a conductive surface or
back into the anti–static bag in which it was shipped.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-3
Isolate Span Lines/Connect LMF
Isolate BTS from T1/E1 Spans
IMPORTANT
– At active sites, the OMC/CBSC must disable the
BTS and place it out of service (OOS). DO NOT
remove the span surge protectors until the
OMC/CBSC has disabled the BTS.
Each frame is equipped with one 50–pair punch block for spans,
customer alarms, remote GPS, and power cabinet alarms. See Figure 3-2
and refer to Table 3-1 for the physical location and pin call–out
information. To disable the span, pull the surge protectors for the
respective span.
Before connecting the LMF to the frame LAN, the OMC/CBSC must
disable the BTS and place it OOS to allow the LMF to control the
CDMA BTS. This prevents the CBSC from inadvertently sending
control information to the CDMA BTS during LMF based tests.
Configure Channel Service
Unit
The M–PATH 537 Channel Service Unit (CSU) provides in–band
SNMP–managed digital service access to T1 and fractional T1 lines.
M–PATH units plug into the ADC Kentrox 2–slot frame (see
Figure 3-1).
Remote M–PATH management is available via SNMP over an in–band
data link on the T1 line (using a facility data link or 8–64 Kbps of a DS0
channel). The unit at the near end of the management path can be an
SNMP manager or another M–PATH CSU.
Each 19 inch rack can support two CSU M–PATH 537 modules. Each
M–PATH 537 module supports one and only one span connection.
Programming of the M–PATH is accomplished through the DCE 9–pin
connector on the front panel of the CSU shelf. Manuals and a Microsoft
Windows programming disk is supplied with each unit.
3-4
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Isolate Span Lines/Connect LMF – continued
Setting the Control Port
Whichever control port is chosen, it must first be set up so the control
port switches match the communication parameters being used by the
control device. If using the rear–panel DTE control port, set the
shelf–address switch SA5 to “up” (leave the switch down for the
rear–panel DCE control port).
For more information, refer to the Kentrox Installation Guide, manual
number 65–77538001 which is provided with each CSU.
Plug one of the cables listed below into the Control Port connectors:
Part Number
Description of Cable
01–95006–022 (six feet)
DB–9S to DB–9P
01–95010–022 (ten feet)
The control port cables can be used to connect the shelf to:
A PC using the AT 9–pin interface
A modem using the 9–pin connector
Other shelves in a daisy chain
Figure 3-1: Back and Front View of the CSU
To/From
Network
To/From
Network
To/From
GLI
DTE
To/From
GLI
DATA PORT
DCE
SLOT 2
T1
DDS
DATA PORT
SLOT 1
T1 TERMINAL
T1
NETWORK
DDS
T1 TERMINAL
NETWORK
CONTROL
PORT
GROUP
ADDRESS
SHELF
ADDRESS
Back View
SLOT 1
DCE Connector
(Craft Port)
Apr 2001
SLOT 2
Front View
REF. FW00212
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-5
Isolate Span Lines/Connect LMF – continued
Alarm and Span Line Cable
Pin/Signal Information
See Figure 3-2 and refer to Table 3-1 for the physical location and pin
call–out information for the 50–pin punch block.
Figure 3-2: 50 Pair Punch Block
TO MODEM
CONNECTOR TO ALARMS
CONNECTOR
STRAIN RELIEVE INCOMING
CABLE TO BRACKET WITH
TIE WRAPS
TO LAN
CONNECTOR
RF Cabinet I/O Area
TO RGD/RGPS
CONNECTOR
LEGEND
1T = PAIR 1 – TIP
1R = PAIR 1 –RING
”
”
”
”
”
”
2R
2T
1R
1T
49T
1T 1R 2T 2R
49R
50T
50R
FW00162
TOP VIEW OF PUNCH BLOCK
3-6
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Isolate Span Lines/Connect LMF – continued
Table 3-1: Pin–Out for 50 Pin Punch Block
Site Component
POWER CABINET
LFR / HSO
PILOT BEACON
CUSTOMER
OUTPUTS / INPUTS
Signal Name
Power Cab Control – NC
Power Cab Control – NO
Power Cab Control – Com
Reserved
Rectifier Fail
AC Fail
Power Cab Exchanger Fail
Power Cab Door Alarm
Power Cab Major Alarm
Battery Over Temp
Power Cab Minor Alarm
Reticifier Over Temp
Power Cab Alarm Rtn
LFR_HSO_GND
EXT_1PPS_POS
EXT_1PPS_NEG
CAL_+
CAB_–
LORAN_+
LORAN_–
Pilot Beacon Alarm – Minor
Pilot Beacon Alarm – Rtn
Pilot Beacon Alarm – Major
Pilot Beacon Control – NO
Pilot Beacon Control–COM
Pilot Beacon Control – NC
Customer Outputs 1 – NO
Customer Outputs 1 – COM
Customer Outputs 1 – NC
Customer Outputs 2 – NO
Customer Outputs 2 – COM
Customer Outputs 2 – NC
Customer Outputs 3 – NO
Customer Outputs 3 – COM
Customer Outputs 3 – NC
Customer Outputs 4 – NO
Customer Outputs 4–COM
Customer Outputs 4 – NC
Customer Inputs 1
Cust_Rtn_A_1
Customer Inputs 2
Cust_Rtn_A_2
Customer Inputs 3
Cust_Rtn_A_3
Customer Inputs 4
Cust_Rtn_A_4
Customer Inputs 5
Cust_Rtn_A_5
Customer Inputs 6
Cust_Rtn_A_6
Customer Inputs 7
Cust_Rtn_A_7
Customer Inputs 8
Cust_Rtn_A_8
Customer Inputs 9
Cust_Rtn_A_9
Customer Inputs 10
Cust_Rtn_A_10
Pin
1T
1R
2T
2R
3T
3R
4T
4R
5T
5R
6T
6R
7T
7R
8T
8R
9T
9R
10T
10R
11T
11R
12T
12R
13T
13R
14T
14R
15T
15R
16T
16R
17T
17R
18T
18R
19T
19R
20T
20R
21T
21R
22T
22R
23T
23R
24T
24R
25T
25R
26T
26R
27T
27R
28T
28R
29T
29R
Color
Blue
Blk/Blue
Yellow
N/C
Blk/Yellow
Green
Blk/Grn
White
Blk/Whit
Red
Blk/Red
Brown
Blk/Brn
. . . continued on next page
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-7
Isolate Span Lines/Connect LMF – continued
Table 3-1: Pin–Out for 50 Pin Punch Block
Site Component
SPAN
RGPS
Phone Line
Miscellaneous
3-8
Signal Name
RVC_TIP_A
RVC_RING_A
XMIT_TIP_A
XMIT_RING_A
RVC_TIP_B
RVC_RING_B
XMIT_TIP_B
XMIT_RING_B
RVC_TIP_C
RVC_RING_C
XMIT_TIP_C
XMIT_RING_C
RVC_TIP_D
RVC_RING_D
XMIT_TIP_D
XMIT_RING_D
RVC_TIP_E
RVC_RING_E
XMIT_TIP_E
XMIT_RING_E
RVC_TIP_F
RVC_RING_F
XMIT_TIP_F
XMIT_RING_F
GPS_POWER_1+
GPS_POWER_1–
GPS_POWER_2+
GPS_POWER_2–
GPS_RX+
GPS_RX–
GPS_TX+
GPS_TX–
Signal Ground (TDR+)
Master Frame (TDR–)
GPS_lpps+
GPS_lpps–
Telco_Modem_T
Telco_Modem_R
Chasis Ground
Reserved
Reserved
Reserved
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Pin
30T
30R
31T
31R
32T
32R
33T
33R
34T
34R
35T
35R
36T
36R
37T
37R
38T
38R
39T
39R
40T
40R
41T
41R
42T
42R
43T
43R
44T
44R
45T
45R
46T
46R
47T
47R
48T
48R
49T
49R
50T
50R
Color
Blue
Bk/Blue
Yellow
Bk/Yellow
White
White
Green
Green
Red
Bk/Red
Brown
Bk/Brn
Apr 2001
Isolate Span Lines/Connect LMF – continued
T1/E1 Span Isolation
Table 3-2 describes the action required for span isolation.
Table 3-2: T1/E1 Span Isolation
Step
Action
The OMC/CBSC must disable the BTS and place it OOS.
The Span Lines can be disabled by removing the surge protectors on the 50–pin punch block. Using
Table 3-1 locate the span or spans which need to be disabled and remove the respective surge
protector.
NOTE
If a third party is used for span connectivity, the third party must be informed before disabling the span
line.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-9
Preparing the LMF
Software and files for installation and updating of the LMF are provided
on CD ROM disks. The following installation items must be available:
LMF Program on CD ROM
LMF Binaries on CD ROM
CDF for each supported BTS (on diskette or available from the
CBSC)
CBSC File for each supported BTS (on diskette or available from the
CBSC)
The following section provides information and instructions for
installing and updating the LMF software and files.
LMF Operating System Installation
Follow the procedure in Table 3-3 to install the LMF operating system.
Table 3-3: LMF Operating System Installation
Step
Action
Insert the LMF Program CD ROM into the LMF CD ROM drive.
– If the Setup screen is displayed, go to step 5.
– If the Setup screen is not displayed, proceed to step 2.
Click on the Start button.
Select Run.
In the Open box, enter d:\autorun and click on the OK button.
NOTE
If applicable, replace the letter d with the correct CD ROM drive letter.
. . . continued on next page
3-10
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Preparing the LMF – continued
Table 3-3: LMF Operating System Installation
Step
Action
Follow the instructions displayed on the Setup screen.
* IMPORTANT
First Time Installations:
– Install U/WIN (First)
– Install Java Runtime Environment (Second)
– Install LMF Software (Third)
– Install BTS Binaries (Fourth)
– Install/Create BTS Folders (Fifth)
Any time you install U/WIN, you must install the LMF software because the installation of the LMF
modifies some of the files that are installed during the U/Win installation. Installing U/Win
over–writes these modifications.
NOTE
There are multiple binary image packages for installation on the CD–ROM. When prompted, choose
the load that corresponds to the switch release that you currently have installed. Perform the Device
Images install after the WinLMF installation.
If applicable, a separate CD ROM of BTS Binaries may be available for binary updates.
CDMA LMF Home Directory
The CDMA LMF installation program creates the default home directory
c:\wlmf, and installs the application files and subdirectories (folders)
in it. Because this can be changed at installation, the CDMA LMF home
directory will be referred to with the generic convention of:
:\
Where:
= the LMF computer drive letter where the CDMA LMF home
directory is located.
= the directory path or name where the CDMA
LMF is installed
NOTE
The CDMA LMF installation program creates the default
home directory c:\wlmf when the CDMA LMF is
installed.
Apr 2001
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
3-11
Preparing the LMF
– continued
Copy CBSC CDF Files to the
LMF Computer
Before logging on to a BTS with the LMF to execute optimization/ATP
procedures, the correct bts-#.cdf and cbsc–#.cdf files must be obtained
from the CBSC and put in a bts-# folder in the LMF computer. This
requires creating versions of the CBSC CDF files on a DOS–formatted
floppy diskette and using the diskette to install the CDF files on the
LMF computer.
IMPORTANT
When copying CDF files, comply with the following to
prevent BTS login problems with the LMF.
– The numbers used in the bts–#.cdf and cbsc–#.cdf
filenames must correspond to the locally assigned numbers
for each BTS and its controlling CBSC.
– The generic cbsc–1.cdf file supplied with the LMF will
work with locally numbered BTS CDF files. Using this file
will not provide a valid optimization unless the generic file
is edited to replace default parameters (e.g., channel
numbers) with the operational parameters used locally.
The procedure in Table 3-4 lists the steps required to transfer the CDF
files from the CBSC to the LMF computer. For any further information,
refer to the CDMA LMF Operator’s Guide (Motorola part number
68P64114A21) or the LMF Help screen..
Table 3-4: Copying CBSC CDF Files to the LMF
Step
Action
Login to the CBSC workstation.
Insert a DOS–formatted floppy diskette in the workstation drive.
Type eject –q and press .
Type mount and press .
NOTE
Look for the “floppy/no_name” message on the last line displayed.
If the eject command was previously entered, floppy/no_name will be appended with a number. Use
the explicit floppy/no_name reference displayed when performing step 7.
Change to the directory, where the files to be copied reside, by typing cd
(e.g., cd bts–248) and pressing .
Type ls and press the Enter key to display the list of files in the directory.
. . . continued on next page
3-12
SC4812ET BTS Optimization/ATP — CDMA LMF
DRAFT
Apr 2001
Preparing the LMF – continued
Table 3-4: Copying CBSC CDF Files to the LMF
Step
Action
With Solaris versions of Unix, create DOS–formatted versions of the bts–#.cdf and cbsc–#.cdf files
on the diskette by entering the following command:
unix2dos
Source Exif Data:
File Type : PDF
File Type Extension : pdf
MIME Type : application/pdf
PDF Version : 1.3
Linearized : No
Modify Date : 2001:09:06 13:59:25-04:00
Create Date : 2001:09:06 13:53:22-04:00
Producer : Acrobat Distiller 4.05 for Windows
Page Count : 84