Shinko Electric Co 199909010001 Communication Modem Controller User Manual System Operation Manual
Shinko Electric Co Ltd Communication Modem Controller System Operation Manual
Contents
System Operation Manual
FCC ID : OPO199909010001 CONFIDENTIAL “SELOHT SOHT-300” SYSTEM OPERATION MANUAL of SHINKO OHT SYSTEM KEN72-3696 FCC ID : OPO199909010001 Table of contents SAFETY PRECAUTIONS ............................................................................................................................................... 3 1.GENERAL...................................................................................................................................................................... 7 1.1 APPLICATION ............................................................................................................................................................ 7 1.2 RELATED SEMI DOCUMENT ..................................................................................................................................... 7 1.3 RELATED RULES, LAWS ............................................................................................................................................ 7 1.4 ABBREVIATIONS........................................................................................................................................................ 7 2. OUTLINE OF OHT SYSTEM..................................................................................................................................... 8 2.1 CONSTRUCTION OF OHT SYSTEM ............................................................................................................................. 9 2.2 NON-CONTACT POWER SUPPLY ............................................................................................................................... 11 2.3 FCC RULES ............................................................................................................................................................. 12 3 SPECIFICATION ........................................................................................................................................................ 14 3.1 GENERAL CONDITION ...................................................................................................................................... 14 3.2 SYSTEM COMPONENT AND CONSTRUCTION ............................................................................................................. 18 4. TRANSPORTATION CONTROL ............................................................................................................................ 23 5. ERROR HANDLING ................................................................................................................................................. 24 5.1 GENERAL ................................................................................................................................................................ 24 5.2 ERROR HANDLING ................................................................................................................................................... 25 5.3 RECOVERY PROCEDURE IN CASE OF HEAVY ERROR OF A VEHICLE .......................................................................... 28 6. RELATED DOCUMENTS......................................................................................................................................... 29 KEN72-3696 FCC ID : OPO199909010001 Safety precautions (1) General Prior to using this product, make sure the “Safety Precautions”, Maintenance Instruction Manual and other attached documents shall be well read and understood for appropriate application. Engage specialists in electrical works. Don’t improve the product by yourselves. Be sufficiently proficient with the equipment, the relevant safety knowledge and the precautions prior to using this product. In the content of this “Safety Precautions”, items which need to be cautions of out shall be classified into “Danger” and “Warning”. (2) Definitions of Danger and Warning [Note 1] and Medium degree of injuries or light injuries refers to injuries, e.g., burns electric shock, which do not require hospitalization of or prolonged hospital visit by the victims. As material losses refers to expanded losses pertaining to the damage of property and equipment. Note that, depending on the situation, the events described under “Warning” may also result in severe outcome. In either case, make sure that the advice is followed. After reading, make sure this information shall be kept at places where it can always be read by users. KEN72-3696 FCC ID : OPO199909010001 (3) Precautions on use Danger Follow the following advice strictly to avoid electric shock or burns. 1. Don’t enter the operation area of the vehicle. Work on the ladder may collide to the vehicle and may cause injury. 2. Don’t touch the vehicle on the track when Power Supply Panel output the power. 3. Don’t touch the moving parts of the vehicle while it is in operation. Doing so may cause injuries. 4. Don’t touch and Teaching and maintenance shall be done by a qualified person. 5. Make sure the earth terminals for the relate equipment shall be grounded. Not doing so may cause electric shock. 6. Don’t break the cable, impose excessive stress, place heavy weights, or pinch it between items. Doing so may cause electric shock. Warning Don’t use the equipment at locations where water, corrosive atmosphere, or flammable gas is present, or beside flammable items. Doing so may cause life and fails. KEN72-3696 FCC ID : OPO199909010001 (4) Storage Prohibition 1. Don’t store the equipment at locations where it is subject to rain, water hazardous gas or liquid. Mandatory Implementation 1. Store the equipment at locations in not subjected to sun shine. Store it at predetermined relative humidity and temperature. 0 50 ,90% RH and below, no dew. (5) Transportation Warning 1. Don’t carry in a manner except for designated. Doing so may cause materiales loss or injuries. Mandatory Implementation 1. The equipment may be broken when overloaded. Follow the advice of the display on the load. (6) Installation Warning 1. Don’t climb on top of the equipment or place heavy items on it. Doing so may cause injuries. 2. Don’t block the air inlet and outlet ports or allow foreign particles to enter them. Doing so may cause fire. 3. Follow the installation direction strictly as it is so design for dissipation of heat. fails or fire. 5. Don’t hit the equipment with strong impact. Doing so may cause equipment fails. (7) Operations KEN72-3696 FCC ID : OPO199909010001 Mandatory Implementation Install an external emergency circuit so that operations can be immediately stopped and power cut off when required (8) Maintenance and lnspection Prohibition Don’t engage non-specialist technicians to disassemble and repair the equipment. Danger 1. Maintenance of the vehicle shall be done on the ground. 2. Switch off the power and wait for 3 minutes or longer before carrying out wiring work or inspection. Not doing so may cause electric shock. (The printed circuit board in the driver applies 300V of high voltage parts) KEN72-3696 FCC ID : OPO199909010001 1.General 1.1 Application This document describes the operation of OHT Vehicle for “SELOHT SOHT-300”, Shinko OHT(Overhead Hoist Transport) System. 1.2 Related SEMI document Following documents are parts of the specification: (1) SEMI E10-0299 (1999) (RAM) (2) SEMI E15.1-0299 (1999) (LOAD PORT) (3) SEMI E30-0998 (1998) (GEM) (4) SEMI Draft 2998 (Future E82-0999 (1999), IBSEM) (5) SEMI E37.1-96 (1996) (HSMS-SS) (6) SEMI E47.1-0299 (1999) (FOUP) (7) SEMI E84-0699 (1999) (Extended P I/O) 1.3 Related Rules, Laws (1) FCC Part15 Subpart C (2) FCC Part 18 1.4 Abbreviations (1) OHT : Overhead Hoist Transport (2) OHV : Overhead Hoist transport Vehicle (3) OHVC : Overhead Hoist Vehicle Controller (4) CMC : Communication Modem Controller KEN72-3696 FCC ID : OPO199909010001 2. Outline of OHT System Fig. 2.1 System Construction KEN72-3696 FCC ID : OPO199909010001 2.1 Construction of OHT system Fig.2.1 shows a typical construction oh Shinko OHT system. As shown in the Fig. , Shinko OHT system is composed from the equipment listed below. OHT Vehicle OHT Track Power Supply Panel Maintenance Shifter/lifter, OHVC Process tool (Stocker) FOUP, etc. (1)OHT Vehicle Main device of the system is an OHT Vehicle, which is hung from the OHT track and travels through the track. OHV has a hoisting mechanism and a FOUP is hoisted down/up to the port of the process tool. (2)OHT Track OHT track is supported from the building ceiling, and OHV is hung from the track. OHV travels by the linear motor power and the electricity is supplied from the track side by non-contact power supply system. (3)Power Supply Panel Power Supply Panel is composed from three portion. (a) Power distribution Panel portion Power source of the facility in the voltage of 208V is connected to the distribution Panel of the Power Supply Panel. And from hear, electric power is distributed to the OHT system components (i.e. Power supply portion of this panel, Maintenance shifter/lifter, OHVC. OHVC is operated in A.C.120 V, so voltage is transformed from 208V to 120 V in this panel. (b) Power Supply portion: Power supply panel generate 8.66kHz Alternative Current for the Non-contact power supply stem (c) CMC(Communication Modem Controller) portion Communication between OHT Vehicle and the ground side controller (OHVC) is realized by power line communication. About 300kHz - 350kHz signals are superposed on the power line of non-contact power supply power line. (4) Maintenance Shifter/Lifter KEN72-3696 FCC ID : OPO199909010001 To move in/out the OHT Vehicle to the OHT track, Maintenance Shifter/Lifter is used. (5) OHVC(Overhead Hoist Vehicle Controller) OHVC is a ground side controller which control the OHT Vehicle, (6)Process tool (Stocker) The port of the process tool is normally called load port. The specification of the load port is defined by SEMI standard. Stocker is a special case of process tool. (7)FOUP Silicon wafers in diameter of 300mm are transferred from the process tool to process tool kept in a specific carrier called FOUP (Front Opening Unified Pod) in the clean room. This specification is defined by SEMI standard. (8) Load Port The port is normally called load port. The specification of the load port is defined by SEMI standard. KEN72-3696 10 FCC ID : OPO199909010001 2.2 Non-contact power supply The principle of non-contact power supply is an electro-magnetic coupling, and it can be understood as an special style of a transformer, by which electric power is supplied to the OHV. There is a power cable on the track and alternate current is constantly supplied from the power supply panel on the ground (Normally it is 400V A.C and 5kW output). Shinko uses 8.66 kHz of the alternate current for the main power supply. About 300kHz and 350kHz signals are superposed on the 8.66 kHz main component for realizing the communication between OHV and ground controller. Fig. 2.2. is a Cross sectional image of Non-contact power supply. Fig. 2.2 Cross sectional image KEN72-3696 11 FCC ID : OPO199909010001 2.3 FCC Rules Structure of Shinko OHT System & FCC Rules For OHT system, there are two FCC rules to be applied. One is part15 subpart C, Intentional radiator portion is applied. The other is Part 18, Power supply and related components are applied. See fig. 2.3 Fig.2.3 FCC rules and OHT construction KEN72-3696 12 FCC ID : OPO199909010001 KEN72-3696 13 FCC ID : OPO199909010001 3 Specification 3.1 GENERAL CONDITION 3.1.1 Transport carrier (1) Name : 300mm wafer FOUP (2) Type : (3) Manufacturer : (4) Material : Compliant with SEMI E47.1-0299 (1999) (5) Color : Compliant with SEMI E47.1-0299 (1999) (6) Weight : 8.7 kgf (Max., including 25 wafers) (7) Dimension : 430mm (W) x 356 mm (L) x 338 mm (H) (8) Outline shape : Compliant with SEMI E47.1-0299 (1999) 3.1.2 Transport unit (1) 1 FOUP / 1 vehicle 3.1.3 Transport capacity Based on the simulation. 3.1.4 Environment condition (1) Cleanliness : Class 100 (0.2 um) (2) Temperature : 23 Degrees Celsius (3) Humidity (4) Corrosive gas : Nil (5) Floor surface : Punching plate (6) Ceiling Material : ULPA filter (7) Ceiling height : 12 feet (8) Required strength of the ceiling height Refer to YDM-12075 for Customer specific condition. 3.1.5 Utility Utility requirement is as below. (1) Electricity AC 208 V, 3 phases, 4 wire 60Hz for Power supply panel ( AC120V 1 phase 60Hz for OHVC (UPS) is generated from AC 208 V supplied by Customer internally) The fluctuation of the voltage must be within +/- 10 %, that of frequency must be within +/- 1 Hz. Electric Power Distribution idea is shown on Fig. 3.1.1 KEN72-3696 14 FCC ID : OPO199909010001 (Electric distribution) Fig. 3.1.1 Electric Power Distribution KEN72-3696 15 FCC ID : OPO199909010001 3.1.6 Total system configuration Fig. 3.1.2 System Configuration (1) Fig. 3.1.3 System Configuration (2) KEN72-3696 16 FCC ID : OPO199909010001 Total system configuration is shown on Fig. 3.1.2 and Fig. 3.1.3. Shinko OHT system does act for Intrabay transportation under the MCS, whether the MCS is Shinko made or supplied by other vendors. Because OHVC (System controller of Shinko OHT) is fully compliant with IBSEM (SEMI E82-0999) scenario, open vendor system can be realized easily. 3.1.7 Transport rule Customer’s HOST system shall send the transport requests to OHVC based on IBSEM procedure (SEMI E82-0999). Refer to Chap. 7 for transport flow. KEN72-3696 17 FCC ID : OPO199909010001 3.2 System Component and construction 3.2.1 System configuration Table 3.2.1 shows the general condition of the system configuration limitation. ITEM SPECIFICATION Configuration OHVC : 1 unit/ system (=bay) OHV (Vehicle) : 60 units / system (Max.) REMARKS It is a logical restriction. Power supply panel shall be designed and supplied separately if more than six vehicles are introduced. Cover area OHV : within the close loop rail By introducing multiple Power Track length : 100 m – (Length of Feeder Supply Panel, the track length Cable between Power Supply Panel to can be multiplied . (In standard Track connection point) / one Power design maximum four Power Supply Panel Supply Panel can be introduced). Communicati HOST-OHVC : ETHERNET on (SEMI E37.1 HSMS-SS) OHVC – OHV : Power line communication (EIA RS232C) Tool - OHV : Photo I/O (SEMI E84) Power Supply One panel covers the following Distance Between Power Supply Panel components Panel to Rail can be extended if (Normal, Rail length : 100 m – (Length of Feeder the total length of Rail and this is 5kW) Cable between Power Supply Panel to less than 100m. Track connection point) Power supply panel to Rail :100 m OHV (Vehicle) : 6 units Power Supply (It is internally considered. But not Panel included in this specification. Followings are the preliminary description) One panel covers the following components Rail length : 100 m – (Length of Feeder Cable between Power Supply Panel to Track connection point) Power supply panel to Rail :100 m OHV (Vehicle) : 18 units Table 3.2.1 System configuration KEN72-3696 18 FCC ID : OPO199909010001 3.2.2 Component outline and quantity restriction No Name 1 Track Rail Description A track rail has no electric instrument for controlling the vehicle running. Maintenance station (including lifting mechanism) is included in the rail. Power 1 Input : Three phase AC 200V ( standard ) or AC400V(Optional) supply Output : 8.66 kHz (A.C 300 V to 400V, it depends on the panel demand), single phase 5 kW, Air cooling CMC Communication unit between OHVC and vehicles EIA RS485, 19.2 kBPS (TX/RX/CS procedure) OHVC 1 OHV controller IBM PC based Personal computer RAID 1 Harddisk Operating System : Microsoft Windows NT 4.0, US version 1 OHVC covers only 1 bay (= 1 close loop) Vehicle Max. 60 Vehicle with hoist mechanism Driven by LDM Main Controller : One board CPU IBM PC compatible Operating System : Microsoft MS-DOS Tool Max. 60 Load / Unload of a FOUP is done at the Load Port of tools.(Customer’s facility) Stocker Max. 10 Load / Unload of a FOUP is done at this stage. (Customer’s facility) Table 3.2.2 Component outline Q’ty 3.2.3 Control System Interface Name OHVC-MCS Media ETHERNET (10MBPS) 2 OHVC-EPLC RS232C RS485 (19200BPS) 3 OHVC-Vehicle RS232C (Via CMC) RS485 (19200BPS) Vehicle-Tool Photo I/O ( or stocker) 8 bit Table 3.2.3 System interface Protocol Remarks HSMS-SS Software scenario is based on IBSEM (SEMI E30.4) PLC supplier base Maximum distance : 200m / Original / Original SEMI E84 KEN72-3696 19 Shinko original Maximum distance : 200m Based on SEMI FCC ID : OPO199909010001 3.2.4 Basic technical specification ITEM SPECIFICATION Track structure One loop Driven method LDM (Linear Direct-currency Motor) Max. payload (kg-F) 10 Running speed, at straight (m/s) Max. 1.5 Running speed, at curve (m/s) 0.5 Running acceleration (m/s ) 1.0 Hoisting speed (m/s) 1.0 Hoisting acceleration (m/s ) Hoist stroke (m) REMARKS 1.0 Max. 2.4 Carrier position Horizontal X,Y(mm) +/- 1 repeatability Height (mm) +/- 1 Vehicle stop Lateral(mm) +/- 30 position Rotational (degree) +/- 10 compensation (horizontal space) Cleanliness Less than CLASS 100 (0.2um) Track radius (mm/r) 500 (at the center) Carrier vibration 0.5G Power supply to Vehicle Non contact , electro-magnetic coupling Communi Controller to vehicle Power line communication continuous, all area Vehicle to Load port P I/O (E23, E84) Track & Material Aluminum & Stainless Steel support Cross section of track 270 (W) x 130 (H) Vehicle Frame material -cation structure Steel(Surface finishing) Stainless steel & aluminum plate Anti flammable plastic Gripper Stainless steel & aluminum plate Weight (kg) 80 Outline dimension (mm) 490(W) x 675(L) x 892(H) Anti flammable plastic Power supply INPUT/OUTPUT panel INPUT : AC208 V (three phase) Optional large power unit OUTPUT: (AC300V to 400V) , 8.66kHz, 5kW can be offered. (Standard) (Normal one) Outline dimension & 500(W) x 500(D) x 1600(H) (Output voltage depends structure Air-cooling, Steel plate enclosure on Demand) Controller Hardware PC/AT compatible Window NT PC (OHVC) Software O/S : Window NT 4.0 HOST I/F : IBSEM compatible (based on SEMI E30.4-0699) Communication : HSMS (Ethernet) KEN72-3696 20 FCC ID : OPO199909010001 3.2.5 Transfer station The transfer stations shall be prepared by Customer and be compliant with SEMI E15.1-0998 (1998). The input/output ports of stockers shall also be based on SEMI E15.1-0998(1998) in shape and the height of them shall be mutually discussed. All the center of the Load ports (including stocker I/O ports) shall be correctly under the center of the OHT track within the predetermined accuracy ( +/- 30mm in lateral, +/- 10 degrees in the horizontal surface). If the Load port is precisely under the track, Shinko OHT vehicle can suddenly start the load/unload operation after the vehicle is stopped, but if the load port position is not precisely under the track, position compensation movement is necessary and the total performance might be lowered. All the docking port of Load ports shall be in the direction (i.e. outer side of the loop). P I/O device (based on SEMI E84) will be fixed on the track by Shinko at installation stage based on the document supplied by Customer I advance, and the connection of the cables between P I/O and the manufacturing tools shall be done by Customer. 3.2.6 Safety consideration Following considerations may be supplied by Shinko based on the mutually agreed discussion. 3.2.6.1 EMO ( Emergency Power OFF) EMO switch is installed on the front surface of Power Supply Panel. By pressing this button, power supply to all the vehicle in that system (generally in the bay) will be suddenly stopped and all the vehicles will be suddenly stopped (stopped within three seconds at worst). Same function EMO switches can be added to the system optionally. Shinko will supply the predetermined quantity of EMO switches and the installation (fixing in adequate position) in the bay shall be done by Customer. (Remarks) Fixing position of EMO switch shall be decided by Customer considering the FAB operation. According the SEMI S8 and other standards, the EMO position shall be between 81 cm to 165 cm in height if the operators are standing position in work. 3.2.6.2 P I/O interlock with manufacturing tool Shinko system is fully compliant with SEMI E84 in P I/O hand shaking. If ES (Emergency Stop) signal from Passive side (Manufacturing tool) is activated, hoisting movement of the corresponding vehicle will be suddenly stopped. 3.2.6.3 Estop on Vehicle Estop button is installed on each vehicle. By pressing this button, vehicle movement (traveling and hoisting gripping) will be suddenly stopped. 3.2.6.4 Envelope sensor Each vehicle has a sensor system monitoring the envelope of its traveling area. By this system, obstacles in front of the vehicle is detected and the collision will be avoided. Refer to YDM-11859. KEN72-3696 21 FCC ID : OPO199909010001 3.2.6.5 Fall protection arm Each vehicle has fall protection arms, which tries to protect the FOUP in vehicle and traveling position falling in the case of FOUP breakage. 3.2.6.6 Look down sensor Each vehicle can be optionally added a look down sensor, which detects the obstacles under the vehicle between the load port. (It is under development, not yet completed.) 3.2.7 Separation of vehicles and operators Even the Shinko system has the safety system offering above, it is strictly expected to Customer for considering the separation of vehicles and operators, such as adding partition or doors on the load port , or inhibit the operators moving into the bay. 3.2.8 Teaching For registering the precise load port positions to vehicles, teaching operation is necessary at the stage of Shinko adjustment work. Refer to KEN72-3644(E) for details. KEN72-3696 22 FCC ID : OPO199909010001 4. Transportation Control Fig. 4.1 Basic transport flow KEN72-3696 23 FCC ID : OPO199909010001 5. ERROR HANDLING 5.1 General (1) The basic classification and handling is summarized in Table 5.1. (2) When a vehicle was moved by outer power such as operator’s hand, following recovery operation is necessary. (2-1) Place all the vehicles on a normal position ( where it is not on branching position, collecting position, etc. In case of OHT there is almost no need for consideration, because the rail is simple loop.). If the moved distance of the vehicle can be neglected small, it is not necessary. In case of moving, in front of the Bar code is recommended. Name Heavy error Contents Handling Recovery The vehicle cannot Total system mode is (1) Recover the error or continue running changed to PAUSE and remove the error device all the vehicles stop such as removal of the error vehicle (2) Then change the mode to Auto Medium The vehicle can re- Total system keeps the (1) Recover the error or error start by operator’s same mode and the failed remove the error device such assist devices are stopped as removal of the error (1) A vehicle can run vehicle by himself (2) Recover within 1 hour Light No needs for Total system and the error operator’s assist for failed device continue re-start Error event log is kept in the OHVC Table 5.1 Error group KEN72-3696 24 FCC ID : OPO199909010001 5.2 Error handling Error handling procedure is summarized in Table 5.2.1 and 5.2.2 Name Device Cause Countermeasure Heavy Vehicle -Servo error (1) OHVC Error -Bar code read error 1) Mode is moved to -Power unit error PAUSED -CPU failure 2) ERROR indication -Load /Unload error (2) Vehicle (error) 1) Emergency stop 2) Error reported to OHVC 3) Error indication by LED (3) Vehicles (normal) Paused OHVC -OHVC-Vehicle communication error -Watch dog of transport command Others Power Supply Panel error Medium Vehicle Error Recovery procedure (1) Check and confirm the error cause (2-1) Recovery can be expected soon 1) Reset of Vehicle power, Reset of other unit 2) OHVC is changed to Auto mode again (2-2) Recovery might be long term 1) Remove the error unit such as error vehicle removal 2) Cancel the command which cannot be continued 3) OHVC is changed to Auto mode again (1) Check and confirm the error cause (2) Confirm the vehicle position is OK (3) Restart of the system (1) OHVC (1) Check and confirm the error cause Time-over of Obstacle Continues Auto mode (2-1) Recovery can be expected by operator assist Detection sensor operation 1) Recovery by operator such as removal of obstacles (2) Vehicle (error) 2) Continues the process Continue operation Error report to OHVC In case detect sensor : automatic restart (2-2) Recovery cannot be expected (3) Vehicles (normal) Continues normal 1) Mode changed to PAUSING by OHVC operation operation 2) same with Heavy error recovery OHVC KEN72-3696 25 FCC ID : OPO199909010001 OTHERS Table 5.2.1 KEN72-3696 26 FCC ID : OPO199909010001 Name Light Error Device Vehicle Cause OHVC Countermeasure Recovery procedure (1) OHVC (1) No assist necessary 1) Auto mode operation (2) In case of special failure special procedure might be continues done (such as Carrier status error, automatic 2) Event is kept by OHVC transport to stocker) (2) Vehicle (error) 1) continue normal operation 2) Error reported to OHVC (3) Vehicles (normal) Continues normal operation Transport request rejected - Host communication error OTHERS Table 5.2.2 KEN72-3696 27 FCC ID : OPO199909010001 5.3 Recovery procedure in case of Heavy error of a vehicle HOST/STC OHVC Fig. Vehicle Operator action 5.3 KEN72-3696 Error 28 recovery procedure FCC ID : OPO199909010001 6. Operation The documents listed in Table 6.1 are operation manual of components. Regarding the operation of the OHT system, refer to these documents. Table 6.1 Related Documents No Name Document Number Rev. Remarks OHT Vehicle Operation Manual KEN72-3699 (E) OHT Teaching Manual KEN72-3644(E) Power Supply Operation Manual YTE7-1002 Operation Manual of OHVC CRP6T3142-01E Remote Manual Control Box Operation KEN72-3502(E) KEN72-3696 29 FCC ID : OPO199909010001 Revision Note #1 Revision Rev.0 Month/Day/Year Sept. 3, 1999 Contents The first edition(Preliminary) KEN72-3696 30 Author Masanao Murata
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : Yes Create Date : 2001:05:27 14:56:49 Producer : Acrobat Distiller 4.0 for Windows Modify Date : 2001:05:27 14:56:50-04:00 Page Count : 30EXIF Metadata provided by EXIF.tools