Japan Radio Co NKE2632 Solid State S-Band Marine Radar User Manual Installation Manual Part 2

Japan Radio Co Ltd. Solid State S-Band Marine Radar Installation Manual Part 2

Installation Manual Part 2

2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-38   Fig 2-14 The permissible bending radius of coaxial cable
2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-39  2.4.3   Scanner installation position 1)  Physical selection criteria • Install the scanner at the center of the mast on the keel line. • If the scanner cannot be installed at the above position for some reason, the amount of deviation must be minimized.    And, reinforce the mount base and the platform and take precautions to protect the scanner from vibration and impact at the installation position.  To avoid the radiating section coming in contact with other installed objects while it is rotating, ensure that there is at least 200 millimeters from the swing circle (turning radius) to other installed objects (Fig 2-15 Installation of scanner).    The swing circle of the JMR-7200/9100 radar's scanner is as shown in Table 2-5 Swing circle. See “SN.1/Circ.271 6.2(b)”.  Fig 2-15 Installation of scanner Table 2-5 Swing circle Scanner unit (length)  Swing circle NKE-2103-6/6HS (6ft) NKE-1125-6      (6ft) NKE-2254-6HS   (6ft) 1910mm NKE-1129-7  (7ft)  2270mm NKE-2632/H  (8ft)  2770mm NKE-1125-9   (9ft) NKE-1129-9   (9ft) 2825mm NKE-1130/1139   (12ft) NKE-1632   (12ft) 4000mm
2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-40  •   Avoid having a rope or signal flag from winding around the radiating section thereby preventing it from rotating.   •   Avoid the effects of dust and heat caused by smoke from a chimney.     •   When determining the appropriate scanner height and installation location, take into consideration the reduction of vibration, the strength of the hull and the scanner mount base, and maintenance properties.     •   Provide for maintenance space: platform, safety link, hand rail, steps, etc.      The lower edge of a radar antenna should be a minimum of 500 mm above any safety rail. See “SN.1/Circ.271 6.1(b)”. •   When installing the scanner, select a location where there are the fewest structural objects in the surrounding area so that the capability to drive the motor will not be depressed by the non-equability wind which is likely to rotate the scanner. 2) Electrical selection criteria   •   The installation height of the scanner relates to the maximum detection distance.  The higher, the better.    However, if it is too high, radio wave energy greatly attenuates above the scanner's vertical beam width (the point -3dB from the peak of the main lobe).    As a result, it is difficult to detect a close-in target.    Sea clutter also increases.   Determine the installation height by taking into consideration the weight, maximum length of the cable, and maintenance after installation. See “SN.1/Circ.271 6.3(b), 7.1”. •   If the installation height of the scanner is low, it is difficult to detect a long distance target.    The ship's mast, derrick, and chimney interfere with radiating beam causing the range that cannot be viewed on the radar display to increase.   Generally, the lowest scanner installation position is supposed to be on the A-B line shown in Fig 2-16 Lowest scanner installation height. In the case of the JMR-7210/7225/9210/9225 type radar, 2θ equals 20 . In the case of the JMR-7230/7272/7282/9230/9272/9282 type radar, 2θ equals 25 .    Specifically, the scanner position is normally elevated so that the chimney and the shrine-gate type mast do not interfere with radiating beam. The A-B line, or L line of sight from the radar antenna to the bow of the ship should hit the surface of the sea in not more than 500 m or twice the ship length, depending which value is smaller, for all load and trim conditions.  See “SN.1/Circ.271 6.3(a)”. ABθJMR-7210 / 7225 / 9210 / 9225 :θ=10°JMA-7230 / 7272 / 7282 / 9230 / 9272 /  9282 :θ=12.5° Fig 2-16 Lowest scanner installation height
2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-41  •   If it is considered that sufficient installation height cannot be provided when the scanner is in-stalled directly on the roof of the wheelhouse, use a mounting rack or radar mast (Fig 2-17 Mounting rack and mast for the scanner).    Normally, when the scanner installation height is less than 2 meters from the roof of the wheelhouse, provide a mounting rack assembled at an angle frame to install the scanner.    When the scanner installation height is 2 meters or higher from the roof of the wheelhouse, provide a cylindrical radar mast to install the scanner.    Con-sider the convenience of the service staff who take care of installation, maintenance, adjustment, and repair of the scanner by providing adequate footholds to the mounting rack and the radar mast.  Fig 2-17 Mounting rack and mast for the scanner •   When installing the scanner, select a location where there are the fewest structural objects in the surrounding area so that false echoes which interfere with target detection will not be generated by signal reflection from other scanners, deck structures, and cargo.    Only as a guide, note that structural objects should not exist within the range of the vertical beam width (Fig 2-18 Scanner and the surrounding structural objects). See “SN.1/Circ.271 6.2(a)”. Vertical beam width of X-band: Approx. 20    ( 10.0    when the height of the radiating section is 0 )     Vertical beam width of S-band: Approx. 25    ( 12.5    when the height of the radiating section is 0 )           Fig 2-18 Scanner and the surrounding structural objects
2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-42  •   When installing two or more scanners, scanners in close proximity should have a minimum vertical elevation separation angle of 20 and a minimum vertical separation of 1m where possible, so that those scanners do not enter each other's vertical beam width range. See “SN.1/Circ.271 6.1(c)”.  •   To avoid interference with other equipment and to prevent radio noise from generating, do not place the VHF antenna, GPS antenna, and INMARSAT's dome within the range of the vertical beam width. See “SN.1/Circ.271 6.1(a)”. •   Keep a record of installation height data.    The data is necessary for the initial setting of the display unit.   •   Minimize the blind sector, and ensure the adequate view angle so that the blind sector does not exist in the range 22.5    from side to rear (Fig 2-19 Ensuring view angle).  Specifically, ensure a sufficient view field in the straight front (relative bearing 000 ). See “SN.1/Circ.271 6.3(c)”. •   Individual blind sectors of more than 5, or a total arc of blind sectors of more than 20, should not occur in the remaining arc, excluding the arc in Fig 2-19 Ensuring view angle. See “SN.1/Circ.271 6.3(d)”. •   For radar installations with two radar systems, where possible, the antennas should be placed in such a way as to minimize the blind sectors. See “SN.1/Circ.271 6.3(e)”.  Fig 2-19 Ensuring view angle  •   Magnetron which has strong magnetic force is included in the scanner.    Install the scanner at least 6 meters away from nautical instruments including magnetic compasses and chronometers. See “SN.1/Circ.271 6.2(c), 7(c)”.
2.Installation of Scanner Unit > 2.4 PRECAUTIONS   2-43  *If there is a concern that structural objects existing within the vertical beam width may generate false echo, equip the structural objects with a radio wave absorber.  (There are two types of absorbers: broadband type having no specific resonant frequency and narrowband type which can absorb a band with a specific frequency.    Use those where applicable.)    Furthermore, it is effective to install a metal reflector, which reflects radio waves upwardly, between the scanner and a structural object so that the radar's radio wave will not directly come in contact with the structural object. When the structural objects exist in the surrounding area of Scanner unit, the false echo may appear. The sector blank function is effective to reduce the signal reflection from the structural objects. Because it can stop transmission. Therefore, it may reduce the false echo appearance.  Because most radio wave absorbers have poor durability, some must be replaced every year.    When installing a reflector, the area to the rear of the reflector becomes a blind sector. Therefore, minimize the size of the reflector. When the sector blank function set to on, ensure a sufficient view field in the straight front.*The above procedures for selecting an scanner installation position are described based on the radar's scanner.  Comprehensively select the scanner position by considering other scanners' installation procedure manual, hull's structure, strength of the selected position, and vibration.   2.4.4   Confirmation during test run   If the scanner vibrates a lot during test run, try to reduce or prevent vibration by reinforcing the scanner mount base or using wire stays attached to the radar mast.   2.4.5   Others •   The design of the mounting platform for the scanner should take into account the vibration requirements of resolution A.694(17) and furthermore defined by IEC 60945. See “SN.1/Circ.271 7(d)”. Vibration  2 to 13.2Hz     Amplitude        +/-1mm +/-10% 13.2 to 100Hz  Acceleration     7m/s2 •   All installations should facilitate protection of equipment, including cabling, from damage. •   The cables should be kept as short as possible to minimize attenuation of the signal. See “SN.1/Circ.271 7.2(b)”. •   Crossing of cables should be done at right angles(90°) to minimize magnetic field coupling. See “SN.1/Circ.271 7.2(e)”. •   Eliminating the interference on frequencies used for marine communications and navigation due to operation of the radar. All cables of the radar are to be run away from the cables of radio equipment. (ex. Radiotelephone. Communications receiver and direction finder, etc.) Especially inter-wiring cables between scanner unit and display unit of the radar should not be run parallel with the cables of radio equipment. See “SN.1/Circ.271 7.2(h)”. •   Cable, coaxial cable and flexible wave guide should not be exposed sharp bends. See also section 2.4.2 (4) “3) Permissible bending radius”. See “SN.1/Circ.271 7.2(g)”. •   The grounding of equipment units should be carried out according to 0 •   Installation for the specified scanner model and 2.3 Installation of Transmitter Receiver See “SN.1/Circ.271 7.2(i)”.
 3 Installation of Display Unit > 3.1 Confirmation of Various Units  3-1   3.  Installation of Display Unit 3.1   Confirmation of Various Units 3.1.1   In case of JMR-9200Series/JAN-9201/JAN-9202 Standard equipment26inch MONITOR UNIT(26 inch MNU)NWZ-208CENTRAL CONTROL UNIT(CCU)NDC-1590POWER SUPPLY UNIT(PSU)NBD-913TRACKBALL OPERATION UNIT(TOPU)NCE-5605CWA-24626inch DISPLAY UNIT MOUNT KITSelect equipmentNCE-5625KEYBOARD OPERATION UNIT(KOPU)CWB-1593LARGE TRAYorJUNCTION BOX(JB)NQE-1143SENSOR LAN SWITCH UNITNQA-2443QUINT-PS/1AC/24DC/20QUINT-BAT/24DC/3.4AHQUINT-DC-UPS/24DC/20ME-MAX-NEF/QUINT20UPSor26inch TOUCH PANEL MONITOR UNIT(26 inch T.P. MNU)NWZ-208-TPStand alone typeDesktop typeCENTRAL CONTROL UNIT(CCU)NDC-1590POWER SUPPLY UNIT(PSU)NBD-913TRACKBALL OPERATION UNIT(TOPU)NCE-5605CML-901-FDISPLAY UNIT INTERCONNECTION(F)NCM-928 Control UnitOption equipmentNCM-928 Control UnitDesktop type cableCWB-159526inch Desktop FrameCWB-1596OPU Desktop Frame Fig3-1: JMR-9200Series/JAN-9201/JAN-9202 Equipment
 3 Installation of Display Unit > 3.1 Confirmation of Various Units  3-2   3.1.2   In case of JMR-7200 Series/JAN-7201/JAN-7202 Standard equipmentCENTRAL CONTROL UNIT(CCU)NDC-1590POWER SUPPLY UNIT(PSU)NBD-913TRACKBALL OPERATION UNIT(TOPU)NCE-5605CWA-24519inch DISPLAY UNIT MOUNT KITSelect equipmentNCE-5625KEYBOARD OPERATION UNIT(KOPU)CWB-1593LARGE TRAYorJUNCTION BOX(JB)NQE-1143SENSOR LAN SWITCH UNITNQA-2443QUINT-PS/1AC/24DC/20QUINT-BAT/24DC/3.4AHQUINT-DC-UPS/24DC/20ME-MAX-NEF/QUINT20UPSStand alone typeDesktop typeCENTRAL CONTROL UNIT(CCU)NDC-1590POWER SUPPLY UNIT(PSU)NBD-913TRACKBALL OPERATION UNIT(TOPU)NCE-5605CML-901-FDISPLAY UNIT INTERCONNECTION(F)NCM-928 Control UnitOption equipmentNCM-928 Control UnitDesktop type cableCWB-159419inch Desktop FrameCWB-1596OPU Desktop Frame19inch MONITOR UNIT(19 inch MNU)NWZ-207or19inch TOUCH PANEL MONITOR UNIT(19 inch T.P. MNU)NWZ-207-TP Fig 3-2: JMR-7200Series/JAN-7201/JAN-7202 Equipment
 3 Installation of Display Unit > 3.2 Confirmation of Various Interface Boards 3-3   3.2   Confirmation of Various Interface Boards NQE-1143 Junction Box (JB) consists of interface boards that correspond with the suffix. Type of interface board is as follow. Interface boardSerial LAN Interface Circuit(SLC)CMH-2370(PC810)Gyro InterfaceCircuit(GIF)CMJ-554(PC820)Analog Option Circuit(AOC)CMJ-560(PC840)Radar Interface Circuit(RIF)CQD-2273(PC830) Fig 3-3: Outline of Interface board Table 3-1: Definition of the JB Type  Therefore, the type of JB :「NQE-1143-SAGR」is shown that JB consists of SLC, AOC, GIF and RIF.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-4   3.3   Selecting the Location for Installation  Determine the installation location of the display unit by considering following conditions:   1)  Consider size of each unit that described in outline drawing, and install them which it is possible to insert a cable from the installation and the base of the bolt. 2)  Do not place obstructions around the front side of the unit so that a user can eject a DVD and USB.   3)  To decrease an influence over the magnetic compass, separate from the compass by more than 3.0m at least. See “SN.1/Circ.271 7(c)”. 4)  Eliminating the interference on frequencies used for marine communications and navigation due to operation of the radar. All cables of the radar are to be run away from the cable of radio equipment. (Ex. Radiotelephone, communications receiver and direction finder. Etc…)   Especially inter-wiring cables between scanner unit and display unit of the radar should not be run parallel with the cable of radio equipment. 5)  Install the monitor unit so that when the user is looking ahead, the lookout view is not obscured. See “SN.1/Circ.271 7.4(b)”. 6)  Away from spray of seawater or rainwater from windows or doors of bridge. 7)  Don't install near the equipment which generates the place, and the heat which gets the direct sunlight. 8)  Establish a next-page, considering an equipped position to the reference. Confirm the position of cable inlet for Display Unit Mount Kit(CWA-245, CWA-246).    - 3.3.10 Outline Drawings of CWA-246 26inch Display Unit Mount Kit  - 3.3.11 Outline Drawings of CWA-245 19inch Display Unit Mount Kit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-5   3.3.1   Outline Drawings of NWZ-208 26inch Monitor Unit    Fig 3-4: Outline Drawings of NWZ-208 26inch Monitor Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-6   3.3.2   Outline Drawings of NWZ-207 19inch Monitor Unit    Fig 3-5: Outline Drawings of NWZ-207 19inch Monitor Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-7   3.3.3   Outline Drawings of NCE-5605 Trackball Operation Unit  Fig 3-6: Outline Drawings of NCE-5605 Trackball Operation Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-8   3.3.4   Outline Drawings of NCE-5625 Keyboard Operation Unit  Fig 3-7: Outline Drawings of NCE-5625 Keyboard Operation Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-9   3.3.5   Outline Drawings of CWB-1593 Large Tray  Fig 3-8: Outline Drawings of CWB-1593 Large Tray
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-10   3.3.6   Outline Drawings of NDC-1590 Central Control Unit  Fig 3-9: Outline Drawings of NDC-1590 Central Control Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-11   3.3.7   Outline Drawings of NBD-913 Power Supply Unit  Fig 3-10: Outline Drawings of NBD-913 Power Supply Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-12   3.3.8   Outline Drawings of NQE-1143 Junction Box  Fig 3-11: Outline Drawings of NQE-1143 Junction Box
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-13   3.3.9   Outline Drawings of NQA-2443 Sensor LAN Switch Unit  Fig 3-12: Outline Drawings of NQA-2443 Sensor LAN Switch Unit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-14   3.3.10   Outline Drawings of CWA-246 26inch Display Unit Mount Kit  Fig 3-13: Outline Drawings of CWA-246 26inch Display Unit Mount Kit   (With display, trackball operation unit and keyboard operation unit installed)
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-15   3.3.11   Outline Drawings of CWA-245 19inch Display Unit Mount Kit  Fig 3-14: Outline Drawings of CWA-245 Display Unit Mount Kit   (With display, trackball operation unit and keyboard operation unit installed)
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-16  3.3.12   Outline Drawings of CWB-1595 26inch Desktop Frame  Fig 3-15: Outline Drawings of CWB-1595 26inch Desktop Frame
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-17   3.3.13   Outline Drawings of CWB-1594 19inch Desktop Frame  Fig 3-16: Outline Drawings of CWB-1594 19inch Desktop Frame
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-18   3.3.14   Outline Drawings of CWB-1596 OPU Desktop Frame  Fig 3-17: Outline Drawings of CWB-1596 OPU Desktop Frame
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-19   3.3.15   Precautions for transporting and storing the display unit ●  A display unit is a heavy load. Be very careful about handing it. ●  Do not allow the scanner fall on its side while it is stored or being installed. ●  Be careful when transporting display unit to prevent damage to the monitor unit.  ●  When lifting the 26inch stand alone type Display Unit - When hoisting the scanner by a crane, do not hoist it by attaching a belt or a rope only to the handrail of display unit.(See Fig 3-18 Improper way to hoist)  Fig 3-18 Improper way to hoist  - Attach to the display unit the lifting lugs specified and eye bolt. And lift over the rope at four positons eyebolts. (See Fig 3-19 When the stand alone type display unit(26inch))   Fig 3-19 When the stand alone type display unit(26inch)
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-20   ●  When lifting the 19inch stand alone type Display Unit - When hoisting the scanner by a crane, do not hoist it by attaching a belt or a rope only to the handrail of display unit.(See Fig 3-20 Improper way to hoist)   Fig 3-20 Improper way to hoist - Attach to the display unit the lifting lugs specified and eye bolt. And lift over the rope at four positons eyebolts. (See Fig 3-21 When the stand alone type display unit(19inch))   Fig 3-21 When the stand alone type display unit(19inch)
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-21   3.3.16   Detaching the front frame of the Display unit mount kit    Do not detach the front frame except under unavoidable circumstances for the sake of the ship's structure. It may lead to unexpected accidents.  Be sure to do it with at least two persons. If only one person does this work, he/she may lead to unexpected accidents. You can pull out the front frame of the Display Unit mount kit if the door of the bridge is too narrow for Display units.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-22   Dimension diagrams of the Display unit mount kit without a front frame   Dimension diagrams of CWA-246: 26inch Display Unit mount kit without a front frame   Dimension diagrams of CWA-245: 19inch Display Unit mount kit without a front frame
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-23   【 Required Tools 】 The tools shown in the following table are required for this work Table  Required Tools No Name  Size  Appearance 1 Phillips screwdriver  Size #2  2 Phillips stubby screwdriver Size #2    Do not lose the screws as they will be needed again  Do not detach the front frame except under unavoidable circumstances for the     sake of the ship's structure. It may lead to unexpected accidents.  Step 1    Remove the monitor Remove the monitor from the Display Unit mount kit on the reverse order of installation. Refer to the 3.4.1 Installation of Monitor Unit NWZ-208/NWZ-207/NWZ-208-TP/NWZ-207-TP.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-24   Step 2  Remove the Trackball Operation Unit Remove the Trackball Operation Unit from the Display Unit mount kit on the reverse order of installation.Refer to the 3.4.2.3 Installation of Trackball Operation Unit (NCE-5605).      It is not necessary to remove Keyboard Operation Unit. (If it has been installed.)   Step 3  Remove Operation Unit frame Remove the screws (M4: 9 locations) that fasten the Operation Unit frame and then take out it.  Taking out the Operation Unit frame from 26inch Display Unit mount kit
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-25    Taking out the Operation Unit frame from 19inch Display Unit mount kit      Step 4  Remove the bottom sheet metal Remove the bottom sheet metal of Operation Unit frame. In the 26inch Display Unit mount kit, Remove the screws (M3: 2 locations) that fasten the sheet metal and then take out it.  Taking out the Operation Unit sheet metal from 26inch Display Unit mount kit    In the 19inch Display Unit mount kit, you can remove the sheet metal and Operation Unit frame together.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-26   Step 5    Remove the front cover and the Junction Box Remove the front cover from the Display Unit mount kit.    ・When the Junction box has been installed Remove the Junction box from the Display Unit mount kit on the reverse order of installation. Refer to the 3.5.1 Installation of Junction Box.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-27   Step 6    Remove the front frame   Using a Phillips stubby screwdriver, remove the M4 screws that fasten the front frame. They are 4 locations in one side, 8 locations in total.      Pull up the front frame slowly in the obliquely upward direction along its line and take away.
 3 Installation of Display Unit > 3.3 Selecting the Location for Installation 3-28     After carrying in the Display Unit is completed, assemble to the original condition by repeating the same procedure in the reverse order. Please make sure to tighten all the screws and connect all the cables back in place.  This completes carrying in the Display Unit into the bridge that has a narrow door by detaching its front frame.
 3 Installation of Display Unit > 3.4 Installation of Standard Equipment 3-29   3.4   Installation of Standard Equipment 3.4.1   Installation of Monitor Unit NWZ-208/NWZ-207/NWZ-208-TP/NWZ-207-TP 1)  Remove the screw covers on the top and bottom spaces in the monitor(NWZ-208 / NWZ-207 / NWZ-208-TP / NWZ-207-TP).                       Monitor unit(26inch) NWZ-208/NWZ-208-TP      Monitor unit(19inch) NWZ-207/NWZ-207-TP   Insert a small flat blade screwdriver into the end of the screw cover and remove the cover by the principle of leverage. If you try to remove forcibly, the panel will break or unit will damage.

Navigation menu